CN2915446Y - Standard maintenance apparatus for cement concrete test piece - Google Patents
Standard maintenance apparatus for cement concrete test piece Download PDFInfo
- Publication number
- CN2915446Y CN2915446Y CN 200620034444 CN200620034444U CN2915446Y CN 2915446 Y CN2915446 Y CN 2915446Y CN 200620034444 CN200620034444 CN 200620034444 CN 200620034444 U CN200620034444 U CN 200620034444U CN 2915446 Y CN2915446 Y CN 2915446Y
- Authority
- CN
- China
- Prior art keywords
- temperature
- electric heater
- generator
- damp
- aqueous medium
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
Abstract
The utility model relates to maintenance equipment of the cement and concrete specimen in civil engineering, which contains a maintenance chamber and an automatic temperature and humidity control device for the chamber, and is featured that the automatic temperature and humidity control device contains a steam generator/hot water generator, a refrigerating compressor and an automatic controller; for the electric heater of the steam generator, a finned electric heater is applied; for the automatic controller, a WSK temperature and humidity controller with electronic digital display is applied. The utility model has the advantages in that the controlling precision is high with controlling temperature being 200+/-2 degrees centigrade; the relative humidity is 95%+/-5% RH, which completely fulfills the maintenance condition the standard requires, and the testing data of the specimen is true and reliable, and could ensure the quality of civil engineering projects.
Description
Technical field
The utility model relates to cement, the concrete sample maintenance of equipment of civil engineering.
Background technology
The cement of civil engineering, concrete sample need maintenances under certain temperature, damp condition, the cement specimen fog room facility of each construction, testing department is very simple and crude at present, be to adopt domestic air conditioner to regulate temperature, artificial water spray is regulated humidity, temperature, the humidity control accuracy is low, can not satisfy the curing condition of code requirement, the check data of test specimen can not its mechanical property of actual response, causes the civil engineering quality to be difficult to guarantee.
The utility model content
The purpose of this utility model provides cement, the concrete sample maintenance of equipment of a kind of high precision in control temperature, humidity, makes the test specimen maintenance satisfy the curing condition of code requirement, guarantees the civil engineering quality.
Technical solution of the present utility model is:
A kind of cement, concrete sample standard curing equipment comprise fog room and humiture automatic control device thereof, and described humiture automatic control device comprises damp and hot aqueous medium generator, refrigeration compressor and automatic controller; The shower of damp and hot aqueous medium generator and the refrigerator pipes of refrigeration compressor are arranged in the fog room.
Described damp and hot aqueous medium generator is a steam generator, comprises water tank and electric heater wherein, and water tank is provided with water inlet and steam outlet; Described electric heater adopts finned electric heater.
Described damp and hot aqueous medium generator is hot water generator also, comprises water tank and electric heater wherein, and water tank is provided with water inlet and hot water rear pump, and shower is provided with atomizer.
Described automatic controller adopts WSK type electronic digital to show temperature and humidity control instrument.
The advantage of the utility model maintenance of equipment is: temperature, humidity control accuracy height, temperature ± 2 ℃; Relative humidity ± 5%RH satisfies the curing condition of code requirement fully, and the check data of test specimen is true and reliable, can guarantee the civil engineering quality.
Description of drawings
Fig. 1 is a structural representation of the present utility model
Fig. 2 is the structural representation of steam generator
Fig. 3 is the A-A view of Fig. 2
Fig. 4 is the structural representation of hot water generator
Code name implication among the figure: 1-humiture automatic control device; 2-automatic controller; 3-refrigeration compressor; 4-damp and hot aqueous medium generator; 5-fog room; 6-support; 7-test specimen; 8-temperature sensor; 9-humidity sensor; 10-refrigerator pipes; 11-shower; 12-water inlet; 13-heating; 14-fin; 15-steam outlet; 16-terminal box; 17-water tank; 18-water inlet; 19-electric heater; 20-water tank; 21-pump; 22-terminal box.
The specific embodiment
Referring to Fig. 1: the utility model comprises fog room 5 and humiture automatic control device 1 two large divisions thereof.Be provided with support 6 in the fog room 5, be used to place test specimen 7.Humiture automatic control device 1 has two kinds of versions.
Example one
Humiture automatic control device 1 comprises damp and hot aqueous medium generator 4 (employing steam generator), refrigeration compressor 3 and automatic controller 2; The shower 11 of steam generator 4 and the refrigerator pipes 10 of refrigeration compressor are arranged in the fog room 5, on the steam shower 11 shower nozzle are arranged.Steam generator 4 is used for humidification, heats, and refrigeration compressor 3 is used for cooling.
Referring to accompanying drawing 2, Fig. 3: steam generator 4 is made up of water tank 17 and electric heater wherein, has water inlet 12, steam outlet 15, heating terminal box 16 on the water tank 17.Another characteristics of the present utility model are to adopt finned electric heater, and heating 13 is arranged in the fin 14.Because fin 14 heat transfer areas are big, thermal capacitance is little, and it is fast to conduct heat, and steam generation is rapid during energising; Cooled off rapidly during power failure, stop immediately steaming.This steam generator 4 is used for automatic regulating system, and lag time is short, and response speed is fast, just can guarantee degree of regulation.
Automatic controller 2 adopts WSK type electronic digital to show temperature, humidity controller, this instrument is commercially available approved product, have supporting temperature sensor 8, humidity sensor 9, measured signal digital display screen and correspondent control circuits, satisfy needs of the present utility model fully.The type selecting parameter of automatic controller 2:
Temperature measurement range 0-60 ℃; Moisture measurement scope 0-98%.
Control accuracy temperature ± 2 ℃; Humidity ± 5%RH.
Example two
Referring to Fig. 4: with example one difference be, damp and hot aqueous medium generator 4 adopts hot water generators, and it comprises water tank 20 and electric heater 19 wherein, and water tank 20 is provided with water inlet 18, hot water rear pump 21, terminal box 22.Water temperature in the water tank 20 is controlled to be steady state value by automaton, and this steady state value is answered>20 ℃, promptly is higher than 20 ℃ of curing temperature setting values.Hot water is by pump 21 outputs, and the atomizer on shower 11 forms water smoke, supplies wet, heat supply to fog room 5.All the other are identical with example one.
When the utility model uses, should set controlled parameter according to the maintenance standard earlier, set value and be: 20 ℃ of temperature; Relative humidity>95%RH.Its course of work is as follows:
In the winter time, temperature is low, the air drying, temperature is lower than 20 ℃ in fog room 5, or relative humidity is when being lower than 95%RH, damp and hot aqueous medium generator 4 starts, input wet-hot steam/water smoke in fog room 5 is in this process, when humidity reaches setting value 95%RH and temperature and still is lower than 20 ℃ of definite values, damp and hot aqueous medium generator 4 continues for wet-hot steam/water smoke, when temperature also reached setting value, damp and hot aqueous medium generator 4 stopped, at this moment, humidity will be greater than 95%RH, but this standard permission just, requires.Otherwise, when temperature reaches setting value and humidity when still being lower than definite value, damp and hot aqueous medium generator 4 continues also to reach setting value for wet-hot steam/water smoke up to humidity, obviously, this will cause temperature to be higher than setting value, rise so reach the moment of setting value when temperature, refrigeration compressor 3 also starts, cooling in fog room 5, when temperature, humidity all reached setting value, damp and hot aqueous medium generator 4, refrigeration compressor 3 all stopped.
In summer, the temperature height, there was dampness in the air, and humidity satisfies setting value>95%RH in fog room 5, and temperature is when being higher than 20 ℃, and refrigeration compressor 3 starts, and cooling in fog room 5 drops to when setting value to temperature, and refrigeration compressor 3 stops.When humidity in the fog room 5 is lower than setting value and temperature is higher than setting value 20 ℃ the time, damp and hot aqueous medium generator 4, refrigeration compressor 3 start simultaneously, confession wet-hot steam/water smoke, cooling in fog room 5.In this process, when moisturt register reached setting value, damp and hot aqueous medium generator 4 stopped, and refrigeration compressor 3 works on, and reduced to setting value up to temperature and just stopped.When temperature drops to setting value and humidity still is lower than when setting value, damp and hot aqueous medium generator 4, refrigeration compressor 3 can not stop, and when temperature, humidity all reached setting value, damp and hot aqueous medium generator 4, refrigeration compressor 3 stopped simultaneously.
Claims (5)
1. a cement, concrete sample standard curing equipment, comprise fog room and humiture automatic control device thereof, it is characterized in that: described humiture automatic control device comprises damp and hot aqueous medium generator, refrigeration compressor and automatic controller, and the shower of damp and hot aqueous medium generator and the refrigerator pipes of refrigeration compressor are arranged in the fog room.
2. test specimen standard curing equipment according to claim 1 is characterized in that: described damp and hot aqueous medium generator is a steam generator, comprises water tank and electric heater wherein, and water tank is provided with water inlet and steam outlet.
3. test specimen standard curing equipment according to claim 2, it is characterized in that: described electric heater adopts finned electric heater.
4. test specimen standard curing equipment according to claim 1 is characterized in that: described damp and hot aqueous medium generator is a hot water generator, comprises water tank and electric heater wherein, and water tank is provided with water inlet and hot water rear pump, and shower is provided with atomizer.
5. test specimen standard curing equipment according to claim 1 is characterized in that: described automatic controller adopts WSK type electronic digital to show temperature and humidity control instrument.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620034444 CN2915446Y (en) | 2006-05-31 | 2006-05-31 | Standard maintenance apparatus for cement concrete test piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620034444 CN2915446Y (en) | 2006-05-31 | 2006-05-31 | Standard maintenance apparatus for cement concrete test piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2915446Y true CN2915446Y (en) | 2007-06-27 |
Family
ID=38186353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620034444 Expired - Fee Related CN2915446Y (en) | 2006-05-31 | 2006-05-31 | Standard maintenance apparatus for cement concrete test piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2915446Y (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102615707A (en) * | 2011-01-27 | 2012-08-01 | 伊犁固锐特建材有限公司 | Circular concrete pole production process and special steam curing kiln thereof |
CN103072200A (en) * | 2013-02-20 | 2013-05-01 | 无锡职业技术学院 | Water curing equipment and curing method for concrete |
CN103266772A (en) * | 2013-05-20 | 2013-08-28 | 山东恒建工程监理咨询有限公司 | Curing method used for highway engineering construction concrete in winter |
CN105599123A (en) * | 2015-12-16 | 2016-05-25 | 北京福斯达轨道交通技术有限公司 | Cement-based concrete electric-heating curing system |
CN106182377A (en) * | 2016-07-21 | 2016-12-07 | 安徽望湖建筑产业发展有限公司 | A kind of PC component conservation system for building |
CN106891429A (en) * | 2017-03-09 | 2017-06-27 | 云南省建筑科学研究院 | A kind of long-distance intelligent formula concrete prefabricated element curing system |
CN110027097A (en) * | 2019-04-17 | 2019-07-19 | 王君国 | A kind of artificial inorganic ecology stone fog curing device |
CN111469259A (en) * | 2020-05-15 | 2020-07-31 | 广东冠粤路桥有限公司 | Prefabricated part spraying maintenance system and maintenance method |
-
2006
- 2006-05-31 CN CN 200620034444 patent/CN2915446Y/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102615707A (en) * | 2011-01-27 | 2012-08-01 | 伊犁固锐特建材有限公司 | Circular concrete pole production process and special steam curing kiln thereof |
CN103072200A (en) * | 2013-02-20 | 2013-05-01 | 无锡职业技术学院 | Water curing equipment and curing method for concrete |
CN103072200B (en) * | 2013-02-20 | 2014-09-10 | 无锡职业技术学院 | Water curing equipment and curing method for concrete |
CN103266772A (en) * | 2013-05-20 | 2013-08-28 | 山东恒建工程监理咨询有限公司 | Curing method used for highway engineering construction concrete in winter |
CN103266772B (en) * | 2013-05-20 | 2015-07-22 | 山东恒建工程监理咨询有限公司 | Curing method used for highway engineering construction concrete in winter |
CN105599123A (en) * | 2015-12-16 | 2016-05-25 | 北京福斯达轨道交通技术有限公司 | Cement-based concrete electric-heating curing system |
CN106182377A (en) * | 2016-07-21 | 2016-12-07 | 安徽望湖建筑产业发展有限公司 | A kind of PC component conservation system for building |
CN106891429A (en) * | 2017-03-09 | 2017-06-27 | 云南省建筑科学研究院 | A kind of long-distance intelligent formula concrete prefabricated element curing system |
CN110027097A (en) * | 2019-04-17 | 2019-07-19 | 王君国 | A kind of artificial inorganic ecology stone fog curing device |
CN111469259A (en) * | 2020-05-15 | 2020-07-31 | 广东冠粤路桥有限公司 | Prefabricated part spraying maintenance system and maintenance method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2915446Y (en) | Standard maintenance apparatus for cement concrete test piece | |
CN102721720B (en) | Device and method for testing thermal performance of phase-change energy-storage composite board, and method for evaluating energy saving of same | |
CN102937464B (en) | Performance detection testing system of mine air returning heat exchanger and using method thereof | |
CN103592142A (en) | System for testing heat transfer and resistance characteristics of large-size generating equipment heat exchanger | |
CN209626330U (en) | A kind of fuel battery test platform air distributing device | |
CN110488894B (en) | Air temperature and humidity testing device and method for controlling temperature and humidity by using same | |
CN205333224U (en) | Thermometer and sensor test bench | |
CN202823407U (en) | Test chamber device capable of automatically controlling temperatures | |
CN204869193U (en) | Case is supported to cement mark | |
CN103868340B (en) | The drying means of ceramic blank and energy-conservation quick drying kiln used thereof | |
CN101871999B (en) | Constant temperature windproof test chamber | |
CN206254303U (en) | A kind of cement briquette automatically conserves bucket | |
CN203479550U (en) | System suitable for testing heat transfer and resistance characteristics of heat exchanger of large-scale generating equipment | |
CN108756996B (en) | Mine hot and humid environment simulation experiment platform | |
CN102706209A (en) | Constant temperature control system for closed cooling tower | |
CN205038136U (en) | Salt -mist corrosion tester | |
CN102418937B (en) | Combustion air and natural gas linear proportion control system for ceramic kiln | |
CN202189027U (en) | Concrete thermal diffusion rate measurement device | |
CN202133634U (en) | Detection device used for testing performance of roof heat insulation module and material | |
CN202928612U (en) | Performance detection system of mine return air heat exchanger | |
CN107132411A (en) | PTC heater power detection device | |
CN201732129U (en) | Constant-temperature wind-proof test box | |
CN205157471U (en) | Experimental temperature -controlled box of emulsified asphalt evaporation residue content | |
CN221066685U (en) | Air supply system for concrete constant temperature laboratory | |
CN202149679U (en) | Multi-functional humidity controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070627 |