DE102005030956A1 - Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork - Google Patents
Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork Download PDFInfo
- Publication number
- DE102005030956A1 DE102005030956A1 DE200510030956 DE102005030956A DE102005030956A1 DE 102005030956 A1 DE102005030956 A1 DE 102005030956A1 DE 200510030956 DE200510030956 DE 200510030956 DE 102005030956 A DE102005030956 A DE 102005030956A DE 102005030956 A1 DE102005030956 A1 DE 102005030956A1
- Authority
- DE
- Germany
- Prior art keywords
- boom
- concrete
- reinforcements
- gripper
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 39
- 239000004567 concrete Substances 0.000 title claims abstract description 38
- 238000009415 formwork Methods 0.000 title claims abstract description 32
- 238000010276 construction Methods 0.000 title abstract 3
- 238000009434 installation Methods 0.000 title 1
- 230000003014 reinforcing effect Effects 0.000 claims description 12
- 238000000034 method Methods 0.000 claims description 4
- 230000005291 magnetic effect Effects 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 230000009471 action Effects 0.000 claims description 2
- 230000007246 mechanism Effects 0.000 claims description 2
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 238000012856 packing Methods 0.000 claims 1
- 238000006073 displacement reaction Methods 0.000 abstract 1
- 230000032258 transport Effects 0.000 description 3
- 241001295925 Gegenes Species 0.000 description 2
- 239000011376 self-consolidating concrete Substances 0.000 description 2
- 230000005641 tunneling Effects 0.000 description 2
- 241001136792 Alle Species 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Technisches GebietTechnical area
Die Erfindung betrifft die Herstellung von Zwischendecken im Tunnelbau.The The invention relates to the production of false ceilings in tunneling.
Zwischendecken im Tunnelbau und Durchgangsöffnungen durch diese dienen dazu, einen Kanal zur Ableitung von Rauch bei eventuellen Tunnelbränden zu schaffen. Hierzu werden relativ dicht unterhalb der Tunneldecke abschnittsweise entlang des Tunnels Schalungen aufgebaut, auf die die Bewehrungen und anschließend der Beton, bevorzugt selbstverdichtender Beton, aufgebracht wird. Die Anlieferung der Bewehrungen und das Einbringen des Betons geschehen dabei mit unterschiedlichen Vorrichtungen.false ceilings in tunneling and passage openings through these serve a channel for the discharge of smoke possible tunnel fires to accomplish. This will be relatively close below the tunnel ceiling Sectionally constructed along the tunnel formwork, on the the reinforcements and then the concrete, preferably self-compacting concrete, is applied. The delivery of the reinforcements and the placing of the concrete happen with different devices.
Das Aufbringen der Bewehrungen und des Betons auf die Schalung geschieht durch Arbeiter, die aufgrund des geringen Abstands zur Tunneldecke immer gebeugt arbeiten müssen. Hohe Ausfallzeiten durch Krankheit sind die Folge.The Applying the reinforcements and the concrete to the formwork happens by workers who due to the short distance to the tunnel ceiling always have to work bent. High downtime due to illness is the result.
Aufgabe der ErfindungObject of the invention
Aufgabe der Erfindung ist es, das Einbringen der Bewehrungen und des Betons mit weniger Personalaufwand zu ermöglichen.task The invention is the introduction of the reinforcements and the concrete to enable with less staff effort.
Darstellung der ErfindungPresentation of the invention
Die Aufgabe wird durch die im Kennzeichen des Anspruchs 1 angegebenen Merkmale gelöst.The The object is specified by that in the characterizing part of claim 1 Characteristics solved.
Die Erfindung sieht hierzu ein Verfahren und eine Vorrichtung (Manipulator) vor, bei dem und mit der zuerst die Bewehrungen und dann der Beton von der Seite her auf die aufgebaute Schalung für die Zwischendecke aufgebracht werden.The The invention provides a method and a device (manipulator) for this purpose. before, at and with the first the reinforcements and then the concrete applied from the side on the constructed formwork for the false ceiling become.
Da die aufgebaute Schalung aus Gründen der Effektivität sehr lang ist (oft 25 Meter) und der Abstand zur Decke relativ gering (größenordnungsmäßig am First 1,5 Meter), sind kranartige Ausleger, die von vorne bis ans Ende der Schalung reichen, sehr instabil, vor allem, was die Pumpstöße (Rückstoßeffekte) beim Einbringen des Betons betrifft.There the constructed formwork for the sake of effectiveness very long (often 25 meters) and the distance to the ceiling is relatively low (on the order of the First 1.5 meters), are crane-like boom, the front to the end the formwork are very unstable, especially what the pump bursts (recoil effects) when introducing the concrete concerns.
Die Erfindung sieht daher vor, den Ausleger des erfindungsgemäßen Manipulators, der sowohl dem Transport der Bewehrungen als auch des Betons dient, an einer odere mehreren Stellen temporär an der Tunneldecke zu befestigen.The The invention therefore provides for the boom of the manipulator according to the invention, which serves both the transport of the reinforcements and the concrete, temporarily attached to the tunnel ceiling at one or more places.
Dies geschieht auf einfache Weise durch eine Vorrichtung, die mit Unterdruck arbeitet, also ähnlich einem Saugnapf. Die Tunneldecke ist nämlich relativ glatt und erlaubt es dieser Vorrichtung, sich daran festzusaugen. Auf diese Weise wird der Ausleger bei Belastung stabilisiert, weil kürzere Hebelarme auftreten.This happens easily by a device that works with negative pressure works, so similar a suction cup. The tunnel ceiling is relatively smooth and allowed it this device to squeeze on it. In this way The boom is stabilized under load, because shorter lever arms occur.
Der Ausleger kann ein starrer Balken mit einer oder mehreren Ansaugvorrichtungen für die Tunneldecke sein, wobei an dem Balken eine Schiene entlangläuft, an der die Vorsatzgeräte (Greifer für Bewehrungen bzw. Betonverteilervorrichtung) verfahrbar sind.Of the Boom can be a rigid beam with one or more suction devices for the Tunnel ceiling, with the beam running along a rail on the attachments (Gripper for Reinforcements or concrete distribution device) are movable.
Der Ausleger kann aber auch selbst teleskopierbar sein und damit der Beförderung des Vorsatzgerätes dienen und an einem oder mehreren seiner teleskopierbaren Glieder Ansaugvorrichtungen für die Tunneldecke aufweisen. Der Ausleger kann auch aus einer Kombination aus teleskopierbarem Teil und starrem balkenförmigen Teil bestehen, an dem der teleskopierbare Teil verschiebbar angeordnet ist.Of the But cantilever can also be telescoped and thus the promotion of the attachment serve and at one or more of its telescopic members Intake devices for the Tunnel ceiling have. The boom can also be a combination consist of telescopic part and rigid beam-shaped part on which the telescopic part is arranged displaceably.
Der erfindungsgemäße und bevorzugt auf Rädern oder Ketten verfahrbare Manipulator stellt nun eine an einem Grundgerüst angebrachte Hebevorrichtung/Hebeplattform (zum Anheben der Bewehrungen auf ungefähr Schalungshöhe) dar, die gleichzeitig mindestens einen der beschriebenen Ausleger aufweist.Of the according to the invention and preferred on wheels or chains movable manipulator now provides a mounted on a skeleton Lifting device / lifting platform (for raising the reinforcements to approximate formwork height), which simultaneously has at least one of the described boom.
Am Ausleger befindet sich eine Hebe- und Transportvorrichtung (Greifer) für die Bewehrungen. Darüberhinaus weist er gleichzeitig oder nach einem Wechseln des Vorsatzgerätes auch noch eine bevorzugt schwenkbare Betonverteilervorrichtung auf, mit der der Beton (bevorzugt selbstverdichtender Beton) von oben auf die Schalung aufgebracht werden kann.At the Boom is a lifting and transport device (gripper) for the Reinforcements. Furthermore he points at the same time or after a change of the attachment also still a preferably pivotable concrete distribution device, with the the concrete (preferably self-compacting concrete) from above onto the Formwork can be applied.
Das Verfahren zur Herstellung einer Zwischendecke in einem Tunnel gestaltet sich nun folgendermaßen:
- 1.) Es werden die Zwischendeckenschalungen für den zu betonierenden Abschnitt der Zwischendecke im Sollabstand unter der Tunneldecke errichtet. Eine sinnvolle Länge eines solchen Abschnitts sind zum Beispiel 25 Meter.
- 2.) Der Manipulator wird neben die aufgebaute Zwischendeckenschalung gefahren/gesetzt. Auf seiner anhebbaren Plattform liegen bereits Bewehrungen, bevorzugt als Bewehrungskörbe, bereit, oder die Bewehrungen/Bewehrungskörbe werden erst später von einem anderen Transporter angeliefert und auf die Plattform gelegt, bevorzugt mitsamt einer Bewehrungspalette.
- 3.) Die Bewehrungen werden sodann bis ungefähr auf das Niveau der Zwischendeckenschalung angehoben.
- 4.) Der Ausleger fährt an der Tunneldecke entlang über die Zwischendeckenschalung hinweg und saugt sich im mittleren oder hinteren Bereich des zwischen Schalung und Tunneldecke aufgespannten Raumes an der Tunneldecke fest. Die Saugvorrichtung wird hierzu nach oben gegen die Decke gefahren, oder der Ausleger wird als Gesamtes etwas angehoben, wodurch die Saugvorrichtung gegen die Decke gepreßt wird und sich festsaugen kann.
- 5.) Ein am Ausleger entlang verfahrbarer Greifer (mechanisch oder magnetisch) packt dann die Bewehrungen/Bewehrungskörbe von der Plattform/Palette und befördert sie nacheinander an ihren Bestimmungsort auf der Schalung.
- 1.) The false ceiling formwork for the section of the false ceiling to be concreted is erected at the nominal distance below the tunnel ceiling. A reasonable length of such a section are for example 25 meters.
- 2.) The manipulator is moved / set next to the built-up false ceiling formwork. Reinforcements, preferably as reinforcing baskets, are already available on his liftable platform, or the reinforcements / reinforcing baskets are only later delivered by another transporter and placed on the platform, preferably together with a reinforcement pallet.
- 3.) The reinforcements are then raised to approximately the level of the false ceiling formwork.
- 4.) The boom moves along the tunnel ceiling over the false ceiling formwork and absorbs itself in the middle or rear area of the space between the formwork and tunnel ceiling stretched space at the tunnel ceiling. The suction device is driven upwards against the ceiling, or the boom is raised slightly as a whole, whereby the suction device is pressed against the ceiling and can be stuck.
- 5.) A gripper (mechanical or magnetic) movable along the boom then unpacks the reinforcements / reinforcing cages from the platform / pallet and carries them one after the other to their destination on the formwork.
Im Falle eines teleskopierbaren Auslegers, der im ineinandergeschobenen Zustand die Bewehrungen/Bewehrungskörbe packt und dann durch Ausfahren nach vorne transportiert, tritt nach einem gewissen Ausfahrzustand der Ansaugmechanismus an einem der bereits ausgefahrenen Glieder in Aktion und von diesem fixierten Zustand aus wird dann weiter ausgefahren.in the Trap of a telescopic boom, in the telescoped State the reinforcements / reinforcing baskets and then by extending transported to the front, occurs after a certain extension state the suction mechanism on one of the already extended limbs in action and from this fixed state will continue then extended.
Besteht der Ausleger aus einer Kombination aus teleskopierbarem teil, welcher an einer balkenförmigen Schiene verfahrbar ist, so kann je nach auftetendem Hebelarm entweder eine Ansaugvorrichtung am teleskopierbaren Teil oder am starren balkenförmigen Teil aktiv werden.Consists the boom of a combination of telescopic part, which on a bar-shaped Rail is movable, so depending on the auftetendem lever arm either a suction device on the telescopic part or rigid bar-shaped Part become active.
In einer aufwendigeren Ausführung der Erfindung ist der Greifer nicht nur entlang des Auslegers (bzw. mitsamt ihm) verfahrbar und anhebbar und absenkbar, sondern auch in der Horizontalen in einem Winkel zum Ausleger verfahrbar, um Bewehrungen/Bewehrungskörbe exakt in Sollage bringen zu können.In a more elaborate design the invention, the gripper is not only along the boom (or. together with it) movable and liftable and lowerable, but also movable in the horizontal at an angle to the boom to Reinforcements / reinforcement cages to bring exactly into desired position.
Das Positionieren der Bewehrungen/Bewehrungskörbe kann von einer bevorzugt steuerbaren Kamera am Greifer oder Ausleger überwacht und von außerhalb der Zwischendecke gesteuert werden. Es kann auch von einer Position (bevorzugt Sitzposition) oberhalb der Zwischendeckenschalung aus gesteuert werden. Bevorzugt wird die Lage der Bewehrungen/Bewehrungskörbe nachträglich aber nocheinmal von einem Arbeiter überprüft.The Positioning of the reinforcements / reinforcing cages may be preferred by one controllable camera on the grab or boom monitors and from outside the false ceiling can be controlled. It can also be from a position (Preferred seating position) above the false ceiling formwork to be controlled. However, the position of the reinforcements / reinforcing baskets is preferred subsequently checked again by a worker.
Alternativ werden die Bewehrungen/Bewehrungskörbe, die der Greifer antransportiert, von Arbeitern manuell an die korrekte Position gerückt.
- 6.) Sind alle Bewehrungen/Bewehrungskörbe ordnungsgemäß verlegt, zieht sich der Greifer auf den Manipulatorwagen zurück.
- 7.) Es wird nun entweder die Betonverteilervorrichtung verfahrbar am Ausleger als neues Vorsatzgerät befestigt, oder der bereits vorhandene Greifer selbst packt die Betonverteilervorrichtung.
- 8.) Die verfahrbare Betonverteilervorrichtung oder der Greifer mit der von ihm gepackten Betonverteilervorrichtung bewegt sich nun über die Zwischendeckenschalung hinweg und verteilt, bevorzugt überwacht von einer Kamera und ferngesteuert von außerhalb der Zwischendecke, an seinem jeweiligen Bestimmungsort den Beton auf der Zwischendeckenschalung. Alternativ überwachen bei einer einfacheren Ausgestaltung der Erfindung Arbeiter die Verteilung des Betons auf der Zwischendeckenschalung.
- 9.) Ist der Beton ordnungsgemäß verteilt, wird der Manipulator verfahren/versetzt. Hierzu muß natürlich der Ausleger von der Tunneldecke getrennt sein. Bevorzugt wird er hierzu über die Plattform des Manipulators eingefahren.
- 10.) Nun kann ohne Behinderung durch den Manipulator eine neue Zwischendeckenschalung errichtet werden und der Vorgang wiederholt sich.
- 6.) If all reinforcements / reinforcement cages are properly laid, the gripper retracts onto the manipulator carriage.
- 7.) It is now either the concrete distribution device movably attached to the boom as a new attachment, or the existing gripper itself grabs the concrete distribution device.
- 8.) The movable concrete distributor device or the gripper with the concrete distributor device packed by it now moves across the false ceiling formwork and distributes, preferably monitored by a camera and remotely from outside the false ceiling, at its respective destination the concrete on the false ceiling formwork. Alternatively, in a simpler embodiment of the invention, workers monitor the distribution of the concrete on the false ceiling formwork.
- 9.) If the concrete is properly distributed, the manipulator is moved / offset. For this purpose, of course, the boom must be separated from the tunnel ceiling. For this purpose, it is preferably retracted via the platform of the manipulator.
- 10.) Now, without obstruction by the manipulator, a new false ceiling formwork can be built and the process is repeated.
Die Figuren veranschaulichen das Verfahren unter Benützung eines Manipulators, dessen Ausleger eine Kombination aus teleskopierbarem Bereich und balkenförmiger Schiene darstellt, an der der teleskopierbare Teil verschiebbar angeordnet ist.The Figures illustrate the method using a manipulator whose Boom a combination of telescopic section and bar-shaped rail represents, on which the telescopic part slidably disposed is.
- 11
- ZwischendeckenschalungBetween slabs
- 22
- Hebeplattformlifting platform
- 33
- Bewehrungskorbreinforcing cage
- 44
- Auslegerboom
- 55
- Ansaugvorrichtungsuction
- 66
- Betonverteilerconcrete distributor
- 77
- flexible Betonzuleitungflexible concrete supply
- 88th
- Tunneldecketunnel ceiling
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200510030956 DE102005030956A1 (en) | 2005-06-30 | 2005-06-30 | Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200510030956 DE102005030956A1 (en) | 2005-06-30 | 2005-06-30 | Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102005030956A1 true DE102005030956A1 (en) | 2007-01-18 |
Family
ID=37563294
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE200510030956 Withdrawn DE102005030956A1 (en) | 2005-06-30 | 2005-06-30 | Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102005030956A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CZ302312B6 (en) * | 2010-04-06 | 2011-02-23 | Metrostav A. S. | Climbing shuttering of tunnel bottom |
-
2005
- 2005-06-30 DE DE200510030956 patent/DE102005030956A1/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CZ302312B6 (en) * | 2010-04-06 | 2011-02-23 | Metrostav A. S. | Climbing shuttering of tunnel bottom |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2725166B1 (en) | Method for creating concreting sections with the aid of a rail-guided self-climbing formwork system | |
DE68915599T2 (en) | Hydraulic scaffold. | |
EP3440283B1 (en) | Self-climbing system, self-climbing unit and method for moving such a self-climbing unit on a concrete building structure | |
EP3899167B1 (en) | Construction site device with climbing formwork and elevator system | |
DE2400313C3 (en) | Auxiliary equipment for assembly and maintenance work on a cooling tower | |
DE102018117727A1 (en) | LIFT DRIVE FOR A RAILWAY CLIMBING SYSTEM | |
DE102018202097A1 (en) | Climbing system and method for operating a climbing system | |
DE4409829A1 (en) | Method and device for producing walls and walls, in particular for buildings | |
DE1283484B (en) | Procedure for building high-rise buildings and formwork to carry out the procedure | |
DE2815898A1 (en) | DEVICE FOR POSITIONING CEILING SUPPORT IN A TUNNEL | |
DE4005997C1 (en) | ||
DE1658641C3 (en) | Device for the production and assembly of a vertical nozzle bridging support or the like | |
EP2035314B1 (en) | Lifting platform and method for setting up a lifting platform | |
DE2217584B2 (en) | Climbing frame for concrete wall formwork - has frame secured to wall by supports and formwork element guided on rollers | |
DE102005030956A1 (en) | Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork | |
DE1684263B1 (en) | Device for lifting ceilings of buildings using the lifting ceiling method | |
DE2461251C3 (en) | Device for pre-assembly, transport and installation of a route or tunnel extension | |
DE19704967C2 (en) | Gantry crane, in particular for the construction of buildings | |
EP0035623B1 (en) | Chimney stack and process for its erection | |
WO1993014288A1 (en) | Device for conveying concrete with an adjustable height concrete distribution mast | |
AT397404B (en) | DEVICE FOR BUILDING CONSTRUCTION WALLS | |
DE2208911B2 (en) | Multi-storey-building concrete distributor - with scaffolding on supports fitted to shaft climbing-formwork bottom cage | |
DE1949674U (en) | DEVICE FOR MANIPULATING ROOM-LARGE STRUCTURES, IN PARTICULAR PRE-FABRICATED GARAGES. | |
CH655045A5 (en) | SHUTTERING DEVICE FOR THE MANUFACTURE OF QUADER-SHAPED READY-MADE READY-MADE CONCRETE GARMENTS. | |
DE2360755C2 (en) | Working platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8139 | Disposal/non-payment of the annual fee |