DE10356897A1 - Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls - Google Patents

Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls Download PDF

Info

Publication number
DE10356897A1
DE10356897A1 DE2003156897 DE10356897A DE10356897A1 DE 10356897 A1 DE10356897 A1 DE 10356897A1 DE 2003156897 DE2003156897 DE 2003156897 DE 10356897 A DE10356897 A DE 10356897A DE 10356897 A1 DE10356897 A1 DE 10356897A1
Authority
DE
Germany
Prior art keywords
support
climbing
screw
tooth
supports
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE2003156897
Other languages
German (de)
Inventor
Karl Bauerdorf
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bauerdorf Karl Dipl-Architekt
Original Assignee
Bauerdorf Karl Dipl-Architekt
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bauerdorf Karl Dipl-Architekt filed Critical Bauerdorf Karl Dipl-Architekt
Priority to DE2003156897 priority Critical patent/DE10356897A1/en
Publication of DE10356897A1 publication Critical patent/DE10356897A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3511Lift-slab; characterised by a purely vertical lifting of floors or roofs or parts thereof

Abstract

The method involves using hydraulically movable telescopic supports which climb up with the storey levels and are set down through controls level at their ideal site. Several support parts can be connected together through overlapping joints. Independent claim describes screw threads in rear plate to take connecting screws. A steel sleeve can be driven into the plates in which a screw and nut can be turned.

Description

Die Erfindung betrifft Verfahren und Vorrichtung zum verbesserten Stockwerksbau gemäß den Oberbegriff des Anspruch 1.The The invention relates to methods and apparatus for improved floor construction according to the generic term of claim 1.

Obwohl der Fertigteilbau gegenwärtig steigende Bedeutung bekommt, ist auch diese Entwicklung nicht ohne Nachteile. Zu nennen sind einmal der Schwertransport mit teilweise großen Bauteilen und zum anderen der alte Baurhytmus; Hochheben und erst dann Einbauen. Und schließlich bekommen die heutigen Montagebauten nur durch ihre Kernbauten ihre horizontale Standfestigkeit.Even though Prefabrication currently this development is not without its importance Disadvantage. To mention are once the heavy transport with partial huge Components and the other the old building rhythm; Raise and only then install. And finally get the today's assembly buildings only by their core constructions theirs horizontal stability.

Die nachfolgend vorgelegte Erfindung besitzt andere Ansatzpunkte und kommt darum auch zu anderen Ergebnissen. Nach vereinfachter Betrachtung besteht ein Bauwerk nur aus den Stützen und den Stockwerksdecken. Dagegen soll nach dieser Erfindung die Stützen eine zusätzliche Aufgabe erfüllen, sie sollen die Decken hydraulisch auf ihre Sollstellung heben.The subsequently presented invention has other starting points and therefore comes to other results. After simplified consideration exists a structure only from the columns and the floor ceilings. In contrast, according to this invention, the Support an additional Fulfill the task, they should raise the ceilings hydraulically to their nominal position.

Die Lösung dieser Aufgabe wird erfindungsgemäß durch die Entwicklung neuartiger Stützen möglich. Merkmale dieser Vorstellung sind im kennzeichnenden Teil des Hauptanspruches aufgezählt.The solution This object is inventively by the development of novel Supports possible. characteristics This idea is in the characterizing part of the main claim enumerated.

1 zeigt einen Längsschnitt durch eine hydraulische Kletterstütze. Hiermit soll das Prinzip der Erfindung vorgestellt werden. Baumartig wie eine Tanne wächst die Stütze nach oben. Durch die Überlappungsstöße wird ihr Querschnitt kleiner und paßt sich der Belastung an, die nach unten zunimmt. 1 shows a longitudinal section through a hydraulic climbing column. Hereby, the principle of the invention will be presented. Tree-like like a fir the support grows upwards. Due to the overlap collisions, their cross-section becomes smaller and adapts to the load, which increases downwards.

2 zeigt einen Querschnitt durch einen Stützenstumpf. Hier ist die teleskopartige Zusammensetzung der Kletterstütze erkennbar. Es ist gleichsam ein Stützenmagazin, aus dem die Einzelstücke von außen nach innen herausgehoben werden. Oben wird der Stützenstumpf durch eine Verbundzunge zusammengehalten. Beim Hub können sich die Einzelele mente automatisch von ihr ablösen. Solch Stützenstumpf müßte fabrikmäßig vormontiert werden. 2 shows a cross section through a stump stump. Here is the telescopic composition of the climbing column recognizable. It is like a column magazine, from which the individual pieces are lifted out from the outside to the inside. Above the stump is held together by a compound tongue. At the hub, the individual elements can automatically detach from it. Such stump stump would have to be factory pre-assembled.

3 zeigt einen oberen Überlappungsstoß im Schraubverbund. Hier sind die Schrauben von beiden Seiten zugänglich. Durch Zwischenhub können auch die anderen angezogen werden. Bindebleche sind bei der Montage nur zwischen dem oberen Stützenpaar innenseitig möglich. Die Beweglichkeit der Pendelstützen muß gewährleistet sein. 3 shows an upper lap joint in the bolted joint. Here the screws are accessible from both sides. By intermediate stroke, the other can be tightened. Ties are only possible between the upper pair of supports on the inside during assembly. The mobility of the pendulum supports must be guaranteed.

4 zeigt zwei Stützenbleche mit Bohrlöchern. Das Rechte besitzt innen ein Schraubgewinde, dadurch kann eine Schraube von links eingedreht werden und beide Stützenbleche verbinden. 4 shows two column plates with holes. The right has a screw thread on the inside, so a screw can be screwed in from the left and connect both support plates.

5 zeigt zwei Stützenbleche mit Bohrlöchern. In sie kann eine Schraube mit innerem Schraubgewinde durch Hammerschlag eintreiben werden. Durch Stützenhub wird die ser Überlappungsstoß frei, und nun besteht die Möglichkeit, die zweite Schraube von der anderen Seite in die Erstschraube einzudrehen. 5 shows two column plates with holes. In it, a screw with internal screw thread can be hammered by hammer blow. By Stützenhub the water overlap shock is free, and now it is possible to screw the second screw from the other side in the first screw.

6 zeigt wie vor auch zwei Stützenbleche mit Bohrlöchern. In sie kann eine verbindende Stahlhülse eingetrieben werden. Und wenn durch Hub der Stoß frei wird, besteht auch hier die Möglichkeit von beiden Seiten eine Schraube einzuziehen. 6 shows as before two columns plates with holes. In it, a connecting steel sleeve can be driven. And if the stroke is released by stroke, there is also the possibility here of pulling a screw from both sides.

7 zeigt eine hydraulische Kletterstütze. Sie besteht aus zwei Halbstützen mit nach innen gerichteten Kletternocken. Eine Halbstütze ist beweglich und pen delt auf- und ab. Sie ist eine Pendelstütze (1). Die Andere ist in den Fundamenten fest verankert und ist eine Feststütze (2). Dazwischen sind zwei teleskopartig verbundene Zahnbacken (3). In ihren runden Verbundhülsen (4) sind Spiraldruckfedern (5) eingelegt, die sie nach außen auf die Kletternocken der Stützen drücken. Durch zwei Steuerschrauben (6) können beide gesteuert werden. Ein Stahlblechmantel (7) hält alles funktionsgerecht zusammen und umschließt auch das untere Lastjoch (8), zur Aufnahme von Deckenträgern (9). Oben sind noch zwei Stutzen (10) zum Anschluß des Stützenmagazins (11). Demgemäß werden beim Lasthub auch die Deckenträger (9) und auch das Stützenmagazin (11) gehoben. 7 shows a hydraulic climbing column. It consists of two half-piers with inwardly directed climbing socks. A half-support is movable and pen delt up and down. It is a pendulum support ( 1 ). The other is firmly anchored in the foundations and is a solid support ( 2 ). In between are two telescopically connected tooth jaws ( 3 ). In their round composite sleeves ( 4 ) are helical compression springs ( 5 ), which push them outwards onto the climbing socks of the supports. By two control screws ( 6 ) Both can be controlled. A sheet steel jacket ( 7 ) holds everything functionally together and also encloses the lower load yoke ( 8th ), for receiving ceiling beams ( 9 ). Above are still two nozzles ( 10 ) for connecting the support magazine ( 11 ). Accordingly, during the load stroke, the ceiling beams ( 9 ) and also the column magazine ( 11 ) lifted.

8 zeigt vergrößert noch einmal das Kernstück der Erfindung. Dargestellt sind die Zahnbacken (3) mit ihren Verbundhülsen (4), die zusammengesteckt werden und in denen Spiraldruckfedern (5) eingelegt sind. Bedeutungsvoll sind auch die zwei Steuerschrauben (6), mit ihnen kann der ganze Bauablauf gesteuert werden. 8th again shows enlarged the core of the invention. Shown are the tooth jaws ( 3 ) with their composite sleeves ( 4 ), which are put together and in which spiral compression springs ( 5 ) are inserted. Meaningful are also the two control screws ( 6 ), with them the entire construction process can be controlled.

9 zeigt die Innenansicht einer Zahnbacke (3). Sichtbar sind die Verbundhülsen (4) und die Steuerschraube (6). 9 shows the inside view of a tooth-jaw ( 3 ). Visible are the composite sleeves ( 4 ) and the tax screw ( 6 ).

10 zeigt eine Kletterstütze in Montagestellung. Beide Steuerschrauben sind festgedreht. 10 shows a climbing column in mounting position. Both control screws are tightened.

11 zeigt eine Kletterstütze in Hubstellung. Beide Steuerschrauben (6) sind losgedreht. 11 shows a climbing column in lifting position. Both control screws ( 6 ) are gone.

12 zeigt eine Kletterstütze in Parkstellung. Die Steuerschraube an der Feststütze ist losgedreht und an der Pendelstütze ist die andere Steuerschraube festgedreht. 12 shows a climbing column in parking position. The control screw on the fixed support is loosened and the other control screw is tightened on the pendulum support.

13 zeigt Hub und Verlängerung der Kletterstütze. Die Pendelstütze macht durch den Hubzylinder (12) Auf und Abbewegungen. Es ist dabei vorteilhaft, daß nur geringe Hubkraft und kleine Hubhöhe notwendig sind, da durch Steuermöglichkeit jeweils nur eine Decke bewegt werden muß. 13 shows lift and extension of the climbing column. The pendulum support makes by the lifting cylinder ( 12 ) Up and down movements. It is advantageous that only low lifting force and small lifting height are necessary because only one blanket must be moved by control possibility.

Beim Hub sind durch Federkraft Kletternocken und Zahnbacken verzahnt. Nach Hubende geht der Druckkolben der Hydraulik abwärts, jedoch bleibt der Verbund mit der Feststütze bestehen, weil ihre Zahnstellung nach oben gerichtet ist. Dadurch sind Decke und Stützenmagazin einen Hub höher. Ein neuer Hub kann beginnen.At the Hubs are toothed by spring force climbing cams and toothed jaws. After stroke end, the pressure piston of the hydraulic goes down, however the bond with the solid support remains because of its tooth position is directed upward. As a result, ceiling and column magazine a stroke higher. A new hub can start.

Ist die Stockwerkshöhe erreicht, wird elektronisch die Hydraulik abgeschaltet und die nächste Stütze wird mit ihrer unteren verschraubt. Aus dem mitgleitendem Magazin (11) werden so eine Stütze nach der anderen herausgezogen. Das Stützenmagazin steht auf einer Lastzunge (13), die vor dem nächsten Hub durch eine nach beiden Seiten wirkende Mittelschraube (14) verkürzt werden muß.When the floor level is reached, the hydraulics are switched off electronically and the next support is bolted to its lower one. From the accompanying magazine ( 11 ) one support after the other are pulled out. The column magazine stands on a load tongue ( 13 ), which, before the next stroke, is driven by a center screw ( 14 ) must be shortened.

Die Vorteile der Erfindung.The advantages of the invention.

Bauen ist nicht nur der Einbau des Materials sondern auch der Hub zur Einbaustelle. Es ist eine Schichtung und hat Ähnlichkeit mit einem Baum. Beide besitzen Kippsicherheit durch Fundament oder Wurzelwerk. Und in beiden Fällen gibt es weder Hubkran noch Gerüst.To build is not only the installation of the material but also the hub for Installation site. It is a layering and has a similarity to a tree. Both have tipping safety through foundation or root system. And in both cases There is neither lifting crane nor scaffolding.

Die Stütze hat eine Mehrfachfunktion Sie hebt nicht nur die Stockwerksdecken, sondern sie wird selbst zum Bestandteil des fertigen Bauwerks. Insgesamt hat die Erfindung folgende Verteile:

  • 1. Durch angepaßte Steuermöglichkeit kann der Hydraulikhub auf eine Stockwerksdecke begrenzt werden und mit relativ geringer Kraft das Bauwerk im Zentimeterbereich nach oben drücken. Schwere Hubgeräte sind darum auf der Baustelle entbehrlich.
  • 2. Es entfallen Transport und Bewegung von Großgeräten und schwerem Bauteilen.
  • 3. Die gehobene Erstdecke ist Arbeitsbühne für Montagearbeiten bei der Stützenverlängerung.
  • 4. Durch das mitgleitende Wetterzelt ist die Baustelle frei von Wettereinflüssen und gestattet auch Winterarbeit.
  • 5. Alle Arbeiten im Handbereich sind ohne Gerüst möglich.
  • 6. Keine Hochgerüste mit hohem Unfallrisiko.
  • 7. Die Knicksteife der Stützen kann durch den Deckenhub gesteuert und gesteigert werden.
  • 8. Auf der Kellersohle kann für das gesamte Bauwerk die Deckenschalung hergerichtet und die Decken können von hier bis zu ihrer Sollstellung gehoben werden.
  • 9. Es entfallen für alle Decken weitere Schalungsarbeiten. Außerdem ermöglicht die Einmalschalung die Herstellung aller filigranen Profildecken, wie Kassettendecken, Rippendecken, Plattenbalken u.ä., ohne zusätzliche Arbeit. Solche Decken sind im Materialverbrauch günstig und haben demgemäß auch ein leichteres Hubgewicht.
  • 10. Geneigter Materialfluß.
  • 11. Großflächige Deckenfelder können als Durchlaufdecken hergestellt werden.
  • 12. Gleichzeitiger Innenausbau durch gesteuerten Deckenhub.
  • 13. Auch im Schalungsbereich Wetterschutz als Nebeneffekt durch voraussteigendes Deckenfeld.
  • 14. Durch Betonverguß der Kraftknoten "Decke mit Stütze" entstehen Raumtragwerke mit erheblichen Belastungsreserven, was besonders in Erdsenkungs- und Erdbebengebieten vorteilhaft ist.
The column has a multiple function It not only raises the floor ceilings, but it is itself part of the finished structure. Overall, the invention has the following parts:
  • 1. By adapted control option, the hydraulic stroke can be limited to a floor ceiling and push the building in the centimeter range with relatively little force upwards. Heavy lifting devices are therefore dispensable on the construction site.
  • 2. It eliminates the transport and movement of large equipment and heavy components.
  • 3. The raised first cover is working platform for assembly work on the column extension.
  • 4. Due to the sliding weather tent, the construction site is free from the weather and also permits winter work.
  • 5. All work in the hand area is possible without scaffolding.
  • 6. No scaffolding with a high accident risk.
  • 7. The buckling resistance of the columns can be controlled and increased by the ceiling lift.
  • 8. On the basement floor, the slab formwork can be prepared for the entire structure and the ceilings can be lifted from here to their nominal position.
  • 9. It eliminates further formwork for all ceilings. In addition, the single formwork allows the production of all filigree profile ceilings, such as coffered ceilings, ribbed ceilings, tiled beams and the like, without additional work. Such ceilings are low in material consumption and accordingly have a lighter lifting weight.
  • 10. Inclined material flow.
  • 11. Large-area ceiling panels can be manufactured as continuous ceilings.
  • 12. Simultaneous interior work by controlled ceiling lift.
  • 13. Also in the shuttering area weather protection as a side effect due to the rising ceiling area.
  • 14. By Betonverguß the power node "ceiling with support" create space structures with considerable load reserves, which is particularly advantageous in Erdsenkungs- and earthquake areas.

11
PendelstützeStabilizer
22
Feststützesolid support
33
Zahnbackentoothed jaws
44
Verbundhülsencomposite sleeves
55
SpiraldruckfedernSpiral springs
66
Steuerschraubencontrol screws
77
StahlblechmantelSheet steel casing
88th
LastjochLastjoch
99
Deckenträgerfloor beams
1010
StutzenSupport
1111
Stützenmagazinbased magazine
1212
Hubzylinderlifting cylinder
1313
LastzungeLast tongue
1414
Mittelschraubecenter screw

Claims (8)

Verfahren und Vorrichtung zum verbesserten Stockwerksbau ist dadurch gekennzeichnet, daß a) hydraulisch bewegte Teleskopstützen, die mit den Stockwerksdecken nach oben aufsteigen, und b) diese durch Steuermöglichkeit an ihrer Sollstelle plangerecht absetzenMethod and device for improved floor construction is characterized in that a) hydraulically operated telescopic supports, who climb up with the floors, and b) these through control possibility settle right at their desired location Verfahren und Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß mehrere Teilstützen durch einen Überlappungsstoß miteinander verbunden sind (1).Method and device according to claim 1, characterized in that several partial supports are connected to each other by a lap joint ( 1 ). Verfahren und Vorrichtung nach Anspruch 1 und 2, dadurch gekennzeichnet, daß zweiteilige Kletterstützen mit nach innen gerichteten Kletternocken durch Vormontage zu einem Stützenstumpf zusammengesetz sind aus dem alle Teilstützen herausgezogen werden können (2).Method and device according to claim 1 and 2, characterized in that two-part climbing posts are combined with inwardly directed climbing cams by pre-assembly into a stump stump from which all partial supports can be pulled out ( 2 ). Verfahren zum vorderseitigen Verbund mehrerer Stützenbleche ist dadurch gekennzeichnet, daß man a) in dem rückwärtigem Blech ein Schraubgewinde eingeschnitten hat und die Verbundschraube unmittelbar eindrehen kann, (4), b) eine Schraube mit inneren Schraubgewinde verwendet, in welche bei freiem Zugang die andere Schraube eingedreht werden kann (5). c) zunächst eine Stahlhülse in die Bleche eintreibt, in welche bei freiem Zugang eine Schraube mit Mutter eingezogen werden kann (6).Method for front composite of several support plates is characterized in that a) in the rear plate a screw thread has cut in and the composite screw can screw in immediately, 4 ), b) uses a screw with internal screw thread into which in free access the other screw can be screwed in ( 5 ). c) first drives a steel sleeve into the metal sheets, into which a screw with nut can be pulled in with free access ( 6 ). Verfahren und Vorrichtung nach Anspruch 1 bis 4, dadurch gekennzeichnet, daß a) durch Spiraldruckfedern (5) die Zahnbacken (3) gegen die Kletternocken der Pendelstütze (1) ge drückt werden und dadurch kraftschlüssig miteinander verbunden sind, b) der Hubzylinder (12) die Pendelstütze (1) mit ihren Kletternocken hochdrückt und dadurch den Deckenträger (9) und das Stützenmagazin (11) mithebt, c) bei Hubende die andere Zahnbacke (3) durch Federdruck (5) mit den Kletternocken der Feststütze (2) verbunden wird und damit durch angepaßte Zahnstellung die Hublast zum Abparken auf diese übergeht, nun kann die Pendelstütze wieder in ihre Ausgangstellung zurückgleiten, d) durch wechselseitigen Druck sind demgemäß Deckenträger (9) und Stützenmagazin (11) bei Hubende mit einer Hubhöhe nach oben gestiegen.Method and device according to claims 1 to 4, characterized in that a) by helical compression springs ( 5 ) the tooth cheeks ( 3 ) against the climbing socks of the pendulum support ( 1 ) are pressed ge and thereby positively connected to each other, b) the lifting cylinder ( 12 ) the pendulum support ( 1 ) with her climbing socks pushed up and thereby the ceiling support ( 9 ) and the column magazine ( 11 ), c) at the end of the stroke, the other tooth jaw ( 3 ) by spring pressure ( 5 ) with the climbing socks of the solid support ( 2 ) is connected and thus passes through adapted tooth position, the lifting load for parking on this, now the pendulum support can slide back to its original position, d) by mutual pressure are accordingly ceiling support ( 9 ) and column magazine ( 11 ) at the end of the stroke with a lifting height increased. Verfahren und Vorrichtung zur Steuerung der Hubvorgänge nach Anspruch 1 bis 5, dadurch gekennzeichnet, daß a) beide Steuerschrauben (6) bis zum Anschlag losgedreht werden, damit sich beide Zahnbacken mit den Kletternocken beider Stützenteile verbinden können, und dadurch ein Kletterhub eingeleitet wird (11). b) durch Festdrehen der Steuerschraube bei der Pendelstütze (1), der dortige Zahnbackenverbund unterbrochen wird, wodurch die jetzige Hublast nunmehr bei der Feststütze verbleibt, und jetzt die Pendelstütze für andere Hubbewegungen frei ist (12).Method and device for controlling the lifting operations according to claims 1 to 5, characterized in that a) both control screws ( 6 ), so that both tooth cheeks can connect with the climbing cams of both support parts, and thereby a climbing stroke is initiated ( 11 ). b) by tightening the control screw on the pendulum support ( 1 ), the local tooth-jaw assembly is interrupted, whereby the current lifting load now remains at the fixed support, and now the pendulum support for other strokes is free ( 12 ). Verfahren und Vorrichtung zur Stützenverlängerung nach Anspruch 1 bis 6, dadurch gekennzeichnet, daß a) vor einer neuen Stützenverlängerung die Hubhydraulik abgestellt werden muß, b) die Bleche der U-förmigen Halbstützen durch vorgebohrte Montagelöcher miteinander verschraubt worden sind, c) das Stützenmagazin (11) auf zwei Lastzungen (13) steht, die durch eine beidseitige Mittelschraube (14) zusammengehalten werden und man durch Drehung beide Lastzungen (13) um Stützenblechstärke verkürzen kann, damit zwei Verlängerungsstützen zum Aufstieg aus dem Magazin herausgelöst werden können, d) die Einzelelemente sich oben selbst herauslösen, e) die Hydraulik (12) wieder eingeschaltet wird, f) für die Arbeit an dem Überlappungsstoß die erste aufsteigende Stockwerksdecke gleichzeitig Arbeitsbühne ist.Method and apparatus for supporting extension according to claim 1 to 6, characterized in that a) in front of a new column extension, the lifting hydraulics must be turned off, b) the sheets of U-shaped half-supports have been screwed together by pre-drilled mounting holes, c) the column magazine ( 11 ) on two load tongues ( 13 ), which by a bilateral center screw ( 14 ) are held together and by rotation both latches ( 13 ) can shorten the support plate thickness so that two extension supports can be released from the magazine for ascent, d) the individual elements detach themselves at the top, e) the hydraulics ( 12 ) is switched on again, f) for the work on the overlap joint, the first ascending floor slab is at the same time working platform. Verfahren und Vorrichtung zum Verbund von Stockwerksdecke und Kletterstütze nach Anspruch 1 bis 7, dadurch gekennzeichnet, daß a) in Montagelöcher der Teleskophülsen Mörtel eingepreßt wird, der den flexiblen Federverbund nun zu einem unbeweglichen Festverbund umwandelt und damit auch die Verzahnung zwischen den Kletternocken und den Zahnbacken verfestigt ist, b) die Kletterstütze unterhalb vom Lastjoch durch Schalung verschlossen wird, und dadurch die Kreuzung von Stütze und Deckenträger vermörtelt werden kann, somit ein Kraftknoten entsteht, in dem die kreuzenden Teile biegesteif eingebunden sind, c) die Kletterstütze ein Hohlkörper ist, in dem Beton mit Bewehrung eingebracht werden kann, und dadurch der Verbund zwischen Stütze und Deckenträger als Nebeneffekt erfolgt, d) durch Außenverschraubung die kreuzenden Bauteile auch verbunden werden können.Method and apparatus for bonding floors of floors and climbing support according to claim 1 to 7, characterized in that a) in mounting holes the telescope sleeves mortar pressed Now, the flexible spring assembly is an immovable Fixed composite converts and thus the interlocking between the Climbing cams and the tooth-cheeks is solidified, b) the climbing support below closed by shuttering by formwork, and thereby the intersection from prop and ceiling beams mortared can be, thus creating a power node in which the crossing Parts are rigidly integrated, c) the climbing support hollow body is, in which concrete can be introduced with reinforcement, and thereby the bond between prop and ceiling beams as a side effect, d) by external screwing the intersecting Components can also be connected.
DE2003156897 2003-12-05 2003-12-05 Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls Withdrawn DE10356897A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE2003156897 DE10356897A1 (en) 2003-12-05 2003-12-05 Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2003156897 DE10356897A1 (en) 2003-12-05 2003-12-05 Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls

Publications (1)

Publication Number Publication Date
DE10356897A1 true DE10356897A1 (en) 2005-07-07

Family

ID=34638395

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2003156897 Withdrawn DE10356897A1 (en) 2003-12-05 2003-12-05 Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls

Country Status (1)

Country Link
DE (1) DE10356897A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109663228A (en) * 2019-01-23 2019-04-23 鞍山拜尔自控有限公司 The automatic support clamp system of tall-building fire fighting bridge trident pole support lifting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109663228A (en) * 2019-01-23 2019-04-23 鞍山拜尔自控有限公司 The automatic support clamp system of tall-building fire fighting bridge trident pole support lifting
CN109663228B (en) * 2019-01-23 2023-09-12 鞍山拜尔自控有限公司 Automatic supporting and clamping mechanism for lifting of three-fork rod support of high-rise fire-fighting bridge

Similar Documents

Publication Publication Date Title
EP3712355B1 (en) Method for retrofitting a building with an elevator and set of components for carrying out the method
EP3899167B1 (en) Construction site device with climbing formwork and elevator system
WO2008148637A1 (en) Self-climbing system and method for pouring concrete for a girder and/or mounting a prefabricated section using a self-climbing system
DE1138208B (en) Method and device for setting up multi-storey buildings with a basement
DE3824387C2 (en)
DE102013006380A1 (en) Decking for scaffolding
DE2227068A1 (en) METHOD OF ERECTING CONCRETE STRUCTURES AND ELEMENT FOR EXERCISING THESE
DE10321947B4 (en) Method for erecting a wooden house or the like. Bauwerkes
DE10356897A1 (en) Method for building high-rise structures uses two-part telescopic hydraulic climbing supports which climb up with storey levels and are then set down level with their ideal site through controls
DE834446C (en) Process for the production of walls from prefabricated components
DE1531102C3 (en) Well equipment for an elevator
DE3835790C1 (en)
EP0480295B1 (en) Set for the construction of private or holiday homes
DE1182411B (en) Method and device for erecting multi-storey buildings with basements
DE10130077C1 (en) Pre-fabricated curved roof component has steel reinforced concrete core and threaded rods tensioned to provide mechanical stabilisation
AT11202U1 (en) CONSTRUCTION OF A BUILDING, IN PARTICULAR BALCONY OR WINTER GARDEN, WITH CONTAINERS ATTACHABLE TO A BUILDING WALL WITH A ZUGANKER
DE2125803A1 (en) Process for the production of high-rise buildings, preferably residential high-rise buildings made of concrete
EP4253299A1 (en) Method for retrofitting a building with a lift assembly amd staircase module
EP4253297A1 (en) Auxiliary scaffolding and method for retrofitting a building with a lift system
EP0645501A1 (en) Method for the production of prefabricated moduls for the construction of buildings and prefabricated modul
DE19757956A1 (en) Climbing shuttering support and lift
DE803368C (en) Reinforced concrete rib ceiling laid without formwork
DE2249166A1 (en) METHOD AND DEVICE FOR ERECTING MULTI-STORY BUILDINGS
DE10302186A1 (en) Method of production of large area concrete sections involves using shuttering placed on base and fixed in position during casting
DE2514293A1 (en) External wall face working platform - on anchor points engaged by two of three jib arms for staged movement

Legal Events

Date Code Title Description
8122 Nonbinding interest in granting licenses declared
8139 Disposal/non-payment of the annual fee