DE102006022335A1 - Coating plant for vehicle body painting, has transport section, along which multiple coating objects are transported and treated in treatment stations, where transport section are arranged in treatment stations - Google Patents

Coating plant for vehicle body painting, has transport section, along which multiple coating objects are transported and treated in treatment stations, where transport section are arranged in treatment stations Download PDF

Info

Publication number
DE102006022335A1
DE102006022335A1 DE102006022335A DE102006022335A DE102006022335A1 DE 102006022335 A1 DE102006022335 A1 DE 102006022335A1 DE 102006022335 A DE102006022335 A DE 102006022335A DE 102006022335 A DE102006022335 A DE 102006022335A DE 102006022335 A1 DE102006022335 A1 DE 102006022335A1
Authority
DE
Germany
Prior art keywords
coating
transport path
transport
station
branches
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102006022335A
Other languages
German (de)
Inventor
Frank Herre
Uwe Dr. Siewert
Günter Weihermüller
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Duerr Systems AG
Original Assignee
Duerr Systems AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Duerr Systems AG filed Critical Duerr Systems AG
Priority to DE102006022335A priority Critical patent/DE102006022335A1/en
Priority to RU2008148954/05A priority patent/RU2436638C2/en
Priority to HUE07724941A priority patent/HUE025991T2/en
Priority to PT77249415T priority patent/PT2018230E/en
Priority to EP07724941.5A priority patent/EP2018230B1/en
Priority to BRPI0711360-9A priority patent/BRPI0711360B1/en
Priority to US12/064,122 priority patent/US8794174B2/en
Priority to MX2008014223A priority patent/MX2008014223A/en
Priority to PL07724941T priority patent/PL2018230T3/en
Priority to ES07724941.5T priority patent/ES2556171T3/en
Priority to JP2009508233A priority patent/JP2009536872A/en
Priority to CN2007800170424A priority patent/CN101448576B/en
Priority to PCT/EP2007/004017 priority patent/WO2007131660A1/en
Publication of DE102006022335A1 publication Critical patent/DE102006022335A1/en
Priority to JP2014047171A priority patent/JP5946486B2/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/04Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
    • B05B13/0447Installation or apparatus for applying liquid or other fluent material to conveyed separate articles
    • B05B13/0452Installation or apparatus for applying liquid or other fluent material to conveyed separate articles the conveyed articles being vehicle bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/20Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0292Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work devices for holding several workpieces to be sprayed in a spaced relationship, e.g. vehicle doors spacers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/04Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
    • B05B13/0431Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation with spray heads moved by robots or articulated arms, e.g. for applying liquid or other fluent material to 3D-surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B7/00Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas
    • B05B7/14Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas designed for spraying particulate materials

Landscapes

  • Spray Control Apparatus (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)
  • Coating Apparatus (AREA)

Abstract

The coating plant has a transport section (2,12), along which multiple coating objects are transported in sequence through the coating plant. The coating objects are treated in multiple treatment stations. The transport sections are sub-divided in multiple parallel branches (5-9) arranged with treatment stations. The parallel branches of the transport sections are brought incoming and outgoing sides together. An independent claim is also included for an operating method of a coating plant.

Description

Die Erfindung betrifft eine Beschichtungsanlage, insbesondere zur Lackierung von Kraftfahrzeugkarosserien, sowie ein entsprechendes Betriebsverfahren gemäß den nebengeordneten Ansprüchen.The The invention relates to a coating system, in particular for painting of motor vehicle bodies, and a corresponding operating method according to the siblings Claims.

Moderne Lackieranlagen für die Serienlackierung von Bauteilen, wie beispielsweise Automobilkarosserien und Anbauteilen, weisen in der Regel eine oder mehrere Lackierlinien auf, in denen die einzelnen Lackier- bzw. Behandlungsschritte nacheinander ausgeführt werden. Hierzu werden die zu lackierenden Bauteile entlang einem linearen Transportweg durch die Lackieranlage und die einzelnen Behandlungsstationen transportiert. Derartige Lackieranlagen arbeiten meist im Durchlaufbetrieb (engl. „Line Tracking"), bei dem die zu lackierenden Bauteile kontinuierlich entlang der Lackierlinie und dem Transportweg durch die einzelnen Behandlungsstationen transportiert werden. Es sind jedoch auch derartige Lackieranlagen bekannt, die im Taktbetrieb („Stop and Go") arbeiten, bei dem die zu lackierenden Bauteile taktweise entlang der Lackierlinie transportiert werden. In beiden Fällen begrenzen die Bandgeschwindigkeit bzw. der Taktabstand zwischen den aufeinanderfolgenden Bauteilen maßgeblich die Kapazität der Lackieranlage.modern Paint shops for the serial painting of components, such as automobile bodies and attachments, usually have one or more painting lines on, in which the individual coating or treatment steps in succession accomplished become. For this purpose, the components to be painted along a linear transport route through the paint shop and the individual treatment stations transported. Such paint systems usually work in continuous operation ("line tracking"), in which the painting components continuously along the Lackierlinie and the Transport path transported through the individual treatment stations become. However, there are also known such painting, the in clock mode ("Stop and Go "), in which the components to be painted cyclically along the Lackierlinie be transported. In both cases limit the tape speed or the pitch between the successive components decisively the capacity the paint shop.

Die gewünschte Kapazität der Lackieranlage bestimmt auch die Anzahl der hierfür erforderlichen Zerstäuber und dadurch auch die Anzahl der benötigten Lackierroboter oder -maschinen. Die Anzahl der benötigten Lackierroboter bzw. -maschinen beeinflusst wiederum die Länge der einzelnen Lackierzonen und damit auch die Länge der vollständigen Lackierlinien.The desired capacity the paint shop also determines the number of atomizers required for this and thereby also the number of needed Painting robots or machines. The number of paint robots needed or machines in turn affects the length of the individual painting zones and therefore the length the complete Painting lines.

Mit zunehmender Band- bzw. Taktgeschwindigkeit müssen entsprechend mehr Lackierroboter eingesetzt werden, um das geforderte Lackierergebnis zu erreichen. Eine Vergrößerung der Anzahl von Lackierrobotern hat jedoch zur Folge, dass der Anteil der aktiven Lackierzeit abnimmt, wodurch die Effektivität der einzelnen Lackierroboter sinkt. So verschlechtert sich das Verhältnis von aktiver Nutzungsdauer zur Nebenzeit (Totzeit) der einzelnen Lackierroboter stetig mit steigender Bandgeschwindigkeit bzw. Taktfrequenz. Darüber hinaus führt eine Vergrößerung der Anzahl der Lackierroboter und damit auch der Zerstäuber zu größeren Farbverlusten pro Farbwechsel und zu beschichtendem Bauteil, was mit einer weiteren Verschlechterung der Effizienz verbunden ist.With Increasing belt or cycle speed must be used according to more painting robots to achieve the required painting result. An enlargement of the Number of painting robots, however, has the consequence that the proportion of active paint time decreases, reducing the effectiveness of the individual Painting robot sinks. This worsens the ratio of active service life for non-productive time (dead time) of the individual painting robots steadily with increasing belt speed or clock frequency. Furthermore leads one Magnification of the Number of painting robots and thus the atomizer too larger color losses per color change and to be coated component, what with another Deterioration of efficiency is connected.

Ein weiterer Nachteil der im Taktbetrieb arbeitenden Lackieranlagen ist die Tatsache, dass sich die Taktzeit der gesamten Lackierlinie nach dem Kraftfahrzeugmodell mit dem größten Lackieraufwand richten muss. Falls beispielsweise in einer Lackierlinie sowohl Luxuslimousinen mit einem großen Lackieraufwand als auch einfache Personenkraftwagen (PKW) mit einem geringen Lackieraufwand lackiert werden sollen, beschränken die Luxuslimousinen aufgrund ihres großen Lackieraufwands die maximal mögliche Taktfrequenz, wodurch der gesamte Lackierprozess verlangsamt wird.One Another disadvantage of operating in clock mode paint shops is the fact that the cycle time of the entire paint line judge according to the motor vehicle model with the largest paint job got to. If, for example, in a paint line both luxury sedans with a great paint job as well as simple passenger cars (cars) with a low Lackieraufwand to be painted the luxury sedans due to their large Lackieraufwands the maximum possible Clock frequency, whereby the entire painting process is slowed down.

Problematisch an den vorstehend beschriebenen bekannten Lackieranlagen ist auch die Sonderfarbversorgung, da alle Entnahmestellen angeschlossen werden müssen, was teuer und aufwendig ist.Problematic on the known paint systems described above is also the special color supply, since all exit points are connected Need to become, which is expensive and expensive.

Der Erfindung liegt deshalb die Aufgabe zugrunde, eine entsprechend verbesserte Lackieranlage zu schaffen.Of the The invention is therefore based on the object, a corresponding to create an improved paint shop.

Diese Aufgabe wird durch eine erfindungsgemäße Beschichtungsanlage und ein entsprechendes Betriebsverfahren gemäß den nebengeordneten Ansprüchen gelöst.These The object is achieved by a coating system according to the invention and a corresponding operating method according to the independent claims solved.

Die Erfindung umfasst die allgemeine technische Lehre, den durch die Beschichtungsanlage führenden linearen Transportweg in mehrere parallele Zweige zu verzweigen, in denen jeweils mindestens eine der Behandlungsstationen angeordnet ist.The The invention comprises the general technical teaching by the Leading coating system branch linear transport path into several parallel branches, in each case arranged at least one of the treatment stations is.

Der im Rahmen der Erfindung verwendete Begriff einer Behandlungsstation ist allgemein zu verstehen und betrifft beispielsweise Lackierstationen bzw. -kabinen, in denen die Beschichtungsobjekte (z.B. Kraftfahrzeugkarosserien) mit einem Beschichtungsmittel, wie beispielsweise Füller, Basislack oder Klarlack, beschichtet werden. Darüber hinaus umfasst der im Rahmen der Erfindung verwendete Begriff einer Behandlungsstation auch Trocknerstationen, in denen die Beschichtungsobjekte nach einem Beschichtungsvorgang trocknen, was beispielsweise durch eine Bestrahlung oder durch einen Plasmaofen erfolgen kann. Ferner umfasst der Begriff einer Behandlungsstation auch solche Behandlungsstationen, in denen die Beschichtungsobjekte gereinigt, entfettet, gespült, phosphatiert, passiviert, maskiert, demaskiert, kontrolliert oder repariert werden oder in denen eine Nahtabdichtung erfolgt.Of the term used in the context of a treatment station is to be understood in general and concerns for example painting stations or cabins in which the coating objects (e.g., motor vehicle bodies) with a coating agent, such as filler, basecoat or clearcoat, to be coated. In addition, it includes in the frame The term "treatment station" used in the invention also refers to drying stations. in which the coating objects after a coating process dry, which, for example, by irradiation or by a Plasma furnace can be done. Furthermore, the term includes a treatment station also such treatment stations, in which the coating objects cleaned, degreased, rinsed, Phosphated, passivated, masked, unmasked, controlled or be repaired or in which a seam sealing takes place.

Der im Rahmen der Erfindung verwendete Begriff eines Beschichtungsobjekts ist ebenfalls allgemein zu verstehen und nicht auf Kraftfahrzeugkarosserien, Kraftfahrzeugkarosserieteile oder deren Anbauteile davon beschränkt. Vielmehr eignet sich die Erfindung auch zur Beschichtung anderer Beschichtungsobjekte, wie sie aus dem Stand der Technik bekannt sind und deshalb nicht näher beschrieben werden müssen.Of the Concept of a coating object used in the context of the invention is also to be understood generally and not on motor vehicle bodies, Motor vehicle body parts or their attachments thereof limited. Much more the invention is also suitable for coating other coating objects, as they are known from the prior art and therefore not described in more detail Need to become.

In einem bevorzugten Ausführungsbeispiel der Erfindung ist an der einlaufseitigen Verzweigungsstelle des Transportwegs eine Weiche angeordnet, über die die Beschichtungsobjekte gezielt einem der parallelen Zweige zugeführt werden können. Dies ermöglicht vorteilhaft eine Verteilung der einzelnen Beschichtungsobjekte auf die verschiedenen Zweige.In a preferred embodiment According to the invention, a switch is arranged at the entry-side branching point of the transport path, via which the coating objects can be selectively fed to one of the parallel branches. This advantageously makes it possible to distribute the individual coating objects over the various branches.

Vorzugsweise sind die parallelen Zweige des Transportwegs auslaufseitig wieder zu einem einzigen Transportweg zusammengeführt, auf dem dann sämtliche Beschichtungsobjekte transportiert werden, die zuvor in den verschiedenen parallelen Zweigen des Transportwegs behandelt wurden.Preferably the parallel branches of the transport path are on the outlet side again merged into a single transport route, on which then all Coating objects are transported previously in the different parallel branches of the transport route were treated.

Weiterhin ist in den parallelen Zweigen des Transportwegs vorzugsweise jeweils mindestens eine Beschichtungsstation angeordnet, in der die Beschichtungsobjekte mit einem Beschichtungsmittel beschichtet werden. Dadurch erhöht sich vorteilhaft die Flexibilität der gesamten Beschichtungsanlage, da beispielsweise Kraftfahrzeugkarosserien mit einem großen Lackieraufwand in einem Zweig lackiert werden können, wohingegen Kraftfahrzeugkarosserien mit einem kleinen Lackieraufwand in einem anderen Zweig des Transportwegs lackiert werden. Hierbei bremst die relativ lange Bearbeitungsdauer für die Kraftfahrzeugkarosserien mit dem großen Lackieraufwand nicht den gesamten Lackierprozess, da die Kraftfahrzeugkarosserien mit dem kleineren Lackieraufwand mit einer unabhängigen Taktzeit bzw. Bandgeschwindigkeit lackiert werden können.Farther is preferably in the parallel branches of the transport path respectively arranged at least one coating station, in which the coating objects be coated with a coating agent. This increases advantageous the flexibility the entire coating system, since, for example, motor vehicle bodies with a great Lackieraufwand can be painted in a branch, whereas motor vehicle bodies with a small paint job in another branch of the transport route to be painted. This slows down the relatively long processing time for the motor vehicle bodies with the big one Lackieraufwand not the entire painting process, since the vehicle bodies with the smaller Lackieraufwand with an independent cycle time or belt speed can be painted.

Darüber hinaus können in den parallelen Zweigen des Transportwegs jeweils hintereinander mehrere Behandlungsstationen angeordnet sein, wie beispielsweise eine Lackierstation und eine oder mehrere Abdunststationen.Furthermore can in the parallel branches of the transport path in each case a plurality of more Treatment stations may be arranged, such as a painting station and one or more flash-off stations.

In einer Variante ist hierbei in den parallelen Zweigen des Transportwegs jeweils die gleiche Anzahl von Behandlungsstationen angeordnet. Dies ist sinnvoll, wenn in den parallelen Zweigen im Wesentlichen dieselben Lackierprozesse ablaufen, die sich lediglich durch die jeweils verwendete Farbe unterscheiden.In a variant is here in the parallel branches of the transport path each arranged the same number of treatment stations. This is useful if in the parallel branches in essence The same paint processes take place, which are only due to the different color used.

In einer anderen Variante ist in den parallelen Zweigen des Transportwegs jedoch eine unterschiedliche Anzahl von Behandlungsstationen angeordnet. Dies ist sinnvoll, wenn in den verschiedenen Zweigen unterschiedliche Lackierprozesse ablaufen sollen, die entsprechend eine unterschiedliche Anzahl von Behandlungsstationen erfordern.In another variant is in the parallel branches of the transport path However, a different number of treatment stations arranged. This is useful if different branches are involved Painting processes are to run, the corresponding a different Require number of treatment stations.

In einem Ausführungsbeispiel einer erfindungsgemäßen Beschichtungsanlage befinden sich in mindestens einem der parallelen Zweige des Transportwegs in Transportrichtung hintereinander eine einlaufseitige Abdunststation, eine auslaufseitige Abdunststation und eine dazwischen angeordnete Beschichtungsstation.In an embodiment a coating system according to the invention are located in at least one of the parallel branches of the transport route in the transport direction one behind the other an inlet-side evaporation station, an outlet-side evaporation station and a coating station arranged therebetween.

