DE102010033158B3 - Bearing device used in construction of railway bridge, has arbor whose upper portion is fixed by pivot bearings provided between bars of U-shaped push plate on which upper tie plate is secured - Google Patents
Bearing device used in construction of railway bridge, has arbor whose upper portion is fixed by pivot bearings provided between bars of U-shaped push plate on which upper tie plate is secured Download PDFInfo
- Publication number
- DE102010033158B3 DE102010033158B3 DE102010033158A DE102010033158A DE102010033158B3 DE 102010033158 B3 DE102010033158 B3 DE 102010033158B3 DE 102010033158 A DE102010033158 A DE 102010033158A DE 102010033158 A DE102010033158 A DE 102010033158A DE 102010033158 B3 DE102010033158 B3 DE 102010033158B3
- Authority
- DE
- Germany
- Prior art keywords
- bearing
- plate
- mandrel
- spherical plain
- radial spherical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
- E01D19/042—Mechanical bearings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
- E01D19/042—Mechanical bearings
- E01D19/045—Line and point rocker bearings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Die Erfindung betrifft eine Vorrichtung zur Lagerung von Brückenbauten, insbesondere ein als Festpunkt- und Führungslager ausgebildetes Horizontalkraftlager, wobei mindestens ein Radial-Gelenklager zwischen einem Über- und Unterbau angeordnet ist.The invention relates to a device for the storage of bridge structures, in particular designed as a fixed point and guide bearings horizontal force bearing, wherein at least one radial spherical plain bearing is disposed between an over- and substructure.
Lager haben, auch wenn sie den Regeln entsprechend bemessen und verbaut werden, eine geringere Lebensdauer als das Haupttragwerk. Daher sind Eisenbahnbrückenlager generell als austauschbare Bauprodukte zu planen. Diese Austauschbarkeit ist bereits bei der Planung der Baumaßnahme in einem Lagerwechselkonzept zu berücksichtigen und darzustellen.Bearings, even if sized and installed according to the rules, have a shorter life than the main structure. Therefore, railway bridge bearings are generally to be planned as interchangeable construction products. This interchangeability must already be taken into account and represented in the planning of the construction measure in a stock change concept.
Aus der
Die
Aus der
Die
Alle bekannten Elastomerlager weisen den Nachteil auf, dass sie jeweils nur für spezielle Anwendungsfälle einsetzbar sind, eine zu geringe Dauerbeständigkeit aufweisen, nur mit großen Aufwand und nur in Ausnahmefällen ohne Streckensperrungen austauschbar sind und dabei den Einsatz einer Spezialfirma bedürfen.All known elastomeric bearings have the disadvantage that they are each used only for special applications, have too low durability, are replaceable only with great effort and only in exceptional cases without track closures and require the use of a special company.
Eisenbahnverkehrsunternehmen sind insbesondere an der Entwicklung von Ausrüstungselementen mit denen die Lebenszykluskosten der Infrastruktur optimiert werden können, interessiert. Deshalb wurde um Rahmen des Projektes Standardisierung von Lagern ein Festpunkt- und Führungslager entwickelt.Railway undertakings are particularly interested in developing equipment elements that can be used to optimize the lifecycle costs of the infrastructure. Therefore, a fixed point and guide bearing was developed around the framework of the project Standardization of bearings.
Bei der Entwicklung des Festpunkt- und Führungslagers wurden folgende Annahmen zu Grunde gelegt:
- • Der Abtrag der Lagerkräfte soll zwängungsfrei sein.
- • Sie sollen für eine Vielzahl von Bauwerken verwendbar sein.
- • Die Lagerung muss den wirtschaftlichen Zwängen genügen.
- • Die Lagerkonstruktion soll solide, unterhaltungsfreundlich und dauerhaft sein.
- • Die Lagerkonstruktion soll in kurzen Bauzeiten und mit geringen Beeinträchtigungen der Baustelle realisierbar sein.
- • Die Lagerkonstruktion soll ohne großen Aufwand möglichst unter „rollendem Rad” nachjustiert bzw. ausgewechselt werden können.
- • Die Lagerkonstruktion soll einen hohen Vorfertigungsgrad haben, damit diese ggf. als Gesamtsystem für die Instandhaltung vorgehalten werden kann.
- • Die Lagerkonstruktion soll für einfeldrige Bauwerke mit einer Stützweite von bis zu 40 m verwendbar sein.
- • The removal of the bearing forces should be constrained.
- • They should be usable for a variety of structures.
- • The storage must meet the economic constraints.
- • The warehouse construction should be solid, easy to maintain and durable.
- • The warehouse construction should be feasible in short construction times and with little damage to the construction site.
- • The bearing design should be readjusted or exchanged as easily as possible under "rolling wheel".
- • The bearing design should have a high degree of prefabrication, so that it may be considered as Entire system for maintenance can be kept.
- • The bearing design should be suitable for single-span structures with a span of up to 40 m.
Der Erfindung liegt die Aufgabe zugrunde, ein Festpunkt- und Führungslager zu entwickeln, welches es gestattet, einen zwängungsfreien Abtrag der Lagerkräfte zu gewährleisten, an einer Vielzahl von Bauwerken einsetzbar zu sein und welches unter dem „rollenden Rad” einfach eingebaut, nachjustiert und ausgebaut werden kann.The invention has for its object to develop a fixed point and guide bearing, which allows to ensure a constraint-free removal of the bearing forces to be used on a variety of structures and which are easily installed, readjusted and expanded under the "rolling wheel" can.
Dies wird erfindungsgemäß dadurch erreicht, dass
bei einem Massivüberbau am Überbau eine über mindestens zwei Zuganker befestigte obere Ankerplatte oder bei einem Stahlüberbau an der oberen Ankerplatte Befestigungsschrauben angeordnet sind, wobei die obere Ankerplatte an einer U-förmigen Druckplatte befestigt ist und zwischen den Stegen der als Kulissenaufnahme ausgeführten U-förmigen Druckplatte Radial-Gelenklager angeordnet sind, die sich umlaufend im oberen Bereich eines Dorns an diesen abstützen, welcher mit seinem unteren Bereich in einer kegelstumpfförmigen Dornaufnahme befestigt und geführt ist, welche mit einer unteren Ankerplatte verbunden ist, die über mindestens zwei Zuganker in den Unterbau eingebunden ist.This is inventively achieved in that
in a solid superstructure on the superstructure, an upper anchor plate fastened by means of at least two tie rods or fastening bolts are arranged on the upper anchor plate with a steel superstructure, the upper anchor plate being fastened to a U-shaped pressure plate and radial between the webs of the U-shaped pressure plate embodied as a slide receptacle -Gelenklager are arranged, which are circumferentially supported in the upper region of a mandrel to this, which is fastened and guided with its lower portion in a frusto-conical mandrel receptacle, which is connected to a lower anchor plate, which is integrated via at least two tie rods in the substructure.
Das Lagersystem ermöglicht es, die vertikalen und horizontalen Lagerkräfte unterschiedlichen standardisierten Lagersystemen (Klassen) zuzuweisen.The storage system makes it possible to assign the vertical and horizontal bearing forces to different standardized storage systems (classes).
Das Festpunkt- und Führungslager wird mittels eines rostfreien, wartungsfreien Radial-Gelenklagers, ein Großserienteil aus dem Maschinenbau, realisiert. Dieses Lager ermöglicht die Taumelbewegung des Überbaus bei gleichzeitiger Übertragung der Horizontalkräfte. Die vertikale Bewegungsfreiheit wird durch eine Kulissenkonstruktion, in dem das Radial-Gelenklager eingebaut ist, ermöglicht.The fixed-point and guide bearing is realized by means of a rust-free, maintenance-free radial spherical plain bearing, a large-scale production part from mechanical engineering. This bearing allows the wobble of the superstructure while transmitting the horizontal forces. The vertical freedom of movement is made possible by a link construction in which the radial spherical plain bearing is installed.
Das Gelenk ist durch einen stehenden Dorn gehalten der seinerseits durch eine Schweißkonstruktion die Kräfte an die Ankerplatte abgibt. Die Verbindung mit der Ankerplatte wird durch eine Montageschweißung hergestellt.The joint is held by a standing mandrel which in turn emits the forces to the anchor plate by a welded construction. The connection with the anchor plate is made by a mounting weld.
Die Kulissenkonstruktion ist auf eine Grundplatte geschweißt. Die Verbindung zwischen der Grundplatte und der Ankerplatte wird ebenfalls durch einen Montageschweißung hergestellt.The backdrop construction is welded to a base plate. The connection between the base plate and the anchor plate is also made by a mounting weld.
Der Dorn wird aus Stahl oder gleichwertigem Material gefertigt. Die restliche Schweiß- bzw. Fräskonstruktion und die Ankerplatten werden aus Stahl (oder gleichwertigem Material) hergestellt.The mandrel is made of steel or equivalent material. The remaining welding or milling construction and the anchor plates are made of steel (or equivalent material).
Das Festpunkt- und Führungslager ist vor Korrosion zu schützen. Hierfür ist die Oberfläche vorzubereiten.The fixed point and guide bearing is to be protected against corrosion. For this the surface has to be prepared.
Der Sitz des Dorns ist nach den Schweißarbeiten mit den angegebenen Toleranzen herzustellen.The seat of the mandrel is to be produced after welding with the specified tolerances.
Die Passungen des Dorns und des Korbs sind mit einem thermisch gespritzten Zinküberzug herzustellen. Dabei ist die Einhaltung der Toleranzen zu berücksichtigen.The fits of the mandrel and the basket are to be made with a thermally sprayed zinc coating. In doing so, compliance with the tolerances must be taken into account.
Die Flächen der Montageschweißung (Seitenflächen der unteren Einspannplatte bzw. die Seitenflächen der Fräskonstruktion) sind vor den Korrosionsschutzmaßnahmen abzukleben. Nach der Montageschweißung ist der Korrosionsschutz auf der Baustelle zu ergänzen. Die Grundbeschichtung wird im Gegensatz zur restlichen Fläche mit einer Zinkstaub-Beschichtung für eine hohe Schutzdauer ersetzt.The surfaces of the assembly weld (side surfaces of the lower clamping plate or the side surfaces of the milling construction) are to be masked from the corrosion protection measures. After assembly welding, corrosion protection must be supplemented on the construction site. In contrast to the rest of the surface, the primer coating is replaced with a zinc dust coating for a long protection period.
Die Toleranzen der Schweißteile sind nach DIN EN ISO 13920 Tabelle 1 Klasse A, Tabelle 2 Klasse A und Tabelle 3 Klasse E einzuhalten.The tolerances of the welded parts must be observed in accordance with DIN EN ISO 13920 Table 1 Class A, Table 2 Class A and Table 3 Class E.
Die horizontalen Kräfte werden durch die Verankerungskonstruktion in den Beton eingeleitet. Durch die gewählte Bewehrung können die Lasten aufgenommen werden. Die Lastweiterleitung und Ableitung in den Baugrund obliegt dem planenden Tragwerksplaner.The horizontal forces are introduced through the anchoring structure in the concrete. The selected reinforcement allows the loads to be absorbed. The load transfer and discharge into the subsoil is the responsibility of the planning structural engineer.
Montage bei eingeschobenem/eingehobenem MassivüberbauAssembly with pushed-in / ingested massive superstructure
Die Kraftübertragung aus dem Überbau in die Lagerkonstruktion und aus dieser in den Unterbau erfolgt mit Hilfe von Ankerplatten, die mit Kopfbolzendübeln die Schubübertragung sichern. Die Kräfte aus dem Versatzmoment werden durch Zuganker aufgenommen.The power transmission from the superstructure into the bearing structure and from this into the substructure takes place with the aid of anchor plates, which secure the shear transmission with head bolt anchors. The forces from the offset moment are absorbed by tie rods.
Die Montage des Festpunktlagers erfolgt in mehreren Schritten. Bei der Betonage der Auflagerbank ist eine Aussparung für den späteren Verguss der Zuganker und der Kopfbolzendübel vorzusehen. In die Aussparung sind im Zuge der Bewehrungsarbeiten die Zuganker lose mit an die vorgesehene Stelle einzubauen. Aufgrund der hohen Bewehrungsdichte im Bereich der Krafteinleitung ist es nicht möglich die Zuganker nach den Bewehrungsarbeiten einzubauen. Die Aussparung sollte mittels Streckmetall (oder ähnlich) hergestellt werden. Die Bewehrung ist vollständig einzubauen. Die Ankerplatte sollte ebenfalls nur lose an die vorgesehene Stelle gebracht werden.The mounting of the fixed point bearing takes place in several steps. When concreting the Auflagerbank a recess for the subsequent casting of the tie rods and the head studs is provided. In the recess in the course of reinforcement work, the tie rods are loosely installed with the intended location. Due to the high reinforcement density in the area of the force application, it is not possible to install the tie rods after the reinforcement work. The recess should be made by means of expanded metal (or similar). The reinforcement is to be completely installed. The anchor plate should also be brought only loosely to the intended location.
Nach der Betonage der Auflagerbank kann die genaue Höhen- und Raumlage der Ankerplatte festgelegt werden. Die Lage ergibt sich durch das Aufmass des Überbaus, der die Solllage der Ankerplatte vorgibt. Für den Verguss der Ankerplatte mit den Zugankern kann die Lage durch die Hilfskonstruktion sichergestellt werden und ein maßgenauer Einbau erfolgen. Nach dem Verguss ist darauf zu achten, dass die erste Belastung erst nach dem Erhärten des Vergussmaterials erfolgen kann. After concreting the Auflagerbank the exact height and position of the anchor plate can be determined. The situation results from the measure of the superstructure, which dictates the desired position of the anchor plate. For the encapsulation of the anchor plate with the tie rods, the position can be ensured by the auxiliary structure and made a dimensionally accurate installation. After casting, it must be ensured that the first load can only be applied after hardening of the casting material.
Die Kulisse wird mit der Grundplatte an den Überbau geschweißt (oder mit der Ankerplatte fertig verschweißt einbetoniert). Der Dorn wird mit Radial-Gelenklager und Festhaltung durch die Montagesicherung an die Kulisse angehängt.The scenery is welded to the superstructure with the base plate (or finally cast in with the anchor plate). The mandrel is attached to the backdrop with radial spherical plain bearings and retention by the mounting safeguard.
Der Überbau wird an seine Sollposition gebracht.The superstructure is brought to its nominal position.
Die Festhaltung wird auf die Ankerplatte geschweißt. Durch die nachträgliche Schweißung können Bautoleranzen ausgeglichen werden.The detention is welded to the anchor plate. By subsequent welding building tolerances can be compensated.
Die Montageschweißungen sind in Ihrer Reihenfolge so durchzuführen, dass ein Schaden an den Gleitmaterialien ausgeschlossen ist. Ebenfalls ist die Schweißreihenfolge so abzustimmen, dass benachbarte Bauteile (z. B. Hochfeste Verschraubungen) die Temperatur von 250°C nicht überschreiten. Die Zuganker werden im Anschluss an die Schweißarbeiten vorgespannt.The assembly welds are to be performed in their order in such a way that damage to the sliding materials is excluded. The welding sequence must also be adjusted so that adjacent components (eg high-strength screwed connections) do not exceed the temperature of 250 ° C. The tie rods are pretensioned after the welding work.
Es ist darauf zu achten, dass die Sicherungsschrauben, die den Dorn in der Festhaltung fixieren, in Bauwerkslängsachse ausgerichtet sind.It must be ensured that the locking screws which fix the mandrel in the retaining position are aligned in the longitudinal axis of the building.
Nach der Montage ist sicherzustellen, dass die Sicherungsbleche, die den Korb für die Montage in der Kulisse sichern, entfernt werden, um die Bewegungsfreiheit des Lagers zu gewährleisten. Alle Gewinde und Verschraubungen die zur Montage oder Lagerwechsel vorgesehen sind, sind dauerhaft mit geeigneten Maßnahmen zu verschließen. Der Verschluss darf die Wiederverwendung nicht einschränken und muss rückstandslos entfernt werden können.After installation, make sure that the locking plates securing the basket for installation in the scenery are removed to ensure freedom of movement of the bearing. All threads and screwed connections intended for mounting or bearing replacement must be permanently closed with suitable measures. The closure must not restrict the reuse and must be able to be removed without residue.
Montage bei Stahl und VerbundüberbautenInstallation on steel and composite superstructures
Für die verschiedenen Überbauarten unterscheidet sich die Montage nur für die Ankerplatten. Im Massivüberbau werden die Ankerplatten einbetoniert und die Zugkräfte aus den Versatzmomenten durch Zuganker eingeleitet. Für den Verbund-Stahlüberbau werden die Ankerplatten an den Endquerträger angeschweißt oder verschraubt.For the different superstructures, the assembly differs only for the anchor plates. In the massive superstructure, the anchor plates are embedded in concrete and the tensile forces are introduced from the offset moments by tie rods. For the composite steel superstructure, the anchor plates are welded or bolted to the end cross member.
Die Lasteinleitung und die Lastverfolgung obliegen dem planenden Tragwerksplaner.The load introduction and the load tracking are the responsibility of the planning structural engineer.
Montage bei in Endlage hergestelltem MassivüberbauInstallation with solid superstructure produced in end position
Die Montage des Festpunktlagers bei örtlich hergestellten Überbauten erfolgt als Gesamtkonstruktion. Bei der Betonage der Auflagerbank ist die gesamte Festhaltekonstruktion mit einzubetonieren. Die Abweichung in der Raumlage kann durch den anschließend gefertigten Überbau aufgenommen werden. Bei der Herstellung des Überbaus ist darauf zu achten, dass die Zuganker, die in den Überbau verankert werden, rechtwinklig zur Ankerplatte eingebaut werden. Die gesamte Konstruktion wird durch die Montagehilfen in ihrer Position zueinander gehalten. Wenn der Beton des Überbaus und des Widerlagers eine ausreichende Festigkeit erreicht haben, werden die Zuganker vorgespannt.The assembly of the fixed point bearing in locally produced superstructures takes place as an overall construction. When concreting the Auflagerbank the entire retaining structure is einzubetonieren with. The deviation in the spatial position can be absorbed by the subsequently manufactured superstructure. When making the superstructure, make sure that the tie rods, which are anchored in the superstructure, are installed at right angles to the anchor plate. The entire construction is held in position relative to each other by the assembly aids. When the concrete of the superstructure and the abutment have reached sufficient strength, the tie rods are prestressed.
Konzept Lagerwechsel FestpunktlagerConcept Bearing Change Fixed Point Bearing
Radial-Gelenklager sind mit einer Lebensdauer von 30 Jahren beziffert. Daraus folgt, dass in der Nutzungsdauer der betrachteten Bauwerke ein Lagerwechsel notwendig wird.Radial spherical plain bearings have a lifespan of 30 years. It follows that a bearing change is necessary in the service life of the considered structures.
Um die Festhaltekonstruktion auswechseln zu können, muss der Überbau festgelegt werden. Das heißt, die Horizontalkräfte müssen für die Zeit des Lagerwechsels durch eine temporäre Sekundärkonstruktion übernommen werden.In order to replace the retaining structure, the superstructure must be specified. This means that the horizontal forces must be taken over by a temporary secondary construction for the time of the bearing change.
Eine Auslegung einer solchen Konstruktion ist aufgrund der vielfältigen Verwendungsmöglichkeiten des vorliegenden Lagerkonzepts nicht möglich. Es wird deshalb nur der Austausch der Festhaltekonstruktion erläutert. Zum Wechseln der Lagereinheit muss die Erreichbarkeit und der Arbeitsschutz für das Personal sichergestellt werden. Ein Gerüst oder eine etwaige Hilfskonstruktion muss in der Lage sein, das Gewicht der ausführenden Personen und das Gewicht der Lagereinheit aufzunehmen.An interpretation of such a construction is not possible due to the multiple uses of the present bearing concept. Therefore, only the replacement of the retaining structure will be explained. To change the storage unit accessibility and health and safety for the staff must be ensured. A scaffolding or any auxiliary structure must be able to accommodate the weight of the implementers and the weight of the storage unit.
Nach der Sicherstellung, dass die Festhaltekonstruktion lastfrei ist und die Horizontalkräfte aus dem Überbau über die Sekundärkonstruktion sicher abgeleitet werden, müssen die Sicherungsbleche an der Kulisse montiert werden. Sie verhindern dass beim Herausnehmen sich das Oberteil vom Unterteil löst. Danach können die Montageschweißnähte gelöst werden. Die Verschweißung am Überbau und am Widerlager werden getrennt. Die Lagerkonstruktion wird entnommen.After ensuring that the retaining structure is load-free and the horizontal forces are safely dissipated from the superstructure via the secondary structure, the locking plates must be mounted on the gate. They prevent that when removing the upper part of the lower part dissolves. Thereafter, the mounting welds can be solved. The welding on the superstructure and the abutment are separated. The bearing construction is removed.
Die Ebenheit der Flächen ist herzustellen. Dabei ist darauf zu achten, dass der Korrosionsschutz in ausreichendem Maße entfernt wird, um die Schweißnahtqualität sicher zu stellen.The flatness of the surfaces must be established. It is important to ensure that the corrosion protection is sufficiently removed to ensure weld quality.
