DE10361621A1 - Modular laboratory, has container modules in which building service components e.g. switchgear cabinet, and firm laboratory equipments e.g. laboratory bench, are installed during prefabrication of building site - Google Patents

Modular laboratory, has container modules in which building service components e.g. switchgear cabinet, and firm laboratory equipments e.g. laboratory bench, are installed during prefabrication of building site Download PDF

Info

Publication number
DE10361621A1
DE10361621A1 DE2003161621 DE10361621A DE10361621A1 DE 10361621 A1 DE10361621 A1 DE 10361621A1 DE 2003161621 DE2003161621 DE 2003161621 DE 10361621 A DE10361621 A DE 10361621A DE 10361621 A1 DE10361621 A1 DE 10361621A1
Authority
DE
Germany
Prior art keywords
laboratory
module
building
modules
container
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE2003161621
Other languages
German (de)
Inventor
Volker Dr. Krieger
Hans Mann
Klaus Ege
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE2003161621 priority Critical patent/DE10361621A1/en
Publication of DE10361621A1 publication Critical patent/DE10361621A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34815Elements not integrated in a skeleton
    • E04B1/3483Elements not integrated in a skeleton the supporting structure consisting of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The laboratory has container modules (1-3), each exhibiting a channel part and a door to obtain a room alignment comparable with a bus system. Building services container modules (4) are put into partial logistics masses for building services. Building service components e.g. switchgear cabinet, and firm laboratory equipments e.g. laboratory bench, are installed in the modules (1-3) during prefabrication of a building site.

Description

Das Anwendungsgebiet der Erfindung ist die Bauwirtschaft für Laborgebäude im allgemeinen, auch unter Einbezug der entsprechenden Gebäudetechnik. Betroffen sind sowohl die Bauplanung, die Bauausführung als auch die Produktion von aktiven und passiven Komponenten eines Gebäudes und seiner Gebäudetechnik. Die Erfindung betrifft eine Vorrichtung entsprechend dem Oberbegriff des Anspruchs I.The Field of application of the invention is the construction industry for laboratory buildings in general, too with the inclusion of the appropriate building technology. Are affected both the construction planning, the construction and the production of active and passive components of a building and its building technology. The invention relates to a device according to the preamble of claim I.

Stand der Technik in der Bauwirtschaft ist, dass die Errichtung von Gebäuden und der darin dem Zweck dienlichen Einbauten nach dem Phasenschema Vorplanung, Ausführungsplanung, Ausschreibung, Vergabe und Errichtung vor Ort erfolgt. Darüber hinaus bestehen insbesondere bei komplexen Gebäuden wie Laborgebäuden komplexe Abhängigkeiten zwischen den wichtigen Einzelgewerke Rohbau, Gebäudetechnik und Innenausbau – oftmals über die einzelnen Phasen hinweg. Dies erschwert die zeitlich lineare Planung und bedingt nicht selten kostenträchtige Verzögerungen, sowie grundsätzliche Planungs- und Kostenunsicherheiten.was standing The engineering in the construction industry is that the construction of buildings and the purpose-built internals according to the phase scheme preliminary planning, Detailed design, Tendering, awarding and construction on site. Furthermore Complex buildings exist especially in complex buildings such as laboratory buildings dependencies between the important individual works shell construction, building technology and interior design - often over the individual phases. This complicates the time-linear planning and often requires costly delays, as well as fundamental Planning and cost uncertainties.

