DE102011122687A1 - Method and device for equipping a multilayer solid wood composite component with a respective even-numbered board layer - Google Patents

Method and device for equipping a multilayer solid wood composite component with a respective even-numbered board layer Download PDF

Info

Publication number
DE102011122687A1
DE102011122687A1 DE201110122687 DE102011122687A DE102011122687A1 DE 102011122687 A1 DE102011122687 A1 DE 102011122687A1 DE 201110122687 DE201110122687 DE 201110122687 DE 102011122687 A DE102011122687 A DE 102011122687A DE 102011122687 A1 DE102011122687 A1 DE 102011122687A1
Authority
DE
Germany
Prior art keywords
boards
numbered
odd
board
cross conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE201110122687
Other languages
German (de)
Inventor
Anmelder Gleich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Michael Weinig AG
Original Assignee
Richard Schmidler
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Richard Schmidler filed Critical Richard Schmidler
Priority to DE201110122687 priority Critical patent/DE102011122687A1/en
Priority to EP12705049.0A priority patent/EP2670569A1/en
Priority to PCT/EP2012/000502 priority patent/WO2012104100A1/en
Publication of DE102011122687A1 publication Critical patent/DE102011122687A1/en
Ceased legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27FDOVETAILED WORK; TENONS; SLOTTING MACHINES FOR WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES
    • B27F7/00Nailing or stapling; Nailed or stapled work
    • B27F7/003Nailing or stapling machines provided with assembling means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Forests & Forestry (AREA)
  • Attitude Control For Articles On Conveyors (AREA)
  • Automatic Assembly (AREA)

Abstract

Um beim Erstellen eines Vollholz-Verbundbauteiles (14) wie insbesondere eines Fertighaus-Wandelementes den Problemen bei der Handhabung langer Bretter (12m), die verschwenkt gegenüber den Brettern (12n) einer schon erstellten Bretter-Lage (13.n) auf diese aufzubringen sind, zu entgehen, wird eine ungeradzahlige Lage (13.n) aus schon längsseits vorverbundenen Brettern (12n) von einem bewegbaren Montagetisch (16) übernommen und unter einen Querförderer (21) für die Bretter (12m) der nächsten, nun geradzahligen Lage (13.m) verfahren, die nacheinander auf die vorhandene Lage (13.n) aufgebracht und jeweils sogleich von einem stationären Portal (25) aus mit ihr vernagelt werden. Wo in der ungeradzahligen Lage (13.n) Aussparungen (11) vorgegeben sind, werden die Bretter (12m) für die geradzahligen Lagen (13.m) zu aufeinanderfolgenden Teilbrettern (12mm) getrimmt, die koaxial gleichzeitig, entsprechend auf Lücke, vom Querförderer (21) auf die oberste ungeradzahlige Lage (13.n) aufgebracht werden. Das Beschicken des Querförderers (21) mit den Brettern (12m) beziehungsweise mit der Folge von Teilbrettern (12mm) für die geradzahligen Lagen (13.m) erfolgt, ohne Wendeerfordernisse, in der ausgereiften Transport- und Positionierungstechnologie der Abbundanlagen mittels eines mit einer Kappsäge (30) bestückten Längsförderers (29). So lassen sich Vollholz-Verbundbauteile (14) praktisch beliebig großer Abmessungen in überaus hoher Taktrate fertigen, und das ohne Anfall von Sondermüll für das Einbringen von Fenster- und Türen-Aussparungen (11).In order to create a solid wood composite component (14) such as a prefabricated wall element, the problems with handling long boards (12m), which are pivoted to the boards (12n) of an already created board layer (13.n) to be applied to them to escape, an odd-numbered layer (13.n) made of boards (12n) already connected along the side is taken over by a movable assembly table (16) and placed under a cross conveyor (21) for the boards (12m) of the next, now even-numbered layer (13 .m), which are successively applied to the existing layer (13.n) and nailed to it immediately from a stationary portal (25). Where recesses (11) are specified in the odd-numbered layer (13.n), the boards (12m) for the even-numbered layers (13.m) are trimmed to successive partial boards (12mm) which are coaxially simultaneously, corresponding to the gap, by the cross conveyor (21) are applied to the uppermost odd-numbered layer (13.n). The loading of the cross conveyor (21) with the boards (12m) or with the sequence of partial boards (12mm) for the even-numbered layers (13.m) takes place, without turning requirements, in the mature transport and positioning technology of the joinery systems by means of a miter saw (30) equipped longitudinal conveyor (29). In this way, solid wood composite components (14) of practically any size can be produced at an extremely high cycle rate, and without the occurrence of hazardous waste for the opening of window and door recesses (11).

Description

Die Erfindung betrifft Verfahren und Vorrichtungen gemäß den Oberbegriffen der Hauptansprüche.The invention relates to methods and apparatus according to the preambles of the main claims.

Derartige Vollholz-Verbundbauteile sind aus der DE 20 2006 005 108 U1 für den Fertighausbau vorbekannt, nämlich als Dach-, Decken- und insbesondere Wandelemente. Danach wird auf einem Montagetisch eine erste (und in der Folge jede ungeradzahlige) Lage von nebeneinander liegenden Brettern mittels einer ersten längsseits angreifenden Spanneinrichtung zusammengehalten und dann eine weitere derartige Lage von ebenfalls zueinander parallelen Brettern, verschwenkt gegenüber der schon darunter gelegenen Bretter-Lage, aufgelegt und mittels einer zweiten derartigen Spanneinrichtung zusammengehalten; woraufhin eine mit Nagelautomaten bestückte Brücke über dieser aktuell obersten Lage verfährt, um sie mit der darunter gelegenen Bretter-Lage zu vernageln. Das wiederholt sich für mindestens eine dritte Bretterlage. Gewöhnlich sind jeweils zwei aufeinanderfolgende, miteinander vernagelte Bretter-Lagen orthogonal zueinander orientiert. Weil ein abschließendes Glatthobeln der Oberfläche des so erstellten Verbundbauteiles die Köpfe von Nägeln abscheren kann, werden, für das Verbinden der jeweils beiden obersten Bretter-Lagen miteinander, Stifte mit längs ihren Schäften versetzt umlaufenden Wülsten eingesetzt.Such solid wood composite components are from the DE 20 2006 005 108 U1 for the prefabricated house previously known, namely as roof, ceiling and in particular wall elements. Thereafter, a first (and consequently each odd-numbered) layer of adjacent boards is held together on a mounting table by means of a first longitudinally engaging tensioning device and then another such layer of boards also parallel to each other, pivoted relative to the already located below board position, placed and held together by a second such tensioning device; whereupon a jumper equipped with nailing machines moves over this topmost layer to nailing it to the underlying board layer. This repeats for at least a third board position. Usually two successive, nailed-together board layers are oriented orthogonal to each other. Because a final Glatthobeln the surface of the thus created composite component can shear off the heads of nails, are used for connecting the two uppermost board layers together, pins with their shafts offset along circumferential beads.

Apparativ problematisch ist das Beherrschen der Durchbiegungen und der Schwingungen beim programmgesteuerten Handhaben der einzelnen nacheinander zu einer Lage nebeneinander abzulegenden langen Bretter, die dafür nacheinander aus einem Materialpuffer entnommen und vor ihrem positionsgenauen Absetzen auf die bisher oberste Lage deren Brettern gegenüber auch noch definiert verschwenkt werden müssen. Abgesehen vom Zeitbedarf, beschränkt diese Problematik in der Praxis die Höhe beziehungsweise Länge solcher Vollholz-Verbundbauteile auf typisch eine Größenordnung von bis zu maximal sechs Metern, noch längere Bretter sind nicht mehr handhabbar; weshalb für beispielsweise längere Wände solche Verbundbauteile am Montageort erst noch aufwändig mit weiteren solchen Verbundbauteilen zusammengesetzt werden müssen. Die, zum Vernageln der beiden aktuell obersten Bretter-Lagen miteinander, über das Verbundbauteil zu verfahrende Brücke mit ihren Nagelautomaten samt deren Nagel-Vorratsbehältern stellt eine sehr große Masse dar, weshalb die Brücke zum rechnergesteuerten Anfahren der genau vorgegeben Nagelpositionen nicht besonders schnell beschleunigt und wieder abgebremst werden kann, was den Fertigungstakt zusätzlich zu den Handhabungsproblemen langer Bretter beschränkt. Ein besonderes Problem stellt es darüber hinaus dar, dass beim Freischneiden von Fenstern und Türen aus derartigen, etwa als Außenwände einzusetzenden, Verbundbauteilen erhebliche Mengen an mit Stiften durchsetztem Restholz anfallen. Dieses darf nicht einfach verbrannt werden; das ist Sondermüll, den der Bauherr (oder der Fabrikant) kostenaufwändig entsorgen muss.Apparat problematic is the mastery of the deflections and vibrations in the program-controlled handling of each successively to a position next to abzustegenden long boards, which must be successively removed from a material buffer and before their positionally precise settling on the previously topmost layer of their boards against also still defined must be pivoted , Apart from the time required, this problem in practice limits the height or length of such solid wood composite components to typically a magnitude of up to a maximum of six meters, even longer boards are no longer manageable; which is why, for example, for longer walls, such composite components at the assembly site still have to be complexly assembled with further such composite components. The, for nailing the two currently topmost boards layers to each other on the composite component to be moved bridge with its nailer together with their nail reservoirs represents a very large mass, which is why the bridge for computer-controlled start of precisely specified nail positions not accelerated very quickly and again can be slowed down, which limits the production cycle in addition to the handling problems of long boards. A particular problem it also represents that when clearing windows and doors from such, to be used as external walls, composite components incurred considerable amounts of interspersed with pins waste wood. This must not be burned easily; this is hazardous waste, which the builder (or the manufacturer) must dispose of costly.

In Erkenntnis derartiger Probleme liegt vorliegender Erfindung die technische Problemstellung zugrunde, Vollholz-Verbundbauteile gattungsgemäßer Art technologisch problemlos und mit hoher Taktrate auch in wesentlich größeren Längen herstellen zu können, wobei zugleich Sondermüll wenigstens reduziert werden, vorzugsweise gar nicht anfallen soll.In recognition of such problems, the present invention is based on the technical problem of being able to produce solid wood composite components of the generic type technologically without problems and with a high cycle rate even in much greater lengths, at the same time hazardous waste is at least reduced, preferably not incurred.

Diese Aufgabe ist erfindungsgemäß nach den in den Hauptansprüchen angegebenen wesentlichen Merkmalen gelöst. Danach ist ein programmgesteuert in seiner Ebene und quer zu seiner Ebene bewegbarer Montagetisch vorgesehen, auf den eine erste Lage aus Brettern, die schon jeweils längsseitig miteinander verbundenen, etwa verklebt, sind, in Bretter-Querrichtung übergeben wird. Der so bestückte Montagetisch fährt dann quer zu dieser Übernahmerichtung so weit bis unter das Ablieferungsende eines Querförderers vor, dass dieser das erste Brett der zweiten Bretter-Lage auf den noch rückwärtig unter dem Querförderer vorstehenden Rand der ersten Bretter-Lage aufbringt. Die Winkellage dieses Brettes gegenüber den Brettern der darunter gelegenen Lage ist über den Verlauf des Ablieferungsendes des Querförderers einstellbar; üblicherweise sind die Bretter-Lagen orthogonal zueinander orientiert.This object is achieved according to the essential features specified in the main claims. Thereafter, a programmatically in its plane and transversely to its plane movable assembly table is provided, on which a first layer of boards, which are already connected to each other along the longitudinal side, such as glued, are handed over in the board transverse direction. The assembly table equipped in this way then travels transversely to this picking direction until below the delivery end of a transverse conveyor that it applies the first board of the second board layer to the edge of the first board layer which is still projecting under the cross conveyor. The angular position of this board relative to the boards of the underlying layer is adjustable over the course of the delivery end of the cross conveyor; Usually the board layers are oriented orthogonal to each other.

Das so aufgebrachte erste Brett der aktuell zu erstellenden geradzahligen Lage wird mit der schon darunter gelegenen ungeradzahligen Lage mittels Stiften oder Klammern vernagelt. Dazu kann der Montagetisch programmgesteuert schrittweise in Längsrichtung dieses Brettes – bei einem hinreichend breiten Brett auch in dessen Querrichtung – unter einem Portal verfahren werden, das hinter dem Ablieferungsende des Querförderers stationär installiert und mit mindestens einem Nagelautomaten einschließlich dessen Vorratsbehälter bestückt ist. Zweckmäßiger ist es allerdings, den oder die Nagelautomaten längs ihres stationären Portales zu verfahren, also längs des aktuell aufgebrachten und mit der darunter gelegenen Lage zu vernagelnden Brettes, das dafür vom Montagetisch unter die Nagelautomaten positioniert wurde.The thus applied first board of the current even-to-create position is nailed to the already underneath odd position by means of pins or staples. For this purpose, the assembly table programmatically stepwise in the longitudinal direction of this board - be moved under a portal at a sufficiently wide board in the transverse direction - which is installed stationary behind the delivery end of the cross conveyor and equipped with at least one nailing machine including its reservoir. It is more expedient, however, to move the nailing machine or nippers along its stationary portal, that is to say along the board currently being applied and with the underlying layer to be boarded, which has been positioned for this purpose from the assembly table under the nailing machines.

Wenn das aktuell aufgebrachte Brett so mit der bisher oberen Lage vernagelt ist, fährt der Montagetisch um die Breite des nächstfolgenden Brettes auf Abstand vom Ablieferungsende des Querförderers, und das nächste Brett wird vom Querförderer vor das soeben vernagelte Brett aufgebracht und unter die Nagelautomaten geschoben; und so fort, bis die zuvor oberste, ungeradzahlige Lage nacheinander mit den Brettern dieser geradzahligen Lage komplett belegt und jeweils vernagelt ist.If the currently applied board is nailed to the previously upper layer, the assembly table moves by the width of the next board at a distance from the delivery end of the cross conveyor, and the next board is applied by the cross conveyor in front of the just boarded board and pushed under the nailing machines; and so on, until the previously highest, odd position one after the other with the boards of this even-numbered layer completely occupied and nailed.

Da zum Vernageln des jeweiligen Brettes an vorgegebenen Positionen nun nur der wenigstens eine Nagelautomat bewegt werden muss, weder die große Masse des bestückten Montagetisches noch die große Masse des Portales mit seiner Vernagelungs-Bestückung, können die einzelnen Bretter der nun obersten Lage nacheinander in überaus hoher Taktrate mit der darunterliegenden Bretter-Lage vernagelt werden. Auch die Zufuhr der Bretter aus einem Materialpuffer in ihrer Längsrichtung zum Querförderer und dort in eine exakte Positionierung (zur Übergabe auf den Montagetisch) ist – wie aus der Technologie der Abbundanlagen geläufig – in außerordentlich hoher Taktrate möglich. Mangels Wendeerfordernissen und Durchhängens von Brettern treten bei diesem Handhaben, des bloßen Längstransportes zum Querförderer mit nachfolgendem Querverschieben vom Querförderer auf den Montagetisch, keine die Arbeitstaktfolge bremsenden kinetischen Probleme auf.Since for nailing the respective board at predetermined positions now only the at least one nail machine must be moved, neither the large mass of the assembled assembly table nor the bulk of the portal with his nailing equipment, the individual boards of the topmost layer can successively in very high Clock rate can be nailed to the underlying board location. Also, the supply of boards from a material buffer in its longitudinal direction to the cross conveyor and there in an exact positioning (for transfer to the assembly table) is - as familiar from the technology of joinery - in extremely high clock rate possible. Due to the lack of turning requirements and sagging of boards, there are no kinetic problems that slow down the working cycle in this handling, the mere longitudinal transport to the cross conveyor with subsequent transverse shifting from the cross conveyor to the assembly table.

Die schrittweise Bewegung des belegten Montagetisches unter das Ablieferungsende des Querförderers in eine Position, in der das nächste Brett vor das soeben festgenagelte Brett abgeliefert wird, führt ohne besondere Handhabungserfordernisse unmittelbar dazu, dass das nächste Brett schon in die vernagungsgerechte Position längsseits direkt vor das soeben vernagelte Brett zu liegen kommt. Bei Brettern unterschiedlicher Breite wird, für die jeweils erforderliche Positionierung des Montagetisches hinter das Ablieferungsende des Querförderers, die Breite des nun aufzubringenden Brettes etwa mittels Photozellen oder Laserabtastung vor oder auf dem Querförderer vermessen, wodurch das aktuell nachzuliefernde Brett wieder gerade längsseits gegen das zuvor aufgenagelte Brett der aktuell erstellten geradzahligen Bretter-Lage anliegt.The gradual movement of the occupied assembly table below the delivery end of the cross conveyor to a position in which the next board is delivered before the just nailed board, without any special handling requirements directly to the fact that the next board already in the appropriate position right next to the nailed nailing Brett comes to rest. For boards of different width, the width of the board now to be applied is measured by means of photocells or laser scanning before or on the cross conveyor for each required positioning of the assembly table behind the delivery end of the cross conveyor, whereby the currently nachzuliefernde board just alongside again against the previously nailed board the currently created even-numbered board position is present.

Zweckmäßigerweise ist für das Aufbringen des ersten Brettes einer geradzahligen Lage ein dessen Querbewegung aus dem Querförderer heraus stoppender Stütz-Anschlag am Montagetisch vorgesehen. Das jeweilige Folgebrett dieser geradzahligen Lage läuft dann mit seiner kinetischen Übergabeenergie gegen das zuvor durch seine Vernagelung starr positionierte Brett an, wodurch eine dichte Packung gewährleistet ist. Wenn, etwa unter dem Querförderer oder beim Nagel-Portal, ein stationärer Richt-Anschlag eingerichtet ist, kann der entsprechend abgesenkte Montagetisch mit dem gerade aufgebrachten Brett dagegen vorgefahren werden, um es unmittelbar vor seinem Vernageln noch inniger längsseits an das vorangehend vernagelte Brett anzuschmiegen.Conveniently, for the application of the first board of an even-numbered position of a transverse movement of the cross conveyor out stopping stop stop on the mounting table provided. The respective follow-up board of this even-numbered layer then runs with its kinetic transfer energy against the previously rigidly positioned by its nailing board, creating a dense packing is guaranteed. If, for example, under the cross conveyor or the nail portal, a stationary straightening stop is set up, the corresponding lowered assembly table with the just applied board can be moved against it, just before nailing him intimately alongside to the previously nailed board.

Nachdem so die aktuelle geradzahlige Lage von Brettern nacheinander mit der darunter gelegenen ungeradzahligen Lage bereits vorverbundener Bretter vernagelt ist, wird der Montagetisch zur Übernahme der parallel gefertigten, nun aufzuschiebenden nächsten ungeradzahligen Lage (wiederum aus schon untereinander verbundenen Brettern) um die Stärke jener jüngsten geradzahligen Bretterlage abgesenkt und zurückgefahren.After the current even-numbered layer of planks is successively nailed to the underlying odd-numbered layer of already-connected boards, the assembly table becomes the takeover of the parallel fabricated, now postponed next odd-numbered layer (again from already interconnected boards) by the strength of that recent even-numbered board layer lowered and retracted.

Diese neue Lage wird nun mit der darunter gelegenen geradzahligen Bretter-Lage vernagelt. Das kann zunächst über die gesamte Fläche dieser ungeradzahligen Lage erfolgen, indem der Montagetisch unter dem Nagel-Portal von einem zum nächsten Brett der jüngsten geradzahligen Lage verfahren wird; ehe wieder über den Querförderer das soeben beschriebene Beschicken mit der Bretterfolge für die nächste geradzahlige Lage einsetzt. Kinematisch günstiger ist es jedoch, die aktuelle ungeradzahlige Lage mit der darunter gelegenen geradzahligen Lage immer nur Längs des Brettes zu vernageln, das gerade für die nächste geradzahlige Lage aufgebracht wird. Allerdings müssten eigens dafür Stifte oder Klammern doppelter Eindring-Länge eingeschleust werden, wenn dieses Vernageln durch das aktuelle Brett und die oberste ungeradzahlige Lage hindurch in die jüngste geradzahlige Lage hinein erfolgen sollte. Deshalb wird bevorzugt an der Position des nächsten Brettes der aktuell im Entstehen begriffenen geradzahligen Lage zunächst die ungeradzahlige Lage mit der darunter gelegenen geradzahligen vernagelt und erst auf diese Nagespur dann das Brett für die aktuelle geradzahlige Lage wie vorstehend beschrieben aufgebracht sowie mit der ungeradzahligen Lage vernagelt.This new location is now boarded up with the even-numbered board location underneath. This can be done first over the entire area of this odd position by the assembly table is moved under the nail portal from one to the next board of the youngest even-numbered layer; before again using the transverse conveyor the loading just described with the board sequence for the next even-numbered position. However, it is kinematically more favorable to nailing the current odd-numbered position with the even-numbered layer underneath it only along the length of the board which is being applied just for the next even-numbered layer. However, pins or double-penetration length pegs would have to be inserted specifically if this nailing was to occur through the current board and the top odd-numbered layer into the youngest even layer. Therefore, preferably at the position of the next board of the currently emerging even-numbered position, the odd-numbered layer is nailed to the even-numbered underneath, and then the board for the current even-numbered layer as described above is applied to this nailspare and nailed to the odd-numbered layer.

Vorteilhafterweise ist im Verlaufe des Längsförderers zum Beschicken des Querförderers eine Kappsäge installiert, die am aus dem Materialpuffer in Längsrichtung angelieferten Brett zunächst einen Stirnschnitt ausführt und das Brett dann auf die Länge trimmt, die durch die Länge des Verbundbauteiles vorgegeben ist, insbesondere durch die Anzahl der Bretter bekannter Breite in den ungeradzahligen Bretter-Lagen. Wenn das Verbundbauteil als Wandelement eingesetzt wird, dann entspricht diese Länge der Länge der Wand aus vorverbundenen sogenannten stehenden oder Vertikal-Brettern in den ungeradzahligen Lagen und darauf nacheinander aufgebrachten und durchgenagelten so genannten liegenden oder Horizontal-Brettern in den geradzahligen Lagen.Advantageously, a chop saw is installed in the course of the longitudinal conveyor for loading the cross conveyor, which initially performs a frontal cut on the board delivered from the material buffer in the longitudinal direction and then trims the board to the length which is predetermined by the length of the composite component, in particular by the number of Planks of known width in the odd-numbered plank layers. If the composite component is used as a wall element, then this length corresponds to the length of the wall of preconnected so-called vertical or vertical boards in the odd-numbered layers and successively applied and perforated so-called horizontal or horizontal boards in the even-numbered layers.

Wenn ein längsseits aus dem Materialpuffer über den Längsförderer dem Querförderer zuzuführendes Brett diese vorgegebene Länge nicht erreicht, wird nach dem Trimmschnitt gleich ein Teilbrett der Ergänzungslänge an den Querförderer nachgeschoben. Der übergibt dann die auf Stoß stirnseitig aneinandergrenzenden Bretter gleichzeitig auf die ungeradzahlige, aktuell oberste Lage auf dem Montagetisch, so dass diese Lage wieder über ihre gesamte Länge belegt wird, nun stirnseitig zusammengesetzt aus zwei Teilbrettern.If a long side to be supplied from the material buffer on the longitudinal conveyor to the cross conveyor board does not reach this predetermined length, a part board of the additional length is fed to the cross conveyor immediately after the trimming cut. The then passes on the front end on impact adjacent boards at the same time on the odd, currently topmost position on the assembly table, so that this position is occupied again over its entire length, now the front side composed of two part boards.

Damit der stirnseitig bündige Stoß des nun aus Teilbrettern zusammengesetzten Längsbrettes und dessen Positionierung sichergestellt sind, ist der Querförderer in seinem vorderen, dem Zufuhr-Bereich zweckmäßigerweise mit einer Positioniereinrichtung ausgestattet. Die kann immateriell, als Positionsregelung am Längsförderer, realisiert sein, oder materiell etwa als einstellbarer End- oder Positionier-Anschlag, gegen den das erste Teilbrett anfährt und sich beim Anlaufen des nachfolgenden zweiten Teilbrettes abstützt; ehe dann beide Teilbretter so koaxial positioniert gleichzeitig vom Querförderer auf die aktuell oberste (ungeradzahlige) Bretter-Lage auf dem Montagetisch übergeben werden.Thus, the front side flush joint of the now composed of partial boards longitudinal board and its positioning are ensured, the cross conveyor is conveniently equipped in its front, the supply area with a positioning device. The immaterial can be realized as a position control on the longitudinal conveyor, or material as about adjustable end or positioning stop against which the first part board anfährt and is supported when starting the subsequent second part board; before then both sub-boards are positioned so coaxially at the same time from the cross conveyor to the topmost (odd-numbered) board position on the assembly table.

Wenn die ungeradzahligen Lagen in ihren vorverbundenen stehenden Brettern mit Aussparungen oder dergleichen Öffnungen für das zu erstellende Verbundbauteil, etwa für Fenster oder Türen in Wandbauteilen, angeliefert werden, dann werden diese Aussparungen auch in den geradzahligen Lagen freigespart. Dazu werden vom Längsförderer Teilbretter in Längsflucht nun nicht auf Stoß, sondern auf Lücke im Zufuhrbereich bereitgestellt und vom Querförderer auf die aktuelle obere, ungeradzahlige Lage übergeben. Diese Lücken sind (in Längsrichtung der Bretter der geradzahligen Lagen betrachtet) so lang, wie von der jeweiligen Aussparung in der ungeradzahligen Lage vorgegeben. Für das gegenseitig Positionieren dieser Teilbretter sind mehrere Positioniereinrichtungen vorerwähnter Art längs des Zufuhrbereiches versetzt vorgesehen, wie materielle Positionier-Anschläge, von denen einige bei aufeinander folgendem Zulauf der getrimmten Teilbretter programmgesteuert in den Zufuhrbereich vor den Querförderer hinein bewegt werden. So werden Lücken vorgegebener Längen zwischen einander axial benachbarten Teilbrettern zu deren gleichzeitiger Übergabe mittels des Querförderers sichergestellt, bis gegebenenfalls wieder Bretter über die gesamte Länge der ungeradzahligen Lage nachfolgen.If the odd-numbered layers are delivered in their pre-connected standing boards with recesses or similar openings for the composite component to be created, such as windows or doors in wall components, then these recesses are also cleared in the even-numbered layers. For this purpose, the longitudinal conveyor sub-boards are provided in longitudinal alignment now not on impact, but on the gap in the feed area and transferred from the cross conveyor to the current upper, odd-numbered position. These gaps are (as viewed in the longitudinal direction of the boards of the even-numbered layers) as long as predetermined by the respective recess in the odd-numbered layer. For mutually positioning these sub-boards, a plurality of positioning devices of the aforementioned type are provided offset along the feed area, such as material positioning stops, some of which are moved programmatically in the feed area in front of the cross conveyor in successive feed the trimmed part boards. Thus, gaps of predetermined lengths between axially adjacent part boards are ensured for their simultaneous transfer by means of the cross conveyor, to possibly follow again boards over the entire length of the odd-numbered layer.

Das Nagel-Portal kann zusätzlich mit einem Fräser ausgestattet sein, um bei einem derartigen Wandelement die Innenränder der Türen- und Fensteröffnungen nachzuarbeiten; der Anfall an Spänen ist entsprechend gering, insbesondere fällt dabei kein Sondermüll an. Zweckmäßiger ist es aber, dieses bereits mit seinen Öffnungen erstellte Verbundbauteil für solches Nacharbeiten an einen gesondert betriebenen Werkzeugroboter zu übergeben, um den Montagetisch möglichst rasch wieder zur Aufnahme der ersten Lage des nächstfolgenden Wandelementes oder dergleichen Verbundbauteil verfügbar zu haben.The nail portal may additionally be equipped with a cutter to rework the inner edges of the door and window openings in such a wall element; the accumulation of chips is correspondingly low, in particular no hazardous waste is generated. It is more expedient, however, to transfer this compound component already created with its openings for such reworking to a separately operated tool robot in order to have the assembly table available again as quickly as possible for receiving the first layer of the next wall element or the like composite component.

Zusätzliche Abwandlungen und Weiterbildungen der erfindungsgemäßen Lösung ergeben sich aus den weiteren Ansprüchen und, auch hinsichtlich deren Vorteilen, aus nachstehender Beschreibung eines bevorzugten Realisierungsbeispieles zum Erstellen eines mehrlagigen Wandelementes als dem Vollholz-Verbundbauteil. Die einzige Figur der Zeichnung zeigt, unmaßstäblich auf das Funktionswesentliche abstrahiert skizziert, das Belegen einer vorgefertigten durchbrochenen ungeradzahligen Bretter-Lage mit den Brettern einer geradzahligen Lage unter Aussparen der von der ersten (untersten) Lage vorgegebenen Öffnungen.Additional modifications and developments of the solution according to the invention will become apparent from the other claims and, also with regard to their advantages, from the following description of a preferred implementation example for creating a multilayer wall element than the solid wood composite component. The sole figure of the drawing, sketched out of scale to the functional essentials, shows the occupation of a prefabricated openwork odd-numbered board position with the boards of an even-numbered layer, omitting the openings defined by the first (lowermost) layer.

Eine – in diesem Beispielsfalle mit Fenster- und Türen-Aussparungen 11 ausgestattete – aus längsseits form- oder stoffschlüssig miteinander verbundenen stehenden Lamellen oder Brettern 12n vorgefertigte ungeradzahlige Bretter-Lage 13.n (beginnend mit n = 1) eines mehrlagigen Vollholz-Verbundbauteiles 14 wird mittels einer Transporteinheit 15 in Form etwa eines Gleit- oder Rollentisches oder einer Übergabebrücke auf einen Montagetisch 16 übergeben. Der ist in seiner Ebene und quer zu seiner Ebene programmgesteuert kontinuierlich oder diskontinuierlich verfahrbar. Er fährt quer zur Übergaberichtung 17 mit der aufliegenden ersten Bretter-Lage 13.n (n = 1) gegen wenigstens einen stationären Richt-Anschlag 18 vor, um diese vorgefertigte Lage 13.n, dieser Vorbewegung entgegen, gegen tischfeste Stütz-Anschläge 19 anzudrücken und damit definiert auf dem Montagetisch 16 auszurichten.One - in this example trap with window and door recesses 11 equipped - from longitudinally form- or cohesively interconnected standing lamellae or boards 12n prefabricated, odd-numbered boards 13.n (starting with n = 1) of a multilayer solid wood composite component 14 is by means of a transport unit 15 in the form of a sliding or roller table or a transfer bridge on a mounting table 16 to hand over. In its plane and transversely to its plane, it can be moved continuously or discontinuously under program control. He drives across to the transfer direction 17 with the resting first board situation 13.n (n = 1) against at least one stationary straightening stop 18 before, to this prefabricated location 13.n , against this Vorbewegung against table-fixed support stops 19 and thus defined on the assembly table 16 align.

Daraufhin wird erforderlichenfalls der Montagetisch 16 um die Bretterstärke der nächsten, nun geradzahligen Bretter-Lage 13.m (beginnend mit m = 2) abgesenkt. Das erste Brett 12m dieser nächsten Lage 13.2 wird mittels eines Querförderers 21 über dessen rückwärtiges Ablieferungsende 22 hinaus, quer zu den Brettern 12n der ersten Lage 13.1 orientiert, auf jene ungerade Lage 13.1 aufgebracht. Der Montagetisch 16 ist dafür in eine Position zurückgefahren, die um wenigstens die Breite der Bretter 12m hinter dem Ablieferungsende 22 des Querförderers 21 liegt. Dieser weist bevorzugt ein geneigtes Gleitbett 23 unter wenigstens einem, vorzugsweise wie skizziert unter mehreren einander benachbarten, umlaufenden Mitnahme-Riemen 24 auf. Aufgrund seiner kinetischen Energie bewegt das erste der Bretter 12m sich über die Lage 13.1 hinweg bis zur Anlage gegen die Stütz-Anschläge 19. Das kann durch einen vorübergehend nach rückwärts geneigten Montagetisch 16 gefördert werden, zweckmäßiger kann es aber sein, die exakte Ausrichtung dieses ersten der Bretter 12m erforderlichenfalls dadurch sicherzustellen, das der Montagetisch 16 nun mit diesem ersten Brett 12m einmal gegen die stationären Richt-Anschläge 18 vor- und dann zum Vernageln des Brettes 12m mit der darunter gelegen Lage 13.n wieder zurückgefahren wird.Then, if necessary, the mounting table 16 around the board thickness of the next, now even-numbered board position 13.m lowered (starting with m = 2). The first board 12m this next situation 13.2 is by means of a cross conveyor 21 beyond its backward delivery end 22 out, across the boards 12n the first location 13.1 oriented, to that odd situation 13.1 applied. The assembly table 16 has moved back to a position that at least the width of the boards 12m behind the delivery end 22 of the cross conveyor 21 lies. This preferably has a sloping sliding bed 23 under at least one, preferably as outlined below a plurality of mutually adjacent, circumferential drive belt 24 on. Due to its kinetic energy moves the first of the boards 12m about the situation 13.1 away until it rests against the support stops 19 , This can be done by temporarily tilting the mounting table backwards 16 It may be more convenient, however, the exact orientation of this first of the boards 12m if necessary, ensure that the assembly table 16 now with this first board 12m once against the stationary attacks 18 before and then to nail the board 12m with the location below 13.n is driven back again.

Dazu wird dieses Brett 12m mittels des programmgesteuerten Montagetisches 16 unter einem hinter dem Querförderer-Ablieferungsende 22 stationär vorgesehenen Portal 25 positioniert, das mit wenigstens einem hier so genannten Nagelautomaten 26 samt Vorratsbehälter 27 für seine Stifte (Nagel) oder Klammern (Krampen) längsverfahrbar bestückt ist. Die Nagelautomaten 26 werden am Portal 25 programmgesteuert längs des darunter positionierten, aktuell zu vernagelnden Brettes 12m verfahren. Der Montagetisch 16 kann das Brett 12m dann vor- oder zurückbewegen, wenn, bei einem breiten Brett, eine zusätzliche Nagelspur parallel zur vorangegangenen gezogen werden soll. So wird das Brett 12m an allen vorprogrammierten Positionen mit der darunter gelegen ungeradzahligen Lage 13.n, form- und kraftschlüssig verwölbungssicher, verbunden.This will be this board 12m by means of the program-controlled assembly table 16 below one behind the cross conveyor delivery finish 22 stationary provided portal 25 positioned, with at least one here called nailing machine 26 including storage container 27 for his pins (nail) or staples (staples) is longitudinally movable equipped. The nailing machines 26 be on the portal 25 programmatically along the currently positioned, currently boarded board 12m method. The assembly table 16 can the board 12m then move forwards or backwards, if, with a wide board, an additional nail track should be drawn parallel to the previous one. This is how the board works 12m at all pre-programmed positions with the odd location underneath 13.n , positive and non-locking buckling proof, connected.

Zur Aufnahme des nächstfolgenden der über den Querförderer 21 nachgelieferten der Bretter 12m wird der Montagetisch 16 sodann in die der Breite der Bretter 12m entsprechende Stellung hinter dem Ablieferungsende 22 des Querförderers 21 gefahren. Dieses nächste der Bretter 12m stützt sich längsseitig gegen das soeben vernagelte Brett 12m ab und kann durch Anfahren gegen die Richt-Anschläge 18 zusätzlich längsseits angepresst werden, ehe es wie zuvor beschrieben unter dem Portal 25 vernagelt wird; und so fort.To accommodate the next following via the cross conveyor 21 redelivered of the boards 12m becomes the assembly table 16 then into the width of the boards 12m appropriate position behind the delivery end 22 of the cross conveyor 21 hazards. This next one of the boards 12m Leaning against the just nailed board 12m off and can by approaching the Richt-attacks 18 in addition to be pressed alongside, before it as described above under the portal 25 is nailed; and so on.

Die einzelnen Bretter 12m der geradzahligen Lagen 13.m werden nacheinander, etwa aus einem Materialpuffer 28 vereinzelt, auf einen Längsförderer 29 übergeben und an einer Kappsäge 30 vorbeigeführt, um sie nach einem sauberen Stirnschnitt auf die von den ungeradzahligen Lagen 13.n vorgegebene Länge zu trimmen. So zugeschnitten werden die Bretter 12m nacheinander, weiterhin stabil auf dem Längsförderer 29 aufliegend, in Längsrichtung bis zu einem einstellbaren Positionier-Anschlag 31 am Ende des Zufuhrbereiches 32 des Querförderers 21 vorbewegt. Dort wird dieses Brett 12m – erforderlichenfalls nach einleitendem Querimpuls mittels eines Rüttlers oder eines Lineals – von den Riemen 24 ergriffen und wie beschrieben über das Ablieferungsende 22 auf die ungeradzahlige Lage 13.n übergeben.The individual boards 12m the even-numbered layers 13.m are successively, for example from a material buffer 28 isolated, on a longitudinal conveyor 29 handed over and on a chop saw 30 passed them to them after a clean forehead cut on those from the odd-numbered layers 13.n to trim the given length. How to cut the boards 12m successively, still stable on the longitudinal conveyor 29 lying, in the longitudinal direction up to an adjustable positioning stop 31 at the end of the feed area 32 of the cross conveyor 21 advanced. There will be this board 12m - if necessary after initial cross-impulse by means of a vibrator or a ruler - of the belt 24 taken and as described on the delivery end 22 on the odd position 13.n to hand over.

In der Zeichnungsskizze ist berücksichtigt, dass in den Brettern 12n der ungeradzahligen Lagen 13.n etwa eines Wandelementes freigesparte Aussparungen 11 nicht durch darüber zu nagelnde Bretter 12m der nächsten Lage 13m wieder verschlossen werden sollen. Deshalb werden die entsprechenden Bretter 12m nicht einstückig aufgebracht, sondern – mittels der Kappsäge 30 getrimmt – als zueinander axial distanzierte Teilbretter 12mm. Der, der Breite einer Aussparung 11 entsprechende, lichte Abstand zwischen axial einander benachbarten Teilbrettern 12mm wird durch programmgesteuert in den Zufuhrbereich 32 des Querförderers 21 hineinragende weitere der Positionier-Anschläge 31 gewährleistet. Die so zueinander distanzierten Teilbretter 12mm werden dann gleichzeitig von den Riemen 24 des Querförderers 21 erfasst und auf die Lage 13.n übergeben. Die Bewegung der Nagelautomaten 26 wird dann so gesteuert, dass sie nur über die Längen der Teilbretter 12mm unter dem Portal 25 zur Wirkung gelangen.In the drawing sketch is taken into account that in the boards 12n the odd-numbered layers 13.n about a wall element freigesparte recesses 11 not by boards to be nailed over 12m the next location 13m should be closed again. Therefore, the corresponding boards 12m not applied in one piece, but - by means of the chop saw 30 trimmed - as mutually axially spaced partial boards 12mm , The, the width of a recess 11 corresponding, clear distance between axially adjacent part boards 12mm is programmatically in the feed area 32 of the cross conveyor 21 protruding further of the positioning stops 31 guaranteed. The so distant parts boards 12mm then be simultaneously from the straps 24 of the cross conveyor 21 recorded and on the location 13.n to hand over. The movement of nailing machines 26 is then controlled so that it only over the lengths of the sub-boards 12mm under the portal 25 come to effect.

Wenn so die Lage 13.2 aus Brettern 12m nacheinander über den Querförderer 21 auf die vorgefertigt übernommene Lage 13.1 aufgebracht und unter dem Nagelportal 25 mit ihr verbunden ist, fährt der Montagetisch 16 ganz zurück, um die unterdessen gefertigte nächste ungeradzahlige Lage 13.n + 2 = 13.3 auf die soeben erstellte Lage 13.m (m = 2) zu übernehmen. Daraufhin querverfahren unter das Portal 25 wird diese neue ungeradzahlige Lage 13.3 dort mit der vorangehenden geradzahligen Lage 13.2 verbunden, wo anschließend das erste Brett 12m der nächsten Lage 13.m (m = 4) aufgebracht und mit der Lage 13.3 vernagelt wird; und so fort.If so the location 13.2 from boards 12m successively over the cross conveyor 21 on prefabricated position taken 13.1 applied and under the nail portal 25 is connected to her, drives the assembly table 16 all the way back to the next odd-numbered position made meanwhile 13.n + 2 = 13.3 on the situation just created 13.m (m = 2). Then cross process under the portal 25 this will be new odd location 13.3 there with the preceding even-numbered position 13.2 where then the first board 12m the next location 13.m (m = 4) applied and with the location 13.3 is nailed; and so on.

In gleicher Weise kann wenigstens ein weiteres Paar von Lagen 13n13m aufgebracht werden. Das aus der vorgegebenen, gewöhnlich ungeradzahligen Anzahl von Lagen 13n + 13m + 13n fertiggestellte Verbundbauteil 14 wird dann abgeliefert, um eventuell lediglich noch eine leichte Fertigbearbeitung der Innenränder der Aussparungen 11 z. B. mittels eines Fräsroboters zu erfahren.In the same way, at least one other pair of layers 13n - 13m be applied. That from the given, usually odd number of layers 13n + 13m + 13n finished composite component 14 is then delivered to possibly only a slight finishing of the inner edges of the recesses 11 z. B. by means of a milling robot.

Um beim Erstellen eines Vollholz-Verbundbauteiles 14 wie insbesondere eines Fertighaus-Wandelementes den Problemen bei der Handhabung langer Bretter 12m, die verschwenkt gegenüber den Brettern 12n einer schon erstellten Bretter-Lage 13.n auf diese aufzubringen sind, zu entgehen, wird also erfindungsgemäß eine ungeradzahlige Lage 13.n aus schon längsseits untereinander vorverbundenen so genannten stehenden Brettern 12n von einem dreiachsig bewegbaren Montagetisch 16 übernommen und unter einen Querförderer 21 für die so genannten liegenden Bretter 12m der nächsten, nun geradzahligen Lage 13.m verfahren, die nacheinander auf die vorhandene Lage 13.n aufgebracht und jeweils sogleich mit ihr vernagelt werden. Um die Probleme beim Bewegen großer Massen wie einer mit Nagelautomaten 26 samt ihren Vorratsspeichern 27 bestückten, verfahrbaren Brücke zu entgehen, wird das aktuell zu vernagelnde Brett 12m – und später auch die nächste übernommene ungeradzahlige Lage 13.n + 2 an der Position eines aufzubringenden Brettes 12m – mittels des Montagetisches 16 unter die längs des Brettes 13m verfahrbaren Nagelautomaten 26 eines stationären Portales 25 verfahren. Wo in der ungeradzahligen Lage 13.n Aussparungen 11 vorgegeben sind, werden die Bretter 12m für die geradzahligen Lagen 13.m zu distanziert aufeinanderfolgenden Teilbrettern 12mm getrimmt, die koaxial gleichzeitig, entsprechend auf Lücke, vom Querförderer 21 auf die aktuelle ungeradzahlige Lage 13.n aufgebracht werden. Das Beschicken des Querförderers 21 mit den Brettern 12m beziehungsweise mit der Folge von Teilbrettern 12mm für die geradzahligen Lagen 13.m erfolgt ohne Wendeerfordernisse in der ausgereiften Transport- und Positionierungstechnologie der Abbundanlagen mittels eines mit einer Kappsäge 30 bestückten Längsförderers 29. So lassen sich aufgrund der erfindungsgemäßen Maßnahmen Vollholz-Verbundbauteile 14 praktisch beliebig großer Abmessungen in überaus schneller Taktrate fertigen, und das ohne Anfall von Sondermüll für ein nachträgliches Einbringen von Fenster- und Türen-Aussparungen 11.To create a solid wood composite component 14 such as in particular a prefabricated house wall element the problems in handling long boards 12m that pivoted against the boards 12n an already created board situation 13.n To be applied to this, to escape, so according to the invention is an odd number 13.n from already alongside each other vorverbundenen so-called standing boards 12n from a three-axis movable assembly table 16 taken over and under a cross conveyor 21 for the so-called lying boards 12m the next, now even-numbered situation 13.m proceed in succession to the existing situation 13.n applied and nailed with her at once. To the problems of moving large masses like one with nails 26 along with their stockpiles 27 The board that is currently being boarded up will be bypassed if it is equipped with a movable, movable bridge 12m - and later the next adopted odd position 13.n + 2 at the position of a board to be applied 12m - by means of the assembly table 16 under the length of the board 13m movable nailing machine 26 a stationary portal 25 method. Where in the odd location 13.n recesses 11 are given, the boards are 12m for the even-numbered layers 13.m to distant successive part boards 12mm trimmed, coaxial at the same time, corresponding to gap, from the cross conveyor 21 on the current odd-numbered position 13.n be applied. Loading the cross conveyor 21 with the boards 12m or with the consequence of partial boards 12mm for the even-numbered layers 13.m takes place without turning requirements in the advanced transport and positioning technology of the joinery by means of a chop saw 30 equipped longitudinal conveyor 29 , Thus, due to the inventive measures solid wood composite components 14 produce almost any size in extremely fast cycle rate, and without the accumulation of hazardous waste for subsequent insertion of window and door recesses 11 ,

BezugszeichenlisteLIST OF REFERENCE NUMBERS

1111
Aussparung (in 13n, 14)Recess (in 13n . 14 )
1212
Bretter (stehende 12n, liegende 12m)Boards (standing 12n , lying 12m )
1313
Lagen (ungeradzahlige 13.n, geradzahlige 13.m) aus 12n12m Layers (odd 13.n , even-numbered 13.m ) out 12n - 12m
1414
Verbundbauteil (aus 13.n und 13.m)Composite component (out 13.n and 13.m )
1515
Transporteinheit (für 13.n aus 12n, nach 16)Transport unit (for 13.n out 12n , to 16 )
1616
Montagetisch (für 13, 14)Assembly table (for 13 . 14 )
1717
Übergaberichtung (für 13.n von 15 nach 16)Transfer direction (for 13.n from 15 to 16 )
1818
Richt-Anschlag (unter 21)Straightening stop (under 21 )
1919
Stütz-Anschlag (auf 16)Support Stop (on 16 )
2020
2121
Querförderer (für 12m, 12mm)Cross conveyor (for 12m . 12mm )
2222
Ablieferungsende (hinter 21, nach 16 mit 13.n hin)Delivery end (behind 21 , to 16 With 13.n out)
2323
Gleitbett (von 21)Sliding bed (from 21 )
2424
Riemen (über 23)Belt (over 23 )
2525
Portal (stationär hinter 22)Portal (stationary behind 22 )
2626
Nagelautomat (an 25)Nailing machine (on 25 )
2727
Vorratsspeicher (für 26 an 25)Storage memory (for 26 at 25 )
2828
Materialpuffer (vor 29, für 12m)Material buffer (before 29 , For 12m )
2929
Längsförderer (für 12m, 12mm)Longitudinal conveyor (for 12m . 12mm )
3030
Kappsäge (im Verlaufe von 29 für 12m, 12mm)Chop saw (in the course of 29 For 12m . 12mm )
3131
Positionier-Anschlag (bei 32, für 12m, 12mm)Positioning stop (at 32 , For 12m . 12mm )
3232
Zufuhrbereich (vor 21, für 12m, 12mm)Feed area (before 21 , For 12m . 12mm )

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 202006005108 U1 [0002] DE 202006005108 U1 [0002]

Claims (10)

Verfahren zum Bestücken eines mehrlagigen Vollholz-Verbundbauteiles (14) mit einer jeweils geradzahligen Lage (13.m) untereinander parallel orientierter, gegenüber den Brettern (12n) der vorangehenden ungeradzahligen Lage (13.n) verschwenkter Bretter (12m) unter kraft- und formschlüssigem Verbinden jeweils aufeinander liegender Lagen-Paare (13.1 + 13.2, 13.2 + 13.3) mittels eines Nagelautomaten (26) auf einem Montagetisch (16), dadurch gekennzeichnet, dass auf den Montagetisch (16) eine ungeradzahlige Lage (13.n; n = 1, 3, ...) aus untereinander vorverbundenen Brettern (12n) übergeben und unter das Ablieferungsende (22) eines Querförderers (21) für verschwenkt gegenüber den Brettern (12n) orientierte Bretter (12m) einer geradzahligen Bretter-Lage (13.m) verfahren wird, die nacheinander auf die oberste ungeradzahlige Lage (13.n) aufgebracht und jeweils mit dieser bei einem stationären Portal (25) hinter dem Querförderer (21) vernagelt werden, bis eine geradzahlige Lage (13.m; m = 2, 4, ...) erreicht ist, auf welche die unterdessen erstellte nächstfolgende der ungeradzahligen Lagen (13.n + 2 = 13.3) aufgebracht und bei dem Portal (25) mit den Brettern (12m) der darunter gelegenen geradzahligen Lage (13.m = 13.2) vernagelt wird, wobei die Folge der auf Länge getrimmten Bretter (12m) mittels eines Längsförderers (29) vor den Querförderer (21) überbracht wird.Method for equipping a multilayer solid wood composite component ( 14 ) with an even-numbered layer ( 13.m ) oriented parallel to each other, opposite the boards ( 12n ) of the preceding odd-numbered position ( 13.n ) pivoted boards ( 12m ) under frictional and positive connection of each successive layer pairs ( 13.1 + 13.2 . 13.2 + 13.3 ) by means of a nailing machine ( 26 ) on a mounting table ( 16 ), characterized in that on the assembly table ( 16 ) an odd position ( 13.n ; n = 1, 3, ...) from interconnected boards ( 12n ) and below the delivery end ( 22 ) of a cross conveyor ( 21 ) for pivoted against the boards ( 12n ) oriented boards ( 12m ) of an even-numbered board layer ( 13.m ) successively to the uppermost odd-numbered position ( 13.n ) and in each case with this at a stationary portal ( 25 ) behind the cross conveyor ( 21 ) until an even position ( 13.m ; m = 2, 4, ...) is reached, to which the meanwhile created next of the odd-numbered layers ( 13.n + 2 = 13.3 ) and at the portal ( 25 ) with the boards ( 12m ) of the underlying even layer ( 13.m = 13.2 ), the sequence of boards trimmed to length ( 12m ) by means of a longitudinal conveyor ( 29 ) in front of the cross conveyor ( 21 ) is delivered. Verfahren nach dem vorangehenden Anspruch, dadurch gekennzeichnet, dass der Montagetisch (16) vorübergehend bis gegen einen stationären Richt-Anschlag (18) für die ungeradzahligen Lagen (13.n) beziehungsweise für die aufeinanderfolgenden Bretter (12m) einer geradzahligen Lage (13.m) vorgefahren wird.Method according to the preceding claim, characterized in that the assembly table ( 16 ) temporarily until against a stationary straightening stop ( 18 ) for the odd-numbered layers ( 13.n ) or for the successive boards ( 12m ) of an even position ( 13.m ) is driven forward. Verfahren nach dem vorangehenden Anspruch, dadurch gekennzeichnet, dass die übernommene ungeradzahlige Lage (13.n) und danach das erste darauf verbrachte der Bretter (12m) der nächsten geradzahligen Lage (13.m) gegen einen montagetischfesten Stütz-Anschlag (19) zurückgeschoben werden.Method according to the preceding claim, characterized in that the assumed odd-numbered position ( 13.n ) and then the first of the boards ( 12m ) of the next even position ( 13.m ) against a mounting table fixed support stop ( 19 ) are pushed back. Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass der Montagetisch (16) mit dem schon auf die ungeradzahlige Lage (13.n) genagelten ersten Brett (12m) zu Aufnahme des nächstfolgenden der Bretter (12m) in eine Position hinter dem Ablieferungsende (22) des Querförderers (21) gefahren wird, die der Breite des Folgebrettes (12m) vor dem zuvor aufgenagelten Brett (12m) entspricht.Method according to one of the preceding claims, characterized in that the assembly table ( 16 ) with the already on the odd position ( 13.n ) nailed first board ( 12m ) to take up the next of the boards ( 12m ) to a position behind the delivery end ( 22 ) of the cross conveyor ( 21 ), the width of the follower board ( 12m ) in front of the previously nailed board ( 12m ) corresponds. Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass der Längsvorschub des Brettes (12m) in den Zufuhrbereich (32) des Querförderers (21) bis gegen einen materiellen oder immateriellen Positionier-Anschlag (31) erfolgt.Method according to one of the preceding claims, characterized in that the longitudinal feed of the board ( 12m ) into the feed area ( 32 ) of the cross conveyor ( 21 ) until a material or immaterial positioning stop ( 31 ) he follows. Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass ein liegendes Brett (12m) in mehrere gleichzeitig in den Querförderer (21) übergebene, stirnseitig aufeinanderfolgend kürzer getrimmte Teilbretter (12mm) unterteilt wird.Method according to one of the preceding claims, characterized in that a lying board ( 12m ) in several simultaneously in the cross conveyor ( 21 ) handed over, frontally successively shorter trimmed part boards ( 12mm ) is divided. Verfahren nach dem vorangehenden Anspruch, dadurch gekennzeichnet, dass mittels im Zufuhrbereich (32) selektiv aktivierbarer materieller oder immaterieller Positionier-Anschläge (31) stirnseitig aufeinanderfolgende Teilbretter (12mm) unter axialem Abstand über den Querförderer (21) auf die aktuell obere ungeradzahlige Lage (13.n) aufgebracht werden.Method according to the preceding claim, characterized in that by means of the supply area ( 32 ) of selectively activatable material or immaterial positioning placards ( 31 ) front side successive part boards ( 12mm ) at an axial distance above the cross conveyor ( 21 ) to the currently upper odd-numbered position ( 13.n ) are applied. Einrichtung zum Ausführen der Verfahren gemäß wenigstens einem der vorangehenden Ansprüche zum Bestücken eines Vollholz-Verbundbauteiles (14) mit geradzahligen Lagen (13.m) aus untereinander parallel orientierten Brettern (12m), unter einem Verschwenkwinkel gegenüber der vorangehenden ungeradzahligen Lage (13.n) untereinander parallel orientierter Bretter (12n), auf einem Montagetisch (16) und zum Vernageln der Bretter-Lagen (13.n, 13.m) miteinander, gekennzeichnet durch einen verfahrbaren und absenkbaren Montagetisch (16) zum Aufnehmen von vorgefertigten ungeradzahligen Lagen (13.n) aus miteinander vorverbundenen Brettern (12n), durch einen Längsförderer (29) für die Bretter (12m) der dazwischen auszubildenden geradzahligen Lagen (13.m), durch einen Querförderer (21) für diese nacheinander auf eine ungeradzahlige Lage (13.n) aufzubringenden Bretter (12m), sowie durch ein stationäres, mit daran verfahrbaren Nagelautomaten (26) bestücktes Portal (25) zum Ausbilden einer geradzahligen Lage (13.m) durch aufeinanderfolgendes Vernageln der nacheinander auf die oberste ungeradzahlige Lage (13.n) aufgebrachten Bretter (12m) mit dieser Lage (13.n).Device for carrying out the method according to at least one of the preceding claims for loading a solid wood composite component ( 14 ) with even layers ( 13.m ) of boards oriented parallel to one another ( 12m ), at a pivoting angle with respect to the preceding odd-numbered position ( 13.n ) parallel to each other boards ( 12n ), on a mounting table ( 16 ) and for nailing the board layers ( 13.n . 13.m ), characterized by a movable and lowerable assembly table ( 16 ) for picking up prefabricated odd-numbered layers ( 13.n ) of prefabricated boards ( 12n ), by a longitudinal conveyor ( 29 ) for the boards ( 12m ) of the even-numbered layers to be formed therebetween ( 13.m ), by a cross conveyor ( 21 ) for these successively to an odd position ( 13.n ) boards to be applied ( 12m ), as well as by a stationary, with it movable nailing machine ( 26 ) equipped portal ( 25 ) to form an even layer ( 13.m by successively nailing the successive to the uppermost odd-numbered position ( 13.n ) applied boards ( 12m ) with this position ( 13.n ). Einrichtung nach dem vorangehenden Anspruch, dadurch gekennzeichnet, dass der Montagetisch (16) mit wenigstens einem Stütz-Anschlag (19) und der Quer-Förderer (21) sowohl mit wenigstens einem Richt-Anschlag (18) für die Bretter (12) auf dem Montagetisch (16) als auch mit wenigstens einem Positionier-Anschlag (31) für die über den Längsförderer (29) zugeführten Bretter (12m) beziehungsweise Teilbretter (12mm12mm) ausgestattet ist.Device according to the preceding claim, characterized in that the assembly table ( 16 ) with at least one support stop ( 19 ) and the cross conveyor ( 21 ) with at least one straightening stop ( 18 ) for the boards ( 12 ) on the assembly table ( 16 ) as well as with at least one positioning stop ( 31 ) for the over the longitudinal conveyor ( 29 ) supplied boards ( 12m ) or partial boards ( 12mm - 12mm ) Is provided. Einrichtung nach einem der beiden vorangehenden Ansprüche, dadurch gekennzeichnet, dass zwischen einem Materialpuffer (28) und dem Querförderer (21) im Verlaufe des Längsförderers (29) für die Bretter (12m) der geradzahligen Lage (13.m) wenigstens eine Kappsäge (30) vorgesehen ist.Device according to one of the two preceding claims, characterized in that between a material buffer ( 28 ) and the cross conveyor ( 21 ) in the course of the longitudinal conveyor ( 29 ) For the boards ( 12m ) of the even-numbered layer ( 13.m ) at least one chop saw ( 30 ) is provided.
DE201110122687 2011-02-04 2011-12-30 Method and device for equipping a multilayer solid wood composite component with a respective even-numbered board layer Ceased DE102011122687A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE201110122687 DE102011122687A1 (en) 2011-02-04 2011-12-30 Method and device for equipping a multilayer solid wood composite component with a respective even-numbered board layer
EP12705049.0A EP2670569A1 (en) 2011-02-04 2012-02-04 Method and device for populating a multilayer solid wood composite component
PCT/EP2012/000502 WO2012104100A1 (en) 2011-02-04 2012-02-04 Method and device for populating a multilayer solid wood composite component

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102011011783 2011-02-04
DE102011011783.0 2011-02-04
DE201110122687 DE102011122687A1 (en) 2011-02-04 2011-12-30 Method and device for equipping a multilayer solid wood composite component with a respective even-numbered board layer

Publications (1)

Publication Number Publication Date
DE102011122687A1 true DE102011122687A1 (en) 2012-08-09

Family

ID=46547136

Family Applications (1)

Application Number Title Priority Date Filing Date
DE201110122687 Ceased DE102011122687A1 (en) 2011-02-04 2011-12-30 Method and device for equipping a multilayer solid wood composite component with a respective even-numbered board layer

Country Status (3)

Country Link
EP (1) EP2670569A1 (en)
DE (1) DE102011122687A1 (en)
WO (1) WO2012104100A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106393308A (en) * 2016-08-30 2017-02-15 福建明鑫机器人科技有限公司 Automatic nailing device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102023116006B3 (en) 2023-06-19 2024-05-23 Minda Industrieanlagen Gmbh Process for manufacturing cross laminated timber panels with cut-outs

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202006005108U1 (en) 2006-03-30 2006-07-06 Hundegger, Hans Building construction component, e.g. for walls or ceilings or roofs, is of a compound material of boards in different alignments forming a layer structure bonded together by holding pins

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU560514B2 (en) * 1981-12-23 1987-04-09 Pitters Pty. Ltd. Nailing machine
JPH09248805A (en) * 1996-03-14 1997-09-22 Sekisui Chem Co Ltd Automatically nailing device
DE29706060U1 (en) * 1997-04-05 1997-07-24 Terwort Roland Wooden pallet lid nailing machine
US6058601A (en) * 1998-07-27 2000-05-09 Dekoning; Hubertus C. M. Apparatus for automatic fence panel assembly
DE10224912A1 (en) * 2002-06-04 2003-12-18 Hans Hundegger Device and method for joining multilayer panels, and panels of this type

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202006005108U1 (en) 2006-03-30 2006-07-06 Hundegger, Hans Building construction component, e.g. for walls or ceilings or roofs, is of a compound material of boards in different alignments forming a layer structure bonded together by holding pins

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106393308A (en) * 2016-08-30 2017-02-15 福建明鑫机器人科技有限公司 Automatic nailing device

Also Published As

Publication number Publication date
WO2012104100A1 (en) 2012-08-09
EP2670569A1 (en) 2013-12-11

Similar Documents

Publication Publication Date Title
DE102008018410B3 (en) Device and method for introducing a spring into a groove
AT8276U1 (en) METHOD AND APPARATUS FOR MANUFACTURING COMPONENTS
AT515385A1 (en) Method and system for depositing profiled bars
EP3439840B1 (en) Formwork device
EP3330060A1 (en) Preparation of xps foam panels with large width and/or length by welding
EP0910248A1 (en) Method, device and cutting tool for producing individual pieces of dough from a continuous line of dough
EP2618972B1 (en) Method for producing flat panel elements
DE102011122687A1 (en) Method and device for equipping a multilayer solid wood composite component with a respective even-numbered board layer
EP3045278B1 (en) Method for manufacturing panels and/or blocks made of wood
DE3203025C2 (en)
DE2622167A1 (en) METHOD AND DEVICE FOR MANUFACTURING CABINET TRACKS AND CABINET MATS
AT17316U1 (en) System for magazining separating strips, system for forming stacks of boards and a magazine
DE102015108986A1 (en) A method of manufacturing precast components and sheet forming apparatus for use in such a method
DE202016105426U1 (en) Press Line
AT509322B1 (en) METHOD FOR PRODUCING PLATE ELEMENTS
AT504611B1 (en) METHOD FOR PRODUCING COMPONENTS COMPRISING COMPONENTS CONTAINING WEDGE PENCIL COMPOSITIONS AND DEVICE FOR CARRYING OUT THIS METHOD
EP1764177B1 (en) Apparatus for cutting glazing bars or the like to lenth and method for cutting glazing bars or the like
AT518387B1 (en) Method and device for producing lamellae layers of lamellas arranged one behind the other
DE102023116006B3 (en) Process for manufacturing cross laminated timber panels with cut-outs
DE2408250A1 (en) Production-line for kitchen fitments - has right-angle bend in conveyor system for easier working on ends
DE102012111879A1 (en) Method and device for processing plates
EP0808700A2 (en) Method and device for manufacturing a wood panel from residual wood
DE19900914A1 (en) Device for manufacturing wooden sections e.g. wooden panels
EP3943258A1 (en) Handling device for handling boards or other flat workpieces
DE1921554A1 (en) Process for the production of plate-shaped workpieces equipped with a cover layer on the edge side and a machine for producing miter cuts on plate-shaped workpieces

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R082 Change of representative

Representative=s name: JACKISCH-KOHL, ANNA KATHARINA, DIPL.-ING., DE

Representative=s name: ,

R081 Change of applicant/patentee

Owner name: MICHAEL WEINIG AG, DE

Free format text: FORMER OWNER: SCHMIDLER, RICHARD, 91180 HEIDECK, DE

Effective date: 20120716

Owner name: MICHAEL WEINIG AG, DE

Free format text: FORMER OWNER: RICHARD SCHMIDLER, 91180 HEIDECK, DE

Effective date: 20120716

R002 Refusal decision in examination/registration proceedings
R003 Refusal decision now final