Als Verschleißteile sind nur das Radial-Gelenklager und die Gleitschichten der Kulissenkonstruktion anzusehen. Die restliche Konstruktion ist einer Sichtprüfung zu unterziehen. Der Korrosionsschutz ist zu überprüfen und gegebenenfalls zu sanieren.As wear parts are only the radial spherical plain bearings and the sliding layers of To view the backdrop construction. The remaining construction is to be visually inspected. The corrosion protection must be checked and, if necessary, remediated.
Die überholte Lagereinheit wird versetzt. Die Montageschweißungen sind in ihrer Reihenfolge so durchzuführen, dass ein Schaden an den Gleitmaterialen ausgeschlossen ist. Ebenfalls ist die Schweißreihenfolge so abzustimmen, dass benachbarte Bauteile (z. B. Hochfeste Verschraubungen) die Temperatur von 250°C nicht überschreiten.The obsolete storage unit is moved. The assembly welds are to be performed in their order in such a way that damage to the sliding materials is excluded. The welding sequence must also be adjusted so that adjacent components (eg high-strength screwed connections) do not exceed the temperature of 250 ° C.
Nach Beendigung der Schweißarbeiten ist der Korrosionsschutz wieder herzustellen. Der Überbau kann freigegeben werden.After completion of the welding work, the corrosion protection must be restored. The superstructure can be released.
Die Flächen der Montageschweißung der überholten Lagereinheit sind vor den Korrosionsschutzmaßnahmen abzukleben. Nach der Montageschweißung ist der Korrosionsschutz auf der Baustelle zu ergänzen. Die Grundbeschichtung wird im Gegensatz zur restlichen Fläche mit einer Zinkstaub-Beschichtung für eine hohe Schutzdauer ersetzt.The surfaces of the assembly welding of the reconditioned bearing unit are to be masked from the corrosion protection measures. After assembly welding, corrosion protection must be supplemented on the construction site. In contrast to the rest of the surface, the primer coating is replaced with a zinc dust coating for a long protection period.
Vorteile der Erfindung:Advantages of the invention:
- • der Abtrag der Lagerkräfte erfolgt weitgehend zwängungsfrei• The removal of the bearing forces is largely constraint-free
- • die Lager können für eine Vielzahl von Brücken verwendet werden• The bearings can be used for a variety of bridges
- • die Konstruktionen sind solide, unterhaltungsfreundlich und dauerhaft• The constructions are solid, easy to maintain and durable
- • die Lager können ohne großen Aufwand möglichst unter dem „rollenden Rad” eingebaut und ausgewechselt werden• The bearings can be installed and replaced as far as possible under the "rolling wheel" with little effort
- • die Lager weisen einen hohen Vorfertigungsgrad auf, damit sie als Gesamtsystem für die Instandhaltung vorgehalten werden können• The bearings have a high degree of prefabrication, so that they can be kept as a complete system for maintenance
- • das Lager ist für einfeldige Bauwerke mit einer Stützweite von bis zu 40 m verwendbar • The bearing can be used for single-span structures with a span of up to 40 m
- • es ist möglich, den Einsatz des Festpunkt- und Führungslagers auch für mehrfeldrige Brücken auszudehnen• it is possible to extend the use of the fixed point and guide bearing also for multi-span bridges
Ausführungsbeispielembodiment
Die Erfindung soll nachstehend anhand eines Ausführungsbeispieles näher erläutert werden.The invention will be explained below with reference to an exemplary embodiment.
Dabei zeigen:Showing:
Das Festpunkt- und Führungslager setzt sich aus einem am Überbau befestigten oberen Bereich, dem im mittleren Bereich eingesetzten Dorn sowie den beiden Radial-Gelenklagern und einem am Unterbau befestigten unteren Bereich zusammen (
Der obere Bereich des Festpunkt- und Führungslagers setzt sich aus der am Überbau mittels Zugankern (
Zwischen den Innenseiten der Schenkel der U-förmigen Druckplatte (
Die Kulisse (
Der Dorn (
Die als Gewindestab ausgebildeten Zuganker (
An der oberen und unteren Ankerplatte (
Die Dornaufnahme (
Im Randbereich der unteren Ankerplatte (
Zum Transport des Festpunkt- und Führungslagers bis zum Einbauort sind verschiedene Sicherungsvorrichtungen vorgesehen.To transport the fixed point and guide bearing to the installation various security devices are provided.
BezugszeichenlisteLIST OF REFERENCE NUMBERS
- 1.11.1
- untere Ankerplattelower anchor plate
- 1.21.2
- Platteplate
- 1.31.3
- Platteplate
- 1.41.4
- Platteplate
- 1.51.5
- KopfbolzendübelShear studs
- 1.61.6
- Dornmandrel
- 2.12.1
- obere Ankerplatteupper anchor plate
- 2.22.2
- U-förmige Druckplatte (Kulissenaufnahme)U-shaped pressure plate (backdrop shot)
- 33
- Radial-GelenklagerRadial spherical plain bearings
- 44
- Sicherungsschraubelocking screw
- 55
- Gleitblechsliding
- 66
- Gleitmaterialsliding
- 77
- Sicherungsringcirclip
- 88th
- Kulissescenery
- 99
- Sicherungsringcirclip
- 1010
- Dornaufnahmepin receptacle
- 1111
- oberer zylindrischer Bereichupper cylindrical area
- 1212
- unterer zylindrischer Bereichlower cylindrical area
- 1313
- kegelstumpfförmiger Zwischenbereichfrusto-conical intermediate area
- 1414
- Aufstandsflächefootprint
- 1515
- dornabgewandte Aufstandsflächethorn-facing footprint
- 1616
- ÜberstandGot over
- 1717
- rechteckige Tascherectangular bag
- 1818
- zylindrische Ausnehmungcylindrical recess
- 1919
- umlaufende Aussparungcircumferential recess
- 2020
- Zuganker als GewindestabTie rod as threaded rod
- 2121
- Stahlplattesteel plate
- 2222
- Muttermother
- 2323
- Unterlegscheibewasher
- 2424
- Muttermother
- 2525
- Stegweb
- 2626
- Muttermother
- 2727
- Unterlegscheibewasher
- 2828
- Stellschraubescrew
- 2929
- L-WinkelL-angle
- 3030
- Schraubescrew
Claims (19)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102010033158A DE102010033158B3 (en) | 2010-08-03 | 2010-08-03 | Bearing device used in construction of railway bridge, has arbor whose upper portion is fixed by pivot bearings provided between bars of U-shaped push plate on which upper tie plate is secured |
AT7702011A AT510230B1 (en) | 2010-08-03 | 2011-05-26 | DEVICE FOR STORING BRIDGES, ESPECIALLY A HORIZONTAL BEARING SHAFT DESIGNED AS A SOLID POLE AND GUIDE BEARING |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102010033158A DE102010033158B3 (en) | 2010-08-03 | 2010-08-03 | Bearing device used in construction of railway bridge, has arbor whose upper portion is fixed by pivot bearings provided between bars of U-shaped push plate on which upper tie plate is secured |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102010033158B3 true DE102010033158B3 (en) | 2012-02-16 |
Family
ID=45528619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102010033158A Expired - Fee Related DE102010033158B3 (en) | 2010-08-03 | 2010-08-03 | Bearing device used in construction of railway bridge, has arbor whose upper portion is fixed by pivot bearings provided between bars of U-shaped push plate on which upper tie plate is secured |
Country Status (2)
Country | Link |
---|---|
AT (1) | AT510230B1 (en) |
DE (1) | DE102010033158B3 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638286B (en) * | 2017-01-10 | 2018-12-28 | 中铁大桥勘测设计院集团有限公司 | A kind of tension girder falling combined isolation device and its construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09100511A (en) * | 1995-10-09 | 1997-04-15 | Tokai Rubber Ind Ltd | Rubber bearing body and bearing structure of bridge using this bearing body |
DE10145857A1 (en) * | 2001-08-06 | 2003-02-27 | Roger Hertzfeldt | Bearing structure for damped transmission of impact and vibration has first part in pot form with guide shell and reinforcing shells |
DE102004062581B3 (en) * | 2004-12-24 | 2005-11-24 | Eurobridge Mobile Brücken GmbH | Roadway support at transition between two bridge sections of transportable bridge has metal staybolts fixed to cross-bearer, at least one roadway retaining device with locking rail in which staybolts engage |
JP2006226449A (en) * | 2005-02-18 | 2006-08-31 | Kawaguchi Metal Industries Co Ltd | Rubber bearing device |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3921240A (en) * | 1971-04-27 | 1975-11-25 | Elastometal Ltd | Structural bearings |
US5597240A (en) * | 1996-03-04 | 1997-01-28 | Hexcel-Fyfe Co., L.L.C. | Structural bearing |
DE19850946A1 (en) * | 1998-11-05 | 2000-05-11 | Schaeffler Waelzlager Ohg | Compensation bearing |
-
2010
- 2010-08-03 DE DE102010033158A patent/DE102010033158B3/en not_active Expired - Fee Related
-
2011
- 2011-05-26 AT AT7702011A patent/AT510230B1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09100511A (en) * | 1995-10-09 | 1997-04-15 | Tokai Rubber Ind Ltd | Rubber bearing body and bearing structure of bridge using this bearing body |
DE10145857A1 (en) * | 2001-08-06 | 2003-02-27 | Roger Hertzfeldt | Bearing structure for damped transmission of impact and vibration has first part in pot form with guide shell and reinforcing shells |
DE102004062581B3 (en) * | 2004-12-24 | 2005-11-24 | Eurobridge Mobile Brücken GmbH | Roadway support at transition between two bridge sections of transportable bridge has metal staybolts fixed to cross-bearer, at least one roadway retaining device with locking rail in which staybolts engage |
JP2006226449A (en) * | 2005-02-18 | 2006-08-31 | Kawaguchi Metal Industries Co Ltd | Rubber bearing device |
Non-Patent Citations (4)
Title |
---|
JP 09 100 511 A (abstract). 15.04.1997. |
JP 09100511 A (abstract). 15.04.1997. * |
JP 2006-226 449 A (abstract). 31.08.2006. |
JP 2006226449 A (abstract). 31.08.2006. * |
Also Published As
Publication number | Publication date |
---|---|
AT510230A3 (en) | 2012-09-15 |
AT510230B1 (en) | 2014-07-15 |
AT510230A2 (en) | 2012-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20080289268A1 (en) | Seismic structural device | |
DE10321047B4 (en) | Lane for magnetic levitation railways and manufacturing method therefor | |
EP3183401B1 (en) | Concrete construction of modular design | |
CN107151976A (en) | Separate type tenon component, elastoplasticity girder falling stopping means and its installation method | |
DE102006044790B4 (en) | Bridge with two trussed discs and kit for their production | |
DE102010033158B3 (en) | Bearing device used in construction of railway bridge, has arbor whose upper portion is fixed by pivot bearings provided between bars of U-shaped push plate on which upper tie plate is secured | |
DE202015100932U1 (en) | Device for securing, in particular rehabilitation, of a foundation in wind turbines, as well as foundation | |
EP2130984B1 (en) | Load distribution body with profile carrier system | |
DE2702672A1 (en) | CLOSED RESILIENT ROUTE EXPANSION, IN PARTICULAR FOR UNDERGROUND PIT ROUTES | |
EP1679404A2 (en) | Bearing construction at the joint of two sections of a movable bridge | |
AT510231B1 (en) | DEVICE FOR STORING BRIDGES, IN PARTICULAR A HORIZONTAL BEARING SHAFT DESIGNED AS A GUIDE BEARING | |
CN103306196B (en) | Spiral bridge support | |
DE19739446A1 (en) | Cross direction support for length joint between reinforced concrete slabs | |
DE102006038888B3 (en) | Roadway for maglev trains | |
WO2006117350A1 (en) | Process for producing a track carrier for a magnetic levitation railway, and track carrier | |
Tandon | Economical design of earthquake-resistant bridges | |
DE10111935C2 (en) | Horizontal force bearings for bridges, especially for railway bridges | |
CN203320406U (en) | Bridge screw type support | |
DE202009007657U1 (en) | Device for bearing mounting in solid structures, preferably on bridges | |
DE102017131351A1 (en) | Trough-shaped superstructure for a bridge, bridge, prefabricated part for a trough of a bridge and method for the construction of a bridge | |
EP3980600B1 (en) | Building structure | |
WO2018121902A1 (en) | Trough-shaped superstructure for a bridge, bridge, finished part for a trough wall of a bridge, and method for producing a bridge | |
DE4337791A1 (en) | Support frame | |
AT513705B1 (en) | radio station | |
AT14344U1 (en) | Silo made of precast concrete parts, in particular chip silo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R016 | Response to examination communication | ||
R018 | Grant decision by examination section/examining division | ||
R020 | Patent grant now final |
Effective date: 20120517 |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |