CN207775696U - A kind of lattice-type steel truss pylon cable-stayed bridge - Google Patents
A kind of lattice-type steel truss pylon cable-stayed bridge Download PDFInfo
- Publication number
- CN207775696U CN207775696U CN201820136958.7U CN201820136958U CN207775696U CN 207775696 U CN207775696 U CN 207775696U CN 201820136958 U CN201820136958 U CN 201820136958U CN 207775696 U CN207775696 U CN 207775696U
- Authority
- CN
- China
- Prior art keywords
- king
- post
- tower
- lattice
- steel truss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model belongs to bridge's design technical field, and in particular to a kind of lattice-type steel truss pylon cable-stayed bridge.It includes tower pier, is connected on tower pier king-post and the tower top crossbeam for being connected to king-post top, it is characterised in that:The tower pier is two, the king-post includes 4 steel box columns, T-shape rib is equipped in the king-post, the support construction of line-styled stull and " X " type diagonal brace is equipped between the steel column, 4 steel box columns are linked to be entirety by the support construction, the tower top crossbeam is steel truss type structure, and two independent king-posts are linked together.Improve king-tower force modes, to achieve the purpose that make full use of steel strength.
Description
Technical field
The utility model belongs to bridge's design technical field, and in particular to a kind of lattice-type steel truss pylon cable-stayed bridge.
Background technology
With the fast development of China's economic technology, the quickening of infrastructure construction speed, in particular with science of bridge building
The raising of construction technique, more and more Urban Bridges are using high standard, large span, the new tie connected as city
The trip of people provides facility.Urban construction is with " dredging stifled " for target, and the traditional Large Span Bridges construction in China is with reinforced concrete
Soil is primary building material, and build is long in time limit, and production material is seriously polluted, " is made stifled " in the construction period, to civic production, life
Life birth life seriously affects, and greatly reduces the Happiness Index of city dweller.
Existing cable-stayed bridge head tower is based on box-type section, interior filling concrete, and based on pressing, moment of flexure control exists king-tower stress
Compared within the scope of small magnitude.
Invention content
Utility model aims to solve above-mentioned technical problems, provide a kind of lattice-type steel truss pylon cable-stayed bridge, change
Philanthropist's tower force modes, to achieve the purpose that make full use of steel strength.
The utility model proposes a kind of lattice-type steel truss pylon cable-stayed bridge, including tower pier, the tower that is connected on tower pier
Column and the tower top crossbeam for being connected to king-post top, the king-post are two, and the king-post includes 4 steel box columns, the king-post
It is interior to be equipped with T-shape rib, it is equipped with line-styled stull and " X " type diagonal brace support construction between the steel column, the support construction is by 4
Steel box column is linked to be entirety, and the tower top crossbeam is steel truss type structure, and two independent king-posts are linked together.
Further embodiment, the tower pier are reinforced concrete structure, and the sections Ta Dun are in single box single chamber section.
Further embodiment, tower pier top portion are equipped with the tower pier crossbeam of enhancing king-post contact.
Further embodiment, the tower top crossbeam are equipped with horizontal brace.
Further embodiment, the tower pier are connect with king-post using PBL key connection modes.
Further embodiment, the king-post are steel construction king-post.
This programme has the beneficial effect that:
1, make the force modes of the complexity such as former king-tower pressure, curved be changed to draw, based on pressure, steel strength is made full use of to reach
Purpose.The head tower is simple in structure, and stress is clear, modern design.
2, this programme truss king-post front face area is small, can be effectively improved wind load lower king-post strut galloping stability;In addition, king-post hinders
The reduction of wind area, can effectively shorten length of airtight area after king-post, improve environment, increase travel safety.Meanwhile king-post
Form of construction work is various, both can after the completion of integral assembling vertical transfer it is in place, also can segment lifting, site welding is bolted, increases not
With the alternative of arrangement and method for construction under construction environment.
3, it is equipped with the support construction of line-styled stull and " X " type diagonal brace between king-post, can effectively shorten king-post slenderness ratio, increases
Strong king-post stability.Simultaneously, it is possible to increase king-post bending stiffness reduces king-post lateral deformation.
4, tower pier and king-post are two kinds of different construction materials, and combined area stress is complicated, using PBL keys, can effectively enhance
The connection reliability of two kinds of different materials.
Description of the drawings
Fig. 1 is the utility model lattice-type steel truss pylon cable-stayed bridge overall perspective view(Front);
Fig. 2 is the utility model lattice-type steel truss pylon cable-stayed bridge overall perspective view(Side);
Fig. 3 is schematic diagram in A-A direction in the utility model Fig. 1;
Fig. 4 is B-B direction schematic diagram in the utility model Fig. 1;
Fig. 5 be in the utility model Fig. 1 C-C to schematic diagram.
Reference numeral:
1, Ta Dun, 2, king-post, 3, tower top crossbeam, 4, stull, 5, diagonal brace, 6, tower top crossbeam horizontal brace, 11, tower pier crossbeam.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and specifically
Embodiment, the present invention will be further described in detail.It should be appreciated that the specific embodiments described herein are only used
To explain the utility model, it is not used to limit the utility model.
As shown in Figures 1 and 2, a kind of lattice-type steel truss pylon cable-stayed bridge of the utility model proposition, including tower pier 1,
The king-post 2 that is connected on tower pier 1 and the tower top crossbeam 3 for being connected to 2 top of king-post, the king-post 2 are two, and the king-post 2 wraps
4 steel box columns are included, T-shape rib is equipped in the king-post 2, line-styled is equipped between the king-post 2(Stull 4)" X " type(Tiltedly
Support 5)Support construction is steel structural form, increases intensity and reliability.4 steel box columns are linked to be whole by the support construction
Body, the tower top crossbeam 3 are steel truss type structure, and two independent king-posts 2 are linked together.
As shown in Figures 2 to 5, the tower pier 1 is reinforced concrete structure, and 1 section of tower pier is in single box single chamber section.
1 top of the tower pier is equipped with the king-post crossbeam 11 of enhancing king-post contact.Tower top crossbeam horizontal brace is additionally provided on the tower top crossbeam 3
6.The tower pier 1 is connect with king-post 2 using PBL key connection modes.The king-post 2 is steel construction king-post.
The relative position relation of tower pier 1 and king-post 2 influences environment huge.King-post 2 uses steel construction, such as attached drawing 3
It is shown, 4 mutually independent steel box columns connected by king-post stull 4, diagonal brace 5 it is integral, with pressure, it is curved based on steel column stress
Mode change at draw, pressure based on king-tower entirety stress, smaller windward side can be effectively improved the galloping under king-post wind load.King-post
2 can ground complete integral assembling after vertical transfer it is in place, reduce working at height risk.If being limited by construction site condition, can also incite somebody to action
King-post is vertically divided into several segments, after segment lifting is in place can site welding, be bolted, segment standardization, be conducive to
Unit in charge of construction's batch micro operations, light tower hoist, that is, Liftable can effectively save engineering cost.Tower top crossbeam 3 shown in attached drawing 4 can be effective
Improve king-tower stress, makes king-post overall deformation.
The utility model makes the force modes of the complexity such as former king-tower pressure, curved be changed to draw, based on pressure, to reach abundant profit
With the purpose of steel strength.The head tower is simple in structure, and stress is clear, modern design.This programme truss king-post front face area is small, can
It is effectively improved wind load lower king-post strut galloping stability;In addition, the reduction of king-post wind resistance area, the calm head of district after king-post can be effectively shortened
Degree improves environment, increases travel safety.Meanwhile king-post form of construction work is various, it both can vertical transfer be just after the completion of integral assembling
Position, also can segment lifting, site welding is bolted, and increases the alternative of arrangement and method for construction under different construction environments.
It should be appreciated that although this specification is described in terms of embodiments, but not each embodiment only includes one
A independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should will say
As a whole, the technical solutions in the various embodiments may also be suitably combined for bright book, and forming those skilled in the art can be with
The other embodiment of understanding.
Claims (6)
1. a kind of lattice-type steel truss pylon cable-stayed bridge, including tower pier, the king-post that is connected on tower pier and it is connected to king-post top
Tower top crossbeam, it is characterised in that:The king-post is two, and the king-post includes 4 steel box columns, and " T " is equipped in the king-post
Type rib, is equipped with support construction between the steel column, and the support construction includes stull and diagonal brace, and the support construction is by 4 boxes
Steel column is linked to be entirety, and the tower top crossbeam is steel truss type structure, and two independent king-posts are linked together.
2. lattice-type steel truss pylon cable-stayed bridge as described in claim 1, it is characterised in that:The tower pier is armored concrete knot
Structure, the sections Ta Dun are in single box single chamber section.
3. lattice-type steel truss pylon cable-stayed bridge as claimed in claim 2, it is characterised in that:Tower pier top portion is equipped with enhancing tower
The tower pier crossbeam of column contact.
4. lattice-type steel truss pylon cable-stayed bridge as described in claim 1, it is characterised in that:The tower top crossbeam is equipped with level
Support.
5. the lattice-type steel truss pylon cable-stayed bridge as described in claim 1-4 any one, it is characterised in that:The Ta Dun and tower
Column is connected using PBL key connection modes.
6. the lattice-type steel truss pylon cable-stayed bridge as described in claim 1-4 any one, it is characterised in that:The king-post is steel
Structure king-post.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820136958.7U CN207775696U (en) | 2018-01-26 | 2018-01-26 | A kind of lattice-type steel truss pylon cable-stayed bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820136958.7U CN207775696U (en) | 2018-01-26 | 2018-01-26 | A kind of lattice-type steel truss pylon cable-stayed bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207775696U true CN207775696U (en) | 2018-08-28 |
Family
ID=63211543
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820136958.7U Expired - Fee Related CN207775696U (en) | 2018-01-26 | 2018-01-26 | A kind of lattice-type steel truss pylon cable-stayed bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207775696U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108004908A (en) * | 2018-01-26 | 2018-05-08 | 西安市政设计研究院有限公司 | A kind of lattice-type steel truss pylon cable-stayed bridge |
-
2018
- 2018-01-26 CN CN201820136958.7U patent/CN207775696U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108004908A (en) * | 2018-01-26 | 2018-05-08 | 西安市政设计研究院有限公司 | A kind of lattice-type steel truss pylon cable-stayed bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201972237U (en) | Section prefabricated rectangular steel pipe concrete truss | |
CN200996127Y (en) | Stayed-cable arched assembled bridge | |
CN108677685A (en) | A kind of ultra-high performance concrete-part girder steel combination bent cap and its construction method | |
CN103981803B (en) | The combined gate pier of precast assembly and construction method thereof | |
CN102061742B (en) | Shockproof reinforced concrete archaized building structure system | |
CN204919302U (en) | Few main girder structure of wave form steel web | |
CN106988208A (en) | A kind of pair of limb main pier hybrid structure of arch and beam formula concrete continuous rigid structure bridge structure | |
CN208293400U (en) | A kind of ultra-high performance concrete-part girder steel combination bent cap | |
CN103541300A (en) | Railway concrete continuous beam implemented based on flat-pushing method and construction method thereof | |
CN207775696U (en) | A kind of lattice-type steel truss pylon cable-stayed bridge | |
CN206279438U (en) | A kind of short tower steel truss girder cable-stayed bridge of steel | |
CN108004908A (en) | A kind of lattice-type steel truss pylon cable-stayed bridge | |
CN110016861B (en) | Double-column cable-stayed bridge cable tower without upper beam and cable-stayed bridge comprising same | |
CN201722594U (en) | Extradosed railway cable-stayed bridge | |
CN2921193Y (en) | Communication tower based on TD-SCDMA | |
CN203498743U (en) | Railway concrete continuous beam implemented on basis of flat pushing method | |
CN203716044U (en) | Low bearing or middle bearing cable arch combined structural bridge | |
CN203393635U (en) | Main tower cable-stayed bridge splicing formwork adopting straight-line mode substituting for arc-line mode | |
CN203741690U (en) | Pedestrian overcrossing assembling type steel truss girder | |
CN206376178U (en) | A kind of steel reinforced concrete beam rigid framed structure arch bridge | |
CN203878459U (en) | Box type prestressed concrete cap beam structure applied to gate-type pier | |
CN202401384U (en) | Ballasting structure of steel-truss cable-stayed bridge | |
CN204000573U (en) | A kind of railway RPC Thin-walled Box Girder | |
CN110373990A (en) | The double-deck whole hole of Combined steel truss beam manufactures and erection construction method | |
CN202865731U (en) | Saddle weight steel box structure of steel truss cable-stayed bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180828 Termination date: 20220126 |
|
CF01 | Termination of patent right due to non-payment of annual fee |