CN206279438U - A kind of short tower steel truss girder cable-stayed bridge of steel - Google Patents
A kind of short tower steel truss girder cable-stayed bridge of steel Download PDFInfo
- Publication number
- CN206279438U CN206279438U CN201621309193.XU CN201621309193U CN206279438U CN 206279438 U CN206279438 U CN 206279438U CN 201621309193 U CN201621309193 U CN 201621309193U CN 206279438 U CN206279438 U CN 206279438U
- Authority
- CN
- China
- Prior art keywords
- bridge
- truss girder
- tower
- steel truss
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model is related to bridge structure technical field, in particular to a kind of short tower steel truss girder cable-stayed bridge of steel.Including basis, pour the cushion cap on the basis of and the bridge pier being supported on cushion cap, it is characterised in that:Also include the bridge tower as the steel truss girder of bridge beam body and for supporting steel truss girder;Described steel truss girder is that, along the truss structure set up to direction along bridge, steel truss girder is fixed on bridge tower;Described bridge tower lower end is held on bridge pier upper end, bridge tower along bridge to both sides be provided with multiple skew cables;The upper end of described suspension cable is fixed on bridge tower, and anchoring lower ends are on steel truss girder.The utility model simple structure, by using steel truss girder as bridge beam body, creeps after no work, can preferably adapt to the requirement of high-speed railway travel safety and comfortableness, while Construction of Steel Structure is convenient, can save the construction period;Horizontal force will not be produced to pier footing, improve bridge pier, the stress on basis during tower pier isolating construction beam body temperature deformation.
Description
Technical field
The utility model is related to bridge structure technical field, in particular to a kind of short tower steel truss girder cable-stayed bridge of steel.
Background technology
Traditional concrete low-pylon cable-stayed bridge, due to the self-characteristic of concrete-bridge, concrete creep is larger after construction,
It is difficult to meet requirement of the high-speed railway to vertical displacement of being crept after work.And the superstructure of concrete-bridge is heavier, while beam
Portion's concrete shrinkage and creep shortens, and off normal is produced to bridge pier and basis, and larger stress is produced in beam body, bridge pier and pile foundation.
The content of the invention
The short tower of concrete that the purpose of this utility model seeks to solve in the prior art mentioned in above-mentioned background technology is oblique
Bridge is drawn to there is the shortcomings of creep after work that vertical displacement is big, produce off normal to act on bridge pier and basis, there is provided a kind of short tower steel truss of steel
Girder stayed-cable bridge.
The technical solution of the utility model is:A kind of short tower steel truss girder cable-stayed bridge of steel, including basis, pour on the basis of
Cushion cap and the bridge pier being supported on cushion cap, it is characterised in that:Also include as the steel truss girder of bridge beam body and for supporting steel
The bridge tower of trusses;Described steel truss girder is that, along the truss structure set up to direction along bridge, steel truss girder is fixed on bridge tower;Described
Bridge tower lower end is held on bridge pier upper end, bridge tower along bridge to both sides be provided with multiple skew cables;The upper end of described suspension cable is consolidated
It is scheduled on bridge tower, anchoring lower ends are on steel truss girder.
Further described bridge pier upper end is provided with pinner;Described pinner upper end is provided with bearing;Described bridge tower
Lower end is shelved on bearing.
Further described bridge tower includes two columns for being shelved on bearing upper end;Described two root posts are along direction across bridge
Direction arranged for interval, middle setting has crossbeam;The direction across bridge two ends of the crossbeam are separately fixed in two root posts and column-type
Into the tower column structure of H types.
Further described steel truss girder includes bridge deck;The both sides of described bridge deck are respectively arranged with along suitable bridge to cloth
The top boom and lower boom put, diagonal brace is provided between the upper and lower chord member;Between two top booms of bridge deck both sides
Horizontal-associate is provided with, horizontal-associate is located at bridge deck top.
Advantage of the present utility model has:1st, by using steel truss girder as bridge beam body, Bridge Beam can effectively be solved
Crept after body work the larger problem of vertical displacement, steel truss girder does not have shrinkage and creep, high-speed railway can be met to Xu after beam body work
Become the requirement of vertical displacement, while Construction of Steel Structure is convenient, the construction period can be saved;
2nd, by setting bearing between bridge pier and bridge tower, bridge tower, bridge pier are separated in the horizontal direction, is solved
The very big horizontal applied force produced when the bridge beam body temperature deformation of traditional Pylon pier consolidation structure and shrinkage and creep is to bridge pier
With the detrimental effect on basis, level will not be produced to pier footing when the isolating construction beam body temperature deformation of tower pier and shrinkage and creep
Power, improves bridge pier of knowing clearly, the stress on basis;
3rd, the mode for by using tower pier separate, can effectively reduce the scale on bridge pier, cushion cap and basis, reduce construction
Difficulty and cost, improve bridge economic performance.
The utility model simple structure, by using steel truss girder as bridge beam body, creeps after no work, can preferably fit
The requirement of high-speed railway travel safety and comfortableness is answered, while Construction of Steel Structure is convenient, the construction period can be saved;Tower pier point
Horizontal force will not be produced to pier footing, improve bridge pier of knowing clearly, the stress on basis when deforming from structural beams temperature.
Brief description of the drawings
Fig. 1:Bridge structure schematic diagram of the present utility model;
Fig. 2:Bridge cross section structure schematic diagram of the present utility model;
Fig. 3:Steel truss structure schematic diagram of the present utility model;
Wherein:1-basis;2-cushion cap;3-bridge pier;4-column;5-crossbeam;6-suspension cable;7-bridge deck;8—
Top boom;9-lower boom;10-horizontal-associate;11-diagonal brace;12-bearing.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1~3, a kind of short tower steel truss girder cable-stayed bridge of steel, including basis 1, basis 1 is anchored on ground, used as whole
The carrying basis of bridge, cushion cap 2 has been poured on basis 1, and bridge pier 3 has been poured on cushion cap 2,.The present embodiment is provided with multiple bridge piers
3, as shown in figure 1, multiple bridge pier 3 along along bridge to direction arranged for interval, for supporting bridge beam body.
As shown in Fig. 1~2, the upper end of bridge pier 3 is provided with pinner, and pinner upper end is provided with bearing 12, and bridge tower lower end is shelved on
On bearing 12.Bridge tower includes two columns 4 for being shelved on the upper end of bearing 12, two root posts 4 along direction across bridge direction arranged for interval, in
Between be provided with crossbeam 5, the direction across bridge two ends of crossbeam 5 are separately fixed in two root posts 4 tower column structure that H types are formed with column 4.
The bridge beam body of the present embodiment uses steel truss structure, steel construction for concrete structure, lighter in weight,
There is no shrinkage and creep after construction, be conducive to high-speed railway to drive a vehicle.As shown in figure 3, steel truss girder include bridge deck 7 (the present embodiment
The bridge deck structure such as including bridge floor and the high speed railway track being arranged on bridge floor), the both sides of bridge deck 7 are provided with two lower edges
Bar 9 and two top booms 8, upper and lower chord member be along along the steel construction being fixed on bridge tower from bridge to arrangement, two top booms 8 it
Between be provided with horizontal-associate 10, be provided with diagonal brace 11 between the upper and lower chord member of direction across bridge homonymy.
Steel truss girder is fixedly connected by upper and lower chord member with column 4, and column 4 is supported in bridge pier upper end, and bridge pier top is provided with
Bearing 12, when steel truss girder occurrence temperature deforms, because tower pier is separated, water will not be produced during beam body temperature deformation to pier footing
Flat power, improves bridge pier of knowing clearly, the stress on basis.
During construction, first construct basis 1, cushion cap 2 and bridge pier 3 recycle hanging device that bridge tower and steel truss girder are hoisted into bridge
On pier 3, high speed railway track structure etc. is arranged on the bridge floor 7 in steel truss girder.
General principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession
The technical staff of industry it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification
Simply illustrate principle of the present utility model, the utility model can also on the premise of the utility model spirit and scope are not departed from
There are various changes and modifications, these changes and improvements are both fallen within the range of claimed the utility model.The utility model will
Protection domain is asked to be defined by appending claims and its equivalent.
Claims (4)
1. the short tower steel truss girder cable-stayed bridge of a kind of steel, including basic (1), pour in the cushion cap (2) on basic (1) and be supported in cushion cap
(2) bridge pier (3) on, it is characterised in that:Also include the bridge tower as the steel truss girder of bridge beam body and for supporting steel truss girder;
Described steel truss girder is that, along the truss structure set up to direction along bridge, steel truss girder is fixed on bridge tower;Put described bridge tower lower end
Be placed in bridge pier (3) upper end, bridge tower along bridge to both sides be provided with multiple skew cables (6);The upper end of described suspension cable (6) is fixed
On bridge tower, anchoring lower ends are on steel truss girder.
2. a kind of short tower steel truss girder cable-stayed bridge of steel as claimed in claim 1, it is characterised in that:Described bridge pier (3) upper end sets
It is equipped with pinner;Described pinner upper end is provided with bearing (12);Described bridge tower lower end is shelved on bearing (12).
3. a kind of short tower steel truss girder cable-stayed bridge of steel as claimed in claim 2, it is characterised in that:Described bridge tower is put including two
Put the column (4) in bearing (12) upper end;Along direction across bridge direction arranged for interval, middle setting has horizontal stroke to described two root posts (4)
Beam (5);The direction across bridge two ends of the crossbeam (5) are separately fixed in two root posts (4) the king-post knot that H types are formed with column (4)
Structure.
4. a kind of short tower steel truss girder cable-stayed bridge of steel as claimed in claim 1, it is characterised in that:Described steel truss girder includes bridge floor
System (7);The both sides of described bridge deck (7) are respectively arranged with the top boom (8) and lower boom (9) to arrangement along suitable bridge, described
Diagonal brace (11) is provided between upper and lower chord member;Horizontal-associate is provided between two top booms (8) of bridge deck (7) both sides
(10), horizontal-associate (10) is positioned at bridge deck (7) top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621309193.XU CN206279438U (en) | 2016-12-01 | 2016-12-01 | A kind of short tower steel truss girder cable-stayed bridge of steel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621309193.XU CN206279438U (en) | 2016-12-01 | 2016-12-01 | A kind of short tower steel truss girder cable-stayed bridge of steel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206279438U true CN206279438U (en) | 2017-06-27 |
Family
ID=59074342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621309193.XU Active CN206279438U (en) | 2016-12-01 | 2016-12-01 | A kind of short tower steel truss girder cable-stayed bridge of steel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206279438U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056494A (en) * | 2018-09-25 | 2018-12-21 | 中铁二院工程集团有限责任公司 | A kind of ultra-wide cross-sectional configuration suitable for double track railway deck type steel truss girder |
CN110130202A (en) * | 2019-04-30 | 2019-08-16 | 饶诗维 | The flexible system railroad bridge vertically bent and its construction method are stabilized using arch rib |
CN110565501A (en) * | 2019-09-23 | 2019-12-13 | 中铁第四勘察设计院集团有限公司 | Side span consolidation-tower beam semi-floating mixed system concrete beam cable-stayed bridge |
CN110761171A (en) * | 2019-11-23 | 2020-02-07 | 李朝阳 | Corridor frame structure of steel structure spliced bridge |
-
2016
- 2016-12-01 CN CN201621309193.XU patent/CN206279438U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056494A (en) * | 2018-09-25 | 2018-12-21 | 中铁二院工程集团有限责任公司 | A kind of ultra-wide cross-sectional configuration suitable for double track railway deck type steel truss girder |
CN110130202A (en) * | 2019-04-30 | 2019-08-16 | 饶诗维 | The flexible system railroad bridge vertically bent and its construction method are stabilized using arch rib |
CN110130202B (en) * | 2019-04-30 | 2024-02-09 | 饶诗维 | Flexible system railway bridge adopting arch rib to stabilize vertical deflection and construction method thereof |
CN110565501A (en) * | 2019-09-23 | 2019-12-13 | 中铁第四勘察设计院集团有限公司 | Side span consolidation-tower beam semi-floating mixed system concrete beam cable-stayed bridge |
CN110761171A (en) * | 2019-11-23 | 2020-02-07 | 李朝阳 | Corridor frame structure of steel structure spliced bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206279438U (en) | A kind of short tower steel truss girder cable-stayed bridge of steel | |
CN100543235C (en) | The method and system of erecting steel trusses by stay cable auxiliary complete cantilever | |
CN106677070A (en) | Construction support and method for overhead large-span heavy-duty cross beam | |
CN106958206A (en) | Hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom basket bilayer button hangs constructing device and method | |
CN206553961U (en) | The short light-duty expanded letter combined type Hanging Basket of tower cable-stayed bridge | |
CN201106155Y (en) | Inclined guy cable auxiliary full cantaliver crane trussed steel beam device | |
CN205242238U (en) | Be applied to self anchored suspension bridge's main girder structure | |
CN105239510A (en) | Dismounting beam support used for high pier small-radius curve cast-in-situ box beam and construction method | |
CN201506952U (en) | Temporary cable matched hanging basket building concrete cable stayed bridge without supporting frame | |
CN106948276A (en) | A kind of method of cast-in-place box beam bracket integral demounting | |
CN114781026A (en) | Construction control method for single leaning tower cable-stayed bridge | |
CN206667079U (en) | Basket double-deck button in hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom hangs constructing device | |
CN206887771U (en) | A kind of small across footpath plate-beam construction platform structure | |
CN206157557U (en) | Hollow gate -type mound of railway bearing formula large -span prestressed concrete | |
CN206376178U (en) | A kind of steel reinforced concrete beam rigid framed structure arch bridge | |
CN203625777U (en) | Adjustable wheeltrack type beam transporting vehicle on beams | |
CN208201645U (en) | A kind of cable-stayed bridge or Construction of Pylon of Long Span Suspension Bridge of no lower beam | |
CN106638265A (en) | Steel reinforced concrete beam rigid framework bridge | |
CN214423168U (en) | Bridge girder erection machine support frame for installing and splicing wide bridge | |
CN212533734U (en) | Cable buckle integrated tower | |
CN210194449U (en) | Tower beam temporary consolidation structure for construction of main beam of semi-floating body system cable-stayed bridge | |
CN204530507U (en) | Long span steel-concrete composite beam cable-stayed bridge limit steel case anchoring temporarily system | |
CN202830730U (en) | Bridge small angle inclining striding structure | |
CN208917696U (en) | A kind of superelevation beam-column type bracket | |
CN208023838U (en) | A kind of novel Self-resetting energy consumption steel column foot connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |