CS241337B1 - Bridge for rake conveyors under mining mining machines - Google Patents

Bridge for rake conveyors under mining mining machines Download PDF

Info

Publication number
CS241337B1
CS241337B1 CS848592A CS859284A CS241337B1 CS 241337 B1 CS241337 B1 CS 241337B1 CS 848592 A CS848592 A CS 848592A CS 859284 A CS859284 A CS 859284A CS 241337 B1 CS241337 B1 CS 241337B1
Authority
CS
Czechoslovakia
Prior art keywords
mining
bridge
rake
machines
connection
Prior art date
Application number
CS848592A
Other languages
Czech (cs)
Slovak (sk)
Other versions
CS859284A1 (en
Inventor
Rudolf Fodor
Jaromir Marsalek
Original Assignee
Rudolf Fodor
Jaromir Marsalek
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rudolf Fodor, Jaromir Marsalek filed Critical Rudolf Fodor
Priority to CS848592A priority Critical patent/CS241337B1/en
Publication of CS859284A1 publication Critical patent/CS859284A1/en
Publication of CS241337B1 publication Critical patent/CS241337B1/en

Links

Landscapes

  • Pusher Or Impeller Conveyors (AREA)

Abstract

Vynález rieši most pre uloženie hrabíových dopravníkov pod banské dobývacie stroje s připojením na banské mechanizované výstuže. Podstata vynálezu spočívá v tom, že je tvořený základnou doskou, ku ktorej je na jednej straně připojená bočnica, na druhej straně je připojená konzola, ku ktorej je připojený káblový kanál. V takto v-ytvorenom moste je uložený žlab hrablového- dopravníka, pričom spojenie jednotlivých mostov je tvořené úchytkou, okom a príložkami. Vynález je možné využit pre uloženie všetkých v súčasnosti používaných banských hrablových dopravníkov a pre po-' jazd banských dobývacích strojov s reťazovým alebo bezreťazovým pojazdom v hlbinno-m baníctve.The invention solves a bridge for placing rake conveyors under mining machines with connection to mining mechanized reinforcements. The essence of the invention lies in the fact that it is formed by a base plate, to which a sidewall is connected on one side, and on the other side a console is connected to which a cable channel is connected. In the bridge thus formed, the trough of the rake conveyor is placed, while the connection of the individual bridges is formed by a handle, an eye and inserts. The invention can be used for placing all currently used mining rake conveyors and for driving mining machines with chain or chainless driving in deep mining.

Description

Vynález rieši most pre uloženie hrabavých dopravníkov pod banské dobývacie stroje s připojením na banské mechanizované výstuže.The invention solves a bridge for storing burrowing conveyors under mining machines with connection to mining mechanized supports.

Podstata vynálezu spočívá v tom, že je tvořený základnou doskou, ku ktorej je na jednej straně připojená bočnica, na druhej straně je připojená konzola, ku ktorej je připojený káblový kanál. V takto vytvorenom moste je uložený žlab hřeblového dopraivníka, pričom spojenie jednotlivých mostov je tvořené úchytkou, okom a príložkami.The essence of the invention consists in that it consists of a base plate to which a sidewall is connected on one side and a bracket to which the cable channel is connected on the other side. In the bridge created in this way, there is a gutter conveyor trough, where the connection of the individual bridges is formed by a clip, eye and shims.

Vynález je možné využit pre uloženie všetkých v súčasnosti používaných banských hrabíových dopravníkov a pre pojazd banských dobývacích strojov s reťazovým alebo bezreťazovým pojazdom v hlbinnom baníctve.The invention can be used to accommodate all currently used mining rake conveyors and to drive mining or chain mining machines in underground mining.

(Vynález rieši most pre uloženie' Hřeblových dopravníkov pod banské dobývacie stroje s připojením na banské, mechanizované výstuže.(The invention solves a bridge for the placement of scraper conveyors under mining mining machines with connection to mining mechanized supports.

Doteraz známe usporiadahie hrabíových dopravníkov pod banské dobývacie stroje je riešené tak, že na žlaby hřeblových dopravníkov sa pomocou skrutiek pripájajú z jednej strany nahrňovacie štíty a z druhej strany žlabov konzoly na vedenie dobývacieho stroja s káblovým kanálom. Žlaby vzájomne sú pospájané skrutkami.The hitherto known arrangement of the rake conveyors under the mining machines is designed in such a way that crimping shields are connected to the trays of the scraper conveyors by screws and on the other side by the trays of the console for guiding the mining machine with a cable channel. The gutters are interconnected by screws.

Nevýhodou doteraz známého usporiadania hrabíových dopravníkov je najma to, že uvedené komponenty nahrňovacie štíty a konzoly na vedenie dobývacieho stroja je nutné priskrutkovať značným množstvom skrutiek, čo spósobuje velkú prácnosť pri montáži. Spodná časť žlabov je priamo spojená s počvou stěnového porubu, čím dochádza k zanášaniu spodnej časti hřeblových dopravníkov a tým aj k ich preťažovaniu.A disadvantage of the prior art arrangement of the rake conveyors is, in particular, that the components of the topping shields and the mining machine guiding brackets have to be screwed with a considerable number of screws, which results in a great assembly effort. The lower part of the troughs is directly connected to the wall coil front, which causes the lower part of the scraper conveyors to become clogged and thus overloaded.

Ďalšou nevýhodou doteraz známého usiporiadania hrabíových dopravníkov pod banské dobývacie stroje je, že pri 1’avom alebo pravom smere odťažby horniny z porubu sa musia nahrňovacie štíty a konzoly na vedenie dobývacieho stroja navzájom premontovať, čo (představuje zvýšenie prácnosti. Jednou z dalších nevýhod doteraz známého usporiadania hrabíových dopravníkov je, že na každý typ súčasne používaných typov hrabíových dopravníkov sú potřebné zvlášť upravené nahrňovacie štíty a konzoly na vedenie dobýváních strojov.A further disadvantage of the prior art arrangement of rake conveyors under mining machines is that in the left or right direction of rock extraction from the lining, the topsheets and the mining machine guiding brackets have to be removable from each other, which constitutes an increase in labor. The arrangement of the rake conveyors is that for each type of rake conveyor used at the same time, specially adapted topping plates and consoles for guiding the mining machines are needed.

Vyššie popísané nedostatky odstraňuje most ipre uloženie hrabíových dopravníkov pod banské dobývacie stroje podía vynálezu, ktorého podstata spočívá v tom, že je tvořený základnou doskou, ku ktorej je na jednej straně připojená bočnica, na druhej straně je připojeni Konzola, Ku ktorej je připojený káblový kanál. V takto vytvorenom moste je plozený žlab hrablového dopravníka., pričom spojenie jednotlivých mosje tvořené úchytkou, okom a príložkami.The above-mentioned drawbacks are eliminated by the bridge for placing of the conveyor belts under mining mining machines according to the invention, which consists in the fact that it consists of a base plate to which on one side is connected sidewall, on the other side is connected bracket to which cable cable is connected . In the bridge formed in this way, there is a gutter of the rake conveyor, whereby the connection of the individual mosques is formed by a clip, eye and shims.

Výhody riešenia podía vynálezu spočívajú najma v tom, že zaisťuje také spojenie jednotlivých mostov, ďalej uloženie a uchytenie žlabov hrablového dopravníka je převedené bez skrutiek, spodná časť žlabov je překrytá pre zabránenie zanášania spodnej časti dopravníka.Advantages of the solution according to the invention consist mainly in providing such a connection of individual bridges, furthermore the placement and gripping of the scraper conveyor troughs is transferred without screws, the bottom part of the troughs is covered to prevent clogging of the bottom part of the conveyor.

Ďalšou výhodou je zabezpečenie všestranného použitia pri 1’avom alebo pravom smere odťažby horniny z porubu.Another advantage is to ensure versatile use in the left or right direction of rock extraction.

Na přiložených výkresoch je na obr. 1 schematicky v náryse znázorněný rez uloženia žlabu dopravníka, na obr. 2 je schematicky znázorněný most pre uloženie hrab1’ových dopravníkov v pódoryse a na obr. 3 schematicky znázorněné spojenie jednotlivých mostov.In the accompanying drawings, FIG. 1 is a schematic cross-sectional view of a conveyor tray seat; FIG. 2 is a schematic illustration of a bridge for storing scraper conveyors in a top view, and FIG. 3 shows schematically the connection of individual bridges.

Most podía vynálezu je tvořený základnou doskou 1, ku ktorej je na jednej straně připojená bočnica 2, na druhej straně je připojená konzola 3 s otvormi 7, ku ktorej je připojený káblový kanál 4. V takto vytvorenom moste je uložený žlab hrablového dopravníka 5, pričom spojenie jednotlivých dielčich mostov je tvořené úchytkou 8, okom 9 a príložkami 10. Žlab hrablového dopravníka 5 všetkých používaných typov je uchytený bez skrutiek, pomocou zaisťovacích segmentov 8.The bridge according to the invention consists of a base plate 1 to which on one side a sidewall 2 is connected, on the other side a bracket 3 with openings 7 is connected, to which a cable channel 4 is connected. the connection of the individual sub-bridges is formed by the clamp 8, the eye 9 and the shims 10. The scraper conveyor trough 5 of all types used is fastened without screws, by means of locking segments 8.

Vynález je možné využit pre uloženie všetkých v súčasnosti používaných banských -hrabíových dopravníkov 5 a pre pojazd banských dobývacích strojov s reťazovým alebo bezreťazovým pojazdom v hlbinnom baníctve.The present invention can be used to accommodate all currently used mining excavator conveyors 5 and to drive mining or chain mining machines in deep mining.

Claims (1)

PREDMET Most pre uloženie hrabíových dopravníkov pod banské dobývacie stroje s připojením na banské mechanizované výstuže vyznačujúci sa tým, že je tvořený základnou doskou (1), ku ktorej je na jednej straně připojená bočnica (2), na druhej straně je VYNALEZU připojená konzola (3), ku ktorej je připojený káblový kanál (4), v takto vytvorenom moste je vložený žlab hrablového dopravníka (5), pričom spojenie jednotlivých dielčich mostov je tvořené úchytkou (8), okom (9) a príložkami (10). 1 list výkresov 241337SUBJECT Bridge for the storage of burial conveyors under mining mining machines with connection to mining mechanized reinforcement, characterized by the fact that it consists of a base plate (1), to which is attached a sidewall (2), on the other side is a connected console (3 ) to which a cable duct (4) is connected, a rake conveyor trough (5) is inserted in the bridge thus formed, the connection of the individual sub-bridges being formed by a gripper (8), an eye (9) and the shims (10). 1 sheet of drawings 241337 Obr. 2FIG. 2 Obr. 3FIG. 3
CS848592A 1984-11-12 1984-11-12 Bridge for rake conveyors under mining mining machines CS241337B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS848592A CS241337B1 (en) 1984-11-12 1984-11-12 Bridge for rake conveyors under mining mining machines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS848592A CS241337B1 (en) 1984-11-12 1984-11-12 Bridge for rake conveyors under mining mining machines

Publications (2)

Publication Number Publication Date
CS859284A1 CS859284A1 (en) 1985-07-16
CS241337B1 true CS241337B1 (en) 1986-03-13

Family

ID=5436702

Family Applications (1)

Application Number Title Priority Date Filing Date
CS848592A CS241337B1 (en) 1984-11-12 1984-11-12 Bridge for rake conveyors under mining mining machines

Country Status (1)

Country Link
CS (1) CS241337B1 (en)

Also Published As

Publication number Publication date
CS859284A1 (en) 1985-07-16

Similar Documents

Publication Publication Date Title
EP0254133A3 (en) Sole for a golf shoe
CS241337B1 (en) Bridge for rake conveyors under mining mining machines
US4270650A (en) Process and apparatus for the aligning of fish
DE3665526D1 (en) Feeding carriage for a battery cage of several stories
US4174831A (en) Device for inserting a new stack of sheets in feeding position without interruption of sheet-feeding mechanism operation
US3458235A (en) Scraper-chain conveyor,particularly face conveyor,suitable for cooperation with a getting machine
US2973742A (en) Egg handling device
US4422542A (en) Scraper-chain conveyors
GB1477690A (en) Laminar settler
FI100234B (en) Band conveyor for transporting loose goods in vertical or steep ascending direction
DE69215825T2 (en) Automatic feeder for book sections
SE458269B (en) CONTAINER HARVESTING DEVICE
DE3768144D1 (en) CONTAINER FOR STORING LONG LINES.
US3433348A (en) Means for conveying coal in mines
US1760848A (en) Mechanism for handling and distributing fibers
DE738600C (en) Driving chain conveyor
JP4926578B2 (en) Paddy field machine
SE462195B (en) DEVICE FOR TRANSPORT OF EMPTY CULTURAL TREASURES IN A DEVELOPMENT PLANT
CS231609B1 (en) Gluing equipment, mainly unedged
KR20180053390A (en) A seedling guide member and a seedling transplanting unit having the seedling guide member
GB2078653A (en) Scraper-chain conveyors
CS228406B1 (en) Flight conveyor
JP3343167B2 (en) Seedling feed belt paper jam prevention device
SU1235468A1 (en) Arrangement for separating root vegetables and impurities
SU1358910A1 (en) Production line for post-harvesting treatment of head cabbage