Nachteile des oben beschriebenen Standes der Technik sind

  • – die bei jeder Baumassnahme jeweils immer wieder neu zu erbringenden individuellen und frühzeitigen Planungsdienstleistungen von Architekt, Baustatiker und Gebäudetechniker, um Raumfunktionen und dazugehörige Einzelkomponenten der Gebäudetechnik im Gesamtbauwerk unterzubringen und auf das Gebäude abzustimmen,
  • – die Unsicherheiten in der Planung auf Grund fehlender Normierung von Maßen, Funktionen und Gewicht,
  • – die bei jeder Maßnahme in herkömmlicher Bauausführung anfallenden umfangreichen Abstimmungen, sowie Verbindungs- und Anschlussarbeiten auf der Baustelle,
  • – die Notwendigkeit von höher qualifizierten Handwerkspersonal für allfällige Schnittstellenprobleme vor Ort auf der Baustelle,
  • – der dadurch entstehende zeitliche Verzug, oftmals verschlimmert durch Abstimmungsprobleme der Einzelgewerken untereinander,
  • – die dadurch entstehenden zusätzlichen Kosten,
  • – die durch mehrere Gewerke oftmals nicht eindeutige Gewährleistungssituation,
  • – die dadurch nicht ausreichend genaue Kostenkalkulation vor der Auftragserteilung des Bauherrn,
  • – die notwendige Vorhaltung von hochqualifizierten Personal für Bauleitung und Bauabwicklung.
  • – Die über die Bauzeiten anfallenden Beeinträchtigungen im Umfeld des Bauwerkes durch An- und Abfahrten von Lieferfahrzeugen, damit auftretende Belästigungen durch Lärm und Schmutz.
Disadvantages of the prior art described above are
  • - The individual and early planning services of the architect, structural engineer and building technician to be provided again and again in each construction work, in order to accommodate room functions and associated individual components of the building technology in the overall structure and to match the building,
  • - the uncertainties in the planning due to the lack of standardization of measures, functions and weight,
  • - the extensive reconciliations arising in the course of each measure in conventional construction, as well as connection and connection work on the construction site,
  • - the need for more skilled craftsmen to deal with any on-site interface problems,
  • - the resulting delay in time, often aggravated by coordination problems of the individual works among themselves,
  • - the resulting additional costs,
  • - The warranty situation, which is often not clear by several trades,
  • - the resulting inaccurate cost calculation before the order is placed by the client,
  • - the necessary provision of highly qualified personnel for construction management and construction.
  • - Over the construction times incurred impairments in the environment of the building by arrivals and departures of delivery vehicles, resulting nuisance by noise and dirt.

Vernachlässigt man Ansprüche an die äußere Gestaltung an Laborgebäude, kann man eine neue Herangehensweise wählen. Diese Bedingungen sind oft bei Provisorien oder zeitlich befristeten Gebäudeinstallationen gegeben. Dabei sind als zeitliche Befristung bzw. als Gebäudelebensdauer durchaus zehn bis 25 Jahre anzusehen. Eine solche neue Herangehensweise kann also unter anderem im Laborgebäudebau allgemein angewendet werden.Neglected claims to the outer design to laboratory buildings, you can choose a new approach. These conditions are often given for temporary or temporary building installations. There are ten as a time limit or as building life quite ten to look at 25 years. So such a new approach can among other things in laboratory building construction generally used.

Grundlage der neuen Herangehensweise ist die Überlegung zu einer Vorfertigung modularer Einheiten – sowohl für die eigentliche Nutzfläche (in diesem Fall überwiegend Labore und Büros) wie auch für die sie versorgende Gebäudetechnik (z.B. Heizungs-, Lüftungs- und Klimatechnik sowie der damit verbundenen Medienversorgung). Die Vorfertigung soll weitgehend die ansonsten eigentliche Bautätigkeit auf der Baustelle ersetzen, bedarf also entsprechender bedarfsangepasster Vorplanung – insbesondere hinsichtlich der „Steckbarkeit" der Module, bzw. deren Schnittstellen. Dadurch verschieben sich Planungsverantwortung und Planungsmaßnahmen erheblich, sowohl in zeitlicher wie auch in ablauforganisatorischer Hinsicht. Historische Tätigkeitsfelder entfallen, neue Aufgabenfelder entstehen an bisher nicht berücksichtigten Stellen.basis The new approach is the idea of prefabrication modular units - both for the actual usable area (in this case mostly Laboratories and offices) as well as for the building technology supplying them (for example, heating, ventilation and air conditioning technology as well as the associated media supply). The prefabrication is largely the otherwise actual construction activity replace on the construction site, so needs appropriate adapted Pre-planning - in particular in terms of "pluggability" of the modules, or their Interfaces. This shifts planning responsibility and planning measures considerably, both in terms of time and in terms of process organization Respect. Historical fields of activity eliminated, new tasks arise on previously not taken into account Put.

Weiterhin sind die Module hinsichtlich einer erheblichen Transporterleichterung so zu dimensionieren, dass die Vorteile einer bestehenden und preislich günstigen Logistik nutzbar sind. Daher ist als Moduldimension der Standard-Container in der internationalen Logistik zu wählen. Übrigens ist auch bei größeren Gebäuden der Einbau von Komponenten der Heizungs-, Lüftungs- und Klimatechnik sowie der damit verbundenen Medienversorgung vermittels solcher Containermodule möglich. Denn Ausmaße und Gewicht der dabei zum Einsatz kommenden Einzelkomponenten (z.B. Kälteerzeuger o.a. Erzeugersysteme) sind im Regelfall so groß, dass der in der internationalen Logistik übliche Container für den Transport auskömmlich ist.Farther are the modules in terms of a significant transport facilitation so to dimension that the benefits of an existing and priced Great Logistics are usable. Therefore, the module dimension is the default container to choose in international logistics. Incidentally, even with larger buildings of Installation of components of heating, ventilation and air conditioning technology as well as associated media supply by means of such container modules possible. Because dimensions and Weight of the individual components used (e.g. cold generator O.A. Producer systems) are usually so large that in the international Logistics usual Container for the transport adequate is.

Auf der Baustelle vor Ort müssen die Module dann nur noch aufgestellt und angeschlossen werden. Der dafür notwendige Zeit- und Materialaufwand für Verbindungs- und Anschlussarbeiten reduziert sich erheblich. Darüber hinaus können Architektur und Baustatik zum frühen Planungsstadium geleistet werden, Gebäude(technik)komponenten zu einem recht frühen Zeitpunkt kostenmäßig berechnet werden.On the site site need the modules are then only set up and connected. Of the necessary for this Time and material costs for Connection and connection work is reduced considerably. Furthermore can Architecture and statics to the early Planning stage to be made, building (engineering) components a pretty early one Time calculated in terms of cost become.

Aufgabe dieser Erfindung ist es,

  • – für spezielle Laborgebäude oder auch für Laborgebäude in allgemeinen die Baukosten und Bauzeiten auf der Baustelle zu verringern durch Vorfertigung,
  • – für spezielle Laborgebäude oder auch für Laborgebäude in allgemeinen immer wiederkehrende Planungs- und Bauausführungsarbeiten im Laborbau und der damit einhergehenden Gebäudetechnik, sowie der damit verbundenen Architektur und Baustatik, zu vermeiden,
  • – das Risiko von Planungsfehlern zu minimieren,
  • – Kosten- und Terminsicherheit durch datenbankgestützte Spezifikationen zu einem frühen Zeitpunkt, nämlich vor der Auftragserteilung, zu gewährleisten,
  • – die Baukosten und Bauzeiten in der Planung zu verringern durch Standardisierungseffekte.
The object of this invention is
  • - to reduce the construction costs and construction times on site for special laboratory buildings or even for laboratory buildings in general by prefabrication,
  • - for special laboratory buildings or for laboratory buildings in general recurring planning and construction work in laboratory construction and the associated building services, as well as the associated architecture and structural engineering, to avoid
  • - minimize the risk of planning errors
  • - ensure cost and schedule security through database-based specifications at an early stage, prior to the award of the contract;
  • - to reduce the construction costs and construction times in the planning by standardization effects.

Diese Aufgabe wird gelöst durch ein System mit den Merkmalen des Anspruchs 1:
Durch dieses System geschieht eine Umverteilung im Produktions- und Dienstleistungsprozess „Planung und Ausführung eines Laborgebäudes":

  • – Wesentliche Planungs-, Ausführungs- und Funktionsprüfungsaufgaben werden von der Baustelle in die Vorfertigung verlegt.
  • – Der vormalige Produzent und Lieferant von Bauprodukten und Gebäudetechnikkomponenten wird ersetzt durch einen Modulanbieter mit Komponentendatenbank
  • – Wesentlich für die Wirtschaftlichkeit wird die Logistikfähigkeit des Anbieters und seiner Produkte sein.
  • – Die vormaligen Planungsleistungen von Architekt, Baustatiker und Gebäudetechniker werden auf eine Modulbaukasten-Planung reduziert. Eine durchgängige, CAD/CAM- gestützte Digitalisierung ermöglicht eine schnellere und genauere Planung.
  • – Im derzeitigen Produktions- und Dienstleistungsprozess „Planung und Ausführung eines Laborgebäudes" ist durch die verschiedenen Sub- und Gewerkeplaner und die betroffenen Ausführenden keine durchgängige Digitalisierung möglich. Mit vollständig virtuell vorfertigbaren Modulen ist dies leicht zu erreichen.
This object is achieved by a system having the features of claim 1:
Through this system, a redistribution occurs in the production and service process "planning and execution of a laboratory building":
  • - Essential planning, execution and functional testing tasks are transferred from the construction site to the prefabrication.
  • - The former producer and supplier of construction products and building technology components will be replaced by a module provider with component database
  • - The logistical capability of the supplier and its products will be crucial for the economy.
  • - The former planning services of the architect, structural engineer and building technician are reduced to a modular module planning. Consistent, CAD / CAM-based digitization enables faster and more accurate planning.
  • - In the current production and service process "Planning and Execution of a Laboratory Building", the various sub-contractors and planners and the executing companies concerned are not able to achieve consistent digitization, which is easily achievable with fully virtual prefabricated modules.

Vorteile dieser Erfindung sind:

  • – Auf der Baustelle sind nur noch wenige Maßnahmen zum Einpassen der Module in das Bauwerk und zum Anschließen an das Versorgungsnetz notwendig. Statik, Architektur und sämtliche Einrichtungen und Unterversorgungen (z.B. Laborbänke, Verkabelung, MSR-Komponenten) bringen die Module bereits mit.
  • – Architektur-, Baustatik- und Gebäudetechnikplanung muss nicht mehr auf Gerätespezifikationen Rücksicht nehmen, sondern können sich an den einheitlichen Modulstandards orientieren.
  • – In der Vorfertigung kann unabhängig von Baustellenzwängen die Funktionstüchtigkeit des Moduls sichergestellt werden.
  • – Der Modulaustausch ist wegen der Standardisierung von Raum- und Gewichtsdimensionen und der Schnittstellen problemlos und schnell durchführbar.
  • – Reparatur- und Wartungsaufwand lassen sich durch Austausch der Module reduzieren.
  • – Kosten- und Terminreduktion durch stark reduzierten Zeit- und Materialaufwand auf der Baustelle.
  • – Bessere Kalkulierbarkeit der Gesamtkosten durch Reduktion der unvorhersehbaren Anteile (klassisch sind dies Stunden und Material auf der Baustelle)
Advantages of this invention are:
  • - At the construction site, only a few measures to fit the modules in the structure and to connect to the supply network are necessary. Statics, architecture and all facilities and sub-supplies (eg laboratory benches, wiring, MSR components) already bring the modules with them.
  • - Architecture, structural engineering and building technology planning no longer has to take account of device specifications, but can orientate itself by the uniform module standards.
  • - In prefabrication, the functionality of the module can be ensured regardless of Baustellenzwängen.
  • - The module replacement is easy and fast to carry out because of the standardization of space and weight dimensions and the interfaces.
  • - Repair and maintenance can be reduced by replacing the modules.
  • - Cost and date reduction due to greatly reduced time and material costs on the construction site.
  • - Better calculability of the total costs by reducing the unpredictable shares (classically these are hours and material on the construction site)

Nachfolgend wird die Patentanmeldung am Beispiel dreier Labor-Containermodule nebst dem dazugehörigen Gebäudetechnik-Containerhalbmodulen beschrieben:
Als Raumeinheit dient einem Containermodul (1-3) in weltweit üblichen Logistikmaßen (z.B. Steel Dry Cargo Container mit den Maßen 20' × 8' × 9,6''). Versorgende Gebäudetechnikhalbmodule (4) in Teilmaßen des obigen Standards werden darauf aufgesetzt und bieten in der Höhe ausreichend Platz für die Haustechnik. Wesentlicher Punkt ist die Einhaltung der bei der internationalen Transportlogistik relevanten Maße.
The patent application is described below using the example of three laboratory container modules together with the associated building services container half modules:
The room unit is a container module ( 1 - 3 ) in worldwide standard logistic dimensions (eg Steel Dry Cargo Containers with the dimensions 20 '× 8' × 9,6 ''). Supplying building technology half modules ( 4 ) in part dimensions of the above standard are set up on it and provide sufficient space for the building services. The essential point is compliance with the relevant dimensions of international transport logistics.

Alle Containermodule sind in Böden, Decken und Wänden so konstruiert, dass die bauübliche Statik erreicht wird. Eine Stapelung der Container auf bis zu 5 Ebenen ist derzeit möglich und erlaubt so ein dreistöckiges Gebäude.All Container modules are in soils, Ceilings and walls designed so that the usual construction Statics is achieved. A stack of containers up to 5 Layers is currently possible and thus allows a three-story Building.

Jedes Labormodul kann ein Gangteil (5) aufweisen mit den erforderlichenfalls vorgeschriebenen Türen (6). Damit lässt sich eine mit einem Bussystem vergleichbare Raumanordnung erzielen.Each laboratory module can be equipped with a 5 ) with the required doors ( 6 ). This makes it possible to achieve a room arrangement comparable to a bus system.

Aus drei bzw. zwei verschiedenen Labor-Containermodulen (1-3) (hier als Links(L), Mitte(M) und Rechts(R) bezeichnet) lassen sich sowohl einfache (L+R) wie doppelte (L+M+R) Labore und Büros erzeugen. Laborrichtlinien (z.B. 2,70m lichte Raumhöhe, Im bzw. 1,45m Fluchtweg und Gangbreite) werden eingehalten.From three or two different laboratory container modules ( 1 - 3 ) (here referred to as links (L), center (M) and right (R)) can be used to create both simple (L + R) and double (L + M + R) laboratories and offices. Laboratory guidelines (eg 2.70m clear room height, Im or 1.45m escape route and aisle width) are complied with.

Der Einbau der festen Laborausstattung (7) (z.B. Digestorien, Labortische) und der Haustechnikkomponenten (7) (z.B. Schaltschränke, Kälteaggregat) erfolgt in der Vorfertigung.The installation of the fixed laboratory equipment ( 7 ) (eg digestories, laboratory tables) and building services components ( 7 ) (eg control cabinets, refrigeration unit) takes place during prefabrication.

Sämtliche Versorgungsverbindungen (8) werden gleichfalls vorinstalliert. Eine Kombination aller Module ist damit einfach zu verwirklichen.All supply connections ( 8th ) are also pre-installed. A combination of all modules is thus easy to implement.

Für die in der Logistik üblichen Transporthilfen (9) sind Vorrichtungen vorhanden. Ein Transport per LKW, Bahn, oder Schiff ist damit leicht möglich.For the transport aids usual in logistics ( 9 ) devices are available. A transport by truck, train, or ship is thus easily possible.

Entsprechend der Modulanordnung sind Außenwände bzw. zusätzliche Isolationsmaßnahmen leicht. nachmontierbar.Corresponding the module assembly are outer walls or additional Isolation measures easily. nachmontierbar.

Eine Erweiterung ist durch einfache Kombination mehrerer Module möglich.A Extension is possible by simple combination of several modules.

Claims (7)

Modulares Labor auf der Basis genormter Container bestehend aus Labor-Containermodul (1-3) und Gebäudetechnik-Containerhalbmodul (4) (beides im nachfolgenden als Modul bezeichnet), durch folgende Merkmale gekennzeichnet: – Ausmaße und Maximalgewichte der fertig bestückten Module sind einheitlich und entsprechen den Normen der internationalen Logistik (z.B. Steel Dry Cargo Container mit den Maßen 20' × 8' × 9,6'). Somit ist ein Transport zu Wasser und zu Lande z.B. mit Hilfe von LKW, Bahn oder Schiff möglich. – Die Labor-Containermodule sind entsprechend den Richtlinien für Laboratorien für ihre jeweilige Nutzungsfunktion vollständig mit festen Einrichtungssystemen (7) versehen (z.B. mit Fenstern, Türen (6), Fluchtwegen (5), Digestorien, Sicherheitsschränken, Medienversorgungsleitungen (8) etc.). – Die Gebäudetechnik-Containermodule sind für ihre jeweilige gebäudetechnische Versorgungsfunktion ausreichend bestückt (7) (z.B. mit Klimatisierungseinheiten, Pumpen, Absperrhähnen, Druckminderer, Verteilern, Elektro-Komponenten, Mess-Steuer-Regelungseinheiten etc.). Es sind keine besonderen Verbindungs- oder Zentralmodule notwendig. – Die Verbindung der Module (8) untereinander erfolgt durch in ihrer räumlichen Anordnung vordefinierte Schnittstellen. Diese sind in Lage und Dimensionierung einheitlich und entsprechen weitgehend dem Prinzip des Bussystems. – Die Module sind im Sinne der Gebäudestatik selbsttragend. Somit also außer des Modulgewichts im oder am Gebäude keine zusätzlichen gebäudestatischen Maßnahmen notwendig. Eine bestimmte Kombination der Module stellt vielmehr für sich genommen ein kleines Gebäude oder einen statisch und haustechnisch selbstständigen Raum (1-4) eines Gebäudegeschosses dar. – Die Bestückung der Containermodule erfolgt mit auswechselbaren Komponenten (7) (z.B. verschiedenen Laboreinrichtungssystemkomponenten, mit Gebäudetechniksystemen verschiedener Hersteller und/oder unterschiedlicher Spezifikation), ohne dass dadurch die Module oder die Verbindungen untereinander verändert werden müssen.Modular laboratory based on standardized containers consisting of laboratory container module ( 1 - 3 ) and building services container half module ( 4 ) (both hereinafter referred to as module), characterized by the following features: - The dimensions and maximum weights of the assembled modules are uniform and comply with international logistics standards (eg Steel Dry Cargo Containers 20 '× 8' × 9.6 '). Thus, a transport by water and on land, for example, by truck, train or ship is possible. - The laboratory container modules are fully complied with fixed set up systems in accordance with the Laboratory Guidelines for their respective function of use ( 7 ) (eg with windows, doors ( 6 ), Escape routes ( 5 ), Digestories, Safety Cabinets, Media Supply Lines ( 8th ) Etc.). - The building services container modules are sufficiently equipped for their respective technical building supply function ( 7 ) (eg with air conditioning units, pumps, shut-off valves, pressure reducers, distributors, electrical components, measuring control units, etc.). There are no special connection or central modules necessary. - The connection of the modules ( 8th ) with each other by means of predefined interfaces in their spatial arrangement. These are uniform in position and dimensioning and largely correspond to the principle of the bus system. - The modules are self-supporting in terms of building statics. So therefore no additional building-static measures necessary in addition to the module weight in or on the building. On the contrary, a specific combination of the modules is in itself a small building or a statically and physically independent space ( 1 - 4 ) of a building floor. - The container modules are equipped with interchangeable components ( 7 ) (eg different laboratory equipment system components, with building management systems of different manufacturers and / or different specification) without having to change the modules or the connections with each other. Modulares Labor auf der Basis genormter Container bestehend aus Labor-Containermodul (1-3) und Gebäudetechnik-Containerhalbmodul (4) (beides im nachfolgenden als Modul bezeichnet) nach dem Anspruch 1, dadurch gekennzeichnet, – dass die Hülle der Modulkombination witterungsbeständig ist und den Vorschriften entsprechend ausreichend isoliert.Modular laboratory based on standardized containers consisting of laboratory container module ( 1 - 3 ) and building services container half module ( 4 ) (both hereinafter referred to as module) according to claim 1, characterized in that - the sheath of the module combination is weather-resistant and sufficiently isolated according to the regulations. Modulares Labor auf der Basis genormter Container bestehend aus Labor-Containermodul (1-3) und Gebäudetechnik-Containerhalbmodul (4) (beides im nachfolgenden als Modul bezeichnet) nach den Ansprüchen 1 oder 2, dadurch gekennzeichnet, – dass Leistungsspezifikation, Planungs- und Baukosten der Module auf Grund von digitalen Bibliotheken für die Module und deren Bestückungsalternativen vorab berechenbar sind.Modular laboratory based on standardized containers consisting of laboratory container module ( 1 - 3 ) and building services container half module ( 4 ) (both hereinafter referred to as module) according to claims 1 or 2, characterized in that - performance specification, planning and construction costs of the modules due to digital libraries for the modules and their equipment alternatives are calculated in advance. Modulares Labor auf der Basis genormter Container bestehend aus Labor-Containermodul (1-3) und Gebäudetechnik-Containerhalbmodul (4) (beides im nachfolgenden als Modul bezeichnet) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, – dass Außenwände der Module demontierbar sind.Modular laboratory based on standardized containers consisting of laboratory container module ( 1 - 3 ) and building services container half module ( 4 ) (both hereinafter referred to as module) according to one of the preceding claims, characterized in that - outer walls of the modules are removable. Modulares Labor auf der Basis genormter Container bestehend aus Labor-Containermodul (1-3) und Gebäudetechnik-Containerhalbmodul (4) (beides im nachfolgenden als Modul bezeichnet) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, – dass ohne jegliche Trennwände eine Grundrahmenkonstruktion gegeben ist.Modular laboratory based on standardized containers consisting of laboratory container module ( 1 - 3 ) and building services container half module ( 4 ) (both hereinafter referred to as module) according to one of the preceding claims, characterized in that - without any partitions, a base frame construction is given. Modulares Labor auf der Basis genormter Container bestehend aus Labor-Containermodul (1-3) und Gebäudetechnik-Containerhalbmodul (4) (beides im nachfolgenden als Modul bezeichnet) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, – dass im Grundrahmen Transporthilfen (7) für gängige Transporteinrichtungen (z.B. Kran, Gabelstapler) vorgesehen sind.Modular laboratory based on standardized containers consisting of laboratory container module ( 1 - 3 ) and building services container half module ( 4 ) (both hereinafter referred to as module) according to one of the preceding claims, characterized in that - in the base frame transport aids ( 7 ) are provided for common transport equipment (eg crane, forklift). Modulares Labor auf der Basis genormter Container bestehend aus Labor-Containermodul (1-3) und Gebäudetechnik-Containerhalbmodul (4) (beides im nachfolgenden als Modul bezeichnet) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, – dass einzelne Module auch als Eingangs- Flur- bzw. Treppenhaus ausbildbar sind und somit zur Stockwerksverbindung dienen können.Modular laboratory based on standardized containers consisting of laboratory container module ( 1 - 3 ) and building services container half module ( 4 ) (both hereinafter referred to as module) according to one of the preceding claims, characterized in that - individual modules can also be formed as an entrance corridor or staircase and thus can serve for the floor connection.
DE2003161621 2003-12-30 2003-12-30 Modular laboratory, has container modules in which building service components e.g. switchgear cabinet, and firm laboratory equipments e.g. laboratory bench, are installed during prefabrication of building site Withdrawn DE10361621A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE2003161621 DE10361621A1 (en) 2003-12-30 2003-12-30 Modular laboratory, has container modules in which building service components e.g. switchgear cabinet, and firm laboratory equipments e.g. laboratory bench, are installed during prefabrication of building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2003161621 DE10361621A1 (en) 2003-12-30 2003-12-30 Modular laboratory, has container modules in which building service components e.g. switchgear cabinet, and firm laboratory equipments e.g. laboratory bench, are installed during prefabrication of building site

Publications (1)

Publication Number Publication Date
DE10361621A1 true DE10361621A1 (en) 2005-07-28

Family

ID=34706680

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2003161621 Withdrawn DE10361621A1 (en) 2003-12-30 2003-12-30 Modular laboratory, has container modules in which building service components e.g. switchgear cabinet, and firm laboratory equipments e.g. laboratory bench, are installed during prefabrication of building site

Country Status (1)

Country Link
DE (1) DE10361621A1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005045847A1 (en) * 2005-09-26 2007-05-10 Epac Gmbh Modular Supply Systems Space module for space construction, has transport aid including dimensions and maximal weight in international logistics, media supply line that is connected via interface predefined in spatial arrangement, where module is self-supporting
WO2007082625A1 (en) * 2006-01-13 2007-07-26 Avl Deutschland Gmbh Modular testing plant
FR2936038A1 (en) * 2008-09-16 2010-03-19 Air Liquide MINIATURIZED INSTALLATION FOR MANUFACTURING SPECIAL GAS MIXTURES.
DE102009020182A1 (en) * 2009-05-06 2010-11-11 Horiba Europe Gmbh Mobile test stand for testing e.g. drive trains, utilized by car manufacturer, has container e.g. roll-off-container, that is included with rollers for rolling on ground, and base fixedly integrated into frame structure
DE102010013963A1 (en) * 2010-04-06 2011-10-06 Siemens Aktiengesellschaft Transport container unit with sorting system
AT510497A1 (en) * 2010-09-29 2012-04-15 Hallach Gmbh MODULAR ROOM UNIT
DE102011107979A1 (en) * 2011-07-18 2013-01-24 Nickl & Partner Architekten Ag module
DE102012111712A1 (en) * 2012-12-03 2014-06-05 Hartwig Jaeger Fecal container rinsing and storage room for, e.g. hospitals, is divided into unclean area having feces spout and cleaning device and a clean area having storage area, where the areas are separated by an optical and/or physical barrier
DE102013201171A1 (en) 2013-01-24 2014-07-24 Infracor Gmbh Method and system for using an industrial property
CN112502288A (en) * 2020-12-07 2021-03-16 上海泰坦科技股份有限公司 Modular pcr laboratory

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1980002578A1 (en) * 1979-05-15 1980-11-27 Ass Octel Prefabricated laboratory unit and octane analyser
DE3611540A1 (en) * 1986-04-05 1987-10-08 Remscheid Volksbank TRANSPORTABLE CONTAINER
EP0366559B1 (en) * 1988-10-26 1993-09-15 B.E.T.E.N. Process and device for the modular construction of industrial buildings
DE19501423A1 (en) * 1995-01-19 1996-07-25 Rsh Repair Service Hamburg Gmb Standard freight containers grouped for alternative static uses
DE29610601U1 (en) * 1996-06-17 1996-09-05 MVS Raumsysteme GmbH, 13469 Berlin Accessible connecting element between multi-purpose containers arranged on different floors
DE20022612U1 (en) * 2000-07-13 2002-03-21 UFZ-Umweltforschungszentrum Leipzig-Halle GmbH, 04318 Leipzig Mobile, connectable containers with variable design of technological units from variable function modules
US20030188507A1 (en) * 2002-04-04 2003-10-09 Cote Edward E. Method for constructing modular shelters using recycled land/sea shipping containers
WO2003095765A1 (en) * 2002-05-08 2003-11-20 PETTUS, Candace, Gale Modular containment unit

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1980002578A1 (en) * 1979-05-15 1980-11-27 Ass Octel Prefabricated laboratory unit and octane analyser
DE3611540A1 (en) * 1986-04-05 1987-10-08 Remscheid Volksbank TRANSPORTABLE CONTAINER
EP0366559B1 (en) * 1988-10-26 1993-09-15 B.E.T.E.N. Process and device for the modular construction of industrial buildings
DE19501423A1 (en) * 1995-01-19 1996-07-25 Rsh Repair Service Hamburg Gmb Standard freight containers grouped for alternative static uses
DE29610601U1 (en) * 1996-06-17 1996-09-05 MVS Raumsysteme GmbH, 13469 Berlin Accessible connecting element between multi-purpose containers arranged on different floors
DE20022612U1 (en) * 2000-07-13 2002-03-21 UFZ-Umweltforschungszentrum Leipzig-Halle GmbH, 04318 Leipzig Mobile, connectable containers with variable design of technological units from variable function modules
US20030188507A1 (en) * 2002-04-04 2003-10-09 Cote Edward E. Method for constructing modular shelters using recycled land/sea shipping containers
WO2003095765A1 (en) * 2002-05-08 2003-11-20 PETTUS, Candace, Gale Modular containment unit

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005045847A1 (en) * 2005-09-26 2007-05-10 Epac Gmbh Modular Supply Systems Space module for space construction, has transport aid including dimensions and maximal weight in international logistics, media supply line that is connected via interface predefined in spatial arrangement, where module is self-supporting
WO2007082625A1 (en) * 2006-01-13 2007-07-26 Avl Deutschland Gmbh Modular testing plant
JP2009523206A (en) * 2006-01-13 2009-06-18 アーファオエル ドイチュラント ゲーエムベーハー Modular testing equipment
CN102159869A (en) * 2008-09-16 2011-08-17 乔治洛德方法研究和开发液化空气有限公司 Miniaturised plant for producing gas mixtures
WO2010031940A1 (en) * 2008-09-16 2010-03-25 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Miniaturised plant for producing gas mixtures
FR2936038A1 (en) * 2008-09-16 2010-03-19 Air Liquide MINIATURIZED INSTALLATION FOR MANUFACTURING SPECIAL GAS MIXTURES.
DE102009020182A1 (en) * 2009-05-06 2010-11-11 Horiba Europe Gmbh Mobile test stand for testing e.g. drive trains, utilized by car manufacturer, has container e.g. roll-off-container, that is included with rollers for rolling on ground, and base fixedly integrated into frame structure
DE102010013963A1 (en) * 2010-04-06 2011-10-06 Siemens Aktiengesellschaft Transport container unit with sorting system
AT510497A1 (en) * 2010-09-29 2012-04-15 Hallach Gmbh MODULAR ROOM UNIT
DE102011107979A1 (en) * 2011-07-18 2013-01-24 Nickl & Partner Architekten Ag module
DE102012111712A1 (en) * 2012-12-03 2014-06-05 Hartwig Jaeger Fecal container rinsing and storage room for, e.g. hospitals, is divided into unclean area having feces spout and cleaning device and a clean area having storage area, where the areas are separated by an optical and/or physical barrier
DE102012111712B4 (en) * 2012-12-03 2016-04-21 Hartwig Jaeger Faecal container flushing and storage room as well as modular kit for it
DE102013201171A1 (en) 2013-01-24 2014-07-24 Infracor Gmbh Method and system for using an industrial property
CN112502288A (en) * 2020-12-07 2021-03-16 上海泰坦科技股份有限公司 Modular pcr laboratory

Similar Documents

Publication Publication Date Title
US10947720B2 (en) Block construction of prefabricated buildings
EP2049398B1 (en) Passenger terminal consisting of mobile room units
DE10361621A1 (en) Modular laboratory, has container modules in which building service components e.g. switchgear cabinet, and firm laboratory equipments e.g. laboratory bench, are installed during prefabrication of building site
EP2948598A1 (en) Method and system for using an industrial site
DE68909169T2 (en) Process and modular construction of industrial buildings.
WO2007082625A1 (en) Modular testing plant
DE20320135U1 (en) Modular laboratory comprises container modules with equipment and a container half-module
Shan et al. Assessing productivity improvement of quick connection systems in the steel construction industry using building information modeling (BIM)
Construction Management Committee of the ASCE Construction Division Constructability and constructability programs: White paper
EP3483520B1 (en) Module for a heating and/or hot water supply system and method for constructing such a system
DE102005045847A1 (en) Space module for space construction, has transport aid including dimensions and maximal weight in international logistics, media supply line that is connected via interface predefined in spatial arrangement, where module is self-supporting
DE19733311B4 (en) building
DE69321453T2 (en) Process for installing fastenings and equipment in a ship's galley or similar space, and fastening and equipment system
DE10342955A1 (en) Construction of international freight containers has internal modular facility for inclusion of lighting and refrigeration system
DE20314863U1 (en) Construction of international freight containers has internal modular facility for inclusion of lighting and refrigeration system
US5400553A (en) Cell construction for a correctional facility
DE19517235C2 (en) Deck house for ships
Magenes et al. Economics of Prefabricated Electrical and Instrumentation Buildings in Industrial Applications
EP0953084A1 (en) Construction method
DE102008058930B3 (en) Method for erecting shaft scaffolding for lift system in building with two floors, involves mounting scaffold segment in lower floor which has static load-carrying capacity for carrying load to floor slab, where opening is cut in floor slab
Clemente Two application case studies of short switchboards in obstructed electrical rooms
DE20220169U1 (en) Transformer station holding at least one transformer is formed monolithically of concrete and has transformer carrying plate across the upper inner walls
EP3070216A1 (en) Modular building
DE202009007729U1 (en) Modular room modules for disassembly and reassembly for residential purposes
Countryman Builder 3 & 2. Naval Education and Training Command Rate Training Manual and Nonresident Career Course. Revised.

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
8122 Nonbinding interest in granting licenses declared
8139 Disposal/non-payment of the annual fee