DE10356897A1 - Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls - Google Patents
Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls Download PDFInfo
- Publication number
- DE10356897A1 DE10356897A1 DE2003156897 DE10356897A DE10356897A1 DE 10356897 A1 DE10356897 A1 DE 10356897A1 DE 2003156897 DE2003156897 DE 2003156897 DE 10356897 A DE10356897 A DE 10356897A DE 10356897 A1 DE10356897 A1 DE 10356897A1
- Authority
- DE
- Germany
- Prior art keywords
- support
- climbing
- screw
- tooth
- supports
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B1/3511—Lift-slab; characterised by a purely vertical lifting of floors or roofs or parts thereof
Abstract
Description
Die Erfindung betrifft Verfahren und Vorrichtung zum verbesserten Stockwerksbau gemäß den Oberbegriff des Anspruch 1.The The invention relates to methods and apparatus for improved floor construction according to the generic term of claim 1.
Obwohl der Fertigteilbau gegenwärtig steigende Bedeutung bekommt, ist auch diese Entwicklung nicht ohne Nachteile. Zu nennen sind einmal der Schwertransport mit teilweise großen Bauteilen und zum anderen der alte Baurhytmus; Hochheben und erst dann Einbauen. Und schließlich bekommen die heutigen Montagebauten nur durch ihre Kernbauten ihre horizontale Standfestigkeit.Even though Prefabrication currently this development is not without its importance Disadvantage. To mention are once the heavy transport with partial huge Components and the other the old building rhythm; Raise and only then install. And finally get the today's assembly buildings only by their core constructions theirs horizontal stability.
Die nachfolgend vorgelegte Erfindung besitzt andere Ansatzpunkte und kommt darum auch zu anderen Ergebnissen. Nach vereinfachter Betrachtung besteht ein Bauwerk nur aus den Stützen und den Stockwerksdecken. Dagegen soll nach dieser Erfindung die Stützen eine zusätzliche Aufgabe erfüllen, sie sollen die Decken hydraulisch auf ihre Sollstellung heben.The subsequently presented invention has other starting points and therefore comes to other results. After simplified consideration exists a structure only from the columns and the floor ceilings. In contrast, according to this invention, the Support an additional Fulfill the task, they should raise the ceilings hydraulically to their nominal position.
Die Lösung dieser Aufgabe wird erfindungsgemäß durch die Entwicklung neuartiger Stützen möglich. Merkmale dieser Vorstellung sind im kennzeichnenden Teil des Hauptanspruches aufgezählt.The solution This object is inventively by the development of novel Supports possible. characteristics This idea is in the characterizing part of the main claim enumerated.
Beim Hub sind durch Federkraft Kletternocken und Zahnbacken verzahnt. Nach Hubende geht der Druckkolben der Hydraulik abwärts, jedoch bleibt der Verbund mit der Feststütze bestehen, weil ihre Zahnstellung nach oben gerichtet ist. Dadurch sind Decke und Stützenmagazin einen Hub höher. Ein neuer Hub kann beginnen.At the Hubs are toothed by spring force climbing cams and toothed jaws. After stroke end, the pressure piston of the hydraulic goes down, however the bond with the solid support remains because of its tooth position is directed upward. As a result, ceiling and column magazine a stroke higher. A new hub can start.
Ist
die Stockwerkshöhe
erreicht, wird elektronisch die Hydraulik abgeschaltet und die nächste Stütze wird
mit ihrer unteren verschraubt. Aus dem mitgleitendem Magazin (
Die Vorteile der Erfindung.The advantages of the invention.
Bauen ist nicht nur der Einbau des Materials sondern auch der Hub zur Einbaustelle. Es ist eine Schichtung und hat Ähnlichkeit mit einem Baum. Beide besitzen Kippsicherheit durch Fundament oder Wurzelwerk. Und in beiden Fällen gibt es weder Hubkran noch Gerüst.To build is not only the installation of the material but also the hub for Installation site. It is a layering and has a similarity to a tree. Both have tipping safety through foundation or root system. And in both cases There is neither lifting crane nor scaffolding.
Die Stütze hat eine Mehrfachfunktion Sie hebt nicht nur die Stockwerksdecken, sondern sie wird selbst zum Bestandteil des fertigen Bauwerks. Insgesamt hat die Erfindung folgende Verteile:
- 1. Durch angepaßte Steuermöglichkeit kann der Hydraulikhub auf eine Stockwerksdecke begrenzt werden und mit relativ geringer Kraft das Bauwerk im Zentimeterbereich nach oben drücken. Schwere Hubgeräte sind darum auf der Baustelle entbehrlich.
- 2. Es entfallen Transport und Bewegung von Großgeräten und schwerem Bauteilen.
- 3. Die gehobene Erstdecke ist Arbeitsbühne für Montagearbeiten bei der Stützenverlängerung.
- 4. Durch das mitgleitende Wetterzelt ist die Baustelle frei von Wettereinflüssen und gestattet auch Winterarbeit.
- 5. Alle Arbeiten im Handbereich sind ohne Gerüst möglich.
- 6. Keine Hochgerüste mit hohem Unfallrisiko.
- 7. Die Knicksteife der Stützen kann durch den Deckenhub gesteuert und gesteigert werden.
- 8. Auf der Kellersohle kann für das gesamte Bauwerk die Deckenschalung hergerichtet und die Decken können von hier bis zu ihrer Sollstellung gehoben werden.
- 9. Es entfallen für alle Decken weitere Schalungsarbeiten. Außerdem ermöglicht die Einmalschalung die Herstellung aller filigranen Profildecken, wie Kassettendecken, Rippendecken, Plattenbalken u.ä., ohne zusätzliche Arbeit. Solche Decken sind im Materialverbrauch günstig und haben demgemäß auch ein leichteres Hubgewicht.
- 10. Geneigter Materialfluß.
- 11. Großflächige Deckenfelder können als Durchlaufdecken hergestellt werden.
- 12. Gleichzeitiger Innenausbau durch gesteuerten Deckenhub.
- 13. Auch im Schalungsbereich Wetterschutz als Nebeneffekt durch voraussteigendes Deckenfeld.
- 14. Durch Betonverguß der Kraftknoten "Decke mit Stütze" entstehen Raumtragwerke mit erheblichen Belastungsreserven, was besonders in Erdsenkungs- und Erdbebengebieten vorteilhaft ist.
- 1. By adapted control option, the hydraulic stroke can be limited to a floor ceiling and push the building in the centimeter range with relatively little force upwards. Heavy lifting devices are therefore dispensable on the construction site.
- 2. It eliminates the transport and movement of large equipment and heavy components.
- 3. The raised first cover is working platform for assembly work on the column extension.
- 4. Due to the sliding weather tent, the construction site is free from the weather and also permits winter work.
- 5. All work in the hand area is possible without scaffolding.
- 6. No scaffolding with a high accident risk.
- 7. The buckling resistance of the columns can be controlled and increased by the ceiling lift.
- 8. On the basement floor, the slab formwork can be prepared for the entire structure and the ceilings can be lifted from here to their nominal position.
- 9. It eliminates further formwork for all ceilings. In addition, the single formwork allows the production of all filigree profile ceilings, such as coffered ceilings, ribbed ceilings, tiled beams and the like, without additional work. Such ceilings are low in material consumption and accordingly have a lighter lifting weight.
- 10. Inclined material flow.
- 11. Large-area ceiling panels can be manufactured as continuous ceilings.
- 12. Simultaneous interior work by controlled ceiling lift.
- 13. Also in the shuttering area weather protection as a side effect due to the rising ceiling area.
- 14. By Betonverguß the power node "ceiling with support" create space structures with considerable load reserves, which is particularly advantageous in Erdsenkungs- and earthquake areas.
- 11
- PendelstützeStabilizer
- 22
- Feststützesolid support
- 33
- Zahnbackentoothed jaws
- 44
- Verbundhülsencomposite sleeves
- 55
- SpiraldruckfedernSpiral springs
- 66
- Steuerschraubencontrol screws
- 77
- StahlblechmantelSheet steel casing
- 88th
- LastjochLastjoch
- 99
- Deckenträgerfloor beams
- 1010
- StutzenSupport
- 1111
- Stützenmagazinbased magazine
- 1212
- Hubzylinderlifting cylinder
- 1313
- LastzungeLast tongue
- 1414
- Mittelschraubecenter screw
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003156897 DE10356897A1 (en) | 2003-12-05 | 2003-12-05 | Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003156897 DE10356897A1 (en) | 2003-12-05 | 2003-12-05 | Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls |
Publications (1)
Publication Number | Publication Date |
---|---|
DE10356897A1 true DE10356897A1 (en) | 2005-07-07 |
Family
ID=34638395
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2003156897 Withdrawn DE10356897A1 (en) | 2003-12-05 | 2003-12-05 | Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE10356897A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109663228A (en) * | 2019-01-23 | 2019-04-23 | 鞍山拜尔自控有限公司 | The automatic support clamp system of tall-building fire fighting bridge trident pole support lifting |
-
2003
- 2003-12-05 DE DE2003156897 patent/DE10356897A1/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109663228A (en) * | 2019-01-23 | 2019-04-23 | 鞍山拜尔自控有限公司 | The automatic support clamp system of tall-building fire fighting bridge trident pole support lifting |
CN109663228B (en) * | 2019-01-23 | 2023-09-12 | 鞍山拜尔自控有限公司 | Automatic supporting and clamping mechanism for lifting of three-fork rod support of high-rise fire-fighting bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3712355B1 (en) | Method for retrofitting a building with an elevator and set of components for carrying out the method | |
EP3899167B1 (en) | Construction site device with climbing formwork and elevator system | |
WO2008148637A1 (en) | Self-climbing system and method for pouring concrete for a girder and/or mounting a prefabricated section using a self-climbing system | |
DE1138208B (en) | Method and device for setting up multi-storey buildings with a basement | |
DE3824387C2 (en) | ||
DE102013006380A1 (en) | Decking for scaffolding | |
DE2227068A1 (en) | METHOD OF ERECTING CONCRETE STRUCTURES AND ELEMENT FOR EXERCISING THESE | |
DE10321947B4 (en) | Method for erecting a wooden house or the like. Bauwerkes | |
DE10356897A1 (en) | Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls | |
DE834446C (en) | Process for the production of walls from prefabricated components | |
DE1531102C3 (en) | Well equipment for an elevator | |
DE3835790C1 (en) | ||
EP0480295B1 (en) | Set for the construction of private or holiday homes | |
DE1182411B (en) | Method and device for erecting multi-storey buildings with basements | |
DE10130077C1 (en) | Pre-fabricated curved roof component has steel reinforced concrete core and threaded rods tensioned to provide mechanical stabilisation | |
AT11202U1 (en) | CONSTRUCTION OF A BUILDING, IN PARTICULAR BALCONY OR WINTER GARDEN, WITH CONTAINERS ATTACHABLE TO A BUILDING WALL WITH A ZUGANKER | |
DE2125803A1 (en) | Process for the production of high-rise buildings, preferably residential high-rise buildings made of concrete | |
EP4253299A1 (en) | Method for retrofitting a building with a lift assembly amd staircase module | |
EP4253297A1 (en) | Auxiliary scaffolding and method for retrofitting a building with a lift system | |
EP0645501A1 (en) | Method for the production of prefabricated moduls for the construction of buildings and prefabricated modul | |
DE19757956A1 (en) | Climbing shuttering support and lift | |
DE803368C (en) | Reinforced concrete rib ceiling laid without formwork | |
DE2249166A1 (en) | METHOD AND DEVICE FOR ERECTING MULTI-STORY BUILDINGS | |
DE10302186A1 (en) | Method of production of large area concrete sections involves using shuttering placed on base and fixed in position during casting | |
DE2514293A1 (en) | External wall face working platform - on anchor points engaged by two of three jib arms for staged movement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8122 | Nonbinding interest in granting licenses declared | ||
8139 | Disposal/non-payment of the annual fee |