DE102005030956A1 - Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork - Google Patents

Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork Download PDF

Info

Publication number
DE102005030956A1
DE102005030956A1 DE200510030956 DE102005030956A DE102005030956A1 DE 102005030956 A1 DE102005030956 A1 DE 102005030956A1 DE 200510030956 DE200510030956 DE 200510030956 DE 102005030956 A DE102005030956 A DE 102005030956A DE 102005030956 A1 DE102005030956 A1 DE 102005030956A1
Authority
DE
Germany
Prior art keywords
boom
concrete
reinforcements
gripper
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE200510030956
Other languages
German (de)
Inventor
Thomas Walliser
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ed Zueblin AG
Original Assignee
Ed Zueblin AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ed Zueblin AG filed Critical Ed Zueblin AG
Priority to DE200510030956 priority Critical patent/DE102005030956A1/en
Publication of DE102005030956A1 publication Critical patent/DE102005030956A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The device has a stand a motor for hydraulically or pneumatically lifting and lowering a platform (2) provided to receive and move large reinforcements. A crane-like boom (4) is connected to a suction unit (5) for performing suction and to fix an intermediate ceiling formwork (1) to the tunnel ceiling (8). A movable gripper is arranged for displacement along the boom and with the boom for holding the reinforcements. A concrete distribution device is moved along the boom and with the boom for applying concrete on the intermediate ceiling formwork. An independent claim is included for the construction of the intermediate ceiling used in tunnel construction.

Description

Technisches GebietTechnical area

Die Erfindung betrifft die Herstellung von Zwischendecken im Tunnelbau.The The invention relates to the production of false ceilings in tunneling.

Zwischendecken im Tunnelbau und Durchgangsöffnungen durch diese dienen dazu, einen Kanal zur Ableitung von Rauch bei eventuellen Tunnelbränden zu schaffen. Hierzu werden relativ dicht unterhalb der Tunneldecke abschnittsweise entlang des Tunnels Schalungen aufgebaut, auf die die Bewehrungen und anschließend der Beton, bevorzugt selbstverdichtender Beton, aufgebracht wird. Die Anlieferung der Bewehrungen und das Einbringen des Betons geschehen dabei mit unterschiedlichen Vorrichtungen.false ceilings in tunneling and passage openings through these serve a channel for the discharge of smoke possible tunnel fires to accomplish. This will be relatively close below the tunnel ceiling Sectionally constructed along the tunnel formwork, on the the reinforcements and then the concrete, preferably self-compacting concrete, is applied. The delivery of the reinforcements and the placing of the concrete happen with different devices.

Das Aufbringen der Bewehrungen und des Betons auf die Schalung geschieht durch Arbeiter, die aufgrund des geringen Abstands zur Tunneldecke immer gebeugt arbeiten müssen. Hohe Ausfallzeiten durch Krankheit sind die Folge.The Applying the reinforcements and the concrete to the formwork happens by workers who due to the short distance to the tunnel ceiling always have to work bent. High downtime due to illness is the result.

Aufgabe der ErfindungObject of the invention

Aufgabe der Erfindung ist es, das Einbringen der Bewehrungen und des Betons mit weniger Personalaufwand zu ermöglichen.task The invention is the introduction of the reinforcements and the concrete to enable with less staff effort.

Darstellung der ErfindungPresentation of the invention

Die Aufgabe wird durch die im Kennzeichen des Anspruchs 1 angegebenen Merkmale gelöst.The The object is specified by that in the characterizing part of claim 1 Characteristics solved.

Die Erfindung sieht hierzu ein Verfahren und eine Vorrichtung (Manipulator) vor, bei dem und mit der zuerst die Bewehrungen und dann der Beton von der Seite her auf die aufgebaute Schalung für die Zwischendecke aufgebracht werden.The The invention provides a method and a device (manipulator) for this purpose. before, at and with the first the reinforcements and then the concrete applied from the side on the constructed formwork for the false ceiling become.

Da die aufgebaute Schalung aus Gründen der Effektivität sehr lang ist (oft 25 Meter) und der Abstand zur Decke relativ gering (größenordnungsmäßig am First 1,5 Meter), sind kranartige Ausleger, die von vorne bis ans Ende der Schalung reichen, sehr instabil, vor allem, was die Pumpstöße (Rückstoßeffekte) beim Einbringen des Betons betrifft.There the constructed formwork for the sake of effectiveness very long (often 25 meters) and the distance to the ceiling is relatively low (on the order of the First 1.5 meters), are crane-like boom, the front to the end the formwork are very unstable, especially what the pump bursts (recoil effects) when introducing the concrete concerns.

