DE102017216889A1 - Bar-shaped scaffolding element, scaffolding part with such a scaffolding element and method for mounting such a scaffolding element - Google Patents

Bar-shaped scaffolding element, scaffolding part with such a scaffolding element and method for mounting such a scaffolding element Download PDF

Info

Publication number
DE102017216889A1
DE102017216889A1 DE102017216889.7A DE102017216889A DE102017216889A1 DE 102017216889 A1 DE102017216889 A1 DE 102017216889A1 DE 102017216889 A DE102017216889 A DE 102017216889A DE 102017216889 A1 DE102017216889 A1 DE 102017216889A1
Authority
DE
Germany
Prior art keywords
scaffolding
scaffold
projection
longitudinal axis
recess
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102017216889.7A
Other languages
German (de)
Inventor
Timo Weber
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peri GmbH
Original Assignee
Peri GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Peri GmbH filed Critical Peri GmbH
Priority to DE102017216889.7A priority Critical patent/DE102017216889A1/en
Priority to PCT/EP2018/075758 priority patent/WO2019057957A1/en
Priority to PL18774038.6T priority patent/PL3688250T3/en
Priority to CN201880060788.1A priority patent/CN111183263B/en
Priority to EP18774038.6A priority patent/EP3688250B1/en
Priority to ES18774038T priority patent/ES2922168T3/en
Publication of DE102017216889A1 publication Critical patent/DE102017216889A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/16Struts or stiffening rods, e.g. diagonal rods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/302Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
    • E04G7/303Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect
    • E04G7/305Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect without tying means for connecting the bars or members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/34Scaffolding bars or members with non-detachably fixed coupling elements with coupling elements using positive engagement, e.g. hooks or pins

Abstract

Die Erfindung betrifft ein sich länglich erstreckendes Gerüstelement (18), insbesondere in Form einer Gerüstdiagonalen. Das Gerüstelement (18) kann bevorzugt einenends mittels eines ersten Verbindungselements (30) durch Schwenken des Gerüstelements (18) um seine Längsachse oder um eine Achse parallel zu seiner Längsachse an einer ersten Vorsprungs-Ausnehmung (20) eines Gerüstbauteils verhakt werden. Anderenends kann das Gerüstelement (18) einen Sicherungsbolzen aufweisen, der in eine zweite Vorsprungs-Ausnehmung eines Gerüstbauteils einführbar ist, um eine Verschwenkbarkeit des Gerüstelements (18) um seine Längsachse bzw. eine Achse parallel zu seiner Längsachse zu unterbinden. Der Sicherungsbolzen kann insbesondere durch ein Sicherungselement an dem Gerüstbauteil gesichert werden. Das erste Verbindungselement (30) kann insbesondere hakenförmig ausgebildet sein, wobei ein Vorsprung (24) am freien Ende des ersten Verbindungselements (30) den Rand (26) der ersten Vorsprungs-Ausnehmung (20) hintergreifen kann. Zwischen dem Vorsprung (24) und einem Gerüstelementkörper (36) kann ein Beabstandungsabschnitt vorgesehen sein, der sich von der Längsrichtung des Gerüstelementkörpers (36) weg erstreckt. Der Vorsprung (24) kann sich in rechtwinklig ±20°, insbesondere rechtwinklig ±10°, vorzugsweise rechtwinklig ±5° vom Beabstandungsabschnitt weg erstrecken.The invention relates to a longitudinally extending framework element (18), in particular in the form of a framework diagonal. The scaffold element (18) can preferably be hooked on one end by means of a first connecting element (30) by pivoting the scaffold element (18) about its longitudinal axis or about an axis parallel to its longitudinal axis on a first projection recess (20) of a scaffolding component. At the other end, the scaffold element (18) can have a securing bolt which can be inserted into a second protrusion recess of a scaffold component in order to prevent pivoting of the scaffold element (18) about its longitudinal axis or an axis parallel to its longitudinal axis. The securing bolt can be secured in particular by a securing element on the scaffolding component. The first connecting element (30) may in particular be hook-shaped, wherein a projection (24) at the free end of the first connecting element (30) can engage behind the edge (26) of the first projection recess (20). Between the projection (24) and a skeleton member body (36) may be provided a spacer portion extending away from the longitudinal direction of the skeleton body (36). The projection (24) may extend at right angles ± 20 °, in particular at right angles ± 10 °, preferably at right angles ± 5 ° away from the spacing section.

Description

Die Erfindung betrifft ein stangenförmiges Gerüstelement zur Anbindung an eine erste Vorsprungs-Ausnehmung eines Gerüst-Teils. Die Erfindung betrifft weiterhin ein Gerüst-Teil mit einem solchen Gerüstelement und ein Verfahren zur Montage eines solchen Gerüstelements.The invention relates to a rod-shaped framework element for connection to a first projection recess of a framework part. The invention further relates to a scaffolding part with such a scaffolding element and a method for mounting such a scaffolding element.

Es ist bekannt, einen einfachen Anbindungsmechanismus zur Verbindung eines stangenförmigen Gerüstelements mit einem Gerüstbauteil vorzusehen. Das stangenförmige Gerüstelement kann dabei insbesondere in Form einer Geländerstange oder einer Gerüstdiagonalen ausgebildet sein. Das Gerüstbauteil kann beispielsweise in Form eines Horizontalriegels ausgebildet sein.It is known to provide a simple connection mechanism for connecting a rod-shaped frame element to a frame component. The rod-shaped framework element can be designed in particular in the form of a railing rod or a framework diagonal. The scaffold component can be designed, for example, in the form of a horizontal bar.

Der Anbindungsmechanismus weist typischerweise eine Ausnehmung am stangenförmigen Gerüstelement auf, die auf einen Vorsprung am Gerüstbauteil geführt wird. Ein solcher Anbindungsmechanismus ist beispielsweise aus der DE 20 2008 001 019 U1 , der US 6,006,862 A , der DE 196 33 092 A1 , der DE 10 2004 005 636 A1 , der DE 10 2008 005 814 B4 , der DE 10 2011 014 614 A1 , der EP 0 234 657 A2 , der EP 1 262 611 A2 , der EP 1 589 162 A1 , der GB 901,351 A , der GB 1 242 224 A , der JP 2004-076468 A , der JP 2006-226001 A , der US 2,681,834 A , der US 2,845,307 A und der US 3,323,271 A bekannt geworden. Weiterhin ist aus der DE 1 559 069 A ein Anbindungsmechanismus bekannt geworden, bei dem ein stangenförmiges Gerüstelement an seiner Stirnseite eine keilförmige Öffnung aufweist, in die ein keilförmiger Vorsprung an einem Gerüstbauteil in Form eines Gerüststiels einführbar ist.The attachment mechanism typically has a recess on the rod-shaped frame element, which is guided on a projection on the frame component. Such a connection mechanism is for example from the DE 20 2008 001 019 U1 , of the US 6,006,862 A , of the DE 196 33 092 A1 , of the DE 10 2004 005 636 A1 , of the DE 10 2008 005 814 B4 , of the DE 10 2011 014 614 A1 , of the EP 0 234 657 A2 , of the EP 1 262 611 A2 , of the EP 1 589 162 A1 , of the GB 901,351 A , of the GB 1 242 224 A , of the JP 2004-076468 A , of the JP 2006-226001 A , of the US 2,681,834 A , of the US 2,845,307 A. and the US 3,323,271 A known. Furthermore, from the DE 1 559 069 A a connection mechanism has become known in which a rod-shaped frame element has on its end face a wedge-shaped opening into which a wedge-shaped projection on a frame component in the form of a scaffolding handle can be inserted.

Die bekannten Anbindungsmechanismen weisen den Nachteil auf, dass sie eine aufwändige Mechanik mit beweglichen Bauteilen aufweisen, nur mit hohen Kosten fertigbar sind und/oder bei der Montage mit so viel Platzbedarf bewegt werden müssen, dass eine Montage in beengten Verhältnissen oftmals unmöglich ist.The known connection mechanisms have the disadvantage that they have a complex mechanism with moving components, can only be produced at high costs and / or must be moved during installation with so much space that an assembly in cramped conditions is often impossible.

Insbesondere Gerüstdiagonalen müssen oftmals zu deren Montage weiträumig ausgeschwenkt werden. Dieses Ausschwenken ist jedoch in vielen Fällen aufgrund von anderen Gerüstbauteilen oder Gebäudewänden nicht möglich.In particular, scaffolding diagonals often have to be swung out over a wide area to assemble them. However, this swinging is not possible in many cases due to other scaffolding components or building walls.

Aufgabe der Erfindung ist es daher, ein stangenförmiges Gerüstelement bereit zu stellen, das sowohl konstruktiv einfach ausgebildet und dadurch kostengünstig fertigbar ist als auch auf einfache Art und Weise auf engem Raum montierbar ist. Aufgabe der Erfindung ist es weiterhin, ein Gerüst-Teil mit einem solchen Gerüstelement und ein Verfahren zur Montage eines solchen Gerüst-Teils bereit zu stellen.The object of the invention is therefore to provide a rod-shaped scaffolding element, which is both structurally simple and therefore cost-manufacturable as well as in a simple manner in a small space can be mounted. The object of the invention is further to provide a scaffolding part with such a scaffolding element and a method for assembling such a scaffold part.

Diese Aufgabe wird durch ein Gerüstelement mit den Merkmalen des Anspruchs 1, einem Gerüst-Teil mit den Merkmalen des Anspruchs 12 sowie einem Verfahren zur Montage eines Gerüstelements gemäß Anspruch 14 gelöst. Die abhängigen Ansprüche geben bevorzugte Weiterbildungen wieder.This object is achieved by a scaffold element having the features of claim 1, a scaffold part having the features of claim 12 and a method for assembling a scaffold element according to claim 14. The dependent claims give preferred developments again.

Im Rahmen der vorliegenden Erfindung beziehen sich die Bezeichnungen „oben“, „unten“, „horizontal“, „vertikal“ usw. auf den montierten Zustand des jeweiligen Bauteils. Weiterhin wird unter dem Begriff „quer“ jede nicht parallele oder deckungsgleiche Ausrichtung verstanden.In the context of the present invention, the terms "top", "bottom", "horizontal", "vertical", etc. refer to the mounted state of the respective component. Furthermore, the term "transverse" is understood to mean any non-parallel or congruent alignment.

Die erfindungsgemäße Aufgabe wird somit gelöst durch ein sich länglich erstreckendes Gerüstelement in Form einer Gerüstdiagonalen. Das Gerüstelement weist einen, vorzugsweise rohrförmigen, Gerüstelementkörper auf, an dem im Bereich eines ersten Endes des Gerüstelements ein erstes Verbindungselement angeordnet oder ausgebildet ist. Das erste Verbindungselement weist einen Vorsprung auf, der in eine erste Vorsprungs-Ausnehmung eines Gerüstbauteils einführbar ist, um einen Rand der Vorsprungs-Ausnehmung zu hintergreifen. Der Vorsprung erstreckt sich dabei quer zur Längsachse des Gerüstelementkörpers.The object of the invention is thus achieved by a longitudinally extending framework element in the form of a framework diagonal. The scaffold element has a, preferably tubular, scaffold element body on which a first connecting element is arranged or formed in the region of a first end of the scaffold element. The first connection element has a projection which can be inserted into a first projection recess of a frame component in order to engage behind an edge of the projection recess. The projection extends transversely to the longitudinal axis of the framework element body.

Dies ermöglicht eine Montage des Gerüstelements durch Verschwenken des Gerüstelements um die Längsachse des Gerüstelementkörpers bzw. durch Verschwenken des Gerüstelements um eine Achse, die parallel zur Längsachse des Gerüstelementkörpers verläuft. Der Platzbedarf zur Montage des Gerüstelements ist dadurch minimal. Darüber hinaus ist das Gerüstelement konstruktiv überraschend einfach ausgebildet und dadurch kostengünstig fertigbar.This makes it possible to mount the scaffold element by pivoting the scaffold element about the longitudinal axis of the scaffold element body or by pivoting the scaffold element about an axis that runs parallel to the longitudinal axis of the scaffold element body. The space required for mounting the scaffolding element is minimal. In addition, the framework element is structurally surprisingly simple and thus cost manufacturable.

Der Vorsprung ist vorzugsweise durch einen Beabstandungsabschnitt des ersten Verbindungselements vom Gerüstelementkörper distanziert ausgebildet. Die Längsachse des Vorsprungs kann sich versetzt zur Längsachse des Gerüstelementkörpers erstrecken. Das Gerüstelement ist dadurch besonders einfach zu dessen Montage zum Gerüstbauteil hin verschwenkbar.The protrusion is preferably formed by a spacing section of the first connecting element distanced from the skeleton body. The longitudinal axis of the projection may extend offset relative to the longitudinal axis of the skeleton body. The scaffold element is characterized particularly easy to pivot for mounting it to the scaffold component.

Zusätzlich zur versetzten Ausrichtung der Längsachse des Vorsprungs zur Längsachse des Gerüstelementkörpers kann sich die Längsachse des Vorsprungs in einem Winkel von 90°± 30°, insbesondere in einem Winkel von 90°± 20°, vorzugsweise in einem Winkel von 90°± 10°, zur Längsachse des Gerüstelementkörpers erstrecken.In addition to the offset orientation of the longitudinal axis of the projection to the longitudinal axis of the framework element body, the longitudinal axis of the projection at an angle of 90 ° ± 30 °, in particular at an angle of 90 ° ± 20 °, preferably at an angle of 90 ° ± 10 °, extend to the longitudinal axis of the scaffold element body.

Der Beabstandungsabschnitt ist bevorzugt zusammen mit dem Vorsprung L-förmig ausgebildet. Die Längsachse des Beabstandungsabschnitts kann einen Winkel von 90°± 30°, insbesondere einen Winkel von 90°± 20°, vorzugsweise einen Winkel von 90°± 10°, mit der Längsachse des Gerüstelementkörpers einschließen. Die Längsachse des Vorsprungs kann einen Winkel von 90°± 30°, insbesondere einen Winkel von 90°± 20°, vorzugsweise einen Winkel von 90°± 10°, mit der Längsachse des Beabstandungsabschnitts einschließen.The spacing section is preferably formed together with the projection L-shaped. The longitudinal axis of the spacer section may be an angle of 90 ° ± 30 °, in particular a Angle of 90 ° ± 20 °, preferably an angle of 90 ° ± 10 °, with the longitudinal axis of the framework element body include. The longitudinal axis of the projection may include an angle of 90 ° ± 30 °, in particular an angle of 90 ° ± 20 °, preferably an angle of 90 ° ± 10 °, with the longitudinal axis of the spacer section.

In besonders bevorzugter Ausgestaltung des Gerüstelements ist der Vorsprung starr relativ zum Gerüstelementkörper ausgebildet.In a particularly preferred embodiment of the scaffold element of the projection is rigidly formed relative to the scaffold element body.

Das erste Verbindungselement kann massiv und/oder einstückig ausgebildet sein.The first connection element can be solid and / or integral.

Das erste Verbindungselement ist vorzugsweise an seiner dem Gerüstelementkörper abgewandten Seite abgeflacht oder abgerundet ausgebildet, um das Verschwenken des Gerüstelements zu erleichtern.The first connecting element is preferably flattened or rounded on its side facing away from the framework element body in order to facilitate the pivoting of the framework element.

Der Beabstandungsabschnitt kann zur weiter erleichterten Fertigung bei gleichzeitig hoher Stabilität des Gerüstelements bolzenförmig ausgebildet sein.The spacing section can be designed to be bolt-shaped for further facilitated production while maintaining high stability of the framework element.

Die Fertigung wird weiter vereinfacht, wenn das erste Verbindungselement einen am Beabstandungsabschnitt angeformten U-förmigen Abschnitt aufweist.The production is further simplified if the first connecting element has a U-shaped portion formed on the spacer section.

Das erste Verbindungselement weist vorzugsweise eine quaderförmige Außenkontur auf, die ein Verdrehen des ersten Verbindungselementes verhindert.The first connecting element preferably has a cuboid outer contour, which prevents a rotation of the first connecting element.

Der U-förmige Abschnitt des ersten Verbindungselements ist bevorzugt in einem U-förmigen Abschnitt des Gerüstelementkörpers aufgenommen.The U-shaped section of the first connection element is preferably accommodated in a U-shaped section of the framework element body.

Das Gerüstelement kann im Bereich des ersten Verbindungselements ein zweites Verbindungselement am Gerüstelementkörper aufweisen. Hierdurch können verschieden weit voneinander beabstandete Abschnitte des Gerüst-Teils mittels des Gerüstelements verbunden werden.The scaffold element may have a second connecting element on the scaffold element body in the region of the first connecting element. As a result, different distances from each other spaced portions of the frame part can be connected by means of the scaffolding element.

Die Fertigung des Gerüstelements wird signifikant erleichtert, wenn das zweite Verbindungselement und das erste Verbindungselement gleich ausgebildet sind.The manufacture of the framework element is significantly facilitated if the second connection element and the first connection element are of the same design.

