DE102019107578A1 - Wood / concrete composite component - Google Patents
Wood / concrete composite component Download PDFInfo
- Publication number
- DE102019107578A1 DE102019107578A1 DE102019107578.5A DE102019107578A DE102019107578A1 DE 102019107578 A1 DE102019107578 A1 DE 102019107578A1 DE 102019107578 A DE102019107578 A DE 102019107578A DE 102019107578 A1 DE102019107578 A1 DE 102019107578A1
- Authority
- DE
- Germany
- Prior art keywords
- composite component
- concrete
- component according
- chord
- wood
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
Die Erfindung betrifft ein Holz-/Beton-Verbundbauteil (1), insbesondere für große Spannweiten von über 8 Metern. Für das erfindungsgemäße Holz-/Beton-Verbundbauteil (1) ist kennzeichnend, dass das Verbundbauteil (1) einen Untergurt (2) aus Holz aufweist, auf dem in Längsrichtung des Untergurts (2) Holzstege (3, 4) vorstehen, die derart voneinander beabstandet sind, dass der Untergurt (2) und die voneinander beabstandeten Holzstege (3, 4) ein U-förmiges Querschnittsprofil aufweisen, dass in dem durch das U-förmige Querschnittsprofil gebildeten Innenraum ein in Längsrichtung des Untergurts (2) orientierter Betonsteg (5) angeordnet ist, und dass auf den Holzstegen (3, 4) des Verbundbauteiles (1) ein Obergurt (2) aus Holz aufliegt. The invention relates to a wood / concrete composite component (1), in particular for large spans of over 8 meters. It is characteristic of the wood / concrete composite component (1) according to the invention that the composite component (1) has a lower chord (2) made of wood on which wooden webs (3, 4) protrude in the longitudinal direction of the lower chord (2), which protrude from one another are spaced so that the lower chord (2) and the spaced apart wooden webs (3, 4) have a U-shaped cross-sectional profile, that in the interior space formed by the U-shaped cross-sectional profile, a concrete web (5) oriented in the longitudinal direction of the lower chord (2) is arranged, and that an upper belt (2) made of wood rests on the wooden webs (3, 4) of the composite component (1).
Description
Die Erfindung betrifft ein Holz-/Beton-Verbundbauteil, insbesondere für große Spannweiten von über 8 Metern.The invention relates to a wood / concrete composite component, in particular for large spans of over 8 meters.
Es ist bereits bekannt, die Decken eines Bauwerks in einer Holz-/Beton-Verbundbauweise zu fertigen. Dabei wird eine Holzbalkendecke oder eine Brettsperrholzdecke mit einer oben liegenden Betonplatte aus Ortbeton so verbunden, dass die Betonplatte die Druckkraft und der hölzerne Unterbau die Zugkraft übernimmt. Dabei erfolgt der Schubverbund dieser Schichten über Kerven, Schrauben und spezielle Schubverbinder.It is already known to manufacture the ceilings of a building in a wood / concrete composite construction. A wooden beam ceiling or a cross laminated timber ceiling is connected to an overhead concrete slab made of in-situ concrete in such a way that the concrete slab takes over the compressive force and the wooden substructure takes over the tensile force. These layers are sheared together using mouths, screws and special shear connectors.
Die Vorteile dieser Holz-/Beton-Verbundbauweise sind die im Vergleich zu einer Holzdecke höhere Tragfähigkeit, - darüber hinaus zeichnet sich diese Holz-/Beton-Verbundbauweise durch bauphysikalische Vorteile beim Brand- und Schallschutz sowie durch eine sehr hohe horizontale Steifigkeit der Decke für die Aussteifung des Gebäudes aus.The advantages of this wood / concrete composite construction are the higher load-bearing capacity compared to a wood ceiling, - in addition, this wood / concrete composite construction is characterized by structural advantages in terms of fire and noise protection as well as a very high horizontal rigidity of the ceiling for the Bracing of the building.
Demgegenüber sind die Nachteile dieser vorbekannten Bauweise allerdings nicht unerheblich. Für das Aufbringen des Betons muss die Decke wie eine übliche Filigrandecke im Massivbau über alle Geschosse abgesprießt werden und mehrere Tage aushärten. Darüber hinaus wird durch das Aufbringen der Betonschicht aus Ortbeton sehr viel Wasser in diesen Deckenaufbau eingebracht, was der trockenen Holzbauweise widerspricht. Die Abdichtung muss daher sehr sorgfältig erfolgen und ist deshalb aufwändig. In den Geschossen muss die Bewehrung für die Betonplatte gelagert und verarbeitet werden, wodurch der zur Verfügung stehende Platz zusätzlich eingeschränkt ist. Aufgrund der üblichen massiven Ausführung des Verbundbauteils kann dessen Querschnitt nicht für die heute erforderliche Haustechnik genutzt werden, weshalb eine zusätzliche abgehängte Unterdecke notwendig ist.In contrast, the disadvantages of this previously known design are not insignificant. For the application of the concrete, the ceiling has to be poured over all floors like a usual filigree ceiling in a solid construction and harden for several days. In addition, the application of the concrete layer made of in-situ concrete brings a lot of water into this ceiling structure, which contradicts the dry wooden construction. The sealing must therefore be done very carefully and is therefore complex. The reinforcement for the concrete slab must be stored and processed in the storeys, which further restricts the available space. Due to the usual massive design of the composite component, its cross-section cannot be used for the building services required today, which is why an additional suspended ceiling is necessary.
Man hat daher auch bereits vorgefertigte Verbundbauteile geschaffen, die beispielsweise als Verbundträger ausgebildet sind (vgl.
Der grundlegende Nachteil dieser vorbekannten Holz-/Beton-Verbundbauteile liegt jedoch immer in der begrenzten Spannweite dieser Verbundbauteile, da wie im Massivbau Spannweiten über 8 Meter ohne Vorspannung nicht möglich sind, weil sonst die Durchbiegung der Verbundbauteile zu groß und die Konstruktion unwirtschaftlich wird. Außerdem macht sich der Schalungsaufwand nachteilig bemerkbar, da der Querschnitt nicht als fertige Rohdecke genutzt werden kann.The fundamental disadvantage of these previously known wood / concrete composite components, however, is always the limited span of these composite components, since, as in solid construction, spans over 8 meters are not possible without pre-tensioning, because otherwise the bending of the composite components is too great and the construction becomes uneconomical. In addition, the formwork expenditure is noticeable disadvantageously, since the cross-section cannot be used as a finished raw ceiling.
Bei den heute im mehrgeschossigen Wohnhaus- und Gewerbebau geforderten flexiblen Grundrissen ist jedoch eine möglichst unterzug- und stützenfreie Ausführung der Geschossdecken und damit Spannweiten von über 8 Metern ausschlaggebend für eine wirtschaftliche Lösung.With the flexible floor plans required in multi-storey residential and commercial buildings today, however, a design of the floor slabs that is as free of beams and columns as possible and thus spans of over 8 meters is decisive for an economical solution.
Es besteht daher insbesondere die Aufgabe, ein Holz-/Beton-Verbundbauteil der eingangs erwähnten Art zu schaffen, mit welchem der Bau eines Bauwerks vereinfacht und beschleunigt werden kann und mit welchem beispielsweise eine belastbare Geschossdecke auch mit Spannweiten größer 8 Metern ausgeführt werden kann.There is therefore the particular task of creating a wood / concrete composite component of the type mentioned, with which the construction of a structure can be simplified and accelerated and with which, for example, a resilient floor ceiling can also be designed with spans greater than 8 meters.
Die erfindungsgemäße Lösung dieser Aufgabe besteht in den Merkmalen des geltenden Patentanspruchs 1.The solution to this problem according to the invention consists in the features of the
Das erfindungsgemäße Verbundbauteil weist einen Untergurt aus Holz auf, auf dem in Längsrichtung des Untergurts Holzstege vorstehen, die derart voneinander beabstandet sind, dass der Untergurt und die voneinander beabstandeten Holzstege ein U-förmiges Querschnittsprofil aufweisen. Sofern hier, beispielsweise im Zusammenhang mit dem Untergurt und/oder den Holzstegen, von Holz gesprochen wird, werden unter diesem Begriff auch geeignete Holzwerkstoffmaterialien und insbesondere verleimte Hölzer verstanden, wie beispielsweise Brettschichtholz (BSH), Furnierschichtholz (LVL oder FSH) oder Brettsperrholz (BBH). Auf den Holzstegen dieses Verbundbauteiles liegt ein Obergurt auf. Dabei ist auch der Obergurt aus Holz hergestellt, wobei auch hier unter dem Begriff Holz ebenso geeignete Holzwerkstoffmaterialien und insbesondere verleimte Hölzer, wie beispielsweise Brettsperrholz (BBH), Brettschichtholz (BSH), oder Funierschichtholz (LVL oder VSH) verstanden werden. Der beispielsweise aus Brettsperrholz (BBH) gefertigte Obergurt wird auf die mit dem Untergurt verbundenen Stege aufgelegt und kann mit den Holzstegen verleimt und/oder verschraubt werden. Der durch das U-förmige Querschnittsprofil gebildete Innenraum des erfindungsgemäßen Holz-/Beton-Verbundbauteiles bildet somit ein Formnest, in das der für den Betonsteg benötigte Beton im Werk oder alternativ auf der Baustelle eingebracht werden kann, ohne dass eine aufwändige Abdichtung gegenüber den Holzbauelementen oder eine Absprießung bei der Montage erforderlich wäre. In diesen Innenraum kann bereits die für den Betonsteg übliche Stahlbetonbewehrung eingelegt sein, bevor zu gegebener Zeit, gegebenenfalls auch nach Fertigstellung des Gebäudes, das Betonieren des Betonsteges im Innenraum des erfindungsgemäßen Holz-/Beton-Verbundbauteils erfolgt. Damit kann ein Warten auf das Aushärten des Betons entfallen, was andernfalls den Baufortschritt behindern würde. Das Betonieren des Betonsteges in dem als Innenraum ausgebildeten U-förmigen Querschnittsprofil des Verbundbauteiles erfordert keine Fachfirma, sondern kann nach Einweisung von jedem Unternehmen selbst durchgeführt werden. Für die Produktion der erfindungsgemäßen Verbundbauteile ist kein spezielles Werk erforderlich, vielmehr können diese Verbundbauteile auch von einem Holzbauunternehmen selbst hergestellt werden. Dabei werden mit Hilfe des erfindungsgemäßen Verbundbauteiles nun auch im Holzbau Tragfähigkeiten möglich, die ansonsten im Massivbau erreichbar sind. Da das erfindungsgemäße Holz-/Beton-Verbundbauteil in seinem Innenraum den Betonsteg als tragendes Element aufweist, sind auf Geschossdecken mit Spannweiten über 8 Metern, beispielsweise von 12 Metern, möglich, wie sie bislang nur mit Hilfe von Spannbetondielen erreichbar waren. Dabei ist auch ein Brandschutz REI
Die hohe Belastbarkeit des erfindungsgemäßen Holz-/BetonVerbundbauteiles wird noch zusätzlich begünstigt, wenn zumindest eine Unterspannung vorgesehen ist, die beidseits mit ihren Endbereichen an einem aus Holz hergestellten Obergurt und in dem zwischen den Endbereichen liegenden Abschnitt der zumindest einen Unterspannung am Untergurt gehalten ist. Um die Durchbiegung zu begrenzen, kann im erfindungsgemäßen Holz-/Beton-Verbundbauteil zumindest eine Unterspannung vorgesehen sein, die beidseits mit ihren Endbereichen am Obergurt und in dem zwischen den Endbereichen liegenden Abschnitt der zumindest einen Unterspannung am Untergurt gehalten ist. Da die durch die zumindest eine Unterspannung erzeugte Vorspannkraft in den Obergurt des erfindungsgemäßen Holz-/Beton-Verbundbauteiles eingeleitet wird, entfällt das Problem der bei den bekannten vorgespannten Konstruktionen und insbesondere bei Spannbetonhohldielen entstehenden Randmomente. Durch die zumindest eine Unterspannung wird eine definierte Vorspannung aufgebracht, wodurch der Verbundquerschnitt des erfindungsgemäßen Holz-/Beton-Verbundbauteiles gemäß den Berechnungen durch die Umlenkkräfte „hochgedrückt“ und daher überhöht wird. Durch eine nachfolgende weitere Vorspannung am fertig betonierten Holz-/Beton-Verbundbauteil kann eine genaue Justierung der für eine Geschossdecke verwendeten Verbundbauteile erreicht werden. Auf eine solche Unterspannung kann bei Bedarf auch verzichtet werden, wenn das erfindungsgemäße Holz-/Beton-Verbundbauteil mit einer Spannweite unter 8 Metern eingesetzt werden soll oder wenn, auch bei größeren Spannweiten, eine besonders hohe Belastbarkeit nicht erforderlich ist.The high load-bearing capacity of the wood / concrete composite component according to the invention is further enhanced if at least one lower tension is provided, which is held on both sides with its end regions on an upper flange made of wood and in the section of the at least one lower tension on the lower flange between the end regions. In order to limit the deflection, at least one lower tension can be provided in the wood / concrete composite component according to the invention, which is held on both sides with its end regions on the upper chord and in the section of the at least one lower tension on the lower chord between the end regions. Since the prestressing force generated by the at least one sub-tensioning is introduced into the upper flange of the wood / concrete composite component according to the invention, the problem of the marginal moments occurring in the known prestressed constructions and in particular in prestressed concrete hollow boards is eliminated. A defined prestress is applied by the at least one lower tension, whereby the composite cross-section of the wood / concrete composite component according to the calculations is "pushed up" by the deflection forces and therefore increased. A precise adjustment of the composite components used for a floor slab can be achieved by a subsequent further prestressing on the finished concreted wood / concrete composite component. Such an under-tensioning can also be dispensed with if the wood / concrete composite component according to the invention is to be used with a span of less than 8 meters or if, even with larger spans, a particularly high load-bearing capacity is not required.
Um den zum Betonieren des Betonsteges benötigten Beton in den durch das U-förmige Querschnittsprofil gebildeten Innenraum leicht einfüllen zu können, ist es vorteilhaft, wenn das aus dem Untergurt und den Holzstegen gebildete U-förmige Querschnittsprofil nach oben offen ausgebildet ist.In order to be able to easily fill the concrete required for concreting the concrete footbridge into the interior space formed by the U-shaped cross-sectional profile, it is advantageous if the U-shaped cross-sectional profile formed from the lower chord and the wooden webs is open at the top.
Damit eine platzsparende Verwendung der erfindungsgemäßen Holz-/Beton-Verbundbauteile noch zusätzlich begünstigt wird, ist es vorteilhaft, wenn in dem vom U-förmigen Querschnittsprofil begrenzten Innenraum des Verbundbauteiles eine Bewehrung für den Betonsteg vorgesehen ist. Die Bewehrung muss somit nicht in den Geschossen gelagert und erst noch auf der Baustelle selbst verarbeitet werden.So that a space-saving use of the wood / concrete composite components according to the invention is additionally promoted, it is advantageous if reinforcement for the concrete web is provided in the interior of the composite component bounded by the U-shaped cross-sectional profile. The reinforcement therefore does not have to be stored in the storeys and processed on the construction site itself.
Um die auf das Holz-/Beton-Verbundbauteil einwirkenden Schub- und Druckkräfte weiterzuleiten, ist es vorteilhaft, wenn der Betonsteg mit dem Untergurt und/oder dem Obergurt einen Schubverbund bildet.In order to pass on the thrust and pressure forces acting on the wood / concrete composite component, it is advantageous if the concrete web forms a shear bond with the lower chord and / or the upper chord.
Um das aus dem Untergurt und den Holzstegen gebildete U-förmige Querschnittsprofil trotz des auf die Holzstege aufgelegten Obergurts nach oben hin offen auszubilden und um gegebenenfalls noch auf der Baustelle den zum Fertigstellen des Betonsteges benötigten Beton in den Innenraum des Betonverbundbauteiles einfüllen zu können, ist es vorteilhaft, wenn im Obergurt zumindest eine Einfüllöffnung zum Einfüllen des den Betonsteg ausbildenden Betons vorgesehen ist.In order to make the U-shaped cross-sectional profile formed from the lower chord and the wooden webs open towards the top despite the upper chord placed on the wooden webs and to be able to pour the concrete required to complete the concrete web into the interior of the concrete composite component on the construction site, if necessary advantageous if at least one filling opening for filling in the concrete forming the concrete web is provided in the upper flange.
Dabei sieht eine bevorzugte Ausführungsform gemäß der Erfindung vor, dass der Schubverbund zwischen Obergurt und Betonsteg mittels dem in die zumindest eine Einfüllöffnung vorstehenden Betonsteg gebildet oder unterstützt ist.A preferred embodiment according to the invention provides that the Shear connection between the upper flange and the concrete web is formed or supported by the concrete web protruding into the at least one filling opening.
Zusätzlich oder stattdessen kann es vorteilhaft sein, dass der Schubverbund zwischen Untergurt und/oder Obergurt mittels Kerven im Untergurt bzw. Obergurt gebildet oder unterstützt ist. Die im Untergurt sowie im Obergurt vorgesehenen Kerven werden etwa an den gleichen Stellen von Untergurt und Obergurt vorgesehen und stellen den Schubverbund zwischen dem Betonsteg und dem oberen bzw. unteren Holzgurt her.Additionally or instead, it can be advantageous that the shear connection between the lower chord and / or the upper chord is formed or supported by means of mouths in the lower chord or the upper chord. The mouths in the lower chord and in the upper chord are provided at roughly the same points of the lower chord and upper chord and establish the shear connection between the concrete web and the upper or lower wooden chord.
Um die Bauelemente des erfindungsgemäßen Holz-/BetonVerbundbauteiles mit möglichst geringem Aufwand an der Baustelle anliefern zu können, und um den Herstellungsaufwand zur Fertigstellung des erfindungsgemäßen Holz-/BetonVerbundbauteiles noch zusätzlich zu reduzieren, ist es vorteilhaft, wenn der Betonsteg aus Ortbeton und/oder aus selbstverdichtendem Beton hergestellt ist.In order to be able to deliver the components of the wood / concrete composite component according to the invention to the construction site with as little effort as possible, and in order to additionally reduce the manufacturing costs for finishing the wood / concrete composite component according to the invention, it is advantageous if the concrete walkway is made of in-situ concrete and / or self-compacting concrete is made.
Die Fertigstellung des erfindungsgemäßen Holz-/BetonVerbundbauteiles an der Baustelle selbst wird begünstigt, wenn der Innenraum als Gussform für den Betonsteg ausgebildet ist und wenn der durch den Untergurt und die Holzstege begrenzte Innenraum an seinen quer zur Längserstreckung des Verbundbauteiles orientierten Stirnenden beschlossen ist. Somit muss auf der Baustelle, gegebenenfalls auch erst nach Fertigstellung des Gebäudes, der Ortbeton in den mit der Betonbewehrung versehenen Innenraum eingefüllt werden, um nach dem Aushärten des Betons den im Innenraum vorgesehenen Betonsteg auszubilden.The completion of the wood / concrete composite component according to the invention at the construction site itself is favored if the interior is designed as a mold for the concrete footbridge and if the interior space bounded by the lower chord and the wooden webs is decided at its front ends oriented transversely to the longitudinal extent of the composite component. Thus, the in-situ concrete must be poured into the interior space provided with the concrete reinforcement on the construction site, possibly only after completion of the building, in order to form the concrete web provided in the interior space after the concrete has hardened.
Eine mit Hilfe der erfindungsgemäßen Holz-/Beton-Verbundbauteile erstellte Geschossdecke lässt sich auf einfache Weise herstellen und in das Bauwerk integrieren, wenn der Obergurt über das durch den Untergurt und die Holzstege gebildete Querschnittsprofil vorsteht und wenn die vorstehenden Endbereiche des Obergurt jeweils ein Auflager für das Verbundbauteil bilden. Somit muss das Verbundbauteil mit den beidseits vorstehenden Endbereichen seines Obergurts lediglich auf einen die Geschossdecke definierenden Absatz des Bauwerks aufgelegt werden, um durch Aneinanderreihen mehrerer solcher Verbundbauteile die benötigte Geschossdecke fertig zu stellen, ohne dass eine aufwändige Abdichtung oder eine Absprießung erforderlich wäre.A floor slab created with the help of the wood / concrete composite components according to the invention can be produced in a simple manner and integrated into the structure if the top chord protrudes over the cross-sectional profile formed by the bottom chord and the wooden webs and if the protruding end regions of the top chord each have a support for form the composite component. Thus, the composite component with the end regions of its upper chord protruding on both sides only has to be placed on a shoulder of the building that defines the floor slab in order to complete the required floor slab by stringing together several such composite components, without the need for complex sealing or spewing.
Eine bevorzugte Ausführungsform gemäß der Erfindung sieht vor, dass die zumindest eine Unterspannung als ein Stahlstab ausgebildet ist, der vorzugsweise aus einem hochfesten Stabstahl hergestellt ist.A preferred embodiment according to the invention provides that the at least one lower tension is designed as a steel bar, which is preferably made from high-strength steel bars.
Eine bevorzugte Weiterbildung gemäß der Erfindung sieht vor, dass die zumindest eine Unterspannung am Obergurt an zumindest einem ihrer Endbereiche mittels wenigstens einer Auflagerkonsole, einer Knagge oder dergleichen Anker gehalten ist. Durch diesen beispielsweise als Stahlauflagerkonsole ausgebildeten Anker wird die angestrebte Vorspannkraft in den Obergurt des erfindungsgemäßen Holz-/Beton-Verbundbauteiles eingelagert, so dass das Problem der bei den bekannten vorgespannten Konstruktionen entstehenden Randmomente entfällt. Ein solcher Anker erlaubt es auch, das erfindungsgemäße Verbundbauteil mittels der an den Obergurten vorgesehenen und als Auflager dienenden Endbereiche aufzulegen. Daher können Stürze und Unterzüge in die Decke integriert und im Gegensatz zu den üblichen Holz- und Holzbetonverbunddecken ohne Aufwand deckengleich ausgeführt werden.A preferred development according to the invention provides that the at least one lower tension on the upper chord is held at at least one of its end regions by means of at least one support bracket, a lug or similar anchor. Through this anchor, designed for example as a steel bearing bracket, the desired prestressing force is stored in the upper flange of the wood / concrete composite component according to the invention, so that the problem of marginal moments occurring in the known prestressed constructions is eliminated. Such an anchor also makes it possible to place the composite component according to the invention by means of the end regions provided on the upper chords and serving as supports. Therefore, lintels and joists can be integrated into the ceiling and, in contrast to the usual wood and wood-concrete composite ceilings, can be made flush with the ceiling without any effort.
Bevorzugt wird eine Ausführung, bei der das Verbundbauteil wenigstens zwei Unterspannungen aufweist, die an zumindest einem ihrer Endbereiche mittels einem gemeinsamen Anker gehalten sind.An embodiment is preferred in which the composite component has at least two sub-voltages which are held at at least one of their end regions by means of a common anchor.
Eine besonders vorteilhafte Weiterbildung gemäß der Erfindung sieht vor, dass das Verbundbauteil zumindest einen quer zur Längserstreckung des Verbundbauteiles orientierten und die Holzstege sowie den Betonsteg des Verbundbauteiles durchsetzenden Installationskanal aufweist. Dabei sind auch mehrere Installationskanäle im erfindungsgemäßen Verbundbauteil ohne statische Nachteile möglich. Mit Hilfe dieser in das erfindungsgemäße Verbundbauteil integrierten Installationskanäle ist der Deckenraum zwischen Obergurt und Untergurt für Installationen der TGA in Längs- und Querrichtung voll nutzbar. Bei einer mit Hilfe der erfindungsgemäßen Verbundbauteile fertiggestellten Geschossdecke kann somit auf eine aufwändige, abgehängte Unterdecke verzichtet werden.A particularly advantageous further development according to the invention provides that the composite component has at least one installation channel oriented transversely to the longitudinal extension of the composite component and penetrating the wooden webs and the concrete web of the composite component. Several installation ducts are also possible in the composite component according to the invention without static disadvantages. With the help of these installation ducts integrated into the composite component according to the invention, the ceiling space between the upper flange and the lower flange can be fully used for installations of the TGA in the longitudinal and transverse directions. In the case of a floor slab completed with the aid of the composite components according to the invention, a complex, suspended ceiling can thus be dispensed with.
Eine besonders vorteilhafte Ausführungsform gemäß der Erfindung sieht vor, dass mittels mehrerer, längsseitig aneinander anliegender Verbundbauteile eine Bauwerksdecke herstellbar ist.A particularly advantageous embodiment according to the invention provides that a building ceiling can be produced by means of a plurality of composite components abutting one another along their length.
Weiterbildungen gemäß der Erfindung ergeben sich aus der nachfolgenden Beschreibung eines erfindungsgemäßen Ausführungsbeispieles in Verbindung mit den Ansprüchen sowie der Zeichnung. Nachstehend wird die Erfindung anhand eines bevorzugten Ausführungsbeispieles noch näher beschrieben.Further developments according to the invention emerge from the following description of an exemplary embodiment according to the invention in conjunction with the claims and the drawing. The invention is described in more detail below using a preferred embodiment.
Es zeigt:
-
1 ein in einer perspektivischen Seitenansicht dargestelltes Holz-/Beton-Verbundbauteil, wobei mit Hilfe mehrerer, längsseitig aneinander anliegender Verbundbauteile auf einfache Weise eine Geschossdecke herstellbar ist, -
2 das Verbundbauteil aus 1 in einem Querschnitt, -
3 dasVerbundbauteil aus den 1 und2 in einem Längsschnitt, wobei das Verbundbauteil in3 beidseits auf einem Gebäudeabsatz oder dergleichen aufliegt und wobei die beidseits überstehenden Endbereiche eines Obergurts des Verbundbauteiles als Auflager dienen, und -
4 dasVerbundbauteil aus den 1 bis 3 in einer Draufsicht auf den Obergurt, wobei der Obergurt im Bereich eines durch den Untergurt und die den Untergurt mit dem Obergurt verbindenden Holzstege gebildeten Innenraums durchsichtig dargestellt ist.
-
1 a wood / concrete composite component shown in a perspective side view, wherein a floor ceiling can be produced in a simple manner with the aid of several composite components abutting one another along their length, -
2 thecomposite component 1 in a cross section, -
3 the composite component from the1 and2 in a longitudinal section, the composite component in3 rests on both sides on a building shoulder or the like, and the end regions of an upper flange of the composite component protruding on both sides serve as supports, and -
4th the composite component from the1 to3 in a plan view of the upper chord, the upper chord being shown transparent in the area of an interior formed by the lower chord and the wooden webs connecting the lower chord to the upper chord.
In den
Das Verbundbauteil
Der Untergurt
In den
In den
Da der im Wesentlichen durch den Untergurt
Da die Vorspannkraft der Unterspannungen
Eine bevorzugte Verwendung des hier dargestellten Verbundbauteiles
Das hier dargestellte Verbundbauteil
ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDED IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant was generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.
Zitierte PatentliteraturPatent literature cited
- DE 804036 A [0005]DE 804036 A [0005]
Claims (17)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102019107578.5A DE102019107578B4 (en) | 2019-03-25 | 2019-03-25 | Wood / concrete composite component and process for its production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102019107578.5A DE102019107578B4 (en) | 2019-03-25 | 2019-03-25 | Wood / concrete composite component and process for its production |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102019107578A1 true DE102019107578A1 (en) | 2020-10-01 |
DE102019107578B4 DE102019107578B4 (en) | 2021-12-30 |
Family
ID=72612799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102019107578.5A Active DE102019107578B4 (en) | 2019-03-25 | 2019-03-25 | Wood / concrete composite component and process for its production |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102019107578B4 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB374804A (en) * | 1932-01-25 | 1932-06-16 | Gotthilf Olbricht | Improvements in or relating to ferro-concrete floors and ceilings |
DE2727631A1 (en) * | 1977-06-20 | 1979-01-25 | Heinz Dipl Ing Borsdorf | Tension and pressure stressing members anchor unit - has spaced discs with tension and pressure rods support and mortar sheath |
DE2802372A1 (en) * | 1978-01-20 | 1979-07-26 | Heinz Dipl Ing Borsdorf | Flexure girder for composite steel and timber structure - uses steel plugs, end supports and suspension brackets to rigidify structure |
DE3636069A1 (en) * | 1985-10-31 | 1987-05-07 | Andre Graffin | COMPOSED BARS |
DE202009004335U1 (en) * | 2009-03-27 | 2009-07-02 | Merk, Max | Two-shell composite component |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE804036C (en) | 1948-11-23 | 1951-04-16 | Kunz Alfred & Co | Composite beam |
-
2019
- 2019-03-25 DE DE102019107578.5A patent/DE102019107578B4/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB374804A (en) * | 1932-01-25 | 1932-06-16 | Gotthilf Olbricht | Improvements in or relating to ferro-concrete floors and ceilings |
DE2727631A1 (en) * | 1977-06-20 | 1979-01-25 | Heinz Dipl Ing Borsdorf | Tension and pressure stressing members anchor unit - has spaced discs with tension and pressure rods support and mortar sheath |
DE2802372A1 (en) * | 1978-01-20 | 1979-07-26 | Heinz Dipl Ing Borsdorf | Flexure girder for composite steel and timber structure - uses steel plugs, end supports and suspension brackets to rigidify structure |
DE3636069A1 (en) * | 1985-10-31 | 1987-05-07 | Andre Graffin | COMPOSED BARS |
DE202009004335U1 (en) * | 2009-03-27 | 2009-07-02 | Merk, Max | Two-shell composite component |
Also Published As
Publication number | Publication date |
---|---|
DE102019107578B4 (en) | 2021-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1930520B1 (en) | Modular latticework structure made of concrete | |
AT511220A1 (en) | CEILING ELEMENT FOR THE EDUCATION OF BUILDING COVERS | |
DE1434624A1 (en) | Set of components, especially for erecting multi-storey buildings from prefabricated parts | |
EP0164330B1 (en) | Reinforced-concrete floor | |
LU101699B1 (en) | Wood / concrete composite component | |
DE102019107578B4 (en) | Wood / concrete composite component and process for its production | |
WO1997013043A1 (en) | Prefabricated solid-construction modular house | |
DE921283C (en) | Construction element, in particular made of reinforced concrete, or auxiliary construction element made of another material with a joint that is resistant to bending, shear and torsion | |
DE102008022180B3 (en) | Frame corner forming arrangement for roller support in concrete construction, has reinforced concrete wall that is reinforced concrete support, and ends of roller support are provided as double-T-profile that is recessed over frame corner | |
AT520519B1 (en) | Support ceiling node for a reinforced concrete floor and two concrete columns in the storey | |
AT380505B (en) | Prefabricated formwork element | |
AT520529B1 (en) | Support ceiling node for a reinforced concrete floor and two concrete columns in the storey | |
CH712684B1 (en) | Room cell element for the modular structure of a building | |
DE10205205A1 (en) | Wall unit, for construction, has a concrete shell with integrated reinforcements to carry projecting bonding structures at a gap from an insulation shell, for concrete to be poured between them | |
DE2728474B2 (en) | Rigid frame body | |
AT277533B (en) | Building skeleton and procedure for its construction | |
WO2014023289A2 (en) | Device and method for constructing a multistorey building from prefabricated concrete parts | |
DE3819329A1 (en) | Fire-assistant hall structure by a composite steel construction method | |
DE1609701C (en) | Reinforced concrete beams | |
EP2452027A1 (en) | Multifunctional wall component for achieving the earthquake suitability of masonry | |
WO2019118998A1 (en) | Column-ceiling node for a reinforced concrete ceiling and two concrete columns in storey construction | |
DE19636828A1 (en) | Method of constructing stiles for roof and wall boards, etc. | |
EP1338715A1 (en) | Prefabricated panel and method of production | |
DE7420037U (en) | Support for precast constructions | |
DE10035960A1 (en) | Precast concrete part system for manufacturing ceilings and buildings comprises support plates, secondary supports and ceiling elements made from prestressed or singly-reinforced concrete of the same thickness |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R012 | Request for examination validly filed | ||
R082 | Change of representative |
Representative=s name: MAUCHER JENKINS PATENTANWAELTE & RECHTSANWAELT, DE |
|
R016 | Response to examination communication | ||
R016 | Response to examination communication | ||
R018 | Grant decision by examination section/examining division | ||
R020 | Patent grant now final |