Die Erfindung sieht daher vor, den Ausleger des erfindungsgemäßen Manipulators, der sowohl dem Transport der Bewehrungen als auch des Betons dient, an einer odere mehreren Stellen temporär an der Tunneldecke zu befestigen.The The invention therefore provides for the boom of the manipulator according to the invention, which serves both the transport of the reinforcements and the concrete, temporarily attached to the tunnel ceiling at one or more places.

Dies geschieht auf einfache Weise durch eine Vorrichtung, die mit Unterdruck arbeitet, also ähnlich einem Saugnapf. Die Tunneldecke ist nämlich relativ glatt und erlaubt es dieser Vorrichtung, sich daran festzusaugen. Auf diese Weise wird der Ausleger bei Belastung stabilisiert, weil kürzere Hebelarme auftreten.This happens easily by a device that works with negative pressure works, so similar a suction cup. The tunnel ceiling is relatively smooth and allowed it this device to squeeze on it. In this way The boom is stabilized under load, because shorter lever arms occur.

Der Ausleger kann ein starrer Balken mit einer oder mehreren Ansaugvorrichtungen für die Tunneldecke sein, wobei an dem Balken eine Schiene entlangläuft, an der die Vorsatzgeräte (Greifer für Bewehrungen bzw. Betonverteilervorrichtung) verfahrbar sind.Of the Boom can be a rigid beam with one or more suction devices for the Tunnel ceiling, with the beam running along a rail on the attachments (Gripper for Reinforcements or concrete distribution device) are movable.

Der Ausleger kann aber auch selbst teleskopierbar sein und damit der Beförderung des Vorsatzgerätes dienen und an einem oder mehreren seiner teleskopierbaren Glieder Ansaugvorrichtungen für die Tunneldecke aufweisen. Der Ausleger kann auch aus einer Kombination aus teleskopierbarem Teil und starrem balkenförmigen Teil bestehen, an dem der teleskopierbare Teil verschiebbar angeordnet ist.Of the But cantilever can also be telescoped and thus the promotion of the attachment serve and at one or more of its telescopic members Intake devices for the Tunnel ceiling have. The boom can also be a combination consist of telescopic part and rigid beam-shaped part on which the telescopic part is arranged displaceably.

Der erfindungsgemäße und bevorzugt auf Rädern oder Ketten verfahrbare Manipulator stellt nun eine an einem Grundgerüst angebrachte Hebevorrichtung/Hebeplattform (zum Anheben der Bewehrungen auf ungefähr Schalungshöhe) dar, die gleichzeitig mindestens einen der beschriebenen Ausleger aufweist.Of the according to the invention and preferred on wheels or chains movable manipulator now provides a mounted on a skeleton Lifting device / lifting platform (for raising the reinforcements to approximate formwork height), which simultaneously has at least one of the described boom.

Am Ausleger befindet sich eine Hebe- und Transportvorrichtung (Greifer) für die Bewehrungen. Darüberhinaus weist er gleichzeitig oder nach einem Wechseln des Vorsatzgerätes auch noch eine bevorzugt schwenkbare Betonverteilervorrichtung auf, mit der der Beton (bevorzugt selbstverdichtender Beton) von oben auf die Schalung aufgebracht werden kann.At the Boom is a lifting and transport device (gripper) for the Reinforcements. Furthermore he points at the same time or after a change of the attachment also still a preferably pivotable concrete distribution device, with the the concrete (preferably self-compacting concrete) from above onto the Formwork can be applied.

Das Verfahren zur Herstellung einer Zwischendecke in einem Tunnel gestaltet sich nun folgendermaßen:

  • 1.) Es werden die Zwischendeckenschalungen für den zu betonierenden Abschnitt der Zwischendecke im Sollabstand unter der Tunneldecke errichtet. Eine sinnvolle Länge eines solchen Abschnitts sind zum Beispiel 25 Meter.
  • 2.) Der Manipulator wird neben die aufgebaute Zwischendeckenschalung gefahren/gesetzt. Auf seiner anhebbaren Plattform liegen bereits Bewehrungen, bevorzugt als Bewehrungskörbe, bereit, oder die Bewehrungen/Bewehrungskörbe werden erst später von einem anderen Transporter angeliefert und auf die Plattform gelegt, bevorzugt mitsamt einer Bewehrungspalette.
  • 3.) Die Bewehrungen werden sodann bis ungefähr auf das Niveau der Zwischendeckenschalung angehoben.
  • 4.) Der Ausleger fährt an der Tunneldecke entlang über die Zwischendeckenschalung hinweg und saugt sich im mittleren oder hinteren Bereich des zwischen Schalung und Tunneldecke aufgespannten Raumes an der Tunneldecke fest. Die Saugvorrichtung wird hierzu nach oben gegen die Decke gefahren, oder der Ausleger wird als Gesamtes etwas angehoben, wodurch die Saugvorrichtung gegen die Decke gepreßt wird und sich festsaugen kann.
  • 5.) Ein am Ausleger entlang verfahrbarer Greifer (mechanisch oder magnetisch) packt dann die Bewehrungen/Bewehrungskörbe von der Plattform/Palette und befördert sie nacheinander an ihren Bestimmungsort auf der Schalung.
The method for producing a false ceiling in a tunnel is now as follows:
  • 1.) The false ceiling formwork for the section of the false ceiling to be concreted is erected at the nominal distance below the tunnel ceiling. A reasonable length of such a section are for example 25 meters.
  • 2.) The manipulator is moved / set next to the built-up false ceiling formwork. Reinforcements, preferably as reinforcing baskets, are already available on his liftable platform, or the reinforcements / reinforcing baskets are only later delivered by another transporter and placed on the platform, preferably together with a reinforcement pallet.
  • 3.) The reinforcements are then raised to approximately the level of the false ceiling formwork.
  • 4.) The boom moves along the tunnel ceiling over the false ceiling formwork and absorbs itself in the middle or rear area of the space between the formwork and tunnel ceiling stretched space at the tunnel ceiling. The suction device is driven upwards against the ceiling, or the boom is raised slightly as a whole, whereby the suction device is pressed against the ceiling and can be stuck.
  • 5.) A gripper (mechanical or magnetic) movable along the boom then unpacks the reinforcements / reinforcing cages from the platform / pallet and carries them one after the other to their destination on the formwork.

Im Falle eines teleskopierbaren Auslegers, der im ineinandergeschobenen Zustand die Bewehrungen/Bewehrungskörbe packt und dann durch Ausfahren nach vorne transportiert, tritt nach einem gewissen Ausfahrzustand der Ansaugmechanismus an einem der bereits ausgefahrenen Glieder in Aktion und von diesem fixierten Zustand aus wird dann weiter ausgefahren.in the Trap of a telescopic boom, in the telescoped State the reinforcements / reinforcing baskets and then by extending transported to the front, occurs after a certain extension state the suction mechanism on one of the already extended limbs in action and from this fixed state will continue then extended.

Besteht der Ausleger aus einer Kombination aus teleskopierbarem teil, welcher an einer balkenförmigen Schiene verfahrbar ist, so kann je nach auftetendem Hebelarm entweder eine Ansaugvorrichtung am teleskopierbaren Teil oder am starren balkenförmigen Teil aktiv werden.Consists the boom of a combination of telescopic part, which on a bar-shaped Rail is movable, so depending on the auftetendem lever arm either a suction device on the telescopic part or rigid bar-shaped Part become active.

In einer aufwendigeren Ausführung der Erfindung ist der Greifer nicht nur entlang des Auslegers (bzw. mitsamt ihm) verfahrbar und anhebbar und absenkbar, sondern auch in der Horizontalen in einem Winkel zum Ausleger verfahrbar, um Bewehrungen/Bewehrungskörbe exakt in Sollage bringen zu können.In a more elaborate design the invention, the gripper is not only along the boom (or. together with it) movable and liftable and lowerable, but also movable in the horizontal at an angle to the boom to Reinforcements / reinforcement cages to bring exactly into desired position.

Das Positionieren der Bewehrungen/Bewehrungskörbe kann von einer bevorzugt steuerbaren Kamera am Greifer oder Ausleger überwacht und von außerhalb der Zwischendecke gesteuert werden. Es kann auch von einer Position (bevorzugt Sitzposition) oberhalb der Zwischendeckenschalung aus gesteuert werden. Bevorzugt wird die Lage der Bewehrungen/Bewehrungskörbe nachträglich aber nocheinmal von einem Arbeiter überprüft.The Positioning of the reinforcements / reinforcing cages may be preferred by one controllable camera on the grab or boom monitors and from outside the false ceiling can be controlled. It can also be from a position (Preferred seating position) above the false ceiling formwork to be controlled. However, the position of the reinforcements / reinforcing baskets is preferred subsequently checked again by a worker.

Alternativ werden die Bewehrungen/Bewehrungskörbe, die der Greifer antransportiert, von Arbeitern manuell an die korrekte Position gerückt.

  • 6.) Sind alle Bewehrungen/Bewehrungskörbe ordnungsgemäß verlegt, zieht sich der Greifer auf den Manipulatorwagen zurück.
  • 7.) Es wird nun entweder die Betonverteilervorrichtung verfahrbar am Ausleger als neues Vorsatzgerät befestigt, oder der bereits vorhandene Greifer selbst packt die Betonverteilervorrichtung.
  • 8.) Die verfahrbare Betonverteilervorrichtung oder der Greifer mit der von ihm gepackten Betonverteilervorrichtung bewegt sich nun über die Zwischendeckenschalung hinweg und verteilt, bevorzugt überwacht von einer Kamera und ferngesteuert von außerhalb der Zwischendecke, an seinem jeweiligen Bestimmungsort den Beton auf der Zwischendeckenschalung. Alternativ überwachen bei einer einfacheren Ausgestaltung der Erfindung Arbeiter die Verteilung des Betons auf der Zwischendeckenschalung.
  • 9.) Ist der Beton ordnungsgemäß verteilt, wird der Manipulator verfahren/versetzt. Hierzu muß natürlich der Ausleger von der Tunneldecke getrennt sein. Bevorzugt wird er hierzu über die Plattform des Manipulators eingefahren.
  • 10.) Nun kann ohne Behinderung durch den Manipulator eine neue Zwischendeckenschalung errichtet werden und der Vorgang wiederholt sich.
Alternatively, the reinforcements / reinforcing baskets that the gripper transports are manually moved to the correct position by workers.
  • 6.) If all reinforcements / reinforcement cages are properly laid, the gripper retracts onto the manipulator carriage.
  • 7.) It is now either the concrete distribution device movably attached to the boom as a new attachment, or the existing gripper itself grabs the concrete distribution device.
  • 8.) The movable concrete distributor device or the gripper with the concrete distributor device packed by it now moves across the false ceiling formwork and distributes, preferably monitored by a camera and remotely from outside the false ceiling, at its respective destination the concrete on the false ceiling formwork. Alternatively, in a simpler embodiment of the invention, workers monitor the distribution of the concrete on the false ceiling formwork.
  • 9.) If the concrete is properly distributed, the manipulator is moved / offset. For this purpose, of course, the boom must be separated from the tunnel ceiling. For this purpose, it is preferably retracted via the platform of the manipulator.
  • 10.) Now, without obstruction by the manipulator, a new false ceiling formwork can be built and the process is repeated.

Die Figuren veranschaulichen das Verfahren unter Benützung eines Manipulators, dessen Ausleger eine Kombination aus teleskopierbarem Bereich und balkenförmiger Schiene darstellt, an der der teleskopierbare Teil verschiebbar angeordnet ist.The Figures illustrate the method using a manipulator whose Boom a combination of telescopic section and bar-shaped rail represents, on which the telescopic part slidably disposed is.

1 zeigt schematisch, wie der erfindungsgemäße Mehrzweck-Manipulator einen Bewehrungskorb auf der Zwischendeckenschalung positioniert, wobei der Ausleger, an dem der Greifer sitzt, an einer Stelle an der Tunneldecke angesaugt ist. 1 shows schematically how the multipurpose manipulator according to the invention positions a reinforcement cage on the false ceiling formwork, wherein the boom, on which the gripper sits, is sucked in at a location on the tunnel ceiling.

2 zeigt, wie derselbe Manipulator auch den Beton aufbringt. 2 shows how the same manipulator also applies the concrete.

11
ZwischendeckenschalungBetween slabs
22
Hebeplattformlifting platform
33
Bewehrungskorbreinforcing cage
44
Auslegerboom
55
Ansaugvorrichtungsuction
66
Betonverteilerconcrete distributor
77
flexible Betonzuleitungflexible concrete supply
88th
Tunneldecketunnel ceiling

Claims (9)

Vorrichtung zum Aufbringen von Bewehrungen und Beton auf die Zwischendeckenschalung bei der Erstellung einer Zwischendecke in einem Tunnel, dadurch gekennzeichnet, daß sie mindestens aus folgenden Bestandteilen besteht: a.) Einem Gerüst mit motorisch, hydraulisch oder pneumatisch anhebbarer und absenkbarer Plattform/Palettenaufnahme, die groß genug ist für die Aufnahme der zu verlegenden Bewehrungen, b.) Einem daran befestigten kranartigen Ausleger, der über mindestens eine Ansaugvorrichtung verfügt, mit der er sich oberhalb der Zwischendeckenschalung an der Tunneldecke ansaugt und damit fixiert, c.) Einem Greifer für die Bewehrungen, der entlang des Auslegers verfahrbar ist oder mit dem Ausleger verfahrbar ist, d.) Einer Betonverteilervorrichtung zum Aufbringen des Betons auf die Zwischendeckenschalung, die entlang des Auslegers verfahrbar ist oder mit dem Ausleger verfahrbar ist.Device for applying reinforcements and concrete to the false ceiling formwork when creating a false ceiling in a tunnel, characterized in that it consists of at least the following components: a.) A scaffold with motorized, hydraulically or pneumatically liftable and lowerable platform / pallet receiver, the large enough to receive the reinforcements to be laid, b.) a crane-type boom attached to it, which has at least one suction device, c) a grab for the reinforcements, which can be moved along the boom or moved with the boom, d. which is movable along the boom or is movable with the boom. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß der Ausleger balkenförmig ist und an ihm eine Schiene verläuft, an der ein Greifer und und eine Betonverteilervorrichtung entlangfahren können.Device according to claim 1, characterized in that that the Boom beam-shaped is and there is a rail on it, along which a gripper and and a concrete distributor device can travel. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß der Ausleger aus ineinanderschiebbaren Teilen teleskopartig aufgebaut ist und im Bereich seines vorderen Endes einen Greifer und eine Betonverteilervorrichtung aufweist, oder ein Kupplungsstück für die unterschiedlichen Vorsatzgeräte Greifer und Betonverteilervorrichtung aufweist, oder nur einen Greifer aufweist, der Mittel zum Packen der Betonverteilervorrichtung besitzt.Device according to claim 1, characterized, that the Boom telescopically constructed telescoping parts is and in the area of its front end a gripper and a Having concrete distributor device, or a coupling piece for the different attachments gripper and concrete distribution device, or just a gripper having means for packing the concrete distribution device. Vorrichtung nach mindestens einem der Ansprüche 2 und 3, dadurch gekennzeichnet, daß der Ausleger aus einem ineinanderschiebbaren teleskopartigen Teil und einem starren schienenartigen Teil besteht, an dem der teleskopartige Teil verschiebbar angeordnet ist.Device according to at least one of claims 2 and 3, characterized in that the boom from a telescoping telescopic part and a rigid rail-like part is made, on which the telescopic part displaceable is arranged. Vorrichtung nach mindestens einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß sie auf Rädern, Ketten oder Schienen auf dem Tunnelboden verfahrbar ist.Device according to at least one of claims 1 to 4, characterized in that on wheels, Chains or rails on the tunnel floor is movable. Vorrichtung nach mindestens einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß der Greifer in der Horizontalen in einem Winkel zum Ausleger beweglich angeordnet ist.Device according to at least one of claims 1 to 5, characterized in that the gripper horizontally disposed at an angle to the boom movable is. Vorrichtung nach mindestens einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, daß die Betonverteilervorrichtung in der Horizontalen in einem Winkel zum Ausleger beweglich angeordnet ist.Device according to at least one of claims 1 to 6, characterized in that the concrete distribution device horizontally disposed at an angle to the boom movable is. Verfahren zur Herstellung der Zwischendecke in einem Tunnel unter Verwendung einer Vorrichtung nach mindestens einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß folgende Schritte ausgeführt werden: a.) Es wird die Zwischendeckenschalung für den zu betonierenden Abschnitt der Zwischendecke im Sollabstand unter der Tunneldecke errichtet. b.) Die Vorrichtung wird neben die aufgebaute Zwischendeckenschalung gefahren/gesetzt. Auf ihrer Hebeeinrichtung liegen bereits Bewehrungen/Bewehrungskörbe, bereit, oder die Bewehrungen/Bewehrungskörbe werden erst später von einem anderen Transporter angeliefert und auf die Hebeeinrichtung gelegt, oder es wird eine gesamte Bewehrungspalette auf die Hebeeinrichtung der Vorrichtung gelegt. c.) Die Hebeeinrichtung wird sodann bis ungefähr auf das Niveau der Zwischendeckenschalung angehoben. d.) Der Ausleger wird an der Tunneldecke entlang über die Zwischendeckenschalung hinweg ausgefahren und saugt sich im mittleren oder hinteren Bereich des zwischen Schalung und Tunneldecke aufgespannten Raumes an der Tunneldecke fest. e.) Ein am Ausleger entlang verfahrbarer vertikal beweglicher Greifer (mechanisch oder magnetisch) packt dann die Bewehrungen/Bewehrungskörbe von der Plattform/Palette und befördert sie nacheinander an ihren Bestimmungsort auf der Schalung. Im Falle eines teleskopierbaren Auslegers, der im ineinandergeschobenen Zustand die Bewehrungen/Bewehrungskörbe mittels Greifer packt und dann durch Ausfahren nach vorne transportiert, tritt nach einem gewissen Ausfahrzustand der Ansaugmechanismus an einem der bereits ausgefahrenen Glieder in Aktion und saugt sich an der Tunneldecke fest. Von diesem fixierten Zustand aus wird dann weiter ausgefahren. Im Falle einer Kombination des Auslegers nach Anspruch 4 saugt sich eine Ansaugvorrichtung am teleskopierbaren Teil oder eine am balkenförmigen starren Teil an der Tunneldecke fest. f.) Sind alle Bewehrungen/Bewehrungskörbe ordnungsgemäß verlegt, zieht sich der Greifer auf den Vorrichtungswagen zurück. g.) Es wird nun entweder die Betonverteilervorrichtung verfahrbar am Ausleger als neues Vorsatzgerät befestigt, oder der bereits vorhandene Greifer selbst packt die Betonverteilervorrichtung. h.) Die verfahrbare Betonverteilervorrichtung oder der Greifer mit der von ihm gepackten Betonverteilervorrichtung bewegt sich nun über die Zwischendeckenschalung hinweg und verteilt an seinem jeweiligen Bestimmungsort den Beton auf der Zwischendeckenschalung. i.) Ist der Beton ordnungsgemäß verteilt, wird der Manipulator verfahren/versetzt. Hierzu löst sich die Ansaugvorrichtung des Auslegers von der Tunneldecke. k.) Ohne Behinderung durch den Manipulator wird eine neue Zwischendeckenschalung neben der bereits betonierten errichtet und die Vorgänge a.) bis i.) wiederholt sich.Method of making the false ceiling in one Tunnel using a device after at least one the claims 1 to 7, characterized in that the following steps are carried out: a.) It becomes the false ceiling formwork for the section to be concreted built the false ceiling at the desired distance under the tunnel ceiling. b.) The device will be next to the constructed intermediate deck formwork run / set. There are already reinforcements / reinforcing cages on their lifting equipment, ready to or the reinforcements / reinforcing baskets will be later delivered by another transporter and on the lifting device or it will be an entire range of reinforcement on the lifting device placed the device. c.) The lifting device is then until about raised to the level of false ceiling formwork. d.) The Boom is along the tunnel ceiling along the false ceiling formwork extended and sucks in the middle or rear of the between the formwork and tunnel ceiling spanned space at the tunnel ceiling firmly. e.) A vertically movable on the boom along Gripper (mechanical or magnetic) then grabs the reinforcements / reinforcing cages from the Platform / pallet and carried one by one to their destination on the formwork. in the Trap of a telescopic boom, in the telescoped State the reinforcements / reinforcing baskets by means of grapple grabs and then transported by extension to the front, occurs after a certain Extension state of the suction mechanism on one of the already extended members in action and sucks on the tunnel ceiling. From this fixed State is then extended further. In case of a combination The boom according to claim 4 sucks a suction device on the telescopic part or on the bar-shaped rigid part on the Tunnel ceiling stuck. f.) Are all reinforcements / reinforcement cages properly laid, The gripper pulls back on the device carriage. G.) It is now either the concrete distribution device movable on Boom attached as a new attachment, or the already existing gripper itself packs the concrete distributor device. H.) The movable concrete distributor device or the gripper with the from him packed concrete distributor device now moves over the Temporary ceiling formwork and distributed at its respective Destination the concrete on the false ceiling formwork. i.) Is the concrete properly distributed, the manipulator is moved / offset. This dissolves the suction device of the jib from the tunnel ceiling. k.) Without obstruction by the manipulator is a new false ceiling formwork erected next to the already concreted and the operations a.) to i.) repeats itself. Verfahren nach Anspruch 8, dadurch gekennzeichnet, daß das Positionieren der Bewehrungen/Bewehrungskörbe und/oder das Verteilen von Beton von einer Kamera am Greifer oder Ausleger überwacht wird.Method according to claim 8, characterized in that that this Positioning of reinforcements / reinforcement cages and / or distribution monitored by concrete from a camera on the grab or boom becomes.
DE200510030956 2005-06-30 2005-06-30 Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork Withdrawn DE102005030956A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE200510030956 DE102005030956A1 (en) 2005-06-30 2005-06-30 Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200510030956 DE102005030956A1 (en) 2005-06-30 2005-06-30 Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork

Publications (1)

Publication Number Publication Date
DE102005030956A1 true DE102005030956A1 (en) 2007-01-18

Family

ID=37563294

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200510030956 Withdrawn DE102005030956A1 (en) 2005-06-30 2005-06-30 Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork

Country Status (1)

Country Link
DE (1) DE102005030956A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ302312B6 (en) * 2010-04-06 2011-02-23 Metrostav A. S. Climbing shuttering of tunnel bottom

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ302312B6 (en) * 2010-04-06 2011-02-23 Metrostav A. S. Climbing shuttering of tunnel bottom

Similar Documents

Publication Publication Date Title
EP2725166B1 (en) Method for creating concreting sections with the aid of a rail-guided self-climbing formwork system
DE68915599T2 (en) Hydraulic scaffold.
EP3440283B1 (en) Self-climbing system, self-climbing unit and method for moving such a self-climbing unit on a concrete building structure
EP3899167B1 (en) Construction site device with climbing formwork and elevator system
DE2400313C3 (en) Auxiliary equipment for assembly and maintenance work on a cooling tower
DE102018117727A1 (en) LIFT DRIVE FOR A RAILWAY CLIMBING SYSTEM
DE102018202097A1 (en) Climbing system and method for operating a climbing system
DE4409829A1 (en) Method and device for producing walls and walls, in particular for buildings
DE1283484B (en) Procedure for building high-rise buildings and formwork to carry out the procedure
DE2815898A1 (en) DEVICE FOR POSITIONING CEILING SUPPORT IN A TUNNEL
DE4005997C1 (en)
DE1658641C3 (en) Device for the production and assembly of a vertical nozzle bridging support or the like
EP2035314B1 (en) Lifting platform and method for setting up a lifting platform
DE2217584B2 (en) Climbing frame for concrete wall formwork - has frame secured to wall by supports and formwork element guided on rollers
DE102005030956A1 (en) Reinforcement installation and concrete application device used in tunnel construction, has gripper and concrete distribution unit that move along or with boom for holding reinforcements and for applying concrete on ceiling formwork
DE1684263B1 (en) Device for lifting ceilings of buildings using the lifting ceiling method
DE2461251C3 (en) Device for pre-assembly, transport and installation of a route or tunnel extension
DE19704967C2 (en) Gantry crane, in particular for the construction of buildings
EP0035623B1 (en) Chimney stack and process for its erection
WO1993014288A1 (en) Device for conveying concrete with an adjustable height concrete distribution mast
AT397404B (en) DEVICE FOR BUILDING CONSTRUCTION WALLS
DE2208911B2 (en) Multi-storey-building concrete distributor - with scaffolding on supports fitted to shaft climbing-formwork bottom cage
DE1949674U (en) DEVICE FOR MANIPULATING ROOM-LARGE STRUCTURES, IN PARTICULAR PRE-FABRICATED GARAGES.
CH655045A5 (en) SHUTTERING DEVICE FOR THE MANUFACTURE OF QUADER-SHAPED READY-MADE READY-MADE CONCRETE GARMENTS.
DE2360755C2 (en) Working platform

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee