CO2021003362A2 - Grout consolidation method for precast pile with full hole casing guide and precast pile for it - Google Patents
Grout consolidation method for precast pile with full hole casing guide and precast pile for itInfo
- Publication number
- CO2021003362A2 CO2021003362A2 CONC2021/0003362A CO2021003362A CO2021003362A2 CO 2021003362 A2 CO2021003362 A2 CO 2021003362A2 CO 2021003362 A CO2021003362 A CO 2021003362A CO 2021003362 A2 CO2021003362 A2 CO 2021003362A2
- Authority
- CO
- Colombia
- Prior art keywords
- well
- precast pile
- pile
- casing
- precast
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/06—Placing concrete under water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D11/00—Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/08—Sinking workpieces into water or soil inasmuch as not provided for elsewhere
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
- E02D27/525—Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Abstract
Un método de consolidación de lechada para un pilote prefabricado con guía de revestimiento de pozos completo, que comprende los siguientes pasos: S1, conducir una plataforma de perforación que lleva un revestimiento (1) para realizar la construcción del pozo, realizándose la construcción del pozo a una profundidad de pozo preestablecida para formar un pozo (2); S2. estando alojada la carcasa (1) en el pozo (2); S3. implantar un pilote prefabricado (4) en el pozo (2) de manera que el pilote prefabricado (4) alcance el fondo del orificio del pozo (2); S4. inyectar una lechada (3) en el pozo (2); S5. extraer la carcasa (1) para que el pilote prefabricado (4) y una cavidad interior del pozo (2) se fijen y cementan en una estructura integrada. También se proporciona un pilote prefabricado, que comprende un cuerpo de pilote y un canal de lechada (5) provisto en el cuerpo del pilote, en donde un extremo de entrada de líquido (11) del canal de lechada (5) se extiende desde una superficie del extremo superior del pilote. El cuerpo y un extremo de salida de líquido (12) del canal de lechada (5) se extienden desde una superficie de extremo inferior del cuerpo de pilote y/o una superficie lateral del cuerpo de pilote.A grout consolidation method for a precast pile with a complete well casing guide, comprising the following steps: S1, drive a drilling rig bearing casing (1) to perform well construction, well construction being performed at a preset well depth to form a well (2); S2. the casing (1) being housed in the well (2); S3. implanting a precast pile (4) in the well (2) so that the precast pile (4) reaches the bottom of the hole of the well (2); S4. inject a slurry (3) into the well (2); S5. remove the casing (1) so that the precast pile (4) and an internal cavity of the well (2) are fixed and cemented in an integrated structure. A precast pile is also provided, comprising a pile body and a slurry channel (5) provided in the pile body, wherein a liquid inlet end (11) of the slurry channel (5) extends from a surface of the upper end of the pile. The body and a liquid outlet end (12) of the slurry channel (5) extend from a lower end surface of the pile body and / or a lateral surface of the pile body.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811091450.0A CN109295972A (en) | 2018-09-25 | 2018-09-25 | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology |
PCT/CN2019/091230 WO2020062940A1 (en) | 2018-09-25 | 2019-06-14 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
Publications (1)
Publication Number | Publication Date |
---|---|
CO2021003362A2 true CO2021003362A2 (en) | 2021-07-19 |
Family
ID=65163301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CONC2021/0003362A CO2021003362A2 (en) | 2018-09-25 | 2021-03-15 | Grout consolidation method for precast pile with full hole casing guide and precast pile for it |
Country Status (10)
Country | Link |
---|---|
US (1) | US20210348355A1 (en) |
EP (1) | EP3839149A4 (en) |
JP (1) | JP2022502586A (en) |
KR (1) | KR20210058901A (en) |
CN (1) | CN109295972A (en) |
BR (1) | BR112021004781A2 (en) |
CO (1) | CO2021003362A2 (en) |
PH (1) | PH12021550571A1 (en) |
SG (1) | SG11202102769TA (en) |
WO (1) | WO2020062940A1 (en) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110896644B (en) * | 2018-09-25 | 2021-04-09 | 高永光 | Grouting consolidation method for full-casing drilling guide precast pile |
CN109295972A (en) * | 2018-09-25 | 2019-02-01 | 高永光 | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology |
CN110565639B (en) * | 2019-09-11 | 2021-03-23 | 中船第九设计研究院工程有限公司 | Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation |
CN111997620A (en) * | 2020-07-28 | 2020-11-27 | 中铁第四勘察设计院集团有限公司 | Grouting construction system and method for karst collapse area |
CN113250238A (en) * | 2021-05-19 | 2021-08-13 | 中交第三航务工程局有限公司 | Rock-socketed construction method of marine ultra-large-diameter single pile based on loosening ring theory |
CN113309089A (en) * | 2021-06-11 | 2021-08-27 | 河北省水利规划设计研究院有限公司 | Prefabricated hollow pile and construction method for taking soil and planting pile |
CN114753376A (en) * | 2022-03-28 | 2022-07-15 | 中电建十一局工程有限公司 | Method for excavating supporting slurry for deep foundation pit in gravel stratum |
CN114562328B (en) * | 2022-04-02 | 2022-12-02 | 中国矿业大学 | Method for controlling surface subsidence by grouting and filling unconsolidated layer of bedrock top boundary |
CN115075238A (en) * | 2022-06-13 | 2022-09-20 | 陕西正诚路桥工程研究院有限公司 | Reinforcing method in bored pile construction based on overwater operation platform |
CN115288212B (en) * | 2022-07-05 | 2023-05-16 | 湖北工业大学 | Optical fiber implantation device and implantation method for existing pile wall |
CN115233685B (en) * | 2022-08-01 | 2023-07-14 | 中交四航工程研究院有限公司 | Recyclable grouting device for maintaining horizontal rigidity of pile foundation and construction method thereof |
CN115323999B (en) * | 2022-09-14 | 2024-02-27 | 赤峰中色白音诺尔矿业有限公司 | Sectional grouting construction device for culvert pipes of tailing pond and construction method thereof |
CN115478560A (en) * | 2022-09-28 | 2022-12-16 | 苏州枫石堂工程科技有限公司 | Wall cracking grouting reinforcement method |
KR102602249B1 (en) | 2023-02-14 | 2023-11-16 | 우창건설 주식회사 | Apparatus for guiding the casing and construction method using the same |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1865652A (en) * | 1929-09-20 | 1932-07-05 | Raymond Concrete Pile Co | Method and apparatus for placing concrete in piles |
JPH05132930A (en) * | 1991-11-07 | 1993-05-28 | Jiototsupu:Kk | Developing method of foundation pile with drain layer |
NL9301176A (en) * | 1993-07-05 | 1995-02-01 | Verstraeten Beheersmij Bv | Method for forming a foundation pile in the ground using a prefabricated pile shaft. |
JPH1171758A (en) * | 1997-08-27 | 1999-03-16 | Nippon Steel Corp | Method for driving pile to rock mass |
JP2000129669A (en) * | 1998-10-22 | 2000-05-09 | Asahi Chem Ind Co Ltd | Connecting method of prefabricated pile |
JP2000257062A (en) * | 1999-03-05 | 2000-09-19 | Taisei Corp | Steel pipe pile pitching method |
JP2002155531A (en) * | 2000-11-21 | 2002-05-31 | Yoshitada Miyake | Pile burial method |
US20050019104A1 (en) * | 2003-07-23 | 2005-01-27 | Derald Christians | Soil stabilization and pile formation method |
JP4667479B2 (en) * | 2008-03-03 | 2011-04-13 | 中国電力株式会社 | Pile attachment / detachment structure and pile construction method |
KR100964796B1 (en) | 2010-02-26 | 2010-06-21 | 송기용 | Method for constructing the steel pipe-concrete composite pile structurized of burying and unifying into the bedrock, and a pile construction |
CN102002945B (en) * | 2010-03-25 | 2013-12-25 | 中国京冶工程技术有限公司 | Capsule type anti-corrosion device with pile shoe and anti-corrosion pile using same and construction method |
DK2527539T3 (en) | 2011-05-27 | 2013-09-30 | Bauer Maschinen Gmbh | Underwater drilling device and method for placing a foundation element in a seabed |
DK2650446T3 (en) | 2012-04-12 | 2014-09-22 | Herrenknecht Ag | Process for making a foundation for an offshore plant |
CN102691296B (en) * | 2012-05-22 | 2015-02-11 | 广州市建筑科学研究院有限公司 | Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof |
JP6260931B2 (en) * | 2013-12-04 | 2018-01-17 | 株式会社大林組 | Steel pipe pile and its embedding method |
EP2930275B1 (en) | 2014-04-08 | 2017-12-20 | Herrenknecht AG | System and method for producing a foundation for a building in water |
CN105442594A (en) * | 2015-12-04 | 2016-03-30 | 荣盛建设工程有限公司 | Hole reaming mud-jacking construction technology for prestress hollow square pile with built-in mud-jacking pipe |
CN107794925A (en) * | 2017-10-31 | 2018-03-13 | 浙江大学城市学院 | The grouting behind shaft or drift lining cast-in-situ concrete thin-wall and construction method of a kind of reserved grouting pipeline |
CN109295972A (en) * | 2018-09-25 | 2019-02-01 | 高永光 | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology |
-
2018
- 2018-09-25 CN CN201811091450.0A patent/CN109295972A/en not_active Withdrawn
-
2019
- 2019-06-14 WO PCT/CN2019/091230 patent/WO2020062940A1/en active Application Filing
- 2019-06-14 SG SG11202102769TA patent/SG11202102769TA/en unknown
- 2019-06-14 US US17/277,860 patent/US20210348355A1/en not_active Abandoned
- 2019-06-14 BR BR112021004781-6A patent/BR112021004781A2/en not_active IP Right Cessation
- 2019-06-14 KR KR1020217010783A patent/KR20210058901A/en not_active Application Discontinuation
- 2019-06-14 EP EP19865349.5A patent/EP3839149A4/en active Pending
- 2019-06-14 JP JP2021515169A patent/JP2022502586A/en active Pending
-
2021
- 2021-03-15 PH PH12021550571A patent/PH12021550571A1/en unknown
- 2021-03-15 CO CONC2021/0003362A patent/CO2021003362A2/en unknown
Also Published As
Publication number | Publication date |
---|---|
BR112021004781A2 (en) | 2021-10-13 |
WO2020062940A1 (en) | 2020-04-02 |
PH12021550571A1 (en) | 2021-10-25 |
JP2022502586A (en) | 2022-01-11 |
EP3839149A4 (en) | 2022-04-20 |
EP3839149A1 (en) | 2021-06-23 |
CN109295972A (en) | 2019-02-01 |
SG11202102769TA (en) | 2021-04-29 |
US20210348355A1 (en) | 2021-11-11 |
KR20210058901A (en) | 2021-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CO2021003362A2 (en) | Grout consolidation method for precast pile with full hole casing guide and precast pile for it | |
MY175098A (en) | Cleaning device for cleaning a base of a borehole and method for creating a foundation element | |
EA201490691A1 (en) | METHOD OF CREATING A SUPERVISION WALL AND A RELATED SUPPORTING WALL | |
AR062045A1 (en) | HETEROGENIC PLACEMENT OF SHARPENING AGENTS IN AN FRACTURE WITH EXTRAIBLE CHANNEL TRAINER FILLING | |
RU2009107213A (en) | INJECTION COMPOSITION FOR A WELL ON THE BASIS OF BIOCIDE AND WAYS OF TREATING WELLS | |
AU2013221032B2 (en) | Method for establishment of a new well path from an existing well | |
MY192204A (en) | A method of plugging and abandoning a well | |
PH12017501665A1 (en) | Hard road construction method for natural groundwater recharge | |
RU109475U1 (en) | DRILLING STAW WITH INTEGRATED INJECT MONITORS | |
KR20180084293A (en) | Embedded Pile Structure And Method for Constructing the Same | |
CN101245597A (en) | Breast wall type cast-in-situ bored pile construction method and pile machine | |
RU172738U1 (en) | DEVICE FOR MANUFACTURING BORED PILES | |
CN105019449B (en) | Prestressed concrete pipe pile and its construction method with degassing function | |
RU165656U1 (en) | INJECTOR FOR FIXING SOILS | |
RU2392382C2 (en) | Method for reinforcement of saturated soils | |
RU2401909C2 (en) | Device for compaction of soil in bottomhole | |
RU2008132763A (en) | DRILLING AND COMPLETION OF WELLS WITH SMALL LATERAL BARKS | |
JP6401574B2 (en) | Pneumatic caisson method | |
RU2634759C1 (en) | Method of auger pile construction | |
RU2558090C1 (en) | Horizontal well operation method | |
CN104047565B (en) | Handling method for diaphragm wall slotted hole cement grout leakage | |
RU2004125555A (en) | METHOD FOR DEVELOPING A CARBONATE MULTIPLAYER OIL DEPOSIT OF PORO-CRACKED POROSITY | |
RU195719U1 (en) | Device for the formation of bored piles screw profile | |
RU167384U1 (en) | DEVICE FOR PERFORMING DRILLING PILES | |
BR112019001850A2 (en) | spiral pipe arrangement for wellbore discharge |