CN2921193Y - Communication tower based on TD-SCDMA - Google Patents

Communication tower based on TD-SCDMA Download PDF

Info

Publication number
CN2921193Y
CN2921193Y CN 200620120728 CN200620120728U CN2921193Y CN 2921193 Y CN2921193 Y CN 2921193Y CN 200620120728 CN200620120728 CN 200620120728 CN 200620120728 U CN200620120728 U CN 200620120728U CN 2921193 Y CN2921193 Y CN 2921193Y
Authority
CN
China
Prior art keywords
tower
section
brace
column
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620120728
Other languages
Chinese (zh)
Inventor
张志勇
邢海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jiande Tower Co., Ltd.
Original Assignee
BEIJING METENO COMMUNICATION INDUSTRIAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING METENO COMMUNICATION INDUSTRIAL TECHNOLOGY Co Ltd filed Critical BEIJING METENO COMMUNICATION INDUSTRIAL TECHNOLOGY Co Ltd
Priority to CN 200620120728 priority Critical patent/CN2921193Y/en
Application granted granted Critical
Publication of CN2921193Y publication Critical patent/CN2921193Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

A communication tower based on the TD-SCDMA standard comprises a tower, a communication platform and a lightning rod. The three-tube tower structure with triangular cross-section is applied in the tower which is composed of the lower tower part, the gradually serrated end of the upper half part of the tower and the straight section of the upper half tower part. The lower part of the tower is composed of the K-shaped prefabricated tower segment with large bearing capacity. The upper part of the tower is composed of the simple and practical fork type prefabricated tower segment. The main bearing column is made with the seamless steel tube. The two upper and lower communication platforms with large diameters are installed on the straight section of the upper half part of the tower. The utility model is provided with the large diameter communication platform, so that the TD-SCDMA transceiver equipment can be installed. At the same time, in the case that the big load of the TD-SCDMA has been met, the structure weight can be lightest. Thus, the materials are saved and the cost is low. With the slender tower form and the nice appearance, the adaptability of the utility model in both urban and rural areas is very well. The bottom occupation area is small so that the land resources can be saved. The utility model with small wind load coefficient, isotropic stress and overall high strength is light weight and easy to install.

Description

Communication tower based on the TD-SCDMA standard
Technical field
The utility model relates to communication equipment, particularly relates to a kind of communication tower based on the TD-SCDMA standard.
Background technology
The TD-SCDMA standard is a kind of very promising 3G mobile communication system, because its standard is different from existing GSM and CDMA system, needs to use the bigger communications platform of diameter.This has just strengthened the load of communication tower, and may there be the hidden danger of load deficiency in the communication tower of existing GSM and CDMA system for the TD-SCDMA system.
Simultaneously along with the development of mobile communication, need set up increasing communication tower, these communication towers all need certain occupation of land, also need to consider to reduce its occupation of land of communication for China of land resources growing tension as far as possible.
The utility model content
Based on the demand, the utility model provides a kind of communication tower based on the TD-SCDMA standard little, that intensity is high that takes up an area of.
The utility model is based on the communication tower of TD-SCDMA standard, comprise king-post, communications platform, lightning rod, described king-post adopts three pipe tower structures of triangular-section, form with the footpath section by king-post the latter half, king-post the first half tapered ends and king-post the first half, described king-post the latter half is made up of the prefabricated tower section of K shape, described king-post the first half is made up of the prefabricated tower section of fork-shaped, and two are installed in described king-post the first half with on the section of footpath about the described communications platform.
The utility model is based on the communication tower of TD-SCDMA standard, the prefabricated tower section of described fork-shaped is the triangular-section, its perpendicular surface has three, each perpendicular surface is by cross tube, left and right pillar and left and right sides brace are formed, one end of the upper end of described left column and described cross tube and the upper end of right brace link to each other, the upper end of described right column links to each other with the upper end of the other end of described cross tube and left brace, the lower end of described left brace is connected with the lower end of right column, the lower end of described right brace is connected with the lower end of left column, and described column upper and lower side is provided with flange.
The utility model is based on the communication tower of TD-SCDMA standard, described king-post the first half is with the prefabricated tower section of described fork-shaped of footpath section, its described perpendicular surface is a rectangle, open the pin size promptly and open pin under equaling, the prefabricated tower section of the described described fork-shaped of king-post the first half gradually closing section section, its described perpendicular surface is trapezoidal, open on promptly the pin size greater than under open pin.
The utility model is based on the communication tower of TD-SCDMA standard, the prefabricated tower section of described K shape is a triangle section, three perpendicular surfaces are arranged, each perpendicular surface is by cross tube, left column, right column, left side brace, right brace, knighthead and hyphen bar are formed, the left end of described cross tube connects the upper end of described left column, the right-hand member of described cross tube connects the upper end of described right column, the mid point of described cross tube connects the upper end of described left and right sides brace, the lower end of described left column is connected with the lower end of described left brace, the lower end of described right column is connected with the lower end of described right brace, between the mid point of the mid point of left brace and left column, connect the hyphen bar, between the epimere of the mid point of left brace and left column, connect knighthead, between the mid point of the mid point of right brace and right column, connect the hyphen bar, connect knighthead between the epimere of the mid point of right brace and right column, described three perpendicular surfaces are identical, for trapezoidal, under open the pin size greater than on open pin, described column upper and lower side is provided with flange.
The utility model is based on the communication tower of TD-SCDMA standard, and described communications platform diameter is 3-4m.
The utility model is based on the communication tower of TD-SCDMA standard, and the following pin of opening of the prefabricated tower section of K shape in the bottom of king-post the latter half is of a size of 3-5m.
The utility model is based on the communication tower of TD-SCDMA standard, and described column adopts seamless steel pipe to make, and described cross tube, brace, knighthead, hyphen bar are made of angle bar.
The utility model is based on the communication tower of TD-SCDMA standard, and is fastening with high-strength bolt by flange between prefabricated tower section of described K shape and the prefabricated tower section of fork-shaped.
The utility model has the bigger communications platform of diameter based on the communication tower of TD-SCDMA standard, and the TD-SCDMA transceiver can be installed, and bulk strength height, in light weight is installed simply, and floor space is little.
Description of drawings
Fig. 1 is the overall schematic of the utility model based on the communication tower of TD-SCDMA standard;
Fig. 2 is the schematic diagram of the utility model based on the prefabricated tower section of the fork-shaped of the communication tower of TD-SCDMA standard;
Fig. 3 is the schematic diagram of the utility model based on the prefabricated tower section of K shape of the communication tower of TD-SCDMA standard.
The specific embodiment
For further setting forth the utility model, do more detailed explanation below in conjunction with embodiment.
Fig. 1 is the overall schematic of the utility model based on the communication tower of TD-SCDMA standard, communication tower adopts three pipe tower structures of triangular-section as can be seen, comprise that king-post bottom part 1, king-post the first half tapered ends 3, king-post the first half are with footpath section 4, communications platform 7, lightning rod 6, communications platform about in the of 7 two be installed in king-post the first half with on the footpath section 4, lightning rod 6 is installed in cat head.King-post the latter half 1 is made up of the prefabricated tower section 10 of K shape, and king-post the first half 3,4 is made up of the prefabricated tower section 20 of fork-shaped, and king-post the latter half 1 and king-post the first half 3 have a mating face 2 that pays particular attention to control fit dimension precision
Fig. 2 is the schematic diagram of the utility model based on the prefabricated tower section of the fork-shaped of the communication tower of TD-SCDMA standard, the prefabricated tower section 20 of fork-shaped is the triangular-section, its perpendicular surface has three, each perpendicular surface is by cross tube 11, left and right pillar 13,14 and left and right sides brace 15,16 form, one end of the upper end of left column 13 and described cross tube 11 and the upper end of right brace 16 link to each other, the other end of the upper end of right column 14 and described cross tube 11 and the upper end of left brace 15 link to each other, the lower end of left side brace 16 and the lower end of right column 14 are connected, the lower end of right brace 15 and the lower end of left column 13 are connected described column 13,14 upper and lower sides are provided with flange 17.Simple saying is exactly to have an intersection to strengthen in the door shape frame.
The prefabricated tower section 20 of fork-shaped of the same footpath of king-post the first half section 4 is slightly different with the prefabricated tower section 20 of fork-shaped on king-post the first half gradually closing section section 4, king-post the first half is rectangle with the perpendicular surface of stating of the prefabricated tower section 20 of fork-shaped of footpath section 4, open the pin size promptly and open pin under equaling, the perpendicular surface of the prefabricated tower section 20 of fork-shaped of king-post the first half gradually closing section section 4 is trapezoidal, open promptly the pin size greater than under open pin, in king-post the first half gradually closing section, and open pin on the prefabricated tower section of each fork-shaped and be the following pin of opening of an adjacent last prefabricated tower section of fork-shaped.
Fig. 3 is the schematic diagram of the utility model based on the prefabricated tower section of K shape of the communication tower of TD-SCDMA standard, because king-post the latter half 1 is stressed bigger, so adopt the prefabricated tower section 10 of K shape, for being connected with king-post the first half gradually closing section 3, it also is a triangle section, three perpendicular surfaces are arranged, and it is more that product is gone up on each surface, is made up of cross tube 21, left column 25, right column 26, left brace 24, right brace 23, knighthead 28 and hyphen bar 27.The left end of cross tube 21 connects the upper end of left column 25, the right-hand member of cross tube 21 connects the upper end of right column 26, the mid point of cross tube 21 connects left and right sides brace 24,23 upper end, the lower end of left column 25 is connected with the lower end of left brace 24, the lower end of right column 26 is connected with the lower end of right brace 23, between the mid point of the mid point of left brace 24 and left column 25, connect hyphen bar 27, between the epimere of the mid point of left brace 24 and left column 25, connect knighthead 28, between the mid point of the mid point of right brace 23 and right column 26, connect hyphen bar 27, between the epimere of the mid point of right brace 23 and right column 26, connect knighthead 28, three perpendicular surfaces are identical, be trapezoidal, under open the pin size greater than on open pin, and open pin on the prefabricated tower section of each K shape and be the following pin of opening of an adjacent last prefabricated tower section of K shape, column 25,26 upper and lower sides are provided with flange 29.
The communications platform diameter is 3-4m.
The following pin of opening of the prefabricated tower section 10 of K shape in the bottom of king-post the latter half 1 is of a size of 3-5m.
All columns 13,14,25,26 adopt seamless steel pipe to make, and all cross bars 11,21, brace 15,16,23,24, knighthead 28, hyphen bar 27 can adopt lower the making of angle bar of cost, to reduce the cost of communication tower.
Fastening between the prefabricated tower section 10 of adjacent K shape, between the prefabricated tower section 20 of fork-shaped, between the prefabricated tower section 10 of K shape and the prefabricated tower section 20 of fork-shaped by flange 17,29 usefulness high-strength bolts, with the intensity of assurance communication tower.
The utility model has the bigger communications platform of diameter based on the communication tower of TD-SCDMA standard, and the TD-SCDMA transceiver can be installed, under the situation of the big load that satisfies TD-SCDMA, make dead load reach the lightest, economical with materials, with low cost simultaneously, tower is very thin, and overall appearance is all good in urban district and suburb compliance, it is little that pin is opened in the bottom, economize the land resource, it is little that wind carries coefficient, stressed isotropism, bulk strength height, in light weight is installed simple.

Claims (8)

1, a kind of communication tower based on the TD-SCDMA standard, comprise king-post, communications platform (7), lightning rod (6), it is characterized in that, described king-post adopts three pipe tower structures of triangular-section, form with footpath section (4) by king-post the latter half (1), king-post the first half gradually closing section (3) and king-post the first half, described king-post the latter half (1) is made up of the prefabricated tower section of K shape (10), described king-post the first half (3,4) is made up of the prefabricated tower section of fork-shaped (20), described communications platform (7) up and down two be installed in described king-post the first half with on the footpath section (4).
2, communication tower according to claim 1 based on the TD-SCDMA standard, it is characterized in that the prefabricated tower section of described fork-shaped (20) is the triangular-section, its perpendicular surface has three, each perpendicular surface is by cross tube (11), left and right pillar (13,14) and left and right sides brace (15,16) form, one end of the upper end of described left column (13) and described cross tube (11) and the upper end of right brace (16) link to each other, the other end of the upper end of described right column (14) and described cross tube (11) and the upper end of left brace (15) link to each other, the lower end of described left brace (16) is connected with the lower end of right column (14), the lower end of described right brace (15) is connected with the lower end of left column (13), described column (13,14) upper and lower side is provided with flange (17).
3, according to the communication tower based on the TD-SCDMA standard of claim 2, it is characterized in that the described fork-shaped prefabricated tower section (20) of described king-post the first half with footpath section (4), its described perpendicular surface is a rectangle, open the pin size promptly and open pin under equaling, the prefabricated tower section of the described fork-shaped of described king-post the first half gradually closing section section (4) (20), its described perpendicular surface is trapezoidal, open on promptly the pin size greater than under open pin.
4, communication tower according to claim 3 based on the TD-SCDMA standard, it is characterized in that the prefabricated tower section of described K shape (10) is triangle section, three perpendicular surfaces are arranged, each perpendicular surface is by cross tube (21), left column (25), right column (26), left side brace (24), right brace (23), knighthead (28) and hyphen bar (27) are formed, the left end of described cross tube (21) connects the upper end of described left column (25), the right-hand member of described cross tube (21) connects the upper end of described right column (26), the mid point of described cross tube (21) connects described left and right sides brace (24,23) upper end, the lower end of described left column (25) is connected with the lower end of described left brace (24), the lower end of described right column (26) is connected with the lower end of described right brace (23), between the mid point of the mid point of left brace (24) and left column (25), connect hyphen bar (27), between the epimere of the mid point of left brace (24) and left column (25), connect knighthead (28), between the mid point of the mid point of right brace (23) and right column (26), connect hyphen bar (27), between the epimere of the mid point of right brace (23) and right column (26), connect knighthead (28), described three perpendicular surfaces are identical, for trapezoidal, under open the pin size greater than on open pin, described column (25,26) upper and lower side is provided with flange (29).
5, the communication tower based on the TD-SCDMA standard of root pick claim 4 is characterized in that described communications platform (7) diameter is 3-4m.
6,, it is characterized in that the following pin of opening of the bottom prefabricated tower section of a K shape (10) of king-post the latter half (1) is of a size of 3-5m according to the communication tower based on the TD-SCDMA standard of claim 5.
7, according to the communication tower based on the TD-SCDMA standard of claim 6, it is characterized in that described column (13,14,25,26) adopts seamless steel pipe to make, described cross tube (11,21), brace (15,16,23,24), knighthead (28), hyphen bar (27) are made of angle bar.
8,, it is characterized in that between the prefabricated tower section of prefabricated tower section of described K shape (10) and fork-shaped (20) fastening with high-strength bolt by flange (17,29) according to the communication tower based on the TD-SCDMA standard of claim 7.
CN 200620120728 2006-06-23 2006-06-23 Communication tower based on TD-SCDMA Expired - Lifetime CN2921193Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620120728 CN2921193Y (en) 2006-06-23 2006-06-23 Communication tower based on TD-SCDMA

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620120728 CN2921193Y (en) 2006-06-23 2006-06-23 Communication tower based on TD-SCDMA

Publications (1)

Publication Number Publication Date
CN2921193Y true CN2921193Y (en) 2007-07-11

Family

ID=38253672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620120728 Expired - Lifetime CN2921193Y (en) 2006-06-23 2006-06-23 Communication tower based on TD-SCDMA

Country Status (1)

Country Link
CN (1) CN2921193Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102076921A (en) * 2008-06-24 2011-05-25 约翰·赫丁杰 Upgradeable lattice tower and components thereof
CN101769081B (en) * 2010-01-20 2013-01-02 北京梅泰诺通信技术股份有限公司 Co-construction and sharing type triangle-tube tower communication base station and setting method thereof
CN103669971A (en) * 2013-12-25 2014-03-26 深圳市海能通信股份有限公司 Trilateral end-closed thin-walled steel section communication tower structure
CN103114757B (en) * 2013-03-14 2015-08-19 安徽省城建设计研究院 A kind of three pipe communication towers
CN105804476A (en) * 2016-05-09 2016-07-27 常熟风范电力设备股份有限公司 High-stability all-steel communication tower
CN114909012A (en) * 2022-05-06 2022-08-16 安徽航塔新能源科技有限公司 Multifunctional intelligent low-carbon 5G communication launching tower and tower manufacturing process

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102076921A (en) * 2008-06-24 2011-05-25 约翰·赫丁杰 Upgradeable lattice tower and components thereof
CN101769081B (en) * 2010-01-20 2013-01-02 北京梅泰诺通信技术股份有限公司 Co-construction and sharing type triangle-tube tower communication base station and setting method thereof
CN103114757B (en) * 2013-03-14 2015-08-19 安徽省城建设计研究院 A kind of three pipe communication towers
CN103669971A (en) * 2013-12-25 2014-03-26 深圳市海能通信股份有限公司 Trilateral end-closed thin-walled steel section communication tower structure
CN103669971B (en) * 2013-12-25 2016-09-28 深圳市海能通信股份有限公司 Trilateral end-closed thin-walled steel section communication tower structure
CN105804476A (en) * 2016-05-09 2016-07-27 常熟风范电力设备股份有限公司 High-stability all-steel communication tower
CN114909012A (en) * 2022-05-06 2022-08-16 安徽航塔新能源科技有限公司 Multifunctional intelligent low-carbon 5G communication launching tower and tower manufacturing process

Similar Documents

Publication Publication Date Title
CN2921193Y (en) Communication tower based on TD-SCDMA
CN202559571U (en) Net rack roof with siphon rainwater pipeline
CN204983171U (en) Prefabricated post connecting device
CN203903834U (en) Internal-climbing tower crane
CN101748796B (en) Large-span mill construction with super heavy-duty steel structure and design method thereof
CN212128825U (en) Assembled integrated pier column and bent cap combined structure
CN203878753U (en) High-strength bolt shear key structure
CN100398770C (en) Method of employing assembled steel arch truss to reinforce metal arch corrugated plate roofing
CN203741690U (en) Pedestrian overcrossing assembling type steel truss girder
CN102536681A (en) Hexagonal tower structure of wind driven generator
CN2801974Y (en) Small variable slope three-pipe iron tower
CN203144882U (en) Assembly type composite material metal truss bridge
CN203559359U (en) Steel girder for reinforcing rigid frame arch bridge beam
CN216197040U (en) Strain-resistant wine glass crossing tower for power transmission line
CN2732912Y (en) Triangular steel tower
CN202431463U (en) Novel hexagonal fan tower
CN206599729U (en) A kind of Single column pier bridge anti-overturning devices based on structure self-balancing
CN209685126U (en) A kind of steel vestibule integrally promotes lifting lug device
CN211645937U (en) Lightweight bridge ETC plane truss structure
CN207775696U (en) A kind of lattice-type steel truss pylon cable-stayed bridge
CN209975552U (en) Steel construction tower crane foundation cushion cap of adjustable size
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN206917806U (en) It is a kind of wind power generation stepped
CN202247660U (en) Steel truss piece unit and steel truss structure
CN206829370U (en) A kind of assembled inner wall based on light gauge cold-formed steel shape and girder truss node structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Effective date of registration: 20080326

Pledge (preservation): Pledge

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20090112

Pledge (preservation): Pledge registration

C56 Change in the name or address of the patentee

Owner name: BEIJING MEI TAINUO COMMUNICATION TECHNOLOGY CO., L

Free format text: FORMER NAME: BEIJING MEI TAINUO COMMUNICATION INDUSTRIAL TECHNOLOGY CO., LTD.

CP03 Change of name, title or address

Address after: Room 302, main building 28, Xinjie Avenue, Xinjie street, Beijing, Xicheng District: 100088

Patentee after: Beijing Meitainuo Communication Technology Co., Ltd.

Address before: Room 302, main building 28, Xinjie Avenue, Xinjie street, Beijing, Xicheng District: 100088

Patentee before: Beijing Meteno Communication Industrial Technology Co., Ltd.

ASS Succession or assignment of patent right

Owner name: JIANGSU JIANDE IRON TOWER CO., LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110613

Address after: 302, room 100088, main building 28, Xinjie street, Xicheng District, Beijing

Co-patentee after: Jiangsu Jiande Tower Co., Ltd.

Patentee after: Beijing Meitainuo Communication Technology Co., Ltd.

Address before: 302, room 100088, main building 28, Xinjie street, Xicheng District, Beijing

Patentee before: Beijing Meitainuo Communication Technology Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20070711

EXPY Termination of patent right or utility model