Beim Betrieb dieser Beschichtungsanlage werden zwei Beschichtungsobjekte hintereinander in den betreffenden Zweig des Transportwegs transportiert, so dass sich das auslaufseitige Beschichtungsobjekt in der mittigen Beschichtungsstation befindet, während sich das einlaufseitige Beschichtungsobjekt in der einlaufseitigen Abdunststation befindet. Anschließend wird das in der Beschichtungsstation befindliche Beschichtungsobjekt mit einem Beschichtungsmittel beschichtet.At the Operation of this coating system will be two coating objects transported one after the other into the relevant branch of the transport path, so that the outlet side coating object in the central Coating station is located while the inlet side coating object in the inlet side Evaporation station is located. This is then done in the coating station coated coating object coated with a coating agent.

Nach dem Ende dieses Beschichtungsvorgangs werden die beiden Beschichtungsobjekte dann gemeinsam um eine Behandlungsstation in Richtung des Auslaufs transportiert, so dass sich das zuvor beschichtete Beschichtungsobjekt in der auslaufseitigen Abdunststation befindet, während das zuvor in einer Warteposition in der einlaufseitigen Abdunststation befindliche Beschichtungsobjekt nun in die mittige Beschichtungsstation transportiert wird. Anschließend wird dann auch das zweite Beschichtungsobjekt in der Beschichtungsstation mit einem Beschichtungsmittel beschichtet, während das bereits zuvor beschichtete Beschichtungsobjekt in der auslaufseitigen Abdunststation trocknet.To The two coating objects then become the end of this coating process transported together around a treatment station in the direction of the outlet, so that the previously coated coating object in the outlet side evaporation station is while the previously in a waiting position in the inlet side evaporation station coating object now in the central coating station is transported. Subsequently then becomes the second coating object in the coating station coated with a coating agent while the previously coated Coating object in the outlet-side evaporation station dries.

Nach dem Ende dieses zweiten Beschichtungsvorgangs werden dann die beiden Beschichtungsobjekte wieder auslaufseitig um eine Behandlungsstation weiter transportiert, so dass sich das erste Beschichtungsobjekt wieder in der Beschichtungsstation befindet, während sich das zuvor in der mittigen Beschichtungsstation beschichtete Beschichtungsobjekt nun in der einlaufseitigen Abdunststation befindet. In dieser Stellung trocknet dann das zweite Beschichtungsobjekt in der einlaufseitigen Abdunststation, während das erste Beschichtungsobjekt in der mittigen Beschichtungsstation erneut mit einem Beschichtungsmittel beschichtet wird.To the end of this second coating process then become the two Coating objects again on the outlet side around a treatment station transported further, so that the first coating object again located in the coating station, while the previously in the center Coating station coated coating object now in the inlet-side evaporation station is located. In this position then it dries the second coating object in the inlet-side evaporation station, while the first coating object in the central coating station is coated again with a coating agent.

Nach dem Abschluss dieses Beschichtungsvorgangs werden die beiden Beschichtungsobjekte dann wieder gemeinsam um eine Behandlungsstation in Richtung des Auslaufs transportiert, so dass sich das erste Beschichtungsobjekt in der auslaufseitigen Abdunststation befindet, während sich das zuvor in der einlaufseitigen Abdunststation getrocknete Beschichtungsobjekt in die mittige Beschichtungsstation transportiert wird. Anschließend wird dann auch das zweite Beschichtungsobjekt zum zweiten Mal beschichtet, während das erste Beschichtungsobjekt in der auslaufsseitigen Abdunststation trocknet.To At the conclusion of this coating process, the two coating objects are then together again around a treatment station in the direction of the spout transported, so that the first coating object in the outlet side evaporation station is located, while the previously in the inlet side evaporation station dried coating object in the central coating station is transported. Subsequently, will then coated the second coating object for the second time, while the first coating object in the outlet-side evaporation station dries.

Auf diese Weise können also in jedem Zweig des Transportwegs jeweils zwei Beschichtungsobjekte abwechselnd beschichtet werden und trocknen, was für eine hohe Effizienz der Beschichtungsanlage sorgt. Der Transportweg ermöglicht deshalb zumindest in einem der parallelen Zweige einen bidirektionalen Transport der Beschichtungsobjekte.In this way, in each branch of the transport path, two coating objects can be alternately coated and dried, which ensures high efficiency of the coating system provides. The transport path therefore enables a bidirectional transport of the coating objects at least in one of the parallel branches.

Weiterhin ist zu erwähnen, dass der Transportweg wahlweise einen auch als Durchlaufbetrieb (engl. „Line Tracking") oder einen auch als Taktbetrieb („Stop and Go") bezeichneten intermittierenden Transportbetrieb ausführen kann, was an sich aus dem Stand der Technik bekannt ist und deshalb nicht weiter beschrieben werden muss.Farther is to mention that the transport route either one as a continuous operation (English "Line Tracking") or a as clock mode ("Stop and Go ") intermittent transport operation can do, which in itself from the State of the art is known and therefore not further described must become.

Darüber hinaus besteht im Rahmen der Erfindung die Möglichkeit, dass der Transportweg die einzelnen Beschichtungsobjekte mit einer einheitlichen Transportgeschwindigkeit oder mit einer unterschiedlichen Transportgeschwindigkeit transportiert, wodurch die Flexibilität der erfindungsgemäßen Beschichtungsanlage wesentlich erhöht wird. Beispielsweise kann die Transportgeschwindigkeit in den parallelen Zweigen des Transportwegs unabhängig voneinander sein, so dass in einem Zweig komplizierte Beschichtungsobjekte mit einer geringen Transportgeschwindigkeit transportiert werden, während in einem anderen Zweig des Transportwegs einfache Beschichtungsobjekte mit einer hohen Transportgeschwindigkeit transportiert werden. Darüber hinaus besteht auch die Möglichkeit, dass die Transportgeschwindigkeit der einzelnen Beschichtungsobjekte völlig voneinander unabhängig ist, was auch innerhalb eines Zweigs oder vor der Verzweigung gilt. Auf diese Weise besteht beispielsweise die Möglichkeit, dass die Transportgeschwindigkeit in einem einheitlichen Transportweg für die verschiedenen Beschichtungsobjekte variiert wird, um Lücken zwischen aufeinander folgenden Beschichtungsobjekten zu schließen oder entstehen zu lassen. Darüber hinaus kann die Taktzeit bzw. Transportgeschwindigkeit auch an den Lackieraufwand des je weiligen Beschichtungsobjekts angepasst werden. Ferner kann die Taktzeit bzw. Transportgeschwindigkeit auch in Abhängigkeit von Modell, Lackart, Farbton, Lackhersteller, der gewünschten Lackqualität und bestimmten Qualitätsmerkmalen variiert werden. Die Erfindung ermöglicht also eine optimale Nutzung der Taktzeit pro Prozessschritt, wodurch die Kapazität der Lackieranlage erhöht werden kann.Furthermore exists within the scope of the invention, the possibility that the transport route the individual coating objects with a uniform transport speed or transported at a different transport speed, thereby the flexibility the coating system according to the invention significantly increased becomes. For example, the transport speed in the parallel Branches of the transport route independently be from each other, so that in a branch complicated coating objects be transported at a low transport speed, while in another branch of the transport path simple coating objects be transported at a high transport speed. In addition there is also the possibility that the transport speed of the individual coating objects completely different from each other independently is what is also true within a branch or before the branch. In this way, for example, there is the possibility that the transport speed in a uniform transport route for the various coating objects is varied to gaps to close between successive coating objects or let develop. About that In addition, the cycle time or transport speed at the Lackieraufwand the respective coating object to be adjusted. Furthermore, the cycle time or transport speed can also be dependent of model, paint type, color, paint manufacturer, the desired paint quality and certain quality characteristics be varied. The invention thus enables optimal use the cycle time per process step, reducing the capacity of the paint shop elevated can be.

In einem bevorzugten Ausführungsbeispiel der Erfindung ist ferner vorgesehen, dass zwischen zwei benachbarten parallelen Zweigen des Transportwegs mindestens ein Roboter angeordnet ist, der die Behandlungsstationen in den beiden benachbarten Zweigen bedient. Zum einen kann dadurch die Anzahl der erforderlichen Roboter verringert werden, da ein Roboter nicht nur eine einzige Behandlungsstation bedient, sondern die beiden benachbarten Behandlungsstationen in den beiden angrenzenden parallelen Zweigen. Zum anderen wird dadurch die Effektivität der einzelnen Roboter erhöht, da das Verhältnis von aktiver Nutzungsdauer zu inaktiver Totzeit verbessert wird.In a preferred embodiment of Invention is further provided that between two adjacent at least one robot arranged parallel branches of the transport path is that of the treatment stations in the two adjacent branches served. On the one hand, this can reduce the number of robots required be reduced because a robot is not just a single treatment station but the two neighboring treatment stations in the two adjacent parallel branches. On the other hand, it will the effectiveness the individual robot increases, because the ratio from active life to inactive dead time.

Weiterhin besteht im Rahmen der Erfindung die Möglichkeit, dass in den verschiedenen parallelen Zweigen des Transportwegs verschiedene Beschichtungsstationen angeordnet sind, wie im Folgenden ausgeführt wird.Farther exists in the context of the invention, the possibility that in the various parallel branches of the transport path different coating stations are arranged, as will be explained below.

Beispielsweise kann in einem Zweig des Transportwegs eine Nasslack-Beschichtungsstation angeordnet sein, während in einem anderen Zweig des Transportwegs eine Pulverlack-Beschichtungsstation angeordnet ist. Auf diese Weise können in einer einzigen Lackierlinie sowohl Nasslack als auch Pulverlack appliziert werden.For example For example, a wet paint coating station may be disposed in a branch of the transport path be while in another branch of the transport path, a powder coating station is arranged. This way, in a single paint line Both wet paint and powder coating can be applied.

Darüber hinaus besteht hierbei die Möglichkeit, dass in einem Zweig des Transportwegs eine monochromatische Beschichtungs station angeordnet ist, die ohne Farbwechsel ausschließlich Beschichtungsmittel der am häufigsten gewünschten Farbe („High-Runner") appliziert, während in einem anderen Zweig des Transportwegs eine multichromatische Beschichtungsstation angeordnet ist, die Beschichtungsmittel mit verschiedenen Farben appliziert. Die monochromatische Beschichtungsstation kann dann ohne Farbwechselverluste und Farbwechselverzögerungen die am häufigsten gewünschte Farbe applizieren, wobei es sich derzeit in Europa um Silber und in Asien um Weiß handelt. Trotzdem ermöglicht dieselbe Lackierlinie hierbei auch die Applikation anderer Farben in den anderen Zweigen des Transportwegs.Furthermore there is the possibility that in a branch of the transport path a monochromatic coating station is arranged, which without color change excluding coating means the most frequently desired color ("High-runner") applied while in another branch of the transport path is a multichromatic coating station is arranged, the coating agent with different colors applied. The monochromatic coating station can then without color change losses and color change delays the most common desired color apply, which is currently in Europe for silver and in Asia is about white. Still possible the same painting line here also the application of other colors in the other branches of the transport route.

Weiterhin besteht im Rahmen der Erfindung die Möglichkeit, dass in einem Zweig des Transportwegs eine aktive Beschichtungsstation für einen Normalbetrieb angeordnet ist, während sich in einem anderen Zweig des Transportwegs eine inaktive Beschichtungsstation für einen Reservebetrieb befindet. Die für den Reservebetrieb vorgesehene Beschichtungsstation ermöglicht beispielsweise bei einem Ausfall einer aktiven Beschichtungsstation eine Aufrechterhaltung der Lackierkapazität der gesamten Beschichtungsanlage, indem die inaktive Beschichtungsstation an die Stelle der ausgefallenen Beschichtungsstation tritt. Darüber hinaus lässt sich die inaktive Beschichtungsstation auch für Lackierversuche unter Großserienbedingungen verwenden, um neue Lacke und Lacksysteme zu testen. Eine weitere Möglichkeit der Nutzung der inaktiven Beschichtungsstation besteht in der Verwendung als sogenannte Teach-Kabine, in der Roboter umprogrammiert werden können. Ferner besteht die Möglichkeit, Lackierprogramme in der inaktiven Beschichtungsstation über einen längeren Zeitraum von mehreren Jahren zu optimieren, um die optimierten Lackierprogramme dann auf die anderen Beschichtungsstationen zu übertragen.Farther exists within the scope of the invention, the possibility that in a branch the transport path an active coating station for a Normal operation is arranged while In another branch of the transport path, an inactive coating station for one Reserve operation is located. The for the reserve operation provided coating station allows, for example maintenance in case of failure of an active coating station the painting capacity the entire coating system by the inactive coating station takes the place of the failed coating station. Furthermore let yourself the inactive coating station also for painting trials under high volume conditions use to test new paints and coating systems. One more way the use of the inactive coating station is in use as a so-called teach-cabin in which robots are reprogrammed can. It is also possible to paint programs in the inactive coating station over a longer period of several years to optimize the optimized paint programs then on the to transfer to other coating stations.

Weiterhin besteht im Rahmen der Erfindung die Möglichkeit, dass in einem Zweig des Transportwegs eine Beschichtungsstation für Kraftfahrzeugkarosserien angeordnet ist, während sich in einem anderen Zweig des Transportwegs eine Beschichtungsstation für Anbauteile (z.B. Stoßfänger) befindet. Dies ermöglicht vorteilhaft eine Optimierung der einzelnen Beschichtungsstationen im Hinblick auf die Anforderungen der jeweiligen Beschichtungsobjekte.Farther exists within the scope of the invention, the possibility that in a branch the transport path, a coating station for motor vehicle bodies is arranged while in another branch of the transport path, a coating station for attachments (e.g., bumper). This allows advantageously an optimization of the individual coating stations with regard to the requirements of the respective coating objects.

In einer anderen Variante der Erfindung ist in den einzelnen Zweigen des Transportwegs jeweils eine monochromatische Beschichtungsstation angeordnet, die jeweils nur Beschichtungsmittel mit einer bestimmten Farbe appliziert, wobei diesen monochromatischen Beschichtungsstationen jeweils eine monochromatische Recycling-Einrichtung zugeordnet ist, die nur das Beschichtungsmittel aus der zugehörigen Beschichtungsstation wiederverwertet. Zum einen bietet dieses monochromatische Recycling den Vorteil, dass sich das gewonnene Beschichtungsmittel aufgrund seiner monochromatischen Zusammensetzung gut für eine Wiederverwertung eignet. Zum anderen ist hierbei trotz der monochromatischen Beschichtungsstationen die Applikation verschiedener Farben möglich, indem die Beschichtungsobjekte auf die verschiedenen Zweige des Transportwegs verteilt werden, in denen sich die Beschichtungsstationen mit den gewünschten Farben befinden.In Another variant of the invention is in the individual branches each transport path a monochromatic coating station arranged, each only coating agent with a specific Color applied, these monochromatic coating stations each associated with a monochromatic recycling facility, the only the coating agent from the associated coating station recycled. On the one hand, this monochromatic recycling offers the Advantage that the recovered coating agent due to its monochromatic composition good for recycling. On the other hand, despite the monochromatic coating stations the application of different colors possible by the coating objects be distributed to the various branches of the transport route, in which the coating stations with the desired Colors are.

In einem Ausführungsbeispiel der Erfindung weist mindestens eine Beschichtungsstation zwei Klarlack-Lackierroboter und zwei Basislack-Lackierroboter auf, die auch als Handhabungsroboter einsetzbar sind. Bei der Applikation von Basislack wird der Klarlack-Lackierroboter nicht zur Applikation von Lack benötigt und dient dann als Handhabungsroboter, um beispielsweise Türen oder Hauben einer Kraftfahrzeugkarosserie zu öffnen. Bei der Applikation des Klarlacks wird dagegen der Basislack-Lackierroboter nicht benötigt und kann dann als Handhabungsroboter eingesetzt werden, um wiederum Türen und Hauben der lackierten Kraftfahrzeugkarosserie zu öffnen.In an embodiment According to the invention, at least one coating station has two clearcoat painting robots and two basecoat paint robots, also called handling robots can be used. When applying base coat, the clear coat painting robot is used not needed for the application of paint and then serves as a handling robot, for example, doors or to open hoods of a motor vehicle body. In the application of the clearcoat, however, the basecoat paint robot is not needed and can then be used as a handling robot to turn doors and Open hoods of the painted vehicle body.

Vorzugsweise ist an dem Transportweg vor der Verzweigung eine zentrale Lesestelle angeordnet, um die einlaufenden Beschichtungsobjekte zu identifizieren und die nachfolgenden Behandlungsstationen sowie die Verteilung auf die verschiedenen parallelen Zweige zu steuern. Wenn die zentrale Lesestelle beispielsweise erkennt, dass auf dem Transportweg eine Kraftfahrzeugkarosserie einläuft, die mit einer häufig gewünschten Farbe („High-Runner") lackiert werden soll, so kann diese Kraftfahrzeugkarosserie gezielt in den Zweig des Transportwegs geleitet werden, der zur Lackierung mit High-Runnern vorgesehen ist. Die zentrale Lesestelle übergibt hierbei die Daten über die einlaufenden Beschichtungsobjekte an eine zentrale Lackiersteuerung bzw. an die nachgeordneten Behandlungsstationen in den parallelen Zweigen des Transportwegs. Diese zentrale Lackiersteuerung ermöglicht vorteilhaft einen Verzicht auf zusätzliche Lesestellen in den einzelnen parallelen Zweigen des Transportwegs.Preferably is at the transport route in front of the branch a central reading point arranged to identify the incoming coating objects and the subsequent treatment stations as well as the distribution to control the different parallel branches. If the central For example, the reading office recognizes that there is a transport problem Vehicle body enters, the one with frequent desired Paint ("high-runner") to be painted should, so this vehicle body can be targeted in the branch the transport route intended for painting with high-runners is. The central reading point passes here the data over the incoming coating objects to a central Lackiersteuerung or to the downstream treatment stations in the parallel Branches of the transport route. This central paint control allows advantageous a waiver of additional Reading points in the individual parallel branches of the transport route.

Weiterhin besteht im Rahmen der Erfindung die Möglichkeit, dass die Behandlungsstationen in den parallelen Zweigen des Transportwegs eine unterschiedliche Klimatisierung aufweisen. So unterscheiden sich die optimalen Klimatisierungsbedingungen hinsichtlich Temperatur, Feuchtigkeit und Luftsinkgeschwindigkeit in Abhängigkeit von den verwendeten Lacksystemen (Füller, Basislack oder Klarlack), dem verwendeten Zerstäubertyp (Luftzerstäuber, elektrostatischer Zerstäuber oder Hochrotationszerstäuber) und dem Farbton. Die unterschiedliche Klimatisierung in den parallelen Zweigen des Transport wegs ermöglicht hierbei eine optimale Anpassung der Klimatisierung an die jeweiligen individuellen Anforderungen.Farther exists within the scope of the invention, the possibility that the treatment stations in the parallel branches of the transport path a different Have air conditioning. This is how the optimal climate conditions differ in terms of temperature, humidity and air sink rate dependent on of the paint systems used (filler, basecoat or clearcoat), the type of atomizer used (Air atomizer, electrostatic atomizer or high-rotation atomizer) and the color. The different air conditioning in the parallel Branches of the transport way allows In this case, an optimal adaptation of the air conditioning to the respective individual requirements.

Ein weiterer Vorteil der erfindungsgemäßen Beschichtungsanlage ist die mögliche Standardisierung der Anlagentechnik, indem die einzelnen Behandlungsstationen als standardisierte Module ausgebildet sind. Auf diese Weise ist es möglich, dass eine Beschichtungsanlage von dem jeweiligen Anlagenbauer gebaut und dann vom Kunden beim Anlagenbauer besichtigt, getestet oder validiert werden kann. Die Inbetriebnahme erfolgt hierbei also nicht erst beim Kunden, sondern bereits beim Anlagenbauer, wodurch die spätere Inbetriebnahme wesentlich einfacher möglich ist.One Another advantage of the coating system according to the invention is the possible Standardization of the plant engineering by the individual treatment stations are designed as standardized modules. That way is it is possible that a coating plant built by the respective plant manufacturer and then visited by the customer at the plant manufacturer, tested or can be validated. Commissioning does not take place in this case at the customer, but already at the plant engineer, reducing the later commissioning much easier possible is.

Die verschiedenen Behandlungsstationen weisen deshalb vorzugsweise einheitliche Außenabmessungen und/oder einheitliche Anschlüsse für Druckluft, Beschichtungsmittel, Spülmittel, Datenleitungen, Zu- und Abluft sowie deren Aufbereitung für die Kabine und/oder Stromversorgung auf, so dass einzelne Behandlungsstationen einfach durch andere Behandlungsstationen ausgetauscht werden können.The different treatment stations therefore preferably have uniform external dimensions and / or uniform connections for compressed air, Coating, rinsing agent, Data lines, supply air and exhaust air as well as their preparation for the cabin and / or power supply, so that individual treatment stations can be easily replaced by other treatment stations.

Weiterhin besteht im Rahmen der Erfindung die Möglichkeit, dass der Transportweg entlang der Lackierlinie nicht nur einmal in mehrere parallele Zweige verzweigt, sondern mehrfach hintereinander.Farther exists within the scope of the invention, the possibility that the transport route along the paint line not just once in several parallel branches branched, but several times in a row.

Vorzugsweise ist in dem Transportweg eine Trocknerstation, insbesondere eine Plasma-Trocknerstation oder eine Strahlungshärtungseinrichtung, in Transportrichtung hinter einer Beschichtungsstation angeordnet, was im Übrigen auch bei Transportwegen ohne Verzweigungen möglich ist.Preferably is in the transport path a dryer station, in particular a Plasma dryer station or a radiation curing device, in the transport direction arranged behind a coating station, which incidentally, too in transport routes without branches is possible.

Ferner besteht im Rahmen der Erfindung die Möglichkeit, dass die Behandlungsstationen in den verschiedenen parallelen Zweigen des Transportwegs einen unterschiedlichen Explosionsschutz und/oder einen unterschiedlichen Brandschutz aufweisen. So enthalten beispielsweise die derzeit verwendeten Silberlacke und andere Lacke weniger Lösungsmittel und sind deshalb weniger brand- bzw. explosionsgefährdet. Wenn nun in einem Zweig des Transportwegs nur ein solcher Lack (z.B. Silberlack) mit einer geringen Brand- bzw. Explosionsneigung appliziert wird, so muss in der zugehörigen Beschichtungsstation ein geringerer Aufwand für Brand- und Explosionsschutz betrieben werden als in den anderen Zweigen des Transportwegs, in denen verschiedene Farben appliziert werden, die auch einen höheren Lösungsmittelanteil aufweisen und deshalb stärker brand- und explosionsgefährdet sind. Im Extremfall kann in einem Zweig des Transportwegs sogar vollständig auf einen Explosions- bzw. Brandschutz verzichtet werden, wenn in diesem Zweig nur Lacke appliziert werden, die so wenig Lösemittel enthalten, dass keine Brand- bzw. Explosionsgefahr besteht.Furthermore, it is within the scope of the invention, the possibility that the treatment stations in the different parallel branches of the transport path have a different explosion protection and / or a different fire protection. For example, currently used silver paints and other paints contain less solvent and are therefore less prone to fire or explosion. If only one such paint (eg silver paint) is applied with a low tendency to fire or explosion in a branch of the transport path, a lesser expenditure for fire and explosion protection must be operated in the associated coating station than in the other branches of the transport path, in which different colors are applied, which also have a higher solvent content and are therefore more at risk of fire and explosion. In extreme cases, in a branch of the transport even completely dispense with an explosion or fire protection, if in this branch only paints are applied, which contain so little solvent that no risk of fire or explosion exists.

Vorzugsweise sind die einzelnen Beschichtungsstationen als im Wesentlichen geschlossene Kabinen ausgebildet, die jeweils einen Kabineneinlauf und einen Kabinenauslauf aufweisen, wobei der Kabineneinlauf und/oder der Kabinenauslauf durch ein Tor, insbesondere durch ein Rolltor, verschließbar ist. Das Tor verhindert hierbei vorteilhaft, dass Personen über den Transportweg unbefugt in die Lackierkabine gelangen. Darüber hinaus ermöglicht ein Tor eine bessere Luftführung in der Kabine, wodurch die Lackierqualität verbessert wird.Preferably the individual coating stations are essentially closed cabins each designed a cabin inlet and a cabin outlet , wherein the cabin inlet and / or the cabin outlet is closed by a gate, in particular by a roller door. The goal prevents this advantageous that people on the Transport route without authorization into the spray booth. Furthermore allows a gate better airflow in the cabin, which improves the paint quality.

Vorzugsweise wird das Tor zu den Lackierkabinen mit einer Schließeinrichtung gesichert, wobei die Schließeinrichtung beispielsweise durch einen Schlüssel, einen PIN-Code, einen Fingerabdruck oder eine Code-Karte bedienbar ist.Preferably becomes the door to the paint booths with a closing device secured, wherein the locking device, for example through a key, a PIN code, a fingerprint or a code card can be operated is.

Weiterhin besteht im Rahmen der Erfindung die Möglichkeit getrennter Beschichtungsmittelversorgungen für Wasserlack einerseits und für Lösungsmittellack andererseits, wobei die beiden getrennten Beschichtungsmittelversorgungen denselben Lackierroboter oder verschiedene Lackierroboter speisen können.Farther exists within the scope of the invention, the possibility of separate coating agent supplies for water-based paint on the one hand and for Solvent paint on the other hand, the two separate coating agent supplies feed the same painting robot or different painting robots can.

Weiterhin ist zu erwähnen, dass die Erfindung nicht nur eine Beschichtungsanlage betrifft, wie sie vorstehend beschrieben wurde, sondern auch ein Betriebsverfahren für eine derartige Beschichtungsanlage.Farther is to mention that the invention relates not only to a coating plant, as described above, but also a method of operation for one Such coating system.

Im Rahmen des erfindungsgemäßen Betriebsverfahrens werden mehrere Beschichtungsobjekte entlang dem Transportweg durch die Beschichtungsanlage transportiert und in mehreren Behandlungsstationen (z.B. Lackierstation, Abdunststation, etc.) behandelt, wobei die Beschichtungsobjekte auf mehrere parallele Zweige des Transportwegs verteilt werden, in denen jeweils mindestens eine der Behandlungsstationen angeordnet ist.in the Frame of the operating method according to the invention Several coating objects will pass along the transport path the coating plant transported and in several treatment stations (e.g., paint booth, flash station, etc.), with the Coating objects on multiple parallel branches of the transport path in each case at least one of the treatment stations is arranged.

Die Verteilung der Beschichtungsobjekte auf die verschiedenen parallelen Zweige des Transportwegs erfolgt vorzugsweise in Abhängigkeit von einer für einen Lackierprozess prozessbestimmenden Größe. Im Rahmen des erfindungsgemäßen Betriebsverfahrens wird also vorzugsweise die prozessbestimmende Größe ermittelt und anschließend bei der Verteilung der Beschichtungsobjekte auf die verschiedenen Zweige des Transportwegs berücksichtigt.The Distribution of the coating objects on the different parallel Branches of the transport path is preferably carried out in dependence from one for a painting process process-determining size. In the context of the operating method according to the invention Thus, preferably the process-determining variable is determined and then at the distribution of the coating objects on the different branches of the transport route.

Bei der prozessbestimmenden Größe für die Verteilung der Beschichtungsobjekte kann es sich beispielsweise um den Typ (z.B. Limousine, Kombi, Coupe, Cabrio, Pickup, Van, Minivan, SUV oder Geländewagen) des zu beschichtenden Beschichtungsobjekts handeln, da beispielsweise eine Luxuskarosserie mit einem großen Lackierumfang in einem anderen Zweig lackiert werden kann als eine einfache Karosserie mit einem geringeren Lackierumfang.at the process-determining size for the distribution The coating objects may be, for example, the type (e.g., saloon, station wagon, coupe, convertible, pickup, van, minivan, SUV or off-road vehicle) act of the coating object to be coated, as for example a luxury body with a large paint size in one other branch can be painted as a simple bodywork with a lower paint finish.

Weiterhin kann es sich bei der prozessbestimmenden Größe für die Verteilung der Beschichtungsobjekte um den Lacklieferanten bzw. den jeweiligen Lack handeln. Dies ist wichtig, da es z.B. von einem Lackhersteller A eine Freigabe für einen Lackvolumenstrom von bis 450 ml/min und von einem anderen Lackhersteller B eine Freigabe bis 300 ml/min geben kann. Dies ergibt unterschiedliche Prozesszeiten für unterschiedliche Farben oder auch unterschiedliche Prozesszeiten gleicher Farbtöne unterschiedlicher Lackhersteller.Farther It may be the process-determining size for the distribution of the coating objects to trade the paint supplier or the respective paint. This is important as it is e.g. from a paint manufacturer A a release for one Paint volume flow of up to 450 ml / min and another paint manufacturer B can give a release up to 300 ml / min. This gives different Process times for different colors or different process times same shades different paint manufacturers.

Weiterhin kann es sich bei der prozessbestimmenden Größe für die Verteilung der Beschichtungsobjekte auf die verschiedenen parallelen Zweige des Transportwegs auch um die Farbe des zu applizierenden Beschichtungsmittels handeln. So können beispielsweise häufig gewünschte Farben („High-Runner") in einem bestimmten Zweig des Transportwegs appliziert werden, während weniger häufige Farben („Low-Runner") in anderen Zweigen des Transportwegs appliziert werden.Farther It may be the process-determining size for the distribution of the coating objects on the various parallel branches of the transport route too the color of the coating agent to be applied act. So can for example frequently desired Colors ("high-runner") in a given Branch of the transport path can be applied while less common colors ("Low-runner") in other branches of the Transport path are applied.

Darüber hinaus kann als prozessbestimmende Größe auch die jeweilige Qualitätsanforderung an die Beschichtung berücksichtigt werden, da beispielsweise Luxuskarosserien qualitativ hochwertiger lackiert werden sollen als einfache Karosserien. In den einzelnen Zweigen des Transportwegs können also qualitativ unterschiedliche Lackierprozesse stattfinden, wobei die Beschichtungsobjekte entsprechend den jeweiligen Qualitätsanforderungen auf die zugehörigen Zweige verteilt werden.Furthermore can also be a process-determining factor the respective quality requirement considered on the coating because, for example, luxury bodies are painted to a higher quality should be considered simple bodies. In the individual branches of the transport path can therefore qualitatively different painting processes take place, the coating objects according to the respective quality requirements on the associated branches be distributed.

Ferner kann es sich bei der prozessbestimmenden Größe für die Verteilung der Beschichtungsobjekte um den Typ des zu applizierenden Beschichtungsmittels handeln. So können in einer Beschichtungslinie sowohl Pulverlacke als auch wässrige Lacke appliziert werden, wobei die Beschichtungsobjekte entsprechend dem gewünschten Lacktyp auf die zugehörigen Zweige des Transportwegs verteilt werden, in denen entweder Pulverlacke oder wässrige Lacke appliziert werden.Furthermore, it may be in the process size for the distribution of the coating objects to the type of coating agent to be applied act. Thus, both powder coatings and aqueous coatings can be applied in a coating line, wherein the coating objects are distributed according to the desired type of paint on the associated branches of the transport path, in which either powder coatings or aqueous coatings are applied.

Weiterhin besteht die Möglichkeit, dass als prozessbestimmende Größe für die Verteilung der Beschichtungsobjekte die jeweilige Explosions- bzw. Brandgefahr des zu applizierenden Beschichtungsmittels berücksichtigt wird. Falls beispielsweise ein Beschichtungsobjekt einläuft, das mit einem Beschichtungsmittel appliziert werden soll, das keine erhebliche Brand- bzw. Explosionsgefahr aufweist, so kann dieses Beschichtungsobjekt in einen Zweig des Transportwegs transportiert werden, in dem sich eine Beschichtungsstation ohne Brand- bzw. Explosionsschutz befindet. Falls dagegen ein Beschichtungsobjekt einläuft, das mit einem Beschichtungsmittel lackiert werden soll, das eine erhebliche Explosions- bzw. Brandgefahr aufweist (z.B. Klarlack), so wird dieses Beschichtungsobjekt in einen Zweig des Transportwegs transportiert, in dem sich eine Beschichtungsstation mit einem Explosions- bzw. Brandschutz befindet.Farther it is possible, that as a process-determining size for the distribution the coating objects the respective explosion or fire hazard of the coating agent to be applied is taken into account. For example a coating object enters, which should be applied with a coating agent that does not has significant risk of fire or explosion, so this can Coating object transported in a branch of the transport path in which a coating station without fire or explosion protection located. In contrast, if a coating object enters, the to be painted with a coating agent that is a significant Explosive or fire hazard (e.g., clear coat), so does this Transported coating object in a branch of the transport path, in which a coating station with an explosion or fire protection located.

Darüber hinaus können bei der Verteilung der Beschichtungsobjekte auf die verschiedenen parallelen Zweige des Transportwegs auch beschichtungsmittelspezifische Lackierparameter berücksichtigt werden.Furthermore can when distributing the coating objects to the different ones parallel branches of the transport path also coating agent specific Paint parameters considered become.

Ferner besteht die Möglichkeit, dass im Rahmen des erfindungsgemäßen Betriebsverfahrens Kraftfahrzeugkarosserien einerseits und Anbauteile andererseits auf unterschiedliche Zweige des Transportwegs verteilt werden, so dass die verschiedenen Zweige des Transportwegs und die daran angeordneten Behandlungsstationen hinsichtlich des Typs der einlaufenden Beschichtungsobjekte optimiert werden können.Further it is possible, that in the context of the operating method according to the invention motor vehicle bodies on the one hand and attachments on the other hand on different branches be distributed along the transport route, so that the different branches the transport path and the treatment stations arranged thereon with respect to the type of incoming coating objects can.

Weiterhin besteht die Möglichkeit, dass häufig benötigte Farben einerseits und selten benötigte Farben andererseits in unterschiedlichen Zweigen des Transportwegs appliziert werden, so dass auch diesbezüglich eine Optimierung möglich ist.Farther it is possible, that often needed Colors on the one hand and rarely needed colors on the other hand applied in different branches of the transport path so, too, in that regard an optimization possible is.

Vorzugsweise erfolgt im Rahmen des erfindungsgemäßen Betriebsverfahrens eine Identifikation der einlaufenden Beschichtungsobjekte an einer zentralen Lesestation vor der Verzweigung des Transportwegs, wobei die Daten der zentralen Lesestation an eine zentrale Lackiersteuerung weitergegeben werden, so dass in den einzelnen Zweigen des Transportwegs auf zusätzliche Lesestationen verzichtet werden kann. Bei der zentralen Identifikation der einlaufenden Beschichtungsobjekte wird deshalb vorzugsweise die aktuelle Uhrzeit gemessen und gespeichert, um diese im weiteren Verlauf der Lackiersteuerung berücksichtigen zu können. Die zentrale Lackiersteuerung ermittelt dann vorzugsweise laufend die aktuelle Position aller eingelaufenen Beschichtungsobjekte innerhalb der Beschichtungsanlage in Abhängigkeit von der Identifikation durch das zentrale Lesegerät und der zugehörigen Uhrzeit sowie unter Berücksichtigung von der Verteilung auf die verschiedenen Zweige des Transportwegs und die dort ablaufenden Prozessschritte.Preferably takes place in the context of the operating method according to the invention a Identification of the incoming coating objects at a central location Reading station before the branch of the transport route, where the data the central reading station to a central Lackiersteuerung passed so that in the individual branches of the transport route to additional Reading stations can be dispensed with. At the central identification the incoming coating objects is therefore preferred the current time is measured and saved to this in the further Consider the course of the paint control to be able to. The central paint control then determines preferably continuously the current position of all incoming coating objects within the coating system in dependence from the identification by the central reader and the associated Time as well as under consideration from the distribution to the different branches of the transport route and the process steps taking place there.

Weiterhin besteht im Rahmen des erfindungsgemäßen Betriebsverfahrens die Möglichkeit, dass eine Behandlungsstation in einem Zweig des Transportwegs arbeitet und beispielsweise Lack appliziert oder ein Beschichtungsobjekt trocknet, während eine andere Behandlungsstation in einem anderen Zweig des Transportwegs montiert, demontiert, gewartet, getestet oder zu Schulungszwecken genutzt wird.Farther exists in the context of the operating method according to the invention the Possibility that a treatment station operates in a branch of the transport path and for example lacquer applied or a coating object dries while another treatment station in another branch of the transport route assembled, dismantled, maintained, tested or for training purposes is being used.

In einer Variante der Erfindung ist weiterhin vorgesehen, dass bei der Verteilung der Beschichtungsobjekte auf die einzelnen Zweige des Transportwegs der Bearbeitungsfortschritt in den einzelnen Zweigen berücksichtigt wird. Falls sich beispielsweise in einem der parallelen Zweige des Transportwegs kein Beschichtungsobjekt mehr befindet, so wird das nächste einlaufende Beschichtungsobjekt vorzugsweise diesem Zweig zugeteilt. Auf diese Weise kann verhindert werden, dass eine Lackierbox leer steht.In a variant of the invention is further provided that at the distribution of the coating objects on the individual branches of the transport path, the processing progress in the individual branches considered becomes. For example, if one of the parallel branches of the Transport path is no longer a coating object, it will next incoming coating object is preferably assigned to this branch. In this way it can be prevented that a Lackierbox is empty.

Weiterhin ist in einer Variante der Erfindung vorgesehen, dass die Verteilung der auf dem Transportweg einlaufenden Beschichtungsobjekte auf die einzelnen parallelen Zweige des Transportwegs in Abhängigkeit von einem oder mehreren Optimierungszielen erfolgt.Farther is provided in a variant of the invention that the distribution the incoming on the transport coating objects on the individual parallel branches of the transport path depending on one or more Optimization goals done.

Bei diesem Optimierungsziel kann es sich beispielsweise um die Minimierung der Farbverluste bzw. Farbwechselverluste handeln. Wenn nun ein einlaufendes Beschichtungsobjekt mit einer bestimmten Farbe lackiert werden soll, so wird dieses Beschichtungsobjekt vorzugsweise dem Zweig des Transportwegs zugeteilt, in dem bereits dieselbe Farbe lackiert wurde bzw. wird, so dass in diesem Zweig kein Farbwechsel erforderlich ist und demzufolge auch keine Farbwechselverluste auftreten.at For example, this optimization goal can be minimization the color losses or color change losses act. If now an incoming Coating object to be painted with a specific color, so this coating object is preferably the branch of the transport path in which the same color has already been painted, so that in this branch no color change is required and therefore also no color change losses occur.

Ein anderes Optimierungsziel ist beispielsweise die Minimierung der Größe der einlaufseitigen bzw. auslaufseitigen Pufferspeicher für die Beschichtungsobjekte. So müssen die auf dem Transportweg einlaufenden Beschichtungsobjekte in dem einlaufseitigen Pufferspeicher warten, bis die gewünschte Farbe lackiert werden kann. Dei zentrale Lackiersteuerung ermittelt hierbei über eine zentrale Lesestelle die gewünschte Farbe für die hintereinander einlaufenden Beschichtungsobjekte, die dann so auf die einzelnen Zweige verteilt werden, dass die Wartezeit und damit die erforderliche Größe des einlaufseitigen Pufferspeichers minimiert wird.Another optimization goal is, for example, the minimization of the size of the upstream and downstream buffer memories for the coating objects. Thus, the incoming coating objects in the transport path must wait in the inlet-side buffer memory until the desired Color can be painted. Dei central paint control determined here via a central reading the desired color for the successive incoming coating objects, which are then distributed to the individual branches, that the waiting time and thus the required size of the inlet side buffer memory is minimized.

Ein weiteres mögliches Optimierungsziel bei der Verteilung der Beschichtungsobjekte besteht in der Maximierung der Lackierkapazität der Beschichtungsanlage. So senkt die Reservierung eines kompletten Zweigs für die Reservierung eines High-Runners zwar vorteilhafterweise die Farbwechselverluste bei der Lackierung des High-Runners, jedoch ist die Lackierkapazität dann unter Umständen nicht optimal, wenn wenig High-Runner lackiert werden sollen. Andererseits führen häufige Farbwechsel aufgrund der erforderlichen Farbwechselzeit ebenfalls zu einer Verringerung der Lackierkapazität der gesamten Lackieranlage. Die einlaufenden Beschichtungsobjekte werden deshalb vorzugsweise so auf die einzelnen parallelen Zweige verteilt, dass die Lackierkapazität maximal ist.One further possible Optimization goal in the distribution of the coating objects consists in maximizing the coating capacity of the coating plant. So lowering the reservation of a complete branch for the reservation Although a high-runner advantageously the color change losses the painting of the high-runner, but the painting capacity is then under circumstances not optimal, if little high-runner should be painted. on the other hand to lead frequent Color change due to the required color change time as well to reduce the painting capacity of the entire paint shop. The incoming coating objects are therefore preferred so distributed to the individual parallel branches that the painting capacity is maximum is.

Ferner kann ein Optimierungsziel bei der Verteilung der einzelnen Beschichtungsobjekte darin bestehen, dass eine möglichst gleichmäßige Verteilung von verschiedenen Typen der Beschichtungsobjekte entsprechend dem Produktionsanteil des jeweiligen Typs erreicht wird.Further can be an optimization goal in the distribution of the individual coating objects to insist that one is possible even distribution of various types of the coating objects according to the Production share of each type is achieved.

Darüber hinaus kann die Verteilung der einlaufenden Beschichtungsobjekte auf die einzelnen parallelen Zweige des Transportwegs so optimiert werden, dass optimal auf Anforderungen aus dem einlaufseitigen Rohbau oder aus der auslaufseitigen Endmontage reagiert wird.Furthermore can the distribution of incoming coating objects on the individual parallel branches of the transport path can be optimized that optimally to requirements from the inlet side bodyshell or is reacted from the outlet side final assembly.

Ein weiteres mögliches Optimierungsziel kann darin bestehen, dass eine möglichst gute Beschichtungsqualität erreicht werden soll.One further possible Optimization goal can be that one as possible good coating quality should be achieved.

Ferner können die einlaufenden Beschichtungsobjekte so auf die parallelen Zweige des Transportwegs verteilt werden, dass die Standzeit der sogenannten Skids minimiert oder zumindest zeitlich begrenzt wird.Further can the incoming coating objects on the parallel branches be distributed to the transport path that the service life of the so-called Skids minimized or at least limited in time.

Schließlich ist noch ein Optimierungsziel möglich, wonach die Lagerzeit der vorgehaltenen Beschichtungsmittel minimiert oder zumindest zeitlich begrenzt wird, um ein Absetzen der Beschichtungsmittel bei längeren Lagerzeiten zu vermeiden.Finally is another optimization goal possible, after which the storage time of the pre-held coating agent minimized or at least temporary, to settle the coating agent for longer To avoid storage times.

Die vorstehend genannten Optimierungsziele sind teilweise untereinander unvereinbar, wie bereits vorstehend angedeutet wurde. Vorzugsweise werden den einzelnen Optimierungszielen deshalb unterschiedliche Prioritäten zugeordnet, so dass die Optimierung durch eine Software gestaffelt für die verschiedenrangigen Optimierungsziele erfolgt. Beispielsweise kann die Minimierung der Farbverluste ein vorrangiges Optimierungsziel sein, während die Maximierung der Lackierkapazität nur ein nachrangiges Optimierungsziel ist.The The optimization goals mentioned above are partially mutually exclusive incompatible, as already indicated above. Preferably Therefore, different priorities are assigned to the individual optimization goals. so the optimization by a software staggered for the dissimilar Optimization goals done. For example, minimizing the Color loss will be a prime optimization goal while maximizing the painting capacity is only a subordinate optimization goal.

Andere vorteilhafte Weiterbildungen der Erfindung sind in den Unteransprüchen gekennzeichnet oder werden nachstehend zusammen mit der Beschreibung der bevorzugten Ausführungsbeispiele der Erfindung anhand der Figuren näher erläutert. Es zeigen:Other advantageous developments of the invention are characterized in the subclaims or will be discussed below together with the description of the preferred Embodiments of the Invention with reference to the figures explained. Show it:

1 eine schematische Darstellung einer erfindungsgemäßen Beschichtungsanlage mit einem Transportweg, der in mehrere parallele Zweige ver zweigt, in denen sich jeweils zwei Abdunststationen und eine Lackierstation befinden, 1 a schematic representation of a coating system according to the invention with a transport path which branches ver into several parallel branches, in each of which there are two evaporation stations and a coating station,

2a-2f verschiedene aufeinanderfolgende Betriebsphasen für die einzelnen Zweige des Transportwegs bei der Beschichtungsanlage gemäß 1, 2a - 2f various successive operating phases for the individual branches of the transport path in the coating system according to 1 .

3 eine Abwandlung des Ausführungsbeispiels gemäß 1, bei der zwischen den benachbarten Zweigen des Transportwegs Roboter angeordnet sind, welche die Lackierstationen in den beiden jeweils angrenzenden Zweigen des Transportwegs bedienen, 3 a modification of the embodiment according to 1 in which robots are arranged between the adjacent branches of the transport path, which operate the painting stations in the two respectively adjacent branches of the transport path,

4 eine Abwandlung des Ausführungsbeispiels gemäß 3, bei dem in einem Transportweg High-Runner appliziert werden, während in einem anderen Zweig des Transportwegs Low-Runner appliziert werden, 4 a modification of the embodiment according to 3 in which high-runners are applied in one transport path, while low-runners are applied in another branch of the transport path,

5 eine Abwandlung des Ausführungsbeispiels gemäß 1, bei dem in einigen Zweigen des Transportwegs Pulverlack appliziert wird, während in den anderen Zweigen des Transportwegs Nasslack appliziert wird, 5 a modification of the embodiment according to 1 in which powder coating is applied in some branches of the transport path, while wet lacquer is applied in the other branches of the transport path,

6 eine Abwandlung des Ausführungsbeispiels gemäß 5, bei der in einigen Zweigen des Transportwegs Karosserien lackiert werden, während in einem anderen Zweig des Transportwegs nur Anbauteile lackiert werden, 6 a modification of the embodiment according to 5 in which bodies are painted in some branches of the transport path, while in another branch of the transport path only attachments are painted,

7 eine vereinfachte, stark schematisierte Darstellung einer erfindungsgemäßen Beschichtungs anlage, bei der der Transportweg hintereinander mehrere Verzweigungen aufweist, 7 a simplified, highly schematic representation of a coating system according to the invention, in which the transport path behind one another has several branches,

8 eine Lackierstation mit zwei Klarlack-Lackierrobotern und zwei Basislack-Lackierrobotern, die alle auch als Handhabungsroboter einsetzbar sind, 8th a painting station with two clear coat painting robots and two base coat painting robots, all of which can also be used as handling robots,

9 einen Zweig einer erfindungsgemäßen Beschichtungsanlage mit einer monochromatischen Beschichtungsanlage und einer monochromatischen Recycling-Einrichtung, 9 a branch of a coating system according to the invention with a monochromatic coating system and a monochromatic recycling device,

10 eine schematische Darstellung eines weiteren Ausführungsbeispiels, bei dem der Transportweg hintereinander mehrere Verzweigungen aufweist sowie 10 a schematic representation of another embodiment in which the transport path in succession has a plurality of branches and

11 eine Abwandlung des Ausführungsbeispiels gemäß 1, bei dem in den einzelnen parallelen Zweigen des Transportwegs ein unterschiedlicher Explosionsschutz vorgesehen ist. 11 a modification of the embodiment according to 1 in which a different explosion protection is provided in the individual parallel branches of the transport path.

1 zeigt einen Teilbereich einer erfindungsgemäßen Lackieranlage zur Lackierung von Kraftfahrzeugkarosserien 1, wobei die Kraftfahrzeugkarosserien 1 über einen einlaufseitigen linearen Transportweg 2 zugeführt werden. Der Transportweg 2 mündet in eine Querverschiebestrecke 3, die eingangsseitig eine Drehvorrichtung 4 aufweist, welche die Kraftfahrzeugkarosserien um 90° um die Senkrechte dreht, so dass die Kraftfahrzeugkarosserien 1 auf der Querverschiebestrecke 3 rechtwinklig zu der Förderrichtung ausgerichtet sind. 1 shows a partial area of a paint shop according to the invention for painting motor vehicle bodies 1 , wherein the motor vehicle bodies 1 via an inlet-side linear transport path 2 be supplied. The transport route 2 opens into a transverse displacement line 3 , the input side, a rotating device 4 which rotates the motor vehicle bodies by 90 ° about the vertical, so that the motor vehicle bodies 1 on the cross slide distance 3 are aligned at right angles to the conveying direction.

Die Querverschiebestrecke 3 dient als Weiche zur Verteilung der Kraftfahrzeugkarosserien 1 auf mehrere parallele Zweige 5-9, die eine Fortsetzung des einlaufseitigen Transportwegs 2 bilden. Hierzu transportiert die Querverschiebestrecke 3 die Kraftfahrzeugkarosserien 1 vor den gewünschten Zweig 5-9, woraufhin die Kraftfahrzeugkarosserien 1 dann rechtwinklig zu der Querverschiebestrecke 3 in den gewünschten Zweig 5-9 transportiert werden.The transverse shift distance 3 serves as a switch for the distribution of motor vehicle bodies 1 on several parallel branches 5 - 9 which is a continuation of the inlet-side transport path 2 form. For this purpose transports the transverse displacement line 3 the motor vehicle bodies 1 in front of the desired branch 5 - 9 , whereupon the motor vehicle bodies 1 then perpendicular to the transverse displacement distance 3 in the desired branch 5 - 9 be transported.

Ausgangsseitig münden die einzelnen parallelen Zweige 5-9 des Transportwegs 2 in eine weitere Querverschiebestrecke 10, die ausgangsseitig ebenfalls eine Drehvorrichtung 11 aufweist. Die Drehvorrichtung 11 dreht die von der Querverschiebestrecke 10 zugeführten Kraftfahrzeugkarosserien 1 wieder um 90° um die Senkrechte, so dass die Kraftfahrzeugkarosserie 1 beim Verlassen der Querverschiebestrecke 10 wieder parallel zu ihrer Transportrichtung ausgerichtet sind.On the output side, the individual parallel branches open 5 - 9 the transport route 2 in another transverse displacement route 10 , the output side also a rotating device 11 having. The turning device 11 Turns off the cross slide distance 10 supplied motor vehicle bodies 1 again at 90 ° to the vertical, so that the vehicle bodywork 1 when leaving the transverse displacement line 10 are aligned again parallel to their transport direction.

Schließlich gelangen die Kraftfahrzeugkarosserien 1 dann in einen auslaufseitigen Transportweg 12, über den die Kraftfahrzeugkarosserien in herkömmlicher Weise abtransportiert werden.Finally, the motor vehicle bodies arrive 1 then in an outlet side transport path 12 over which the motor vehicle bodies are transported in a conventional manner.

In den einzelnen parallelen Zweigen 5-9 befindet sich jeweils eine Lackierbox 13-17, so dass in jedem der Zweige 5-9 eine Lackierung der Kraftfahrzeugkarosserien 1 möglich ist.In the individual parallel branches 5 - 9 there is a paint box 13 - 17 so that in each of the branches 5 - 9 a paint of the motor vehicle bodies 1 is possible.

Darüber hinaus befindet sich in den parallelen Zweigen 5-9 jeweils eine einlaufseitige Abdunststation 18-22 und eine auslaufseitige Ablaufstation 23-27.In addition, located in the parallel branches 5 - 9 in each case an inlet-side evaporation station 18 - 22 and an outlet side drainage station 23 - 27 ,

Ferner zeigt die Zeichnung noch eine zentrale Lesestation 28, welche die einlaufenden Kraftfahrzeugkarosserien 1 identifiziert. Die Identifikation der einlaufenden Kraftfahrzeugka rosserien 1 ist für die zentrale Steuerung der gesamten Lackieranlage wichtig, damit die einlaufenden Kraftfahrzeugkarosserien 1 in optimaler Weise auf die verschiedenen Zweige 5-9 verteilt werden können.Furthermore, the drawing still shows a central reading station 28 which the incoming motor vehicle bodies 1 identified. The identification of the incoming Kraftfahrzeugka rosserien 1 is important for the central control of the entire paint shop, so that the incoming motor vehicle bodies 1 in an optimal way on the different branches 5 - 9 can be distributed.

So ist es beispielsweise wünschenswert, die Farbwechselverluste zu minimieren. Dies lässt sich dadurch erreichen, dass die einlaufenden Kraftfahrzeugkarosserien 1 nach Möglichkeit auf denjenigen Zweig 5-9 verteilt werden, in dem bereits die gewünschte Farbe lackiert wird, so dass dort kein Farbwechsel erforderlich ist.For example, it is desirable to minimize the color change losses. This can be achieved by the incoming motor vehicle bodies 1 if possible on that branch 5 - 9 be distributed, in which already the desired color is painted, so there no color change is required.

Im Folgenden wird nun unter Bezugnahme auf die 2a-2f die Betriebsweise der vorstehend beschriebenen und in 1 dargestellten Lackieranlage beschrieben, wobei zur Vereinfachung nur der Zweig 5 dargestellt ist. Der Betrieb in den anderen Zweigen 6-9 erfolgt jedoch in entsprechender Weise.The following will now be with reference to the 2a - 2f the operation of those described above and in 1 described Lackieranlage described, for simplicity, only the branch 5 is shown. The plant in the other branches 6 - 9 However, it is done in a similar way.

2a zeigt den Zustand des Zweigs 5 der Lackieranlage zu Beginn, wobei sich weder in den beiden Abdunststationen 18, 23 noch in der Lackierbox 13 eine Kraftfahrzeugkarosserie befindet. 2a shows the state of the branch 5 the paint shop at the beginning, with neither in the two evaporation stations 18 . 23 still in the paint box 13 a motor vehicle body is located.

Die Querverschiebestrecke 3 fördert dann nacheinander zwei Kraftfahrzeugkarosserien A, B in den Zweig 5, so dass sich die Kraftfahrzeugkarosserie A in der Lackierbox 13 und die Kraftfahrzeugkarosserie B in der Abdunststation 18 befindet wie in 2b dargestellt ist. In dieser Phase wird dann die Kraftfahrzeugkarosserie A in der Lackierbox 13 lackiert, während die Kraftfahrzeugkarosserie B in der Abdunststation 18 wartet.The transverse shift distance 3 then successively promotes two motor vehicle bodies A, B in the branch 5 , so that the motor vehicle body A in the Lackierbox 13 and the vehicle body B in the evaporation station 18 located as in 2 B is shown. In this phase then the vehicle body A in the Lackierbox 13 painted while the vehicle body B in the evaporation station 18 waiting.

Anschließend werden die beiden Kraftfahrzeugkarosserien A, B dann in dem Zweig 5 in Auslaufrichtung um eine Station weiter gefördert, so dass sich die Kraftfahrzeugkarosserie A in der auslaufseitigen Abdunststation 23 und die Kraftfahrzeugkarosserie B in der Lackierbox 13 befindet, wie in 2c dargestellt ist. In dieser Phase erfolgt dann eine Trocknung der zuvor lackierten Kraftfahrzeugkarosserie A in der Abdunststation 23, während die Kraftfahrzeugkarosserie B in der Lackierbox 13 erstmalig lackiert wird.Subsequently, the two motor vehicle bodies A, B then in the branch 5 in the outlet direction further promoted by one station, so that the motor vehicle body A in the outlet side evaporation station 23 and the vehicle body B in the paint box 13 is located as in 2c is shown. In this phase, then a drying of the previously painted vehicle body A in the evaporation station 23 while the vehicle body B in the paint box 13 first time is painted.

Danach werden die beiden Kraftfahrzeugkarosserien A, B dann in dem Zweig 5 wieder um eine Station zurück transportiert, so dass sich die Kraftfahrzeugkarosserie A wieder in der Lackierbox 13 und die Kraftfahrzeugkarosserie B in der einlaufseitigen Abdunststation 18 befindet, wie in 2D dargestellt ist. Die Kraftfahrzeugkarosserie A wird dann in der Lackierbox 13 ein zweites Mal lackiert, während die zuvor erstmalig lackierte Kraftfahrzeugkarosserie B in der einlaufseitigen Abdunststation 18 trocknet.Thereafter, the two motor vehicle bodies A, B then in the branch 5 again transported back to a station, so that the vehicle body A again in the Lackierbox 13 and the vehicle body B in the inlet side Evaporation station 18 is located as in 2D is shown. The motor vehicle body A is then in the Lackierbox 13 painted a second time, while the previously first-time painted vehicle body B in the inlet side evaporation station 18 dries.

Anschließend werden die beiden Kraftfahrzeugkarosserien A, B dann wieder um eine Station in Richtung des Auslaufs transportiert, so dass sich die Kraftfahrzeugkarosserie A in der auslaufseitigen Abdunststation 23 und die Kraftfahrzeugkarosserie B in der Lackierbox 13 befindet, wie in 2e dargestellt ist. In dieser Phase trocknet dann die zuvor zum zweiten Mal lackierte Kraftfahrzeugkarosserie A in der auslaufseitigen Abdunststation 23, während die Kraftfahrzeugkarosserie B in der Lackierbox 13 zum zweiten Mal lackiert wird.Subsequently, the two motor vehicle bodies A, B are then transported again by one station in the direction of the outlet, so that the motor vehicle body A in the outlet side evaporation station 23 and the vehicle body B in the paint box 13 is located as in 2e is shown. In this phase, then dried before the second time painted vehicle body A in the outlet side evaporation station 23 while the vehicle body B in the paint box 13 is painted for the second time.

Schließlich werden die beiden Kraftfahrzeugkarosserien A, B dann nach Abschluss der zweimaligen Lackierung aus dem Zweig 5 abtransportiert, so dass sich in den beiden Abdunststationen 18, 23 und in der Lackierbox 13 keine Kraftfahrzeugkarosserien A, B bzw. 1 befinden, wie in 2f dargestellt ist.Finally, the two motor vehicle bodies A, B then after completion of the two-coat from the branch 5 transported away, so that in the two evaporation stations 18 . 23 and in the paint box 13 no motor vehicle bodies A, B or 1 are as in 2f is shown.

Das Ausführungsbeispiel gemäß 3 stimmt weitgehend mit dem vorstehend beschriebenen und in den 1 sowie 2a-2f dargestellten Ausführungsbeispiel überein, so dass zur Vermeidung von Wiederholungen auf die vorstehende Beschreibung verwiesen wird, wobei für entsprechende Bauteile dieselben Bezugszeichen verwendet werden.The embodiment according to 3 is largely consistent with that described above and in the 1 such as 2a - 2f illustrated embodiment, so reference is made to avoid repetition of the above description, wherein the same reference numerals are used for corresponding components.

Eine Besonderheit dieses Ausführungsbeispiels besteht darin, dass zwischen den benachbarten Lackierboxen 13-17 jeweils ein Lackierroboter R und ein Handhabungsroboter H angeordnet sind, wobei der Handhabungsroboter H und der Lackierroboter R die beiden angrenzenden Lackierboxen 13-17 bedienen. Hierzu sind die einzelnen Lackierboxen 13-17 so nah nebeneinander angeordnet, dass jeweils zwei benachbarte Lackierboxen 13-17 in der Reichweite des dazwischen angeordneten Handhabungsroboters H bzw. des dazwischen angeordneten Lackierroboters R befinden. Dies bietet den Vorteil, dass auf zahlreiche Roboter verzichtet werden kann.A special feature of this embodiment is that between the adjacent Lackierboxen 13 - 17 in each case a painting robot R and a handling robot H are arranged, wherein the handling robot H and the painting robot R the two adjacent painting boxes 13 - 17 serve. These are the individual paint boxes 13 - 17 arranged so close together that each two adjacent paint boxes 13 - 17 in the range of the arranged therebetween handling robot H or the interposed painting robot R are located. This offers the advantage that many robots can be dispensed with.

Das Ausführungsbeispiel gemäß 4 stimmt weitgehend mit dem vorstehend beschriebenen und in 3 dargestellten Ausführungsbeispiel überein, so dass zur Vermeidung von Wiederholungen auf die vorstehende Beschreibung verwiesen wird, wobei für entsprechende Bauteile dieselben Bezugszeichen verwendet werden.The embodiment according to 4 is largely consistent with that described above and in 3 illustrated embodiment, so reference is made to avoid repetition of the above description, wherein the same reference numerals are used for corresponding components.

Eine Besonderheit dieses Ausführungsbeispiels besteht darin, dass die Lackierbox 13 ausschließlich zur Lackierung des am häufigsten gewünschten Lacks vorgesehen ist, wobei es sich derzeit in Europa um Silber und in Asien um Weiß handelt. Dementsprechend weist die Lackierbox 13 in diesem Ausführungsbeispiel auch keine Farbwechseleinrichtungen auf. Wenn das zentrale Lesegerät 28 also einlaufseitig erkennt, dass die einlaufende Kraftfahrzeugkarosserie 1 mit Silber lackiert werden soll, so wird die Querverschiebestrecke 3 so angesteuert, dass die zugehörige Kraftfahrzeugkarosserie 1 in den Zweig 5 transportiert wird.A special feature of this embodiment is that the Lackierbox 13 is intended exclusively for painting the most commonly desired paint, which is currently in Europe for silver and in Asia for white. Accordingly, the Lackierbox 13 in this embodiment also no color change devices. If the central reader 28 So inlet side recognizes that the incoming motor vehicle body 1 is to be painted with silver, so is the Querverschiebestrecke 3 so controlled that the associated vehicle body 1 in the branch 5 is transported.

Der Zweig 6 dient dagegen in diesem Ausführungsbeispiel zur Lackierung von häufig gewünschten Farben (engl. „High-Runner"), wobei die Lackierbox 14 in dem Zweig 6 im Gegensatz zu der Lackierbox 13 in dem Zweig 5 einen Farbwechsel zwischen den verschiedenen häufig gewünschten Farben ermöglicht.The branch 6 on the other hand serves in this embodiment for painting often desired colors (English "High-Runner"), wherein the Lackierbox 14 in the branch 6 in contrast to the paint box 13 in the branch 5 allows a color change between the different colors often desired.

Die Lackierboxen 15 bzw. 16 in den Zweigen 7 bzw. 8 dienen dagegen sowohl zur Lackierung von häufig gewünschten Farben („High-Runnern") als auch zur Lackierung von selten gewünschten Farben („Low-Runnern").The paint boxes 15 respectively. 16 in the branches 7 respectively. 8th On the other hand, they are used both to paint frequently desired colors ("high-runners") and to paint rarely desired colors ("low-runners").

Eine weitere Besonderheit dieses Ausführungsbeispiels besteht schließlich darin, dass der Zweig 9 ausschließlich als Reserve dient und im normalen Lackierbetrieb nicht benötigt wird. Die Lackierbox 17 in dem Zweig 9 kann deshalb beispielsweise zu Wartungszwecken oder für Reparaturarbeiten genutzt werden, ohne dass die Kapazität der gesamten Lackieranlage darunter leidet.Another special feature of this embodiment is finally that the branch 9 only serves as a reserve and is not required in the normal paint shop. The paint box 17 in the branch 9 can therefore be used, for example, for maintenance or repair work, without the capacity of the entire paint shop suffers.

5 zeigt ein weiteres Ausführungsbeispiel einer erfindungsgemäßen Beschichtungsanlage, das weitgehend mit den vorstehend beschriebenen Ausführungsbeispielen übereinstimmt, so dass zur Vermeidung von Wiederholungen auf die vorstehende Beschreibung verwiesen wird, wobei für entsprechende Bauteile dieselben Bezugszeichen verwendet werden. 5 shows a further embodiment of a coating system according to the invention, which is largely consistent with the embodiments described above, so reference is made to avoid repetition of the above description, wherein the same reference numerals are used for corresponding components.

Eine Besonderheit dieses Ausführungsbeispiels besteht darin, dass die Lackierboxen 13, 14 in den Zweigen 5, 6 nur Pulverlack applizieren, während die Lackierboxen 15, 16 in den Zweigen 7, 8 nur Nasslack applizieren. Die Beschichtungsanla ge ermöglicht also in diesem Ausführungsbeispiel wahlweise die Applikation von Pulverlack und Nasslack. Wenn die zentrale Lesestation 28 erkennt, dass die einlaufende Kraftfahrzeugkarosserie 1 mit Pulverlack lackiert werden sollen, so steuert die zentrale Lackiersteuerung die Querverschiebestrecke 3 so an, dass die Kraftfahrzeugkarosserie 1 entweder in den Zweig 5 oder in den Zweig 6 gefördert wird. Wenn die zentrale Lesestation 28 dagegen erkennt, dass die einlaufende Kraftfahrzeugkarosserie 1 mit Nasslack lackiert werden soll, so steuert die zentrale Lackiersteuerung die Querverschiebestrecke 3 so an, dass diese Kraftfahrzeugkarosserie 1 entweder in den Zweig 7 oder in den Zweig 8 transportiert wird.A special feature of this embodiment is that the Lackierboxen 13 . 14 in the branches 5 . 6 apply only powder paint while the paint boxes 15 . 16 in the branches 7 . 8th Apply only wet paint. The Beschichtungsungsanla ge thus allows in this embodiment optionally the application of powder coating and wet paint. If the central reading station 28 recognizes that the incoming motor vehicle body 1 should be painted with powder coating, the central paint control controls the transverse displacement 3 so on, that the vehicle body 1 either in the branch 5 or in the branch 6 is encouraged. If the central reading station 28 on the other hand recognizes that the incoming motor vehicle body 1 is to be painted with wet paint, the central paint control controls the transverse displacement 3 so on, that this vehicle bodywork 1 either in the branch 7 or in the branch 8th is transported.

Das Ausführungsbeispiel gemäß 6 stimmt wiederum weitgehend mit den vorstehend beschriebenen Ausführungsbeispielen überein, so dass zur Vermeidung von Wiederholungen auf die vorstehende Beschreibung verwiesen wird, wobei für entsprechende Bauteile dieselben Bezugszeichen verwendet werden.The embodiment according to 6 in turn, is largely consistent with the embodiments described above, so that reference is made to avoid repetition of the above description, wherein the same reference numerals are used for corresponding components.

Eine Besonderheit dieses Ausführungsbeispiels besteht darin, dass die Lackierboxen 13, 14, 15 in den Zweigen 5, 6, 7 nur zur Lackierung der Kraftfahrzeugkarosserien 1 dienen, während die Lackierbox 16 in dem Zweig 8 für die Lackierung von Anbauteilen reserviert ist. Die Lackierbox 16 kann deshalb im Hinblick auf die spezifischen Anforderungen für die Lackierung von Anbauteilen optimiert werden, während die anderen Lackierboxen 13-15 im Hinblick auf die spezifischen Anforderungen an die Lackierung der Kraftfahrzeugkarosserien 1 optimiert werden können.A special feature of this embodiment is that the Lackierboxen 13 . 14 . 15 in the branches 5 . 6 . 7 only for painting the vehicle bodies 1 serve while the paint box 16 in the branch 8th reserved for the painting of attachments. The paint box 16 can therefore be optimized in view of the specific requirements for the painting of attachments, while the other paint boxes 13 - 15 in view of the specific requirements for the painting of motor vehicle bodies 1 can be optimized.

7 zeigt ein weiteres Ausführungsbeispiel einer erfindungsgemäßen Beschichtungsanlage in stark vereinfachter, schematisierter Form. 7 shows a further embodiment of a coating system according to the invention in a greatly simplified, schematic form.

Hierbei verzweigt ein einlaufseitiger Transportweg 29 in vier parallele Zweige 30-33, die auslaufseitig wieder zu einem gemeinsamen Transportweg 34 zusammengeführt sind. Der gemeinsame Transportweg 34 verzweigt dann wieder in drei parallele Zweige 35, 36, 37, die dann wiederum auslaufseitig zu einem gemeinsamen Transportweg 38 zusammengeführt sind.Here, an inlet-side transport route branches 29 in four parallel branches 30 - 33 , the outlet side again to a common transport 34 are merged. The common transport route 34 then branches again into three parallel branches 35 . 36 . 37 , which then turn out to a common transport route 38 are merged.

In den Zweigen 30-33 befinden sich jeweils hintereinander zwei Abdunststationen und eine dazwischen angeordnete Lackierkabine, wie bereits vorstehend anhand der 1 und 2a-2f beschrieben wurde.In the branches 30 - 33 are located behind each other two evaporation stations and an interposed paint booth, as already above with reference to 1 and 2a - 2f has been described.

In den Zweigen 35-37 befindet sich dagegen jeweils ein Plasmatrockner, der die Beschichtungsobjekte trocknet, was an sich aus dem Stand der Technik bekannt ist.In the branches 35 - 37 On the other hand, there is in each case a plasma dryer, which dries the coating objects, which is known per se from the prior art.

8 zeigt ein vereinfachtes Ausführungsbeispiel einer Lackierbox 39 zur Lackierung einer Kraftfahrzeugkarosserie 40, wobei die Kraftfahrzeugkarosserie 40 entlang einem Transportweg 41 durch die Lackierbox 39 transportiert wird. Bei dem Transportweg 41 kann es sich beispielsweise um einen von mehreren parallelen Zweigen handeln, wie vorstehend beschrieben wurde. 8th shows a simplified embodiment of a Lackierbox 39 for painting a motor vehicle body 40 , wherein the vehicle body 40 along a transport route 41 through the paint box 39 is transported. In the transport route 41 For example, it may be one of several parallel branches as described above.

In der Lackierbox 39 befinden sich zwei Klarlack-Lackierroboter 42, 43 und zwei Basislack-Lackierroboter 44, 45, wobei sowohl die beiden Klarlack-Lackierroboter 42, 43 als auch die beiden Basislack-Lackierroboter 44, 45 auch als Handhabungsroboter eingesetzt werden können. In 8 applizieren die beiden Klarlack-Lackierroboter 42, 43 Klarlack auf die Kraftfahrzeugkarosserie 40, während die beiden Basislack-Lackierroboter 44, 45 keinen Basislack applizieren, sondern als Handhabungsroboter dienen und dabei Türen 46, 47 der Kraftfahrzeugkarosserie 40 öffnen.In the paint box 39 There are two clearcoat paint robots 42 . 43 and two basecoat paint robots 44 . 45 , where both the two clearcoat paint robots 42 . 43 as well as the two basecoat paint robots 44 . 45 can also be used as a handling robot. In 8th Apply the two clearcoat paint robots 42 . 43 Clear coat on the vehicle body 40 while the two basecoat paint robots 44 . 45 do not apply a base coat, but serve as handling robots and doors 46 . 47 the vehicle body 40 to open.

9 zeigt ein weiteres Ausführungsbeispiel mit einer erfindungsgemäßen Beschichtungsanlage mit einem Transportweg 48, in dem hintereinander zwei Abdunststationen 49, 50 und eine monochromatische Lackierstation 51 angeordnet sind. Die Lackierstation 51 dient hierbei zur Applikation von Pulverlack, der von einer Pulverversorgungseinrichtung 52 bereitgestellt wird, wobei die Pulverversorgungseinrichtung 52 teilweise mit frischem Pulverlack und teilweise mit Recycling-Pulver versorgt wird. 9 shows a further embodiment with a coating system according to the invention with a transport path 48 , in which two flash-off stations in a row 49 . 50 and a monochromatic painting station 51 are arranged. The painting station 51 in this case serves for the application of powder coating, that of a powder supply device 52 is provided, wherein the powder supply device 52 partially supplied with fresh powder coating and partly with recycled powder.

Das Recycling-Pulver wird hierbei von einer Pulver-Recycling-Einrichtung 53 an der Lackierstation 51 aufgefangen. Vorteilhaft hierbei ist die Tatasche, dass das aufgefangene Recycling-Pulver monochromatisch ist und sich deshalb gut zur Wiederverwertung eignet.The recycling powder is from a powder recycling facility 53 at the painting station 51 collected. The advantage here is the fact that the collected recycling powder is monochromatic and therefore is well suited for recycling.

10 zeigt ein weiteres Ausführungsbeispiel einer erfindungsgemäßen Beschichtungsanlage, das weitgehend mit den vorstehend beschriebenen Ausführungsbeispielen übereinstimmt, so dass zur Vermeidung von Wiederholungen auf die vorstehende Beschreibung verwiesen wird, wobei für entsprechende Bauteile dieselben Bezugszeichen verwendet werden. 10 shows a further embodiment of a coating system according to the invention, which is largely consistent with the embodiments described above, so reference is made to avoid repetition of the above description, wherein the same reference numerals are used for corresponding components.

Eine Besonderheit dieses Ausführungsbeispiels besteht darin, dass die Querverschiebeeinrichtung 3 vier parallele Zweige mit den Kraftfahrzeugkarosserien 1 versorgt, wobei in den parallelen Zweigen 54-57 jeweils eine Lackierbox 58-61 und jeweils eine Abdunststation 62-65 angeordnet ist.A special feature of this embodiment is that the transverse displacement device 3 four parallel branches with the motor vehicle bodies 1 supplied, being in the parallel branches 54 - 57 one painting box each 58 - 61 and one each evaporation station 62 - 65 is arranged.

Die Zweige 54-57 münden in eine zusätzliche Querverschiebestrecke 66, die wiederum vier parallele Zweige 67-70 mit den Kraftfahrzeugkarosserien 1 versorgt. In den parallelen Zweigen 67-70 ist jeweils ein Plasmaofen 71-74 angeordnet.The branches 54 - 57 open into an additional transverse displacement path 66 , in turn, four parallel branches 67 - 70 with the motor vehicle bodies 1 provided. In the parallel branches 67 - 70 is each a plasma oven 71 - 74 arranged.

Schließlich zeigt 11 wieder ein Ausführungsbeispiel einer erfindungsgemäßen Lackieranlage, das weitgehend mit den vorstehend beschriebenen Ausführungsbeispielen übereinstimmt, so dass zur Vermeidung von Wiederholungen auf die vorstehende Beschreibung verwiesen wird.Finally shows 11 Again, an embodiment of a painting according to the invention, which largely coincides with the embodiments described above, so that reference is made to avoid repetition of the above description.

Eine Besonderheit dieses Ausführungsbeispiels besteht darin, dass in der Lackierbox 13 nur Silber oder ein anderer High-Runner appliziert wird, der wenig Lösungsmittel enthält und deshalb nur eine geringe Brand- bzw. Explosionsgefahr aufweist. Dementsprechend weist die Lackierbox 13 keinen Explosionsschutz auf.A special feature of this embodiment is that in the Lackierbox 13 Only silver or another high-runner is applied, which contains little solvent and therefore only one has low risk of fire or explosion. Accordingly, the Lackierbox 13 no explosion protection.

Die Lackierboxen 14-16 dienen dagegen zur Applikation anderer Farben mit einem höheren Lösemittelanteil und einer entsprechend größeren Brand- bzw. Explosionsgefahr, so dass die Lackierboxen 14-16 mit einem Explosionsschutz ausgestattet sind, wie er aus dem Stand der Technik bekannt ist und deshalb nicht näher beschrieben werden muss.The paint boxes 14 - 16 On the other hand, they serve to apply other colors with a higher proportion of solvent and a correspondingly greater risk of fire or explosion, so that the painting boxes 14 - 16 equipped with explosion protection, as it is known from the prior art and therefore need not be described in detail.

Die Erfindung ist nicht auf die vorstehend beschriebenen bevorzugten Ausführungsbeispiele beschränkt. Vielmehr ist eine Vielzahl von Varianten und Abwandlungen möglich, die ebenfalls von dem Erfindungsgedanken Gebrauch machen und deshalb in den Schutzbereich fallen.The Invention is not limited to those described above embodiments limited. Rather, a variety of variants and modifications is possible, the also make use of the idea of the invention and therefore in fall within the scope of protection.

Darüber hinaus beansprucht die Erfindung auch Schutz für die verschiedenen vorstehend beschriebenen Varianten unabhängig von dem übergeordneten Gedanken einer Verzweigung des Transportwegs auf mehrere parallele Zweige.Furthermore The invention also claims protection for the various above independently described variants from the parent Thoughts of a branching of the transport route on several parallel Branches.

Claims (51)

Beschichtungsanlage, insbesondere zur Lackierung von Kraftfahrzeugkarosserien, mit a) einem Transportweg (2, 12), entlang dem nacheinander mehrere Beschichtungsobjekte (1) durch die Beschichtungsanlage transportiert werden, und b) mehreren Behandlungsstationen (13-17, 18-22, 23-27), in denen die Beschichtungsobjekte (1) behandelt werden, dadurch gekennzeichnet, dass der Transportweg (2, 12) in mehrere parallele Zweige (5-9, 30-33, 35-37, 54-57) verzweigt, in denen jeweils mindestens eine der Behandlungsstationen (13-17, 18-22, 23-27) angeordnet ist.Coating plant, in particular for painting motor vehicle bodies, having a) a transport path ( 2 . 12 ), along which successively several coating objects ( 1 ) are transported through the coating plant, and b) several treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ), in which the coating objects ( 1 ), characterized in that the transport route ( 2 . 12 ) into several parallel branches ( 5 - 9 . 30 - 33 . 35 - 37 . 54 - 57 ), in each of which at least one of the treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) is arranged. Beschichtungsanlage nach Anspruch 1, dadurch gekennzeichnet, dass die parallelen Zweige (5-9, 30-33, 35-37, 54-57) des Transportwegs (2, 12) auslaufseitig wieder zusammengeführt sind.Coating plant according to claim 1, characterized in that the parallel branches ( 5 - 9 . 30 - 33 . 35 - 37 . 54 - 57 ) of the transport route ( 2 . 12 ) are merged again on the outlet side. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in den parallelen Zweigen des Transportwegs (2, 12) jeweils mindestens eine Beschichtungsstation (13-17) angeordnet ist, in der die Beschichtungsobjekte (1) mit einem Beschichtungsmittel beschichtet werden.Coating plant according to one of the preceding claims, characterized in that in the parallel branches of the transport path ( 2 . 12 ) at least one coating station ( 13 - 17 ) in which the coating objects ( 1 ) are coated with a coating agent. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in den parallelen Zweigen des Transportwegs (2, 12) jeweils hintereinander mehrere Behandlungsstationen (13-17, 18-22, 23-27) angeordnet sind.Coating plant according to one of the preceding claims, characterized in that in the parallel branches of the transport path ( 2 . 12 ) in each case several treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) are arranged. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in den parallelen Zweigen jeweils die gleiche Anzahl von Behandlungsstationen (13-17, 18-22, 23-27) angeordnet ist.Coating plant according to one of the preceding claims, characterized in that in the parallel branches in each case the same number of treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) is arranged. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in den parallelen Zweigen eine unterschiedliche Anzahl von Behandlungsstationen (13-17, 18-22, 23-27) angeordnet ist.Coating plant according to one of the preceding claims, characterized in that in the parallel branches a different number of treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) is arranged. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in den einzelnen Zweigen des Transportwegs (2, 12) in Transportrichtung hintereinander folgende Behandlungsstationen (13-17, 18-22, 23-27) angeordnet sind: a) einlaufseitig eine erste Abdunststation (18-22), in der ein Beschichtungsobjekt (1) nach dem Auftragen eines Beschichtungsmittels abdunstet, b) auslaufseitig eine zweite Abdunststation (23-27), in der ein Beschichtungsobjekt (1) nach dem Auftragen eines Beschichtungsmittels abdunstet. c) zwischen den beiden Abdunststationen (18-22, 23-27) eine Beschichtungsstation (13-17), in der ein Beschichtungsmittel auf eines der Beschichtungsobjekte (1) aufgebracht wird.Coating plant according to one of the preceding claims, characterized in that in the individual branches of the transport path ( 2 . 12 ) in the transport direction following treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) are arranged: a) on the inlet side, a first evaporation station ( 18 - 22 ), in which a coating object ( 1 ) evaporates after the application of a coating agent, b) on the outlet side, a second flash-off station ( 23 - 27 ), in which a coating object ( 1 ) evaporates after the application of a coating agent. c) between the two evaporation stations ( 18 - 22 . 23 - 27 ) a coating station ( 13 - 17 ), in which a coating agent is applied to one of the coating objects ( 1 ) is applied. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in mindestens einem Zweig des Transportwegs vor der Behandlungsstation eine Wartestation angeordnet ist.Coating plant according to one of the preceding Claims, characterized in that in at least one branch of the transport path before the treatment station is arranged a waiting station. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Transportweg (2, 12) zumindest in den parallelen Zweigen einen bidirektionalen Transport der Beschichtungsobjekte (1) ermöglicht.Coating plant according to one of the preceding claims, characterized in that the transport path ( 2 . 12 ) at least in the parallel branches bidirectional transport of the coating objects ( 1 ). Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Transportweg (2, 12) einen kontinuierlichen oder einen intermittierenden Transportbetrieb ausführt.Coating plant according to one of the preceding claims, characterized in that the transport path ( 2 . 12 ) performs a continuous or an intermittent transport operation. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Transportweg (2, 12) die einzelnen Beschichtungsobjekte (1) mit einer einheitlichen Transportgeschwindigkeit oder mit unterschiedlichen Transportgeschwindigkeiten transportiert.Coating plant according to one of the preceding claims, characterized in that the transport path ( 2 . 12 ) the individual coating objects ( 1 ) transported at a uniform transport speed or at different transport speeds. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass zwischen zwei benachbarten parallelen Zweigen des Transportwegs (2, 12) mindestens ein Roboter (H, R) angeordnet ist, der die Behandlungsstationen (13-17, 18-22, 23-27) in den beiden benachbarten Zweigen bedient.Coating plant according to one of the preceding claims, characterized in that between two adjacent parallel branches of the transport path ( 2 . 12 ) at least one robot (H, R) is arranged, the the treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) in the two neighboring operated branches. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in einem Zweig (7, 8) des Transportwegs (2, 12) eine Nasslack-Beschichtungsstation (15, 16) und in einem anderen Zweig (5, 6) des Transportwegs (2, 12) eine Pulverlack-Beschichtungsstation (13, 14) angeordnet ist.Coating plant according to one of the preceding claims, characterized in that in a branch ( 7 . 8th ) of the transport route ( 2 . 12 ) a wet paint coating station ( 15 . 16 ) and in another branch ( 5 . 6 ) of the transport route ( 2 . 12 ) a powder coating station ( 13 . 14 ) is arranged. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, a) dass in mindestens einem Zweig (5) des Transportwegs (2, 12) eine monochromatische Beschichtungsstation (13) angeordnet ist, die ohne Farbwechsel ausschließlich Be schichtungsmittel der am häufigsten gewünschten Farbe appliziert, b) dass in einem anderen Zweig (6-8) des Transportwegs (2; 12) eine multichromatische Beschichtungsstation (14-16) angeordnet ist, die Beschichtungsmittel mit verschiedenen Farben appliziert.Coating plant according to one of the preceding claims, characterized in that a) that in at least one branch ( 5 ) of the transport route ( 2 . 12 ) a monochromatic coating station ( 13 ) is applied, which applies without color change exclusively coating agent of the most frequently desired color, b) that in another branch ( 6 - 8th ) of the transport route ( 2 ; 12 ) a multichromatic coating station ( 14 - 16 ), the coating agent applied with different colors. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass a) in einem Zweig (5-8) des Transportwegs (2, 12) eine aktive Beschichtungsstation (13-16) für einen Normalbetrieb angeordnet ist und b) in einem anderen Zweig (9) des Transportwegs (2, 12) eine inaktive Beschichtungsstation (17) für einen Reservebetrieb angeordnet ist.Coating plant according to one of the preceding claims, characterized in that a) in a branch ( 5 - 8th ) of the transport route ( 2 . 12 ) an active coating station ( 13 - 16 ) is arranged for a normal operation and b) in another branch ( 9 ) of the transport route ( 2 . 12 ) an inactive coating station ( 17 ) is arranged for a reserve operation. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass a) in einem Zweig (5-7) des Transportwegs (2, 12) eine Beschichtungsstation (13-15) für Kraftfahrzeugkarosserien (1) angeordnet ist und b) in einem anderen Zweig (8) des Transportwegs (2, 12) eine Beschichtungsstation (16) für Anbauteile angeordnet ist.Coating plant according to one of the preceding claims, characterized in that a) in a branch ( 5 - 7 ) of the transport route ( 2 . 12 ) a coating station ( 13 - 15 ) for motor vehicle bodies ( 1 ) and b) in another branch ( 8th ) of the transport route ( 2 . 12 ) a coating station ( 16 ) is arranged for attachments. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, a) dass in den einzelnen Zweigen des Transportwegs (2, 12) jeweils eine monochromatische Beschichtungsstation (51) angeordnet ist, die jeweils nur Beschichtungsmittel mit einer bestimmten Farbe appliziert, und b) dass in den einzelnen Zweigen des Transportwegs (2, 12) jeweils eine monochromatische Recycling-Einrichtung (53) angeordnet sind, die nur das Beschichtungsmittel aus der zugehörigen Beschichtungsstation (51) wiederverwertet.Coating plant according to one of the preceding claims, characterized in that a) that in the individual branches of the transport path ( 2 . 12 ) a monochromatic coating station ( 51 ), which in each case applies only coating agent of a specific color, and b) that in the individual branches of the transport path ( 2 . 12 ) a monochromatic recycling facility ( 53 ) are arranged, which only the coating agent from the associated coating station ( 51 ) recycled. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in mindestens einer Beschichtungsstation zwei Klarlack-Lackierroboter (42, 43) und zwei Basislack-Lackierroboter (44, 45) angeordnet sind, die alle auch als Handhabungsroboter einsetzbar sind.Coating plant according to one of the preceding claims, characterized in that in at least one coating station two clearcoat lacquer robots ( 42 . 43 ) and two basecoat paint robots ( 44 . 45 ) are arranged, all of which can also be used as handling robots. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, a) dass an dem Transportweg (2, 12) vor der Verzweigung eine zentrale Lesestelle (28) angeordnet ist, um die einlaufenden Beschichtungsobjekte (1) zu identifizieren und b) dass in den parallelen Zweigen des Transportwegs (2, 12) keine zusätzliche Lesestelle angeordnet ist.Coating plant according to one of the preceding claims, characterized in that a) that on the transport path ( 2 . 12 ) in front of the branch a central reading point ( 28 ) is arranged to the incoming coating objects ( 1 ) and b) that in the parallel branches of the transport path ( 2 . 12 ) no additional reading location is arranged. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Behandlungsstationen (13-17, 18-22, 23-27) in den parallelen Zweigen des Transportwegs (2, 12) eine unterschiedliche Klimatisierung aufweisen.Coating plant according to one of the preceding claims, characterized in that the treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) in the parallel branches of the transport path ( 2 . 12 ) have a different air conditioning. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die einzelnen Behandlungsstationen (13-17, 18-22, 23-27) standardisierte Module bilden.Coating plant according to one of the preceding claims, characterized in that the individual treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) form standardized modules. Beschichtungsanlage nach Anspruch 21, dadurch gekennzeichnet, a) dass die verschiedenen Behandlungsstationen (13-17, 18-22, 23-27) einheitliche Außenabmessungen aufweisen oder b) dass die verschiedenen Behandlungsstationen (13-17, 18-22, 23-27) einheitliche Anschlüsse für Druckluft, Beschichtungsmittel, Spülmittel, Zuluft, Abluft, Steuersignale, Messsignale und/oder Stromversorgung aufweisen.Coating plant according to claim 21, characterized in that a) that the various treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) have uniform external dimensions or b) that the different treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) have uniform connections for compressed air, coating agent, flushing agent, supply air, exhaust air, control signals, measuring signals and / or power supply. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Transportweg (2, 12) mehrere Verzweigungen in jeweils mehrere parallele Zweige (5-9, 30-33, 35-37, 54-57) aufweist, wobei die Verzweigungen in Transportrichtung hintereinander angeordnet sind.Coating plant according to one of the preceding claims, characterized in that the transport path ( 2 . 12 ) several branches into several parallel branches ( 5 - 9 . 30 - 33 . 35 - 37 . 54 - 57 ), wherein the branches are arranged one behind the other in the transport direction. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in dem Transportweg (2, 12) eine Trocknerstation (71-74), insbesondere eine Plasma-Trocknerstation oder eine Strahlungshärtungseinrichtung, in Transportrichtung hinter einer Beschichtungsstation angeordnet ist.Coating plant according to one of the preceding claims, characterized in that in the transport path ( 2 . 12 ) a dryer station ( 71 - 74 ), in particular a plasma dryer station or a radiation curing device, is arranged in the transport direction behind a coating station. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Behandlungsstationen (13-17, 18-22, 23-27) in den verschiedenen parallelen Zweigen des Transportwegs (2, 12) einen unterschiedlichen Explosionsschutz und/oder einen unterschiedlichen Brandschutz aufweisen.Coating plant according to one of the preceding claims, characterized in that the treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) in the different parallel branches of the transport path ( 2 . 12 ) have a different explosion protection and / or a different fire protection. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, a) dass die einzelnen Beschichtungsstationen als im Wesentlichen geschlossene Kabinen ausgebildet sind, die jeweils einen Kabineneinlauf und einen Kabinenauslauf aufweisen, b) dass der Kabineneinlauf und/oder der Kabinenauslauf durch ein Tor, insbesondere durch ein Rolltor, verschließbar ist.Coating plant according to one of the preceding claims, characterized in that a) that the individual coating stations as in Essentially closed cabins are formed, each having a cabin inlet and a cabin outlet, b) that the cabin inlet and / or the cabin outlet through a gate, in particular by a roller shutter, can be closed. Beschichtungsanlage nach Anspruch 26, dadurch gekennzeichnet, dass das Tor mit einer Schließeinrichtung gesichert ist, wobei die Schließeinrichtung durch einen Schlüssel, einen PIN-Code, einen Fingerabdruck oder eine Code-Karte bedienbar ist.Coating plant according to claim 26, characterized in that that the gate with a locking device is secured, the locking device through a key, a PIN code, a fingerprint or a code card can be operated is. Beschichtungsanlage nach einem der vorhergehenden Ansprüche, gekennzeichnet durch getrennte Beschichtungsmittelversorgungen für Wasserlack einerseits und Lösemittellack andererseits, wobei die beiden getrennten Beschichtungsmittelversorgungen denselben Lackierroboter oder verschiedene Lackierroboter speisen.Coating plant according to one of the preceding Claims, characterized by separate coating agent supplies for water-based paint on the one hand and solvent-based paint on the other hand, the two separate coating agent supplies feed the same painting robot or different painting robots. Betriebsverfahren für eine Beschichtungsanlage, mit den folgenden Schritten: a) Transport von Beschichtungsobjekten (1) entlang einem Transportweg (2, 12) durch die Beschichtungsanlage, b) Behandlung der Beschichtungsobjekte (1) in mehreren Behandlungsstationen (13-17, 18-22, 23-27), gekennzeichnet durch folgenden Schritt: c) Verteilung der Beschichtungsobjekte (1) auf mehrere parallele Zweige (5-9, 30-33, 35-37, 54-57) des Transportwegs (2, 12), in denen jeweils mindestens eine der Behandlungsstationen (13-17, 18-22, 23-27) angeordnet ist.Operating procedure for a coating installation, with the following steps: a) Transport of coating objects ( 1 ) along a transport route ( 2 . 12 ) by the coating system, b) treatment of the coating objects ( 1 ) in several treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ), characterized by the following step: c) distribution of the coating objects ( 1 ) on several parallel branches ( 5 - 9 . 30 - 33 . 35 - 37 . 54 - 57 ) of the transport route ( 2 . 12 ), in each of which at least one of the treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) is arranged. Betriebsverfahren nach Anspruch 29, gekennzeichnet durch folgende Schritte: a) Ermittlung einer für einen Lackierprozess prozessbestimmenden Größe, b) Verteilung der Beschichtungsobjekte (1) auf die verschiedenen Zweige (5-9, 30-33, 35-37, 54-57) des Transportwegs (2, 12) in Abhängigkeit von der prozessbestimmenden Größe.Operating method according to claim 29, characterized by the following steps: a) determination of a process-determining variable for a painting process, b) distribution of the coating objects ( 1 ) on the different branches ( 5 - 9 . 30 - 33 . 35 - 37 . 54 - 57 ) of the transport route ( 2 . 12 ) depending on the process-determining size. Betriebsverfahren nach Anspruch 30, dadurch gekennzeichnet, dass die prozessbestimmende Größe für die Verteilung der Beschichtungsobjekte (1) mindestens eine der folgenden Größen umfasst: a) Typ des zu beschichtenden Beschichtungsobjekts, b) Farbe des zu applizierenden Beschichtungsmittels, c) Qualitätsanforderungen an die Beschichtung, d) Typ des zu applizierenden Beschichtungsmittels, e) Explosionsgefahr und/oder Brandgefahr des zu applizierenden Beschichtungsmittels und/oder f) beschichtungsmittelspezifische Lackierparameter.Operating method according to claim 30, characterized in that the process-determining variable for the distribution of the coating objects ( 1 ) at least one of the following sizes: a) type of coating object to be coated, b) color of the coating agent to be applied, c) quality requirements of the coating, d) type of coating agent to be applied, e) risk of explosion and / or fire hazard of the coating composition to be applied and / or f) coating agent-specific coating parameters. Betriebsverfahren nach einem der Ansprüche 29 bis 31, dadurch gekennzeichnet, dass Kraftfahrzeugkarosserien einerseits und Anbauteile andererseits auf unterschiedliche Zweige (5-9, 30-33, 35-37, 54-57) des Transportwegs (2, 12) verteilt werden.Operating method according to one of claims 29 to 31, characterized in that motor vehicle bodies on the one hand and attachments on the other hand on different branches ( 5 - 9 . 30 - 33 . 35 - 37 . 54 - 57 ) of the transport route ( 2 . 12 ). Betriebsverfahren nach einem der Ansprüche 29 bis 32, dadurch gekennzeichnet, dass häufig benötigte Farben einerseits und selten benötigte Farben andererseits in unterschiedlichen Zweigen des Transportwegs (2, 12) appliziert werden.Operating method according to one of claims 29 to 32, characterized in that frequently required colors on the one hand and rarely required colors on the other hand in different branches of the transport path ( 2 . 12 ) are applied. Betriebsverfahren für eine Beschichtungsanlage nach einem der Ansprüche 29 bis 33, gekennzeichnet durch folgenden Schritt: Identifikation der einlaufenden Beschichtungsobjekte (1) an einer zentralen Lesestation vor der Verzweigung des Transportwegs (2, 12).Operating method for a coating installation according to one of Claims 29 to 33, characterized by the following step: identification of the incoming coating objects ( 1 ) at a central reading station before the branching of the transport path ( 2 . 12 ). Betriebsverfahren nach Anspruch 34, dadurch gekennzeichnet, dass bei der Identifikation der einlaufenden Beschichtungsobjekte (1) jeweils die aktuelle Uhrzeit gemessen und gespeichert wird.Operating method according to claim 34, characterized in that in the identification of the incoming coating objects ( 1 ) in each case the current time is measured and stored. Betriebsverfahren nach Anspruch 35, gekennzeichnet durch folgenden Schritt: Ermittlung der Position aller eingelaufenen Beschichtungsobjekte (1) innerhalb der Beschichtungsanlage in Abhängigkeit von der Identifikation durch das zentrale Lesegerät und der zugehörigen Uhrzeit und von der Verteilung auf die verschiedenen Zweige (5-9, 30-33, 35-37, 54-57) des Transportwegs (2, 12).Operating method according to claim 35, characterized by the following step: determination of the position of all run-in coating objects ( 1 ) within the coating installation, depending on the identification by the central reading device and the associated time and on the distribution to the various branches ( 5 - 9 . 30 - 33 . 35 - 37 . 54 - 57 ) of the transport route ( 2 . 12 ). Betriebsverfahren für eine Beschichtungsanlage nach einem der Ansprüche 29 bis 36, gekennzeichnet durch folgenden Schritt: Unterschiedliche Klimatisierung der Behandlungsstationen (13-17, 18-22, 23-27) in den verschiedenen parallelen Zweigen des Transportwegs (2, 12).Operating method for a coating installation according to one of Claims 29 to 36, characterized by the following step: different air conditioning of the treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) in the different parallel branches of the transport path ( 2 . 12 ). Betriebsverfahren nach einem der Ansprüche 29 bis 37, gekennzeichnet durch folgenden Schritte: a) Applikation eines Basislacks auf ein Beschichtungsobjekt (1) mittels eines Basislack-Lackierroboters (44, 45), b) Handhabung des Beschichtungsobjekts (1) durch einen Klarlack-Lackierroboter (42, 43) bei der Applikation des Basislacks, c) Applikation eines Klarlacks auf das Beschichtungsobjekt (1) mittels des Klarlack-Lackierroboters (42, 43), d) Handhabung des Beschichtungsobjekts (1) durch den Basislack-Lackierroboter (44, 45) bei der Applikation des Klarlacks.Operating method according to one of Claims 29 to 37, characterized by the following steps: a) application of a basecoat to a coating object ( 1 ) by means of a basecoat paint robot ( 44 . 45 ), b) handling the coating object ( 1 ) by a clear lacquer painting robot ( 42 . 43 ) when applying the basecoat, c) applying a clearcoat to the coating object ( 1 ) by means of the clearcoat paint robot ( 42 . 43 ), d) handling the coating object ( 1 ) by the basecoat paint robot ( 44 . 45 ) when applying the clearcoat. Betriebsverfahren nach einem der Ansprüche 29 bis 38, dadurch gekennzeichnet, dass in einem Zweig des Transportwegs (2, 12) ein Nasslack und in einem anderen Zweig des Transportwegs (2, 12) ein Pulverlack appliziert wird.Operating method according to one of claims 29 to 38, characterized in that in a branch of the transport path ( 2 . 12 ) a wet paint and in another branch of the transport path ( 2 . 12 ) a powder coating is applied. Betriebsverfahren nach einem der Ansprüche 29 bis 39, dadurch gekennzeichnet, dass die Beschichtungsobjekte (1) zumindest in den parallelen Zweigen des Transportwegs (2, 12) bidirektional transportiert werden.Operating method according to one of claims 29 to 39, characterized in that the coating objects ( 1 ) at least in the parallel branches of the transport path ( 2 . 12 ) are transported bidirectionally. Betriebsverfahren nach einem der Ansprüche 29 bis 40, dadurch gekennzeichnet, dass die Beschichtungsobjekte (1) entlang dem Transportweg (2, 12) kontinuierlich oder intermittierend transportiert werden.Operating method according to one of claims 29 to 40, characterized in that the coating objects ( 1 ) along the transport route ( 2 . 12 ) are transported continuously or intermittently. Betriebsverfahren nach einem der Ansprüche 29 bis 41, dadurch gekennzeichnet, dass die Beschichtungsobjekte (1) entlang dem Transportweg (2, 12) mit einer einheitlichen Transportgeschwindigkeit oder mit unterschiedlichen Transportgeschwindigkeiten transportiert werden.Operating method according to one of Claims 29 to 41, characterized in that the coating objects ( 1 ) along the transport route ( 2 . 12 ) are transported at a uniform transport speed or at different transport speeds. Betriebsverfahren nach einem der Ansprüche 29 bis 42, gekennzeichnet durch eine Beschichtungsstation, in der ein einschichtiger Pulverlack auf die Beschichtungsobjekte (1) aufgebracht wird.Operating method according to one of Claims 29 to 42, characterized by a coating station in which a single-layer powder coating is applied to the coating objects ( 1 ) is applied. Betriebsverfahren nach einem der Ansprüche 29 bis 43, dadurch gekennzeichnet, dass ein zwischen zwei benachbarten Zweigen des Transportwegs (2, 12) angeordneter Roboter Behandlungsstationen (13-17, 18-22, 23-27) in den beiden benachbarten Zweigen bedient.Operating method according to one of claims 29 to 43, characterized in that a between two adjacent branches of the transport path ( 2 . 12 ) arranged robotic treatment stations ( 13 - 17 . 18 - 22 . 23 - 27 ) operated in the two adjacent branches. Betriebsverfahren nach einem der Ansprüche 29 bis 44, dadurch gekennzeichnet, a) dass in den einzelnen Zweigen des Transportwegs (2, 12) jeweils nur Beschichtungsmittel mit einer bestimmten Farbe appliziert wird, und b) dass das in den einzelnen Zweigen des Transportwegs (2, 12) applizierte überschüssige Beschichtungsmittel getrennt in den einzelnen Zweigen wieder verwertet wird.Operating method according to one of claims 29 to 44, characterized in that a) that in the individual branches of the transport path ( 2 . 12 ) in each case only coating agent with a certain color is applied, and b) that in the individual branches of the transport path ( 2 . 12 ) applied excess coating agent is recycled separately in the individual branches. Betriebsverfahren nach einem der Ansprüche 29 bis 45, dadurch gekennzeichnet, dass eine Behandlungsstation in einem Zweig des Transportwegs (2, 12) arbeitet, während eine andere Behandlungsstation in einem anderen Zweig des Transportwegs (2, 12) a) montiert, b) demontiert, c) gewartet, d) getestet e) optimiert oder f) zu Schulungszwecken genutzt wird.Operating method according to one of claims 29 to 45, characterized in that a treatment station in a branch of the transport path ( 2 . 12 ), while another treatment station in another branch of the transport path ( 2 . 12 ) a) mounted, b) disassembled, c) serviced, d) tested e) optimized or f) used for training purposes. Betriebsverfahren nach einem der Ansprüche 29 bis 46, gekennzeichnet durch folgende Schritte: a) Ermittlung des Bearbeitungsfortschritts in den einzelnen Zweigen des Transportwegs, b) Verteilung der einlaufenden Beschichtungsobjekte jeweils auf den Zweig des Transportwegs mit dem größten Bearbeitungsfortschritt.Operating method according to one of claims 29 to 46, characterized by the following steps: a) Determination of the Processing progress in the individual branches of the transport path, b) Distribution of the incoming coating objects in each case on the Branch of the transport route with the largest processing progress. Betriebsverfahren nach einem der Ansprüche 29 bis 47, dadurch gekennzeichnet, dass die auf dem Transportweg einlaufenden Beschichtungsobjekte in Abhängigkeit von vorgegebenen Optimierungszielen für den Betrieb der Beschichtungsanlage auf die parallelen Zweige des Transportwegs verteilt werden.Operating method according to one of claims 29 to 47, characterized in that the incoming on the transport path Coating objects depending on of predetermined optimization goals for the operation of the coating system be distributed to the parallel branches of the transport path. Betriebsverfahren nach Anspruch 48, gekennzeichnet durch folgende Optimierungsziele für den Betrieb der Beschichtungsanlage: a) Minimierung von Farbverlusten, b) Minimierung von Farbwechselverlusten, c) Minimierung der erforderlichen Größe für einen einlaufseitigen oder auslaufseitigen Pufferspeicher für eine Zwischenlagerung der Beschichtungsobjekte, d) Maximierung der Beschichtungskapazität der Beschichtungsanlage, e) Möglichst gleichmäßige Verteilung von verschiedenen Typen der Beschichtungsobjekte entsprechend dem Produktionsanteil des jeweiligen Typs, f) Optimale Reaktion auf Anforderungen aus einem einlaufseitigen Rohbau und/oder einer auslaufseitigen Endmontage, g) Beschichtungsqualität, h) Minimierung oder Begrenzung der Standzeit von Transportgestellen, die zum Transport der einzelnen Beschichtungsobjekte dienen, und/oder i) Minimierung oder Begrenzung der Lagerzeit der verwendeten Beschichtungsmittel, um ein Absetzverhalten der Beschichtungsmittel zu vermeiden.Operating method according to claim 48, characterized through the following optimization goals for the operation of the coating system: a) Minimization of paint losses, b) minimization of color change losses, c) Minimizing the required size for an inlet side or Outlet buffer for an intermediate storage of the coating objects, d) maximization the coating capacity the coating plant, e) As even distribution as possible of various types of the coating objects according to the Production share of the respective type, f) Optimal reaction on requirements from an inlet side shell and / or a outgoing final assembly, g) coating quality, H) Minimization or limitation of the service life of transport racks, which serve to transport the individual coating objects, and / or i) Minimizing or limiting the storage time of the coating materials used, to avoid settling of the coating agent. Betriebsverfahren nach Anspruch 48 oder 49, dadurch gekennzeichnet, dass die Optimierungsziele verschiedene Prioritäten aufweisen.Operating method according to claim 48 or 49, characterized characterized in that the optimization goals have different priorities. Betriebsverfahren nach einem der Ansprüche 29 bis 50, dadurch gekennzeichnet, dass in mindestens einer Beschichtungsstation nacheinander Grundierung und/oder Basislack und/oder Klarlack nass-in-nass aufgetragen wird.Operating method according to one of claims 29 to 50, characterized in that in at least one coating station successively primer and / or basecoat and / or clearcoat wet-on-wet is applied.
DE102006022335A 2006-05-12 2006-05-12 Coating plant for vehicle body painting, has transport section, along which multiple coating objects are transported and treated in treatment stations, where transport section are arranged in treatment stations Pending DE102006022335A1 (en)

Priority Applications (14)

Application Number Priority Date Filing Date Title
DE102006022335A DE102006022335A1 (en) 2006-05-12 2006-05-12 Coating plant for vehicle body painting, has transport section, along which multiple coating objects are transported and treated in treatment stations, where transport section are arranged in treatment stations
MX2008014223A MX2008014223A (en) 2006-05-12 2007-05-07 Coating plant and associated operating method.
PL07724941T PL2018230T3 (en) 2006-05-12 2007-05-07 Coating plant and associated operating method
PT77249415T PT2018230E (en) 2006-05-12 2007-05-07 Coating plant and associated operating method
EP07724941.5A EP2018230B1 (en) 2006-05-12 2007-05-07 Coating plant and associated operating method
BRPI0711360-9A BRPI0711360B1 (en) 2006-05-12 2007-05-07 INSTALLATION OF COATING AND RESPECTIVE OPERATING METHOD
US12/064,122 US8794174B2 (en) 2006-05-12 2007-05-07 Coating installation and associated operating method
RU2008148954/05A RU2436638C2 (en) 2006-05-12 2007-05-07 Plant for coating application and method of its operation
HUE07724941A HUE025991T2 (en) 2006-05-12 2007-05-07 Coating plant and associated operating method
ES07724941.5T ES2556171T3 (en) 2006-05-12 2007-05-07 Coating installation and corresponding operating procedure
JP2009508233A JP2009536872A (en) 2006-05-12 2007-05-07 Coating equipment and method of operating coating equipment
CN2007800170424A CN101448576B (en) 2006-05-12 2007-05-07 Coating plant and associated operating method
PCT/EP2007/004017 WO2007131660A1 (en) 2006-05-12 2007-05-07 Coating plant and associated operating method
JP2014047171A JP5946486B2 (en) 2006-05-12 2014-03-11 Coating equipment and method of operating coating equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102006022335A DE102006022335A1 (en) 2006-05-12 2006-05-12 Coating plant for vehicle body painting, has transport section, along which multiple coating objects are transported and treated in treatment stations, where transport section are arranged in treatment stations

Publications (1)

Publication Number Publication Date
DE102006022335A1 true DE102006022335A1 (en) 2007-11-15

Family

ID=38580065

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102006022335A Pending DE102006022335A1 (en) 2006-05-12 2006-05-12 Coating plant for vehicle body painting, has transport section, along which multiple coating objects are transported and treated in treatment stations, where transport section are arranged in treatment stations

Country Status (2)

Country Link
CN (1) CN101448576B (en)
DE (1) DE102006022335A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007063163A1 (en) * 2007-12-19 2009-07-09 Karl-Heinz Fehr coating plant
US20110094444A1 (en) * 2008-04-08 2011-04-28 Juergen Haas Painting station comprising a measuring cell for measuring the layer thickness
CN102892515A (en) * 2010-07-24 2013-01-23 艾森曼股份公司 Modular installation for the surface treatment of articles
US8544409B2 (en) 2007-06-25 2013-10-01 Dürr Systems GmbH Coating zone with inclined guide rails
WO2017133929A1 (en) * 2016-02-02 2017-08-10 Eisenmann Se Multi-axis robot and method for controlling the same for painting objects
CN114616392A (en) * 2019-12-24 2022-06-10 住友电工烧结合金株式会社 Method for manufacturing crosslinked fluororesin-coated rotor

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102157092B (en) * 2010-02-11 2014-06-04 柳州职业技术学院 Simulated training device for paint spraying
DE202012103894U1 (en) * 2012-10-11 2014-01-15 Dürr Systems GmbH A surface treatment device
CN103171892B (en) * 2013-03-07 2016-05-11 浙江华立涂装设备有限公司 A kind of auxiliary retinue stabilising arrangement for wheel hub spraying coating line hanging-changing system
DE102019126290A1 (en) * 2019-09-30 2021-04-01 Krones Ag Device for handling containers with maintenance options during operation
CN110899039B (en) * 2019-11-14 2021-05-25 河南飞龙(芜湖)汽车零部件有限公司 General type car water pump processingequipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2306851A1 (en) * 1973-02-12 1975-03-13 Duerr O Fa Surface coating method for car chasses - electrostatic powder coating applied inside spray cabin followed by electrophoretic polishing
DE69711089T2 (en) * 1996-12-16 2002-11-28 Vantico Ag METHOD AND DEVICE FOR COATING PANELS

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3144566B2 (en) * 1990-05-08 2001-03-12 マツダ株式会社 Painting method and painting equipment
JP3517959B2 (en) * 1993-09-30 2004-04-12 マツダ株式会社 Painting equipment
DE10355562A1 (en) * 2003-11-28 2005-06-30 Daimlerchrysler Ag Full repair process by using a plasma process

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2306851A1 (en) * 1973-02-12 1975-03-13 Duerr O Fa Surface coating method for car chasses - electrostatic powder coating applied inside spray cabin followed by electrophoretic polishing
DE69711089T2 (en) * 1996-12-16 2002-11-28 Vantico Ag METHOD AND DEVICE FOR COATING PANELS

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8544409B2 (en) 2007-06-25 2013-10-01 Dürr Systems GmbH Coating zone with inclined guide rails
DE102007063163A1 (en) * 2007-12-19 2009-07-09 Karl-Heinz Fehr coating plant
DE102007063163B4 (en) * 2007-12-19 2009-12-10 Karl-Heinz Fehr coating plant
US20110094444A1 (en) * 2008-04-08 2011-04-28 Juergen Haas Painting station comprising a measuring cell for measuring the layer thickness
US9061309B2 (en) * 2008-04-08 2015-06-23 Durr Systems Gmbh Painting station comprising a measuring cell for measuring the layer thickness
CN102892515A (en) * 2010-07-24 2013-01-23 艾森曼股份公司 Modular installation for the surface treatment of articles
CN102892515B (en) * 2010-07-24 2017-03-29 艾森曼股份公司 For the modular apparatus of the surface treatment of object
WO2017133929A1 (en) * 2016-02-02 2017-08-10 Eisenmann Se Multi-axis robot and method for controlling the same for painting objects
CN108698226A (en) * 2016-02-02 2018-10-23 艾森曼欧洲公司 Multi-axis robot and control the robot for lacquered body method
CN114616392A (en) * 2019-12-24 2022-06-10 住友电工烧结合金株式会社 Method for manufacturing crosslinked fluororesin-coated rotor
CN114616392B (en) * 2019-12-24 2023-07-28 住友电工烧结合金株式会社 Method for manufacturing rotor with cross-linked fluororesin coating

Also Published As

Publication number Publication date
CN101448576B (en) 2012-07-04
CN101448576A (en) 2009-06-03

Similar Documents

Publication Publication Date Title
EP2018230B1 (en) Coating plant and associated operating method
DE102006022335A1 (en) Coating plant for vehicle body painting, has transport section, along which multiple coating objects are transported and treated in treatment stations, where transport section are arranged in treatment stations
EP2040854B1 (en) Paint shop and corresponding method of operation
DE102010023578B4 (en) Painting plant for coating / painting an elongated workpiece
EP3354352B1 (en) Coating assembly and method for operating same
DE102006045642A1 (en) Coating unit for painting motor vehicle body, has transport path branched to number of parallel branches in which one of handling stations is arranged, where coating objects are handled in handling stations
WO2008000345A1 (en) Drier module for a drier
EP2024102B1 (en) Device and method for painting rims
EP2153909A2 (en) Processing concept
EP2089164B1 (en) Universal atomizer, and associated operating method
EP2791008B1 (en) Coating device and corresponding method
EP1702686B1 (en) Automotive high volume paint shop
EP1702687B1 (en) Automotive high volume paint shop
DE102016001006A1 (en) Plant, treatment module and method of treating objects
DE19945291A1 (en) Painting system for painting plastic objects has painting zone for objects to pass through number of times with one or more painting stations for successively spraying with different paints
DE102019109976B4 (en) Modular coating system and method for coating at least one component
DE102011107601A1 (en) Coating apparatus for coating plastic material profile section, has control unit by which coating beam of coating nozzles of each stop unit are aligned in predetermined orientation with respect to plastic profile section by working arm
WO2004007093A2 (en) Method for coating, especially painting, objects
DE3214964C2 (en) Process for repairing the coating of an object
WO2023237157A1 (en) Treatment plant for treating workpieces, and method for treating workpieces
DE102007027617B4 (en) Method for painting components by using a painting robot
WO2023051874A1 (en) Treatment system and method for treating workpieces
EP3167957B1 (en) Modular coating unit and method for coating plastic components
DE102004033619A1 (en) Coating method, corresponding coating system and varnish layer produced therewith
EP1769852A1 (en) Coating method and device

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8127 New person/name/address of the applicant

Owner name: DUERR SYSTEMS GMBH, 74321 BIETIGHEIM-BISSINGEN, DE

R081 Change of applicant/patentee

Owner name: DUERR SYSTEMS AG, DE

Free format text: FORMER OWNER: DUERR SYSTEMS GMBH, 74321 BIETIGHEIM-BISSINGEN, DE

R082 Change of representative

Representative=s name: V. BEZOLD & PARTNER PATENTANWAELTE - PARTG MBB, DE

R081 Change of applicant/patentee

Owner name: DUERR SYSTEMS AG, DE

Free format text: FORMER OWNER: DUERR SYSTEMS AG, 74321 BIETIGHEIM-BISSINGEN, DE

R082 Change of representative

Representative=s name: V. BEZOLD & PARTNER PATENTANWAELTE - PARTG MBB, DE

R016 Response to examination communication