CN86105051A - 整体预应力板墙结构 - Google Patents
整体预应力板墙结构 Download PDFInfo
- Publication number
- CN86105051A CN86105051A CN 86105051 CN86105051A CN86105051A CN 86105051 A CN86105051 A CN 86105051A CN 86105051 CN86105051 CN 86105051 CN 86105051 A CN86105051 A CN 86105051A CN 86105051 A CN86105051 A CN 86105051A
- Authority
- CN
- China
- Prior art keywords
- wall
- plate
- cushion block
- floor
- presstressed reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Landscapes
- Panels For Use In Building Construction (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
在以墙体做为竖向支撑构件的建筑开间方向上,将两块或三块预制板对接,沿建筑物纵向通长布置预应力筋。在横墙上设置垫块,使垫块和板平接,在端部对预应力筋进行张拉,并锚固在端部横墙的垫块上,使板与板、板与墙拼装成整体。必要时沿建筑物纵、横、垂直三个方向穿以预应力筋,靠三向预应力把楼板、墙、楼层拼装成整体。
Description
本发明属于一种后张预应力钢筋混凝土建筑结构。
在以墙体做为竖向支撑构件的房屋建筑中,为满足房屋建筑使用功能的需要,并便于建筑平面灵活布置,常常要将房间由小开间扩大为大开间,即将开间扩大到7.2~12.0米。而目前采用的预制楼板,如双向预应力实心大楼板、预应力空心大楼板、短向空心条板等都不能满足这一要求;现有长向空心条板,虽然跨度可达6.6米,但板厚已达24厘米,占净空较多;如用现浇楼板,则工艺复杂,增加施工困难;如若采取加设进深梁,上铺短向空心条板,则要减少建筑净空,势必增加建筑高度,提高工程造价。现有的整体预应力板柱结构,其拼装楼板采取摩擦节点连接,但该体系仅在以柱作竖向支撑构件的建筑结构中使用。
本发明整体预应力板墙结构是后张预应力拼装楼板与多种墙体结构相结合而形成的一种钢筋混凝土建筑结构,旨在利用现有建筑的横墙支承,采用预应力的方法将几块预制板沿楼板跨度方向串接在一起,依靠预应力摩擦节点将楼板与楼板、楼板与墙、墙与墙拼装组成整体,以达到减少横墙,扩大建筑开间的目的。其开间可以做到7.2~12米。
本发明的内容是:
在以墙体做为竖向支撑构件的房间跨度方向上(见附图),将两块或多块预制板沿长度方向对接,利用楼板1与楼板1之间的明槽或空心板本身的孔洞布置预应力筋5。在两块拼板的对接拼缝9内,用压折器将预应力筋压折,用吊环7和钢销8予以固定。板与板之间的预应力由拼缝内水泥砂浆11传递,形成预应力摩擦节点。当拼缝较宽时,在拼缝内设垫块6,板与板之间预应力由垫块传递,形成垫块传力摩擦节点。同时,在两块拼板的侧向明槽内也设吊环和钢销,以固定压折后的预应力筋。
垫块设置在横墙2的楼层高度处,板与垫块之间2~3厘米缝隙填筑水泥砂浆,预应力筋如同上述一样布置。施加预应力后,楼板通过垫块传力并连接成为整体,剪力由楼板与垫块之间的摩擦力来传递。当楼板直接搁置于横墙上时,此时板墙节点构成与前述相同,但是可以减少楼板的临时支撑。
大板建筑采用本发明的拼接工艺时,先在纵、横墙的交叉处设置垫块6,沿纵向、横向、竖向即三个方向穿以预应力筋5,经张拉锚固,靠三向预应力把板、墙、楼层拼装成整体。
上述的预应力均是沿房屋全长一次完成的,预应力筋沿房屋全长是连续的,预应力完成后,楼板与横墙形成多跨连续梁板形式。
本发明的优点是:
1、可将剪力墙结构的大模板、滑模、大板,砖混建筑体系的房屋开间扩大到7.2~12米,且高跨比可达1/40,有利于压缩层高。
2、大大提高建筑物的整体性。虽然采用装配式拼装技术,但其节点连接可靠,结构整体受力性能不低于现浇混凝土结构,有利于抗震。
3、拼装楼板与垫块摩擦连接,横墙宽度不受楼板搁置长度限制,可以完全根据受力要求选取,从而节省材料,降低成本。
4、简化了大模板、大板建筑体系的节点构造,便于制作,便于施工。
5、可实行楼板与墙体交叉作业,提高施工速度。
本发明适用于钢筋混凝土剪力墙结构的大模板、滑模、大板体系及砌块、砖混结构。
附图:
图1 整体预应力板墙结构平面图
图2 整体预应力板墙结构剖面图
图3 板-板拼缝节点示意图
图4 板-墙连接节点示意图
图5 墙-墙连接节点示意图
图例说明:
1-楼板 2-横墙 3-纵墙 4-外墙板 5-预应力筋 6-垫块 7-吊环 8-钢销 9-拼缝 10-浇灌孔 11-水泥砂浆
实施例1
以内浇外挂大模建筑,7.2米开间,跨度方向采用两拼板,预制板尺寸为3.5×2.45米的空心板,并孔内布置预应力筋的方法为例,具体做法如图1-4,先浇灌横墙2和纵墙3的混凝土,当混凝土浇灌到楼层高度,并脱去模板以后,将预制空心板吊装就位在临时支撑上,垫块6搁置在横墙上,用砂浆找平。然后用早强微膨胀水泥砂浆11浇注跨中两板间拼缝9和支座处垫块与板间缝隙。在空心板圆孔和垫块预留孔内,沿建筑物纵向通长穿好预应力筋5,待灌缝砂浆达到张拉强度后进行张拉,并锚固在端部横墙垫块上。然后在跨中用压折器将预应力筋压折,并用吊环7和钢销8固定。这时即可拆除临时支撑,承受施工荷载,支模、浇灌上层墙体。最后通过空心楼板预留浇灌孔10,用细石混凝土浇灌穿预应力筋的圆孔,用水泥砂浆浇灌垫块的预留孔,待混凝土强度达到设计强度的70%时,割掉留在板下的钢销,一层楼板与墙的拼装就完成了。
采用明槽布筋时,板侧明槽内除设吊环、钢销外,两板侧如有预留的非预应力筋时,需要互相连接,或者板外甩出钢筋焊接,或者板外甩出“L”型钢筋靠二次浇灌混凝土连接。如采用拼缝明槽时,需设垫块6,其预留的非预应力筋连接与板侧明槽相同。
预制外墙板,可用预应力筋拼接在横墙上,做法是:在横墙2与外墙板4交叉处设置垫块6,这里的垫块需预留钢筋,使其埋入横墙,以加强垫块与横墙的连接。预应力筋沿楼层纵向布置在上下外墙板与楼板形成的明槽内。为了便于临时固定外墙板,可按楼板滞后一层张拉。张拉锚固之后浇灌好上下层墙板与楼板边缘所形成的明槽内混凝土。
实施例2
以剪力墙结构的预制大板建筑,7.2米开间,跨度方向采用两拼板,空心板孔内布置预应力筋的方法为例,具体做法是:
先吊装内墙板,在上下横墙2和上下纵墙3交叉连接处,用垫块6将纵墙和横墙连系起来,这里的垫块需预留三向空心孔洞。垫块与墙间缝隙用早强微膨胀水泥砂浆11浇灌密实,预应力筋5沿楼层纵、横、垂直方向布置,待砂浆达到张拉强度后,进行水平方向的预应力张拉。垂直方向的预应力需待房屋顶板吊装后进行,一次张拉完成,最后分层浇灌竖缝混凝土。
外墙板用垫块6与内墙板相连,见图5。这里的垫块需预留三向空心孔洞,然后靠三向预应力筋将内、外墙、楼层装配成整体。
Claims (4)
1、一种整体预应力钢筋混凝土板墙建筑结构,主要由墙与楼板通过预应力组装而成。其特征是板与板、板与墙、墙与墙之间的连接采用预应力摩擦节点。
2、根据权利要求1所述的建筑结构,其特征是楼板在一个开间内由两块或多块预制板拼装而成,板间对接拼缝由预应力筋、吊环、钢销、水泥砂浆组成板-板连接节点。
3、根据权利要求1所述的建筑结构,其特征是垫块设在横墙上,由预应力筋、垫块、水泥砂浆组成板-墙节点。
4、根据权利要求1所述的建筑结构,其特征是垫块搁置在墙与墙交叉处,由纵向、横向、竖向即三个方向的预应力筋,以及垫块、水泥砂浆组成墙与墙连接节点。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN198686105051A CN86105051B (zh) | 1986-08-21 | 1986-08-21 | 整体预应力板墙结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN198686105051A CN86105051B (zh) | 1986-08-21 | 1986-08-21 | 整体预应力板墙结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN86105051A true CN86105051A (zh) | 1987-02-11 |
CN86105051B CN86105051B (zh) | 1988-05-18 |
Family
ID=4802704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN198686105051A Expired CN86105051B (zh) | 1986-08-21 | 1986-08-21 | 整体预应力板墙结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN86105051B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103243830A (zh) * | 2012-02-08 | 2013-08-14 | 上海奇谋能源技术开发有限公司 | 一种屋顶预制件的防震安装方法 |
CN107190849A (zh) * | 2017-06-28 | 2017-09-22 | 中国华西企业股份有限公司 | 可消除楼板预应力张拉约束影响的剪力墙 |
-
1986
- 1986-08-21 CN CN198686105051A patent/CN86105051B/zh not_active Expired
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103243830A (zh) * | 2012-02-08 | 2013-08-14 | 上海奇谋能源技术开发有限公司 | 一种屋顶预制件的防震安装方法 |
CN107190849A (zh) * | 2017-06-28 | 2017-09-22 | 中国华西企业股份有限公司 | 可消除楼板预应力张拉约束影响的剪力墙 |
CN107190849B (zh) * | 2017-06-28 | 2019-07-19 | 中国华西企业股份有限公司 | 可消除楼板预应力张拉约束影响的剪力墙 |
Also Published As
Publication number | Publication date |
---|---|
CN86105051B (zh) | 1988-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6244008B1 (en) | Lightweight floor panel | |
EP2021555B1 (en) | Concrete beam | |
CN201217898Y (zh) | 混凝土预制楼梯 | |
US5373675A (en) | Composite building system and method of manufacturing same and components therefor | |
CN106555453A (zh) | 一种预应力预制叠合空心板及其施工方法 | |
CA2018525A1 (en) | Method of adding addditional storeys to an existent low-storeyed building | |
CN111576619A (zh) | 高强混凝土后浇的装配式框架体系生产方法 | |
CN1399047A (zh) | 一种三维结构体系建筑及工业化施工方法 | |
CN111364681B (zh) | 一种端部柱梁节点预应力筋交错张拉锚固构造及施工方法 | |
CN102418387A (zh) | 一种后张法体外预应力钢梁和先张法预应力叠合梁结合的房屋结构体系及其施工工艺 | |
CN110805144B (zh) | 全装配式高层/超高层混凝土框支结构体系及其施工方法 | |
CN110439291A (zh) | 一种适用于低层建筑的装配式生产施工方法 | |
US5146726A (en) | Composite building system and method of manufacturing same and components therefor | |
CN212295037U (zh) | 一种可快速装配的结构体系 | |
CN213741571U (zh) | 装配式混凝土建筑结构预留钢筋穿孔的预制柱及梁柱节点 | |
CN212656384U (zh) | 高强混凝土连接件、高强混凝土后浇的装配式框架体系及支撑架 | |
CN1079130C (zh) | 一种房屋建筑三维结构体系的施工方法 | |
CN217517862U (zh) | 一种装配式l形柱与生态内墙自攻钉集块连接构造 | |
CN86105051A (zh) | 整体预应力板墙结构 | |
CN215290989U (zh) | 一种预制混凝土管桩柱与空心楼盖或无梁楼盖的连接结构 | |
DE2546769A1 (de) | Rippendeckenelement | |
CN114457949A (zh) | 一种板端凹凸型且不出筋的叠合板底板及安装结构 | |
CN112227580A (zh) | 一种钢管桁架预应力空心叠合板 | |
CN108487506B (zh) | 一种基于sp板的装配整体式剪力墙的施工方法 | |
DE102004059590A1 (de) | Deckensystem mit werkseitig eingelegten und gegen Auftrieb gesicherten Hohlkörpern aus verschiedenen Materialien untergeordneter Bedeutung |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C13 | Decision | ||
GR02 | Examined patent application | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |