CN203878753U - High-strength bolt shear key structure - Google Patents

High-strength bolt shear key structure Download PDF

Info

Publication number
CN203878753U
CN203878753U CN201420213170.3U CN201420213170U CN203878753U CN 203878753 U CN203878753 U CN 203878753U CN 201420213170 U CN201420213170 U CN 201420213170U CN 203878753 U CN203878753 U CN 203878753U
Authority
CN
China
Prior art keywords
backing plate
steel beam
steel
steel pipe
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420213170.3U
Other languages
Chinese (zh)
Inventor
李秉南
戴航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201420213170.3U priority Critical patent/CN203878753U/en
Application granted granted Critical
Publication of CN203878753U publication Critical patent/CN203878753U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

<b/>一种高强螺栓剪力键构造。构造包括钢梁腹板和钢梁翼缘板组成的钢梁、预制混凝土板、高强螺栓以及由上垫板、下垫板和支撑钢管组成的连接件;支撑钢管的上下两端分别与上垫板和下垫板相抵且固定,连接件浇筑于预制混凝土板内。用以下方法制造,将钢梁腹板和钢梁翼缘板加工制作成工字梁形式的钢梁,同时进行预制混凝土板的制作,并将由上垫板、下垫板和支撑钢管组成的连接件浇筑在预制混凝土板的设计位置上,支撑钢管由上垫板与下垫板夹在其间;在钢梁上进行预制混凝土板的铺设,并利用连接件的支撑钢管作模板进行钻孔;将预制混凝土板与钢梁的翼缘板栓接就位至贴合状态,通过高强螺栓的夹持力使两者形成连接。

<b/>A high-strength bolt shear key structure. The structure includes steel beams composed of steel beam webs and steel beam flanges, prefabricated concrete slabs, high-strength bolts, and connectors consisting of upper backing plates, lower backing plates and supporting steel pipes; the upper and lower ends of the supporting steel pipes are connected to the upper backing plate and The lower backing plate is offset and fixed, and the connectors are poured into the prefabricated concrete slab. Manufactured by the following method, the steel beam web and the steel beam flange plate are processed into a steel beam in the form of an I-beam, and the precast concrete slab is manufactured at the same time, and the connecting piece consisting of the upper backing plate, the lower backing plate and the supporting steel pipe is poured At the design position of the precast concrete slab, the supporting steel pipe is sandwiched between the upper backing plate and the lower backing plate; the precast concrete slab is laid on the steel beam, and the supporting steel pipe of the connector is used as a template for drilling; the precast concrete The plate and the flange plate of the steel girder are bolted in place until they fit together, and the two are connected by the clamping force of the high-strength bolts.

Description

一种高强螺栓剪力键构造A high-strength bolt shear key structure

技术领域 technical field

  本实用新型涉及一种用来连接钢梁和预制混凝土板的高强螺栓剪力键构造,属于土建工程建造技术领域。  The utility model relates to a high-strength bolt shear key structure used to connect steel beams and prefabricated concrete slabs, and belongs to the technical field of civil engineering construction. the

背景技术 Background technique

预制装配式钢-混凝土组合结构通过剪力连接件将钢梁与预制混凝土板组合成整体共同工作,可以充分发挥钢与混凝土两种材料的各自优势,具有环境友好、施工方便、经济性好等优点,应用日益广泛。  The prefabricated steel-concrete composite structure combines steel beams and prefabricated concrete slabs to work together through shear connectors, which can give full play to the respective advantages of steel and concrete, and is environmentally friendly, convenient for construction, and economical. Advantages, increasingly widely used. the

剪力键是钢-混凝土组合结构中的关键部件,形式有很多种。高强螺栓剪力键通过高强螺栓的夹持力将预制混凝土板和钢梁的翼缘板形成连接,具有连接质量易于保证、施工快捷方便、混凝土板更换容易等优点,具有广阔的应用前景。目前普通的高强螺栓剪力键中混凝土直接承受高强螺栓的预加力,在局部高应力下混凝土的徐变引起高强螺栓预拉力松弛的问题比较突出,导致组合结构连接性能的降低。  Shear keys are key components in steel-concrete composite structures, and there are many forms. The high-strength bolt shear key connects the precast concrete slab and the flange plate of the steel beam through the clamping force of the high-strength bolt. It has the advantages of easy guarantee of connection quality, quick and convenient construction, and easy replacement of concrete slab, and has broad application prospects. At present, the concrete in the ordinary high-strength bolt shear key directly bears the preload of the high-strength bolts. Under the local high stress, the creep of the concrete causes the pretension relaxation of the high-strength bolts to be more prominent, resulting in the reduction of the connection performance of the composite structure. the

实用新型内容 Utility model content

    本实用新型的目的是提供一种结构简单、施工方便、可以有效减小预拉力松弛的高强螺栓剪力键构造。  The purpose of this utility model is to provide a high-strength bolt shear key structure with simple structure, convenient construction, and effective reduction of pre-tension relaxation. the

本实用新型的技术方案是:  The technical scheme of the utility model is:

一种高强螺栓剪力键构造,包括钢梁腹板和钢梁翼缘板组成的钢梁、预制混凝土板、高强螺栓以及上垫板、下垫板和支撑钢管组成的连接件;所述支撑钢管的上下两端分别与上垫板和下垫板相抵且固定,所述钢梁翼缘板、上垫板和下垫板在支撑钢管的轴线上均设有与高强螺栓适配的圆孔,所述支撑钢管的内径不小于上述圆孔的直径,所述连接件浇筑于预制混凝土板内。 A high-strength bolt shear key structure, including a steel beam composed of a steel beam web and a steel beam flange, a prefabricated concrete slab, high-strength bolts, and a connecting piece consisting of an upper backing plate, a lower backing plate, and a supporting steel pipe; the supporting steel pipe The upper and lower ends are respectively fixed against the upper backing plate and the lower backing plate. The steel beam flange plate, the upper backing plate and the lower backing plate are all provided with round holes on the axis of the supporting steel pipe that are suitable for high-strength bolts. The supporting The inner diameter of the steel pipe is not smaller than the diameter of the above-mentioned circular hole, and the connecting piece is poured in the prefabricated concrete slab.

本实用新型的有益效果是:本实用新型结构简单,施工方便,支撑钢管不仅是预制混凝土板内高强螺栓的孔道,而且是高强螺栓的支撑骨架,承受高强螺栓大部分的预加力,从而大大降低混凝土承受的压力,使混凝土的徐变显著减小,能够有效减小高强螺栓预拉力的松弛,增强组合结构的剪切连接能力和强度。  The beneficial effects of the utility model are: the utility model has a simple structure and is convenient for construction. The supporting steel pipe is not only the channel of the high-strength bolt in the prefabricated concrete slab, but also the supporting frame of the high-strength bolt, which bears most of the pre-stressed force of the high-strength bolt, thus greatly Reduce the pressure on the concrete, so that the creep of the concrete is significantly reduced, which can effectively reduce the relaxation of the pretension of the high-strength bolts, and enhance the shear connection capacity and strength of the composite structure. the

附图说明 Description of drawings

    图1为本实用新型实施例的主视剖面图。  Figure 1 is a front sectional view of an embodiment of the utility model. the

图2为图1的侧视剖面图。  FIG. 2 is a side sectional view of FIG. 1 . the

图3为图1的俯视剖面图。  FIG. 3 is a top sectional view of FIG. 1 . the

图中标记为,1.钢梁腹板,2.钢梁翼缘板,3.预制混凝土板,4.高强螺栓,5.上垫板,6.下垫板,7.支撑钢管。  Marked in the figure, 1. steel beam web, 2. steel beam flange, 3. prefabricated concrete slab, 4. high-strength bolts, 5. upper backing plate, 6. lower backing plate, 7. supporting steel pipe. the

具体实施方式 Detailed ways

实施例1  Example 1

一种高强螺栓剪力键构造,包括钢梁腹板1和钢梁翼缘板2组成的钢梁、预制混凝土板3、高强螺栓4以及由上垫板5、下垫板6和支撑钢管7组成的连接件,所述支撑钢管7的上下两端分别与上垫板5和下垫板6相抵且固定,所述钢梁翼缘板2、上垫板5和下垫板6在支撑钢管7的轴线上均设有与高强螺栓4适配的圆孔,所述支撑钢管7的内径不小于上述圆孔的直径,所述连接件浇筑于预制混凝土板3内,支撑钢管7用作支撑骨架,且承受大部分高强螺栓的预加力,从而实现混凝土所受压力的降低,显著减小混凝土的徐变,减小高强螺栓预拉力的松弛,增强组合结构的剪切连接能力和强度。 A high-strength bolt shear key structure, including a steel beam composed of a steel beam web 1 and a steel beam flange 2, a prefabricated concrete slab 3, high-strength bolts 4, and an upper backing plate 5, a lower backing plate 6, and a supporting steel pipe 7 Connectors, the upper and lower ends of the supporting steel pipe 7 are respectively fixed against the upper backing plate 5 and the lower backing plate 6, and the steel beam flange plate 2, the upper backing plate 5 and the lower backing plate 6 are on the axis of the supporting steel pipe 7 All are provided with round holes adapted to the high-strength bolts 4, the inner diameter of the supporting steel pipe 7 is not smaller than the diameter of the above-mentioned round hole, the connecting piece is poured in the precast concrete slab 3, the supporting steel pipe 7 is used as a supporting Most of the high-strength bolts are pre-stressed, so as to reduce the pressure on the concrete, significantly reduce the creep of the concrete, reduce the relaxation of the pre-tension of the high-strength bolts, and enhance the shear connection capacity and strength of the composite structure.

如图1~3所示,本实用新型的一种高强螺栓剪力键构造。钢梁腹板1和钢梁翼缘板2组成钢梁;支撑钢管7的上下两端分别与上垫板5和下垫板6焊接固定组成连接件,上垫板5和下垫板6在支撑钢管7的轴线上均设有与高强螺栓4适配的圆孔,连接件浇筑于预制混凝土板3内;混凝土板3根据支撑钢管7对称置于钢梁翼缘板2上,钢梁翼缘板2在支撑钢管7的轴线上均设有与高强螺栓4适配的圆孔;高强螺栓4的螺杆依次穿过上垫板5、支撑钢管7、下垫板6和钢梁翼缘板2后拧紧螺母,完成钢梁与预制混凝土板的连接。  As shown in Figures 1 to 3, a high-strength bolt shear key structure of the present invention. The steel beam web 1 and the steel beam flange 2 form a steel beam; the upper and lower ends of the supporting steel pipe 7 are respectively welded and fixed with the upper backing plate 5 and the lower backing plate 6 to form a connecting piece, and the upper backing plate 5 and the lower backing plate 6 are connected to the supporting steel pipe The axis of 7 is provided with round holes adapted to the high-strength bolts 4, and the connectors are poured in the precast concrete slab 3; the concrete slab 3 is symmetrically placed on the steel beam flange plate 2 according to the supporting steel pipe 7, and the steel beam flange 2 is placed on the supporting steel pipe The axis of 7 is provided with a round hole adapted to the high-strength bolt 4; the screw rod of the high-strength bolt 4 passes through the upper backing plate 5, the supporting steel pipe 7, the lower backing plate 6 and the steel beam flange plate 2 in turn, and then the nuts are tightened to complete the steel beam. Connection to precast concrete slabs. the

实施例2  Example 2

一种高强螺栓剪力键构造的建造施工方法,首先将钢梁腹板1和钢梁翼缘板2加工制作成工字梁形式的钢梁,同时进行预制混凝土板3的制作,并将由上垫板5、下垫板6和支撑钢管7组成的连接件浇筑在预制混凝土板的设计位置上,且所述支撑钢管7由上垫板5与下垫板6夹在其间;然后完成钢梁的工地架设,再在钢梁上进行预制混凝土板3的铺设,并利用连接件的支撑钢管7作模板进行钻孔;最后将预制混凝土板3与钢梁的翼缘板2栓接就位至贴合状态,通过高强螺栓4的夹持力使两者形成连接。 A construction method for a high-strength bolt shear key structure. Firstly, a steel beam web 1 and a steel beam flange 2 are processed into a steel beam in the form of an I-beam, and a precast concrete slab 3 is manufactured at the same time, and the upper backing plate 5. The connecting piece consisting of the lower backing plate 6 and the supporting steel pipe 7 is poured on the design position of the precast concrete slab, and the supporting steel pipe 7 is sandwiched between the upper backing plate 5 and the lower backing plate 6; then the construction site of the steel beam is completed erection, and then lay the precast concrete slab 3 on the steel beam, and use the supporting steel pipe 7 of the connector as a formwork for drilling; finally, the precast concrete slab 3 and the flange plate 2 of the steel beam are bolted in place until they fit together state, the two are connected by the clamping force of the high-strength bolt 4 .

Claims (1)

1. a high-strength bolt shear key structure, it is characterized in that: the girder steel that comprises steel beam web plate (1) and girder steel frange plate (2) composition, precast concrete plank (3), high-strength bolt (4) and by upper padding plate (5), the connector of lower bolster (6) and supporting steel pipe (7) composition, the two ends up and down of described supporting steel pipe (7) offset with upper padding plate (5) and lower bolster (6) respectively and are fixing, described girder steel frange plate (2), upper padding plate (5) and lower bolster (6) are equipped with the circular hole adaptive with high-strength bolt (4) on the axis of supporting steel pipe (7), the internal diameter of described supporting steel pipe (7) is not less than the diameter of above-mentioned circular hole, described connector is built in precast concrete plank (3).
CN201420213170.3U 2014-04-29 2014-04-29 High-strength bolt shear key structure Expired - Fee Related CN203878753U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420213170.3U CN203878753U (en) 2014-04-29 2014-04-29 High-strength bolt shear key structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420213170.3U CN203878753U (en) 2014-04-29 2014-04-29 High-strength bolt shear key structure

Publications (1)

Publication Number Publication Date
CN203878753U true CN203878753U (en) 2014-10-15

Family

ID=51679270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420213170.3U Expired - Fee Related CN203878753U (en) 2014-04-29 2014-04-29 High-strength bolt shear key structure

Country Status (1)

Country Link
CN (1) CN203878753U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924674A (en) * 2014-04-29 2014-07-16 东南大学 High-strength bolt shear key structure and constructing method thereof
CN106284657A (en) * 2016-10-13 2017-01-04 哈尔滨工业大学 Assembled girder is widened district at secondary beam and is run through bolt of long stem connection node and method of attachment
CN108625493A (en) * 2018-06-30 2018-10-09 湖北神州建材有限责任公司 Steam-pressing aero-concrete Assembled Building panel or roofing board support connecting structure
CN108660948A (en) * 2018-05-15 2018-10-16 浙江大学 Detachable Prefabricated combined beam screw and combination beam
CN109736198A (en) * 2018-12-07 2019-05-10 东南大学 A composite interface preloaded connection high-performance steel-UHPC sheet composite structural system
CN116043668A (en) * 2022-12-27 2023-05-02 安徽省交通控股集团有限公司 A replaceable cluster shear connector device and its construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924674A (en) * 2014-04-29 2014-07-16 东南大学 High-strength bolt shear key structure and constructing method thereof
CN106284657A (en) * 2016-10-13 2017-01-04 哈尔滨工业大学 Assembled girder is widened district at secondary beam and is run through bolt of long stem connection node and method of attachment
CN108660948A (en) * 2018-05-15 2018-10-16 浙江大学 Detachable Prefabricated combined beam screw and combination beam
CN108625493A (en) * 2018-06-30 2018-10-09 湖北神州建材有限责任公司 Steam-pressing aero-concrete Assembled Building panel or roofing board support connecting structure
CN109736198A (en) * 2018-12-07 2019-05-10 东南大学 A composite interface preloaded connection high-performance steel-UHPC sheet composite structural system
CN116043668A (en) * 2022-12-27 2023-05-02 安徽省交通控股集团有限公司 A replaceable cluster shear connector device and its construction method

Similar Documents

Publication Publication Date Title
CN103924674A (en) High-strength bolt shear key structure and constructing method thereof
CN203878753U (en) High-strength bolt shear key structure
CN204252286U (en) A kind of rectangular steel-tube concrete column-steel beam connecting joint
CN208668721U (en) Removable prefabricated steel-concrete composite beam slab
CN103510639B (en) A kind of can the overlaid plate type shear wall of restore funcitons and implementation method thereof
CN103074959B (en) A kind of steel plate high-strength concrete composite coupling beams
CN103572839B (en) Mixed shear connector
CN106400954A (en) Steel beam-steel pipe concrete column joint based on damage control concept
CN110593485A (en) Main material damage-free detachable steel-concrete combined beam
CN106567499B (en) Prefabricated steel-concrete combined column structure and its implementation method
CN201296979Y (en) Embedded part for large-sized reinforcing steel bar concrete column top beam node
CN207436373U (en) A kind of assembled is bolted steel core concrete column entirely
CN204163196U (en) A kind of embedded concrete-filled steel square tubular column in T-steel top flange and steel beam connecting joint
CN106836492A (en) A kind of group frame-embedded faced wall Lateral Resistant System
CN103924680A (en) Precast concrete beam and square-rectangular concrete-filled steel tube column combining joint employing unbonded prestressed and ordinary reinforcement for connection
CN205329851U (en) Novel bolt collar shear connector
CN202248283U (en) Connecting piece of joint part of steel and concrete combined structure
CN101435237A (en) Novel hollow combined board
CN204098241U (en) Trapezoidal steel plate interpolation type rectangular steel-tube concrete column and steel beam connecting joint
CN203514528U (en) Composite connection structure of concrete filled steel tubular column and thin steel plate shear wall
CN206360207U (en) A kind of high ductility reinforced concrete deep beam of shaped steel
CN105442860A (en) Method for reinforcing reinforced concrete coupling beam through corrugated steel plate assemblies
CN206736696U (en) A kind of prefabricated assembled anchor bolts steel reinforced concrete combination beam
CN203307937U (en) Concrete column and steel beam rigidity node construction
CN201474083U (en) Novel steel-concrete combined panel node

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141015

Termination date: 20180429