Am zweiten Ende des Gerüstelements kann am Gerüstelementkörper ein Sicherungselement zur Anbindung des Gerüstelements an eine zweite Vorsprungs-Ausnehmung angeordnet oder ausgebildet sein. Das Sicherungselement ist vorzugsweise bewegbar relativ zum Gerüstelementkörper ausgebildet.At the second end of the scaffold element, a securing element for connecting the scaffold element to a second protrusion recess can be arranged or formed on the scaffold element body. The securing element is preferably designed to be movable relative to the framework element body.

Das Gerüstelement kann weiterhin einen Sicherungsbolzen, insbesondere in Form eines Steckbolzens, aufweisen, an dem vorzugsweise das Sicherungselement, insbesondere verschwenkbar, angeordnet ist. Der Sicherungsbolzen kann zur zumindest teilweisen Einführung in eine zweite Vorsprungs-Ausnehmung eines Gerüstbauteils ausgebildet sein, um das Gerüstelement verdrehsicher montiert zu halten.The scaffolding element can furthermore have a securing bolt, in particular in the form of a plug-in bolt, on which the securing element, in particular pivotable, is preferably arranged. The securing bolt can be designed for at least partial introduction into a second projection recess of a scaffold component in order to hold the scaffold element mounted secured against rotation.

Das Gerüstelement kann im Bereich des Sicherungsbolzens einen weiteren Sicherungsbolzen aufweisen, an dem vorzugsweise ein weiteres Sicherungselement, insbesondere verschwenkbar, angeordnet ist. Der weitere Sicherungsbolzen kann zur zumindest teilweisen Einführung in eine zweite Vorsprungs-Ausnehmung eines Gerüstbauteils ausgebildet sein. Mittels des zweiten Sicherungsbolzens können noch mehr unterschiedliche Abstände bzw. Längen mit einem Gerüstelement abgedeckt werden.The scaffolding element may have in the region of the securing bolt a further securing bolt on which preferably a further securing element, in particular pivotable, is arranged. The further securing bolt can be designed for at least partial introduction into a second projection recess of a framework component. By means of the second securing bolt even more different distances or lengths can be covered with a scaffolding element.

Die erfindungsgemäße Aufgabe wird weiterhin gelöst durch ein Gerüst-Teil mit einem Gerüstbauteil, einer ersten Vorsprungs-Ausnehmung und einem zuvor beschriebenen Gerüstelement, wobei das Gerüstelement so an der ersten Vorsprungs-Ausnehmung montiert ist, dass der Vorsprung des ersten Verbindungselements den Rand der ersten Vorsprungs-Ausnehmung hintergreift.The object of the invention is further achieved by a scaffold part with a scaffold component, a first protrusion recess and a scaffold element described above, wherein the scaffold element is mounted on the first protrusion recess, that the projection of the first connecting element, the edge of the first protrusion -Easnehmung engages behind.

In weiter bevorzugter Ausgestaltung des Gerüst-Teils ist die erste Vorsprungs-Ausnehmung in einem Gerüstbauteil vorgesehen, das in Form eines Horizontalverbinders, d.h. eines horizontal anordenbaren bzw. angeordneten Gerüstriegels,ausgebildet ist.In a further preferred embodiment of the framework part, the first projection recess is provided in a frame component which is in the form of a horizontal connector, i. a horizontally arranged or arranged Gerstriegel, is formed.

Die Erfindung betrifft weiterhin ein Gerüst mit einem zuvor beschriebenen Gerüst-Teil.The invention further relates to a scaffold with a scaffold part described above.

Die erfindungsgemäße Aufgabe wird weiterhin gelöst durch ein Verfahren zur Montage eines, insbesondere zuvor beschriebenen, Gerüstelements an einem Gerüstbauteil mit den Verfahrensschritten:

  1. A) Einführen eines ersten Vorsprungs des Gerüstelements in eine erste Vorsprungs-Ausnehmung des Gerüstbauteils;
  2. B) Schwenken des Gerüstelements um die Längsachse des Gerüstelementkörpers oder um eine Achse parallel zum Gerüstelementkörper, sodass der erste Vorsprung den Rand der ersten Vorsprungs-Ausnehmung zumindest abschnittsweise hintergreift.
The object according to the invention is furthermore achieved by a method for mounting a scaffold element, in particular previously described, on a scaffold component with the method steps:
  1. A) inserting a first projection of the framework element into a first projection recess of the framework component;
  2. B) pivoting of the scaffold element about the longitudinal axis of the scaffold element body or about an axis parallel to the scaffold element body, so that the first projection at least partially engages behind the edge of the first protrusion recess.

Das Verfahren weist insbesondere folgenden Verfahrensschritt auf:

  • C) Verschwenken des Gerüstelements um die Längsachse des Beabstandungsabschnitts.
The method has in particular the following method step:
  • C) pivoting of the framework element about the longitudinal axis of the spacer section.

Das Verfahren weist bevorzugt weiterhin folgenden Verfahrensschritt auf:

  • D) Einführen eines Sicherungselements in eine zweite Vorsprungs-Ausnehmung des Gerüst-Teils, um das Gerüstelement beidenends anzubinden und das Gerüstelement um ein Verschwenken um seine Längsachse oder eine Achse parallel zu seiner Längsachse zu sichern.
The method preferably further comprises the following method step:
  • D) inserting a securing element in a second projection recess of the frame part to tie the scaffolding element both ends and to secure the scaffolding element about a pivot about its longitudinal axis or an axis parallel to its longitudinal axis.

Weitere Merkmale und Vorteile der Erfindung ergeben sich aus der nachfolgenden detaillierten Beschreibung mehrerer Ausführungsbeispiele der Erfindung, anhand der Figuren der Zeichnung, die erfindungswesentliche Einzelheiten zeigt sowie aus den Patentansprüchen.Further features and advantages of the invention will become apparent from the following detailed description of several embodiments of the invention, with reference to the figures of the drawing, which shows details essential to the invention and from the claims.

Die in der Zeichnung dargestellten Merkmale sind nicht notwendigerweise maßstäblich zu verstehen und derart dargestellt, dass die erfindungsgemäßen Besonderheiten deutlich sichtbar gemacht werden können. Die verschiedenen Merkmale können je einzeln für sich oder zu mehreren in beliebigen Kombinationen bei Varianten der Erfindung verwirklicht sein.The features illustrated in the drawing are not necessarily to scale and illustrated in such a way that the features of the invention can be made clearly visible. The various features may be implemented individually for themselves or for a plurality of combinations in variants of the invention.

Es zeigen:

  • 1a eine isometrische Ansicht eines ersten Gerüst-Teils mit einem ersten Gerüstelement;
  • 1b eine vergrößerte Teilansicht des ersten Gerüst-Teils aus 1a, die das Befestigen des ersten Gerüstelements an seinem ersten Ende darstellt;
  • 1c eine isometrische Ansicht des ersten Gerüstelements in Alleinstellung, wobei das erste Gerüstelement einen Gerüstelementkörper, einenends ein erstes Verbindungselement und anderenends ein Sicherungselement aufweist;
  • 1d eine vergrößerte Teilansicht des ersten Gerüst-Teils aus 1c im Bereich des ersten Verbindungselements;
  • 1e eine Draufsicht auf das erste Gerüst-Teil mit vollständig montiertem ersten Gerüstelement;
  • 1f eine vergrößerte teilweise Schnittansicht des ersten Gerüst-Teils gemäß 1e im Bereich der Linie F-F;
  • 2a eine isometrische Teilansicht eines zweiten Gerüstelements im Bereich des ersten Verbindungselements, wobei das zweite Gerüstelement im Bereich des ersten Verbindungselements ein zweites Verbindungselement aufweist;
  • 2b eine Draufsicht auf ein Gerüstbauteil mit mehreren Ausnehmungen zur Anordnung mehrerer Gerüstelemente; und
  • 2c eine Draufsicht auf ein zweites Gerüst-Teil mit dem Gerüstbauteil gemäß 2b und zwei daran angeordneten Gerüstelementen.
Show it:
  • 1a an isometric view of a first frame part with a first frame element;
  • 1b an enlarged partial view of the first frame part 1a depicting the fastening of the first scaffolding element at its first end;
  • 1c an isometric view of the first scaffolding element in isolation, said first scaffolding element having a scaffold element body, at one end a first connecting element and at the other end a securing element;
  • 1d an enlarged partial view of the first frame part 1c in the region of the first connecting element;
  • 1e a plan view of the first frame part with fully assembled first frame element;
  • 1f an enlarged partial sectional view of the first frame part according to 1e in the area of the line FF;
  • 2a a partial isometric view of a second scaffolding element in the region of the first connecting element, wherein the second scaffolding element in the region of the first connecting element has a second connecting element;
  • 2 B a plan view of a scaffold component with a plurality of recesses for arranging a plurality of scaffolding elements; and
  • 2c a plan view of a second frame part with the scaffold component according to 2 B and two scaffolding elements arranged thereon.

1a zeigt ein Gerüst-Teil 10 mit vertikalen Gerüststielen 12a, 12b, 12c, 12d. Die Gerüststiele 12a-12d sind mittels Gerüstbauteilen 14a, 14b, hier in Form von Horizontalriegeln, verbunden. Das Gerüstbauteil 14a und das Gerüstbauteil 14b sind insbesondere gleich ausgebildet. Die Gerüstbauteile 14a, 14b sind dabei in, hier rosettenförmige, Anschlussplatten 16a, 16b, 16c, 16d eingesteckt. Die Anschlussplatten 16a-16d sind mit den Gerüststielen 12a-12d verbunden, insbesondere an die Gerüststiele 12a-12d geschweißt. 1a shows a scaffolding part 10 with vertical scaffolding posts 12a . 12b . 12c . 12d , The scaffolding stems 12a - 12d are by means of scaffolding components 14a . 14b , here in the form of horizontal bars, connected. The scaffolding component 14a and the scaffolding component 14b are especially the same. The scaffolding components 14a . 14b are in, here rosette-shaped, connection plates 16a . 16b . 16c . 16d plugged in. The connection plates 16a - 16d are with the scaffold stems 12a - 12d connected, in particular to the scaffolding stems 12a - 12d welded.

Zur Versteifung des Gerüst-Teils 10 ist ein Gerüstelement 18 vorgesehen. Das Gerüstelement 18 ist zur Anbindung seiner beiden Enden an die Gerüstbauteile 14a, 14b ausgebildet. Zur Anbindung des Gerüstelements 18 weist das Gerüstbauteil 14a eine erste Vorsprungs-Ausnehmung 20 und das Gerüstbauteil 14b eine zweite Vorsprungs-Ausnehmung 22 auf.For stiffening the scaffolding part 10 is a scaffolding element 18 intended. The scaffolding element 18 is to connect its two ends to the scaffolding components 14a . 14b educated. For connection of the scaffolding element 18 has the scaffolding component 14a a first projection recess 20 and the scaffolding component 14b a second projection recess 22 on.

1b zeigt das Gerüst-Teil 10 im Bereich der ersten Vorsprungs-Ausnehmung 20. Aus 1b ist ersichtlich, dass das Gerüstelement 18 einen Vorsprung 24 aufweist, der bei der Montage des Gerüstelements 18 den Rand 26 der ersten Vorsprungs-Ausnehmung 20 abschnittsweise hintergreift. Wie durch einen Pfeil 28 angedeutet, erfolgt bei der Montage des Gerüstelements 18 eine Schwenkbewegung des Gerüstelements 18, um den Vorsprung 24 in die erste Vorsprungs-Ausnehmung 20 einzuführen und anschließend das Verhaken des Vorsprungs 24 am Rand 26 zu erreichen. 1b shows the scaffolding part 10 in the region of the first projection recess 20 , Out 1b it can be seen that the framework element 18 a lead 24 having, during assembly of the scaffolding element 18 the edge 26 the first projection recess 20 partially engages behind. As if by an arrow 28 indicated, takes place during assembly of the scaffolding element 18 a pivoting movement of the scaffolding element 18 to the projection 24 in the first projection recess 20 introduce and then the hooking of the projection 24 on the edge 26 to reach.

Der Vorsprung 24 ist Teil eines ersten Verbindungselements 30. Das erste Verbindungselement 30 ist massiv ausgebildet und weist vorzugsweise einen U-förmigen Endabschnitt 32 auf. Der U-förmige Endabschnitt 32 des ersten Verbindungselements 30 ist in einen U-förmigen Endabschnitt 34 eines Gerüstelementkörpers 36 des Gerüstelements 18 eingepasst. Hierdurch wird eine besonders feste, insbesondere drehfeste, aber einfach zu fertigende Verbindung zwischen dem ersten Verbindungselement 30 und dem Gerüstelementkörper 36 geschaffen.The lead 24 is part of a first connection element 30 , The first connection element 30 is solid and preferably has a U-shaped end portion 32 on. The U-shaped end section 32 of the first connecting element 30 is in a U-shaped end section 34 a skeleton body 36 of the scaffolding element 18 fitted. As a result, a particularly strong, in particular rotationally fixed, but easy to be made connection between the first connecting element 30 and the skeleton member body 36 created.

1c zeigt das Gerüstelement 18 mit dem ersten Verbindungselement 30 und einem Sicherungselement 38. Das Sicherungselement 38 ist mittelbar oder unmittelbar an einem Endbereich des Gerüstelementkörpers 36 angeordnet oder ausgebildet, der dem Endbereich des Gerüstelementkörpers 36 mit dem ersten Verbindungselement 30 entgegengesetzt liegt. Das Sicherungselement 38 ist im vorliegenden Fall bewegbar, hier schwenkbar, an einem Sicherungsbolzen 40 angeordnet. Der Sicherungsbolzen 40 kann einen beliebigen Querschnitt, beispielsweise einen mehreckigen Querschnitt, aufweisen. Vorzugsweise weist der Sicherungsbolzen einen kreisförmigen oder ellipsenförmigen Querschnitt auf. Der Sicherungsbolzen 40 kann massiv ausgebildet sein. 1c shows the scaffolding element 18 with the first connecting element 30 and a fuse element 38 , The fuse element 38 is directly or indirectly at an end portion of the skeleton body 36 arranged or formed, which the end portion of the skeleton element body 36 with the first connecting element 30 is opposite. The fuse element 38 is movable in the present case, here pivotable, on a safety pin 40 arranged. The safety bolt 40 may have any cross-section, for example a polygonal cross-section. Preferably, the securing bolt has a circular or elliptical cross-section. The safety bolt 40 can be solid.

1d zeigt den in 1b kreisförmig umrandeten Teil des Gerüstelements 18. 1d verdeutlicht die fingerförmige Ausbildung des ersten Verbindungselements 30 im Bereich des Vorsprungs 24. Der Vorsprung 24 ist durch einen Beabstandungsabschnitt 42 vom Gerüstelementkörper 36 beabstandet. 1d shows the in 1b circular edged part of the scaffolding element 18 , 1d illustrates the finger-like design of the first connecting element 30 in the area of the projection 24 , The lead 24 is by a spacer section 42 from the framework body 36 spaced.

Die Längsachse 44 des Beabstandungsabschnitts 42 schneidet die Längsachse 46 des Vorsprungs 24 in einem Winkel von 90°±30°, insbesondere in einem Winkel von 90°±20°, vorzugsweise in einem Winkel von 90°±10°. Die Längsachse 44 des Beabstandungsabschnitts 42 schneidet weiterhin die Längsachse 48 des Gerüstelementkörpers 36 in einem Winkel von 90°±30°, insbesondere in einem Winkel von 90°±20°, vorzugsweise in einem Winkel von 90°±10°.The longitudinal axis 44 of the spacer section 42 cuts the longitudinal axis 46 of the projection 24 at an angle of 90 ° ± 30 °, in particular at an angle of 90 ° ± 20 °, preferably at an angle of 90 ° ± 10 °. The longitudinal axis 44 of the spacer section 42 continues to cut the longitudinal axis 48 of the skeleton element body 36 at an angle of 90 ° ± 30 °, in particular at an angle of 90 ° ± 20 °, preferably at an angle of 90 ° ± 10 °.

Aus 1d ist weiterhin ersichtlich, dass der Gerüstelementkörper 36 vorzugsweise eine erste Ausnehmung 50 aufweist, die von dem ersten Verbindungselement 30 durchgriffen wird.Out 1d It can also be seen that the framework element body 36 preferably a first recess 50 that of the first connecting element 30 is penetrated.

Fertigung und Montage des Gerüstelements 18 werden erleichtert, wenn der Gerüstelementkörper 36 spiegelsymmetrisch zu einer mittigen Spiegelebene S (siehe 1c) ausgebildet ist, die sich senkrecht zur Längsachse 48 des Gerüstelementkörpers 36 erstreckt.Production and installation of the scaffolding element 18 be facilitated when the skeleton body element 36 mirror-symmetrical to a central mirror plane S (see 1c) is formed, which is perpendicular to the longitudinal axis 48 of the skeleton element body 36 extends.

1e zeigt das Gerüst-Teil 10 (vgl. 1a) mit vollständig montiertem Gerüstelement 18. Das erste Verbindungselement 30 (siehe 1d) des Gerüstelements 18 ist dabei zumindest abschnittsweise in die erste Vorsprungs-Ausnehmung 20 (siehe 1a) eingeführt worden und hintergreift den Rand 26 (siehe 1b) des Gerüstbauteils 14a (siehe 1a). Weiterhin ist das Gerüstelement 18 um die Längsachse 44 des Beabstandungsabschnitts 42 verschwenkt worden. Schließlich ist das Sicherungselement 38 (siehe 1c) durch die zweite Vorsprungs-Ausnehmung 22 (siehe 1a) geführt worden und hintergreift den Rand des Gerüstbauteils 14b (siehe 1a) im Bereich der zweiten Vorsprungs-Ausnehmung 22 (siehe 1a). 1e shows the scaffolding part 10 (see. 1a) with fully assembled scaffolding element 18 , The first connection element 30 (please refer 1d) of the scaffolding element 18 is at least partially in the first projection recess 20 (please refer 1a) been introduced and takes hold of the edge 26 (please refer 1b) of the scaffolding component 14a (please refer 1a) , Furthermore, the scaffolding element 18 around the longitudinal axis 44 of the spacer section 42 been pivoted. Finally, the fuse element 38 (please refer 1c) through the second projection recess 22 (please refer 1a) has been guided and engages behind the edge of the scaffolding component 14b (please refer 1a) in the region of the second projection recess 22 (please refer 1a) ,

Das Gerüstelement 18 ist in Form einer Gerüstdiagonalen ausgebildet.The scaffolding element 18 is designed in the form of a framework diagonal.

1f zeigt das Gerüst-Teil 10 gemäß 1e im Bereich der Line F-F. Aus 1f ist ersichtlich, dass im montierten Zustand des ersten Verbindungselements 30 die lichte Weite der ersten Vorsprungs-Ausnehmung 20 mit einer Spielpassung der (Querschnitts-) Dicke des ersten Verbindungselements 30 im Bereich der ersten Vorsprungs-Ausnehmung 20 entspricht. 1f shows the scaffolding part 10 according to 1e in the area of the line FF. Out 1f it can be seen that in the assembled state of the first connecting element 30 the clear width of the first projection recess 20 with a clearance fit of the (cross-sectional) thickness of the first connecting element 30 in the region of the first projection recess 20 equivalent.

Im Übergangsbereich zwischen dem Vorsprung 24 und dem Beabstandungsabschnitt 42 weist das Verbindungselement 30 einen abgerundeten oder abgeflachten Bereich 52 auf. Hierdurch wird das Einschwenken bzw. Ausschwenken des Gerüstelements 18 zu dessen Montage bzw. Demontage am bzw. vom Gerüstbauteil 14a erleichtert.In the transition area between the projection 24 and the spacer section 42 has the connecting element 30 a rounded or flattened area 52 on. As a result, the pivoting or swiveling out of the scaffolding element 18 for its assembly or disassembly on or from the scaffolding component 14a facilitated.

2a zeigt eine weitere Ausführungsform eines Teils eines Gerüstelements 18a. Das Gerüstelement 18a weist in einem Endbereich des Gerüstelements 18a ein erstes Verbindungselement 30 und ein zweites Verbindungselement 54 auf. Das zweite Verbindungselement 54 ist parallel zur Längsachse 48 eines Gerüstelementkörpers 36 des Gerüstelements 18a versetzt zum ersten Verbindungselement 30 am Gerüsteiementkörper 36 angeordnet oder ausgebildet. Der Gerüstelementkörper 36 weist vorzugsweise eine zweite Ausnehmung 56 auf, die vom zweiten Verbindungselement 54 durchgriffen wird. Besonders bevorzugt sind das erste Verbindungselement 30 und das zweite Verbindungselement 54 gleich ausgebildet. Das Gerüstelement 18a kann wahlweise mittels des ersten Verbindungselements 30 oder des zweiten Verbindungselements 54 an ein Gerüstbauteil 14a (vgl. 1a) angebunden werden, sodass auf einfache Art und Weise verschiedene effektive Verbindungslängen des Gerüstelements 18a erzielbar sind. 2a shows a further embodiment of a part of a scaffolding element 18a , The scaffolding element 18a points in an end region of the scaffold element 18a a first connecting element 30 and a second connecting element 54 on. The second connection element 54 is parallel to the longitudinal axis 48 a skeleton body 36 of the scaffolding element 18a offset to the first connection element 30 on the skeletal body 36 arranged or formed. The skeleton element body 36 preferably has a second recess 56 on, that of the second connecting element 54 is penetrated. Particularly preferred are the first connecting element 30 and the second connecting element 54 the same education. The scaffolding element 18a can optionally by means of the first connecting element 30 or the second connecting element 54 to a scaffolding component 14a (see. 1a) be connected, so in a simple manner different effective connection lengths of the scaffolding element 18a can be achieved.

2b zeigt ein Gerüstbauteil 14a. Das Gerüstbauteil 14a gemäß 2b entspricht dem Gerüstbauteil 14a gemäß 1a. Allerdings weist das Gerüstbauteil 14a gemäß 2b in zumindest einem Endbereich, insbesondere in seinen beiden Endbereichen, jeweils mehr als eine erste Vorsprungs-Ausnehmung 20a, 20b, 20c, 20d, 20e, 20f, insbesondere in jedem Endbereich jeweils genau drei Vorsprungs-Ausnehmungen 20a-20f auf. 2 B shows a scaffolding component 14a , The scaffolding component 14a according to 2 B corresponds to the scaffolding component 14a according to 1a , However, the scaffolding component has 14a according to 2 B in at least one end region, in particular in its two end regions, in each case more than one first projection recess 20a . 20b . 20c . 20d . 20e . 20f , in each case exactly three projection recesses in each end region 20a - 20f on.

2c zeigt ein Gerüst-Teil 10 mit dem Gerüstbauteil 14a gemäß 2b. Das Gerüst-Teil 10 weist weiterhin ein Gerüstbauteil 14b auf. Das Gerüstbauteil 14a und das Gerüstbauteil 14b sind insbesondere gleich ausgebildet. Das Gerüstbauteil 14b weist mehrere zweite Vorsprungs-Ausnehmungen 22a, 22b, 22c, 22d, 22e, 22f auf. Die ersten Vorsprungs-Ausnehmungen 20a-20f ermöglichen zusammen mit den zweiten Vorsprungs-Ausnehmungen 22a-22f die Verbindung der Gerüstbauteile 14a, 14b durch parallele Gerüstelemente 18a, 18b. Die Gerüstelemente 18a, 18b sind vorzugsweise gleich ausgebildet. Das Gerüst-Teil 10 wird hierdurch besonders stabil ausgebildet. 2c shows a scaffolding part 10 with the scaffolding component 14a according to 2 B , The scaffolding part 10 also has a scaffolding component 14b on. The scaffolding component 14a and the scaffolding component 14b are especially the same. The scaffolding component 14b has a plurality of second projection recesses 22a . 22b . 22c . 22d . 22e . 22f on. The first protrusion recesses 20a - 20f allow together with the second projection recesses 22a - 22f the connection of the scaffolding components 14a . 14b by parallel scaffolding elements 18a . 18b , The scaffolding elements 18a . 18b are preferably the same. The scaffolding part 10 This makes it particularly stable.

Bei der Verwendung zweier paralleler Gerüstelemente 18a, 18b werden vorzugsweise die äußeren Vorsprungs-Ausnehmungen 20a, 20c, 22d, 22f bzw. 20d, 20f, 22a, 22c von den Gerüstelementen 18a, 18b belegt. Hierdurch ist rückseitig ein weiteres Gerüstelement 18 (in 2c nicht gezeigt) in den Vorsprungs-Ausnehmungen 20b, 22e bzw. 20e, 22b montierbar. Bei der Verwendung eines einzelnen Gerüstelements 18 (in 2c nicht gezeigt), wird dieses vorzugsweise in den mittleren Vorsprungs-Ausnehmungen 20b, 22e bzw. 20e, 22b montiert.When using two parallel scaffolding elements 18a . 18b are preferably the outer projection recesses 20a . 20c . 22d . 22f respectively. 20d . 20f . 22a . 22c from the scaffolding elements 18a . 18b busy. As a result, there is another scaffolding element on the back 18 (in 2c not shown) in the projection recesses 20b . 22e respectively. 20e . 22b mountable. When using a single scaffolding element 18 (in 2c not shown), this is preferably in the central projection recesses 20b . 22e respectively. 20e . 22b assembled.

Unter Vornahme einer Zusammenschau aller Figuren der Zeichnung betrifft die Erfindung zusammenfassend ein sich länglich erstreckendes Gerüstelement 18, 18a, 18b, insbesondere in Form einer Gerüstdiagonalen. Das Gerüstelement 18, 18a, 18b kann einenends mittels eines ersten Verbindungselements 30 durch Schwenken des Gerüstelements 18, 18a, 18b um seine Längsachse 48 oder um eine Achse, die sich im Wesentlichen parallel zu seiner Längsachse 48 erstreckt, an einer ersten Vorsprungs-Ausnehmung 20, 20a-20f eines Gerüstbauteils 14a, 14b verhakt werden. Anderenends kann das Gerüstelement 18, 18a, 18b einen Sicherungsbolzen 40 aufweisen, der in eine zweite Vorsprungs-Ausnehmung 22, 22a-22f eines Gerüstbauteils 14a, 14b einführbar ist, um eine Verschwenkbarkeit des Gerüstelements 18, 18a, 18b um seine Längsachse 48 bzw. eine Achse parallel zu seiner Längsachse 48 zu unterbinden. Der Sicherungsbolzen 40 kann insbesondere durch ein Sicherungselement 38 an dem Gerüstbauteil 14a, 14b gesichert werden. Das erste Verbindungselement 30 kann insbesondere hakenförmig ausgebildet sein, wobei ein Vorsprung 24 am freien Ende des ersten Verbindungselements 30 den Rand 26 der ersten Vorsprungs-Ausnehmung 20, 20a-20f hintergreifen kann. Zwischen dem Vorsprung 24 und einem Gerüstelementkörper 36 kann ein Beabstandungsabschnitt 42 vorgesehen sein, der sich von der Längsrichtung des Gerüstelementkörpers 36 weg erstreckt. Der Vorsprung 24 kann sich in rechtwinklig ±20°, insbesondere rechtwinklig ±10°, vorzugsweise rechtwinklig ±5° vom Beabstandungsabschnitt 42 weg erstrecken.Taking a synopsis of all figures of the drawing, the invention in summary relates to a longitudinally extending scaffolding element 18 . 18a . 18b , in particular in the form of a framework diagonal. The scaffolding element 18 . 18a . 18b can at one end by means of a first connecting element 30 by pivoting the framework element 18 . 18a . 18b around its longitudinal axis 48 or about an axis that is substantially parallel to its longitudinal axis 48 extends, on a first projection recess 20 . 20a - 20f a scaffolding component 14a . 14b be hooked. Otherwise, the scaffolding element 18 . 18a . 18b a safety bolt 40 having, in a second projection recess 22 . 22a - 22f a scaffolding component 14a . 14b is insertable to a pivoting of the scaffolding element 18 . 18a . 18b around its longitudinal axis 48 or an axis parallel to its longitudinal axis 48 to prevent. The safety bolt 40 can in particular by a securing element 38 on the scaffolding component 14a . 14b be secured. The first connection element 30 may in particular be hook-shaped, with a projection 24 at the free end of the first connecting element 30 the edge 26 the first projection recess 20 . 20a - 20f can engage. Between the projection 24 and a skeleton member body 36 may be a spacing section 42 be provided, which extends from the longitudinal direction of the framework element body 36 extends away. The lead 24 may be at right angles ± 20 °, in particular at right angles ± 10 °, preferably at right angles ± 5 ° from the spacer section 42 extend away.

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 202008001019 U1 [0003]DE 202008001019 U1 [0003]
  • US 6006862 A [0003]US6006862A [0003]
  • DE 19633092 A1 [0003]DE 19633092 A1 [0003]
  • DE 102004005636 A1 [0003]DE 102004005636 A1 [0003]
  • DE 102008005814 B4 [0003]DE 102008005814 B4 [0003]
  • DE 102011014614 A1 [0003]DE 102011014614 A1 [0003]
  • EP 0234657 A2 [0003]EP 0234657 A2 [0003]
  • EP 1262611 A2 [0003]EP 1262611 A2
  • EP 1589162 A1 [0003]EP 1589162 A1 [0003]
  • GB 901351 A [0003]GB 901351 A [0003]
  • GB 1242224 A [0003]GB 1242224 A [0003]
  • JP 2004076468 A [0003]JP 2004076468A [0003]
  • JP 2006226001 A [0003]JP 2006226001 A [0003]
  • US 2681834 A [0003]US 2681834 A [0003]
  • US 2845307 A [0003]US Pat. No. 2,845,307 A [0003]
  • US 3323271 A [0003]US 3323271 A [0003]
  • DE 1559069 A [0003]DE 1559069A [0003]

Claims (14)

Stangenförmiges Gerüstelement (18, 18a, 18b) in Form einer Gerüstdiagonalen zur Anbindung an eine erste Vorsprungs-Ausnehmung (20, 20a-20f) eines Gerüst-Teils (14a, 14b), wobei das Gerüstelement (18, 18a, 18b) Folgendes aufweist: a) Einen sich länglich erstreckenden Gerüstelementkörper (36); b) ein im Bereich eines ersten Endes des Gerüstelements (18, 18a, 18b) angeordnetes oder ausgebildetes erstes Verbindungselement (30) mit einem Vorsprung (24); wobei sich die Längsachse (46) des Vorsprungs (24) quer zur Längsachse (48) des Gerüstelementkörpers (36) erstreckt, sodass der Vorsprung (24) durch Schwenken des Gerüstelementkörpers (36) um dessen Längsachse (48) oder um eine Achse parallel zu dessen Längsachse (48) den Rand (26) der ersten Vorsprungs-Ausnehmung (20, 20a-20f) hintergreifen kann, um das Gerüstelement (18, 18a, 18b) am Gerüst-Teil (10) zu montieren.Bar-shaped scaffolding element (18, 18a, 18b) in the form of a framework diagonal for connection to a first protrusion recess (20, 20a-20f) of a scaffold part (14a, 14b), wherein the scaffold element (18, 18a, 18b) has the following : a) an elongated skeleton member body (36); b) a in the region of a first end of the scaffold element (18, 18 a, 18 b) arranged or formed first connecting element (30) having a projection (24); wherein the longitudinal axis (46) of the projection (24) extends transversely to the longitudinal axis (48) of the framework body (36) such that the projection (24) is pivotable about the frame body (36) about its longitudinal axis (48) or about an axis parallel to the longitudinal axis (48) of which can engage behind the edge (26) of the first projection recess (20, 20a-20f) in order to mount the frame element (18, 18a, 18b) on the frame part (10). Gerüstelement nach Anspruch 1, bei dem sich die Längsachse (46) des Vorsprungs (24) versetzt und in einen Winkel von 90°± 30° zur Längsachse (48) des Gerüstelementkörpers (36) erstreckt.Scaffolding after Claim 1 in that the longitudinal axis (46) of the projection (24) is offset and extends at an angle of 90 ° ± 30 ° to the longitudinal axis (48) of the framework element body (36). Gerüstelement nach Anspruch 1 oder 2, bei dem ein Beabstandungsabschnitt (42) des ersten Verbindungselements (30) zusammen mit dem Vorsprung (24) L-förmig ausgebildet ist.Scaffolding after Claim 1 or 2 in which a spacing section (42) of the first connecting element (30) is L-shaped together with the projection (24). Gerüstelement nach Anspruch 3, bei dem das erste Verbindungselement (30) im Bereich des Übergangs vom Beabstandungsabschnitt (42) zum Vorsprung (24) einen abgeflachten oder abgerundeten Bereich (52) aufweist, um das Verschwenken des Gerüstelements (18, 18a, 18b) zu erleichtern.Scaffolding after Claim 3 in that the first connecting element (30) has a flattened or rounded region (52) in the region of the transition from the spacing section (42) to the projection (24) in order to facilitate the pivoting of the frame element (18, 18a, 18b). Gerüstelement nach Anspruch 3 oder 4, bei dem der Beabstandungsabschnitt (42) bolzenförmig ausgebildet ist.Scaffolding after Claim 3 or 4 in which the spacer portion (42) is bolt-shaped. Gerüstelement nach einem der vorhergehenden Ansprüche, bei dem das erste Verbindungselement (30) eine Außenkontur aufweist, die aufgrund ihres Formschlusses mit dem Gerüstelementkörper (36) eine drehfeste Verbindung mit dem Gerüstelementkörper (36) aufweist.Scaffolding element according to one of the preceding claims, wherein the first connecting element (30) has an outer contour, which due to its positive connection with the skeleton element body (36) has a rotationally fixed connection with the skeleton element body (36). Gerüstelement nach einem der vorhergehenden Ansprüche, bei dem der Gerüstelementkörper (36) im Bereich des ersten Verbindungselements (30) einen U-förmigen Querschnitt aufweist.Scaffolding element according to one of the preceding claims, wherein the skeleton element body (36) in the region of the first connecting element (30) has a U-shaped cross section. Gerüstelement nach einem der vorhergehenden Ansprüche, bei dem das Gerüstelement (18, 18a, 18b) im Bereich des ersten Verbindungselements (30) ein zweites Verbindungselement (54) am Gerüstelementkörper (36) aufweist, um unterschiedlich weit voneinander beabstandete Abschnitte des Gerüst-Teils (10) mit dem Gerüstelement (18, 18a, 18b) verbinden zu können.Scaffolding element according to one of the preceding claims, in which the scaffold element (18, 18a, 18b) has, in the region of the first connecting element (30), a second connecting element (54) on the scaffold element body (36) in order to ensure sections of the scaffold part ( 10) with the scaffold element (18, 18 a, 18 b) to connect. Gerüstelement nach Anspruch 8, bei dem das zweite Verbindungselement (54) und das erste Verbindungselement (30) gleich ausgebildet sind.Scaffolding after Claim 8 in which the second connecting element (54) and the first connecting element (30) are identical. Gerüstelement nach einem der vorhergehenden Ansprüche, bei dem das Gerüstelement (18, 18a, 18b) im Bereich seines zweiten Endes, das dem ersten Ende entgegengesetzt ist, ein bewegbares Sicherungselement (38) zur Anbindung des Gerüstelements (18, 18a, 18b) an eine zweite Vorsprungs-Ausnehmung (22, 22a-22f) des Gerüst-Teils (10) aufweist.Scaffolding element according to one of the preceding claims, wherein the scaffold element (18, 18a, 18b) in the region of its second end, which is opposite the first end, a movable securing element (38) for connecting the scaffold element (18, 18a, 18b) to a second projection recess (22, 22a-22f) of the frame part (10). Gerüstelement nach einem der vorhergehenden Ansprüche, bei dem das Gerüstelement (18, 18a, 18b) einen Sicherungsbolzen (40) aufweist, der in eine zweite Vorsprungs-Ausnehmung (22, 22a-22f) des Gerüst-Teils 10 einführbar ist, um das Gerüstelement (18, 18a, 18b) gegen ein Verschwenken um seine Längsachse (48) oder eine Achse parallel zu seiner Längsachse (48) zu sichern.Scaffolding element according to one of the preceding claims, in which the scaffold element (18, 18a, 18b) has a securing bolt (40) which can be inserted into a second protrusion recess (22, 22a-22f) of the scaffolding part 10, around the scaffolding element (18, 18a, 18b) to prevent pivoting about its longitudinal axis (48) or an axis parallel to its longitudinal axis (48). Gerüst-Teil (10) mit einem Gerüstbauteil (14a, 14b) mit einer ersten Vorsprungs-Ausnehmung (20, 20a-20f) und einem Gerüstelement (18, 18a, 18b) nach einem der vorhergehenden Ansprüche, wobei der Vorsprung (24) des ersten Verbindungselements (30) den Rand (26) der ersten Vorsprungs-Ausnehmung (20, 20a-20f) hintergreift.A scaffolding part (10) comprising a scaffolding member (14a, 14b) having a first protrusion recess (20, 20a-20f) and a scaffolding member (18, 18a, 18b) according to any one of the preceding claims, wherein the protrusion (24) of the first connecting element (30) engages behind the edge (26) of the first projection recess (20, 20a-20f). Gerüst-Teil nach Anspruch 12, bei dem die erste Vorsprungs-Ausnehmung (20, 20a-20f) in einem Gerüstbauteil (14a, 14b) in Form eines Horizontalverbinders ausgebildet ist.Scaffolding part after Claim 12 in which the first projection recess (20, 20a-20f) is formed in a frame component (14a, 14b) in the form of a horizontal connector. Verfahren zur Montage eines Gerüstelements (18, 18a, 18b), insbesondere nach einem der Ansprüche 1 bis 11, an einem Gerüstbauteil (14a, 14b) mit den Verfahrensschritten: A) Einführen eines ersten Vorsprungs (24) des Gerüstelements (18, 18a, 18b) in eine erste Vorsprungs-Ausnehmung (20, 20a-20f) des Gerüstbauteils (14a, 14b); B) Schwenken des Gerüstelements (18, 18a, 18b) um die Längsachse (48) des Gerüstelementkörpers (36) oder um eine Achse parallel zur Längsachse (48) des Gerüstelementkörpers, sodass der erste Vorsprung (24) den Rand (26) der ersten Vorsprungs-Ausnehmung (20, 20a-20f) zumindest abschnittsweise hintergreift.Method for mounting a scaffold element (18, 18a, 18b), in particular according to one of Claims 1 to 11 on a scaffolding component (14a, 14b) with the method steps: A) inserting a first protrusion (24) of the scaffold element (18, 18a, 18b) into a first protrusion recess (20, 20a-20f) of the scaffold component (14a, 14b) ); B) pivoting the scaffold member (18, 18a, 18b) about the longitudinal axis (48) of the scaffold member body (36) or about an axis parallel to the longitudinal axis (48) of the scaffold member body, such that the first protrusion (24) engages the rim (26) of the first Projection recess (20, 20a-20f) engages behind at least in sections.
DE102017216889.7A 2017-09-25 2017-09-25 Bar-shaped scaffolding element, scaffolding part with such a scaffolding element and method for mounting such a scaffolding element Pending DE102017216889A1 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
DE102017216889.7A DE102017216889A1 (en) 2017-09-25 2017-09-25 Bar-shaped scaffolding element, scaffolding part with such a scaffolding element and method for mounting such a scaffolding element
PCT/EP2018/075758 WO2019057957A1 (en) 2017-09-25 2018-09-24 Pole-shaped scaffolding element, scaffolding part having a scaffolding element of this kind and method for mounting a scaffolding element of this kind
PL18774038.6T PL3688250T3 (en) 2017-09-25 2018-09-24 Pole-shaped scaffolding element, scaffolding part having a scaffolding element of this kind and method for mounting a scaffolding element of this kind
CN201880060788.1A CN111183263B (en) 2017-09-25 2018-09-24 Rod-shaped scaffold element, scaffold part with such a scaffold element and method for mounting such a scaffold element
EP18774038.6A EP3688250B1 (en) 2017-09-25 2018-09-24 Pole-shaped scaffolding element, scaffolding part having a scaffolding element of this kind and method for mounting a scaffolding element of this kind
ES18774038T ES2922168T3 (en) 2017-09-25 2018-09-24 Post-shaped scaffolding element, scaffolding part having such a scaffolding element and method for erecting such a scaffolding element

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102017216889.7A DE102017216889A1 (en) 2017-09-25 2017-09-25 Bar-shaped scaffolding element, scaffolding part with such a scaffolding element and method for mounting such a scaffolding element

Publications (1)

Publication Number Publication Date
DE102017216889A1 true DE102017216889A1 (en) 2019-03-28

Family

ID=63683212

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102017216889.7A Pending DE102017216889A1 (en) 2017-09-25 2017-09-25 Bar-shaped scaffolding element, scaffolding part with such a scaffolding element and method for mounting such a scaffolding element

Country Status (6)

Country Link
EP (1) EP3688250B1 (en)
CN (1) CN111183263B (en)
DE (1) DE102017216889A1 (en)
ES (1) ES2922168T3 (en)
PL (1) PL3688250T3 (en)
WO (1) WO2019057957A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190010718A1 (en) * 2015-07-17 2019-01-10 Sistemas Tecnicos De Encofrados, S.A. Diagonal reinforcement for support structures for floor formwork and method for mounting same

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2681834A (en) 1951-10-15 1954-06-22 Howard R Benson Collapsible scaffold and lock therefor
US2845307A (en) 1954-04-19 1958-07-29 Superior Scaffold Company Detachable coupling for scaffold elements
GB901351A (en) 1957-11-16 1962-07-18 John Burton Improvements in or relating to scaffolding systems for use in building construction and the like
US3323271A (en) 1963-03-19 1967-06-06 Mabey & Johnson Ltd Framework systems
DE1559069A1 (en) 1965-06-10 1969-09-11 Karl Sikler & Sohn Scaffolding coupling
GB1242224A (en) 1967-12-09 1971-08-11 Mills Scaffold Co Ltd Improvements in or relating to builders scaffolding
US3693309A (en) * 1970-08-19 1972-09-26 Jacob H Kutchai Shoring system
EP0234657A2 (en) 1986-02-18 1987-09-02 de Leeuw, Petrus Johannes Lambertus Scaffolding system
GB2258998A (en) * 1991-08-24 1993-03-03 Universal Shelving Co Ltd Frame structure
DE19633092A1 (en) 1996-08-16 1998-02-19 Peri Gmbh Removable facade scaffolding
US6006862A (en) 1997-04-07 1999-12-28 Palmer; John Temporary guard rail assembly for scaffolding
EP1262611A2 (en) 2001-05-31 2002-12-04 Tatsuo Ono Improvements in and relating to handrails for scaffolding frames
JP2004076468A (en) 2002-08-21 2004-03-11 Tatsuo Ono Handrail mounting apparatus and handrail post
DE102004005636A1 (en) 2004-02-04 2005-08-25 Hünnebeck GmbH Fixing element used as part of a scaffold, especially a facade scaffolding, is S- or zigzag-shaped
EP1589162A1 (en) 2002-12-02 2005-10-26 Ingenieria de Encofrados y Servicios, S.L. FA4çADE SCAFFOLD
JP2006226001A (en) 2005-02-18 2006-08-31 Sumitomo Metal Steel Products Inc Preceding handrail frame, and method of constructing prefabricated scaffolding
DE202008001019U1 (en) 2008-01-24 2008-04-17 Rux Gmbh Device for arranging struts on scaffolding uprights
DE102008005814B4 (en) 2008-01-24 2009-11-12 Rux Gmbh stand column
DE102011014614A1 (en) 2011-03-21 2012-09-27 Rux Gmbh scaffolding and procedures for creating a scaffolding

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1230190B (en) * 1959-04-25 1966-12-08 Emil Mauritz Huennebeck Dipl I Framework
FR1341262A (en) * 1962-12-14 1963-10-25 Improvements to prefabricated scaffolding
DE10355495A1 (en) * 2003-11-27 2005-07-21 Peri Gmbh Dismountable scaffolding
JP5705647B2 (en) * 2011-04-20 2015-04-22 平和技研株式会社 Temporary strut hardware
CN202882393U (en) * 2012-10-16 2013-04-17 郑其雄 Pitch point connecting structure of inclined draw rod of scaffold
ES2597430B1 (en) * 2015-07-17 2017-07-04 Sistemas Técnicos De Encofrados, S.A. Diagonal reinforcement, for support structures for floor formwork and assembly procedure
DE102017211288A1 (en) * 2017-07-03 2019-01-03 Peri Gmbh Scaffolding element with a connection between components by means of a molding and method for producing the scaffold element
DE102017216255A1 (en) * 2017-09-14 2019-03-14 Peri Gmbh Scaffold, scaffolding and method for setting up a scaffold

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2681834A (en) 1951-10-15 1954-06-22 Howard R Benson Collapsible scaffold and lock therefor
US2845307A (en) 1954-04-19 1958-07-29 Superior Scaffold Company Detachable coupling for scaffold elements
GB901351A (en) 1957-11-16 1962-07-18 John Burton Improvements in or relating to scaffolding systems for use in building construction and the like
US3323271A (en) 1963-03-19 1967-06-06 Mabey & Johnson Ltd Framework systems
DE1559069A1 (en) 1965-06-10 1969-09-11 Karl Sikler & Sohn Scaffolding coupling
GB1242224A (en) 1967-12-09 1971-08-11 Mills Scaffold Co Ltd Improvements in or relating to builders scaffolding
US3693309A (en) * 1970-08-19 1972-09-26 Jacob H Kutchai Shoring system
EP0234657A2 (en) 1986-02-18 1987-09-02 de Leeuw, Petrus Johannes Lambertus Scaffolding system
GB2258998A (en) * 1991-08-24 1993-03-03 Universal Shelving Co Ltd Frame structure
DE19633092A1 (en) 1996-08-16 1998-02-19 Peri Gmbh Removable facade scaffolding
US6006862A (en) 1997-04-07 1999-12-28 Palmer; John Temporary guard rail assembly for scaffolding
EP1262611A2 (en) 2001-05-31 2002-12-04 Tatsuo Ono Improvements in and relating to handrails for scaffolding frames
JP2004076468A (en) 2002-08-21 2004-03-11 Tatsuo Ono Handrail mounting apparatus and handrail post
EP1589162A1 (en) 2002-12-02 2005-10-26 Ingenieria de Encofrados y Servicios, S.L. FA4çADE SCAFFOLD
DE102004005636A1 (en) 2004-02-04 2005-08-25 Hünnebeck GmbH Fixing element used as part of a scaffold, especially a facade scaffolding, is S- or zigzag-shaped
JP2006226001A (en) 2005-02-18 2006-08-31 Sumitomo Metal Steel Products Inc Preceding handrail frame, and method of constructing prefabricated scaffolding
DE202008001019U1 (en) 2008-01-24 2008-04-17 Rux Gmbh Device for arranging struts on scaffolding uprights
DE102008005814B4 (en) 2008-01-24 2009-11-12 Rux Gmbh stand column
DE102011014614A1 (en) 2011-03-21 2012-09-27 Rux Gmbh scaffolding and procedures for creating a scaffolding

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PERI GmbH: PERI UP Rosett Stützturm Aufbau und Verwendungsanleitung für die Regelausführung. 04/2012. D-89259 Weißenhorn, 2012. S. 1, 5, 27, 28. - Firmenschrift *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190010718A1 (en) * 2015-07-17 2019-01-10 Sistemas Tecnicos De Encofrados, S.A. Diagonal reinforcement for support structures for floor formwork and method for mounting same
US10570631B2 (en) * 2015-07-17 2020-02-25 Sistemas Tecnicos De Encofrados, S.A. Diagonal reinforcement for support structures for floor formwork and method for mounting same

Also Published As

Publication number Publication date
CN111183263A (en) 2020-05-19
PL3688250T3 (en) 2022-08-16
EP3688250A1 (en) 2020-08-05
WO2019057957A1 (en) 2019-03-28
EP3688250B1 (en) 2022-06-08
CN111183263B (en) 2022-06-07
ES2922168T3 (en) 2022-09-09

Similar Documents

Publication Publication Date Title
EP2443352B1 (en) Profile bar connection system
DE202011101112U1 (en) fastening device
EP3224429B1 (en) Railing bar and scaffolding having a railing bar
DE202006003836U1 (en) Ceiling formwork system
EP2949833B1 (en) Fastening element for railings for detachable attachment to a frame element, frame element, assembly of a railing and a fixing element and method for fixing and for securing a fastening element
DE212016000072U1 (en) Scaffolding and scaffolding with such a framework part
EP3440281B1 (en) Metal fitting for a toe board of a scaffold
EP3688250B1 (en) Pole-shaped scaffolding element, scaffolding part having a scaffolding element of this kind and method for mounting a scaffolding element of this kind
WO2002087035A1 (en) Sectional steel frame from profiled sections that are screwed together
EP3548678A1 (en) Handrail for scaffolding structures
DE102017216892A1 (en) Scaffolding element for connection to a disk-shaped connection plate and scaffolding part with such a scaffolding element
WO2001073302A2 (en) Tubular element
EP1785550B1 (en) Connection device
DE10112035B4 (en) Safety fence
AT16917U1 (en) Connecting element
EP3561199A1 (en) Connection element for formworks and method of connecting the formworks
DE102019002077A1 (en) Railing device, namely leading railing for a scaffold
EP3130716B1 (en) Wall construction panel and wall building system for exhibition stand construction
DE202020103287U1 (en) Retrofit kit for a window grille
DE102020207149A1 (en) Retrofit kit for a window grille
DE102020132056A1 (en) Railing, modular scaffolding, method of erecting a modular scaffolding, and using a railing in a modular scaffolding
DE19946929A1 (en) Device to connect two adjacent parts of system scaffolding for erections with non-rectangular bases; has connection elements for scaffolding elements with connection piece having connection heads
DE202021106848U1 (en) Modular lattice railing for a French balcony
DE202020105837U1 (en) Rail system for the wall mounting of a switch cabinet and switch cabinet arrangement with such a rail system
DE102019116119A1 (en) SCAFFOLDING KNOTS, SCAFFOLDING ROSETS, SCAFFOLDING HANDLES AND SCAFFOLDING LATCHES AND MANUFACTURING PROCESS FOR A SCAFFOLDING ROSETTE

Legal Events

Date Code Title Description
R163 Identified publications notified
R082 Change of representative