CN2890242Y - Arrangement structure for combined factory building of electrolysis shop and casting shop - Google Patents

Arrangement structure for combined factory building of electrolysis shop and casting shop Download PDF

Info

Publication number
CN2890242Y
CN2890242Y CN 200620200203 CN200620200203U CN2890242Y CN 2890242 Y CN2890242 Y CN 2890242Y CN 200620200203 CN200620200203 CN 200620200203 CN 200620200203 U CN200620200203 U CN 200620200203U CN 2890242 Y CN2890242 Y CN 2890242Y
Authority
CN
China
Prior art keywords
casting
shop
casting shop
electrolysis
potroom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620200203
Other languages
Chinese (zh)
Inventor
吴展光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN 200620200203 priority Critical patent/CN2890242Y/en
Application granted granted Critical
Publication of CN2890242Y publication Critical patent/CN2890242Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

The utility model discloses an arrangement structure for combined factory building of electrolysis shop and casting shop, comprising electrolysis shops and casting shops. Two parallel electrolysis shops are arranged side by side at the side of the casting shop, and at least one connection corridor for feeding aluminium liquid is provided between the two electrolysis shops. The utility model directly integrates the electrolysis procedure together with the casting procedure by the ends, and is of compact layout, shorter transportation distance between procedures. And over 10 percent of the building area, road pavement area, and length of pipes are saved than those in separating procedure, the transportation efficiency is enhanced by 50 percent. Meanwhile, the utility model is efficiently of less factory land, shorter transportation distance, and less requirement of transportation equipment, so the infrastructural investment and operation cost are reduced.

Description

The configuration structure of potroom and casting shop's assembled factory building
Technical field
The utility model relates to the configuration structure of a kind of electrolytic aluminium factory potroom and casting shop's assembled factory building, belongs to potroom and casting shop factory building configuring technical field.
Background technology
Production electrolysis aluminium ingot (finished product) relates to following production process: 1. electrolytic cell is aluminium liquid at potroom with alumina eltrolysis; 2. with the special aluminium liquid car of two-maing ladle aluminium liquid is transported to casting shop from potroom; 3. aluminium liquid is cast into the aluminium ingot finished product in casting shop.In the plane figure of existing Aluminum factory, all be that plant area is divided into block one by one with road network, each production department and facility are arranged in different blocks.Potroom and casting shop just layout in the both sides of factory road.Because all above Ground between the 2.5m~3.0m of plane, the aluminium liquid pouring operation plane of casting shop is also above Ground about the 2.2m of plane for the restriction of process conditions, the production operation plane of potroom.Therefore, the transportation of aluminium liquid must be arrived at the plant area arterial highway by the ramp (trestle) that connects potroom, and then arrives at the aluminium liquid pouring operation plane of casting shop by the ramp (trestle) that connects casting shop, transports trouble.And the factory building of this two production process is separated from each other, and can cause factory floor space big, and material transportation range lengthening between the operation.Road is paved area and the increasing of pipe installation length when causing investment construction, and when especially building in the mountain area, capital works earth and rock works amount increases greatly, the factory and enterprise capital investment is increased and the rising of production and operation cost.
Summary of the invention
The purpose of this utility model is: provide a kind of simple in structure, rationally distributed, can reduce capital investment increases and the potroom of production and operation cost and the configuration structure of casting shop's assembled factory building, overcomes the deficiencies in the prior art.
The utility model is to constitute like this: it comprises potroom (1) and casting shop (2), side in casting shop (2) is arranged side by side two potrooms that are arranged parallel to each other (1), and is provided with a vestibule (3) that is used to carry aluminium water between two potrooms that are arranged parallel to each other (1) at least; Between two potrooms that are arranged parallel to each other (1), be provided with three vestibules (3) that are used to carry aluminium water; The aluminium liquid pouring operation plane absolute altitude of casting shop (2) is identical with the operation planar absolute altitude of potroom (1); The length of casting shop (2) is 85-100 rice, and width is a 42-63 rice; Be provided with outside workshop lead the way (4) in casting shop (2) side.
Owing to adopted such scheme, the utility model directly connects into as a whole by the end electrowinning process and casting process, compact in design, transportation range between the operation reduces, its regional land area, road are paved area, the pipe network laying length separates layout than each operation and will save more than 10%, conevying efficiency improves 50%, therefore the utility model can reduce factory site effectively, shorten the material transportation range, reduce the demand of haulage device, thereby reduced the capital investment and the production and operation cost of engineering.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model.
The specific embodiment
Embodiment of the present utility model: build a casting shop (2), build two potrooms (1) at the side of casting shop (2), two potrooms (1) setting that is arranged parallel to each other, and between potroom (1), build three vestibules (3) that are used to carry aluminium water; Single potroom width is generally 24-27 rice, and the distance between two potrooms is generally 40-50 rice, and therefore, casting shop (2) length is typically designed to 85-100 rice, and width is typically designed to two and strides to combination 42-63 rice between three standdle carriers; Make when building that the aluminium liquid pouring operation plane absolute altitude of casting shop (2) is identical with the operation planar absolute altitude of potroom (1), build in casting shop (2) side outside workshop lead the way (4) connect outside road and get final product.
The casting end of casting shop (2) is positioned at a side in workshop.The aluminium water of a potroom (1) directly enters the casting end of casting shop (2) along the sidepiece vestibule in workshop by the car of two-maing ladle; The aluminium water of another potroom (1) enters the potroom that is connected with the casting end of casting shop (2) by the car of two-maing ladle along the vestibule (3) of two potrooms (1), enters the casting end of casting shop (2) then.The casting of casting shop (2) holds the operation planar absolute altitude in a relative side finished product district identical with outside ground level, and by the workshop lead the way (4) be connected with outside road, be convenient to the outside transportation of finished product aluminium ingot.

Claims (5)

1. the configuration structure of a potroom and casting shop's assembled factory building, it comprises potroom (1) and casting shop (2), it is characterized in that: the side in casting shop (2) is arranged side by side two potrooms that are arranged parallel to each other (1), and is provided with a vestibule (3) that is used to carry aluminium water between two potrooms that are arranged parallel to each other (1) at least.
2. the configuration structure of potroom according to claim 1 and casting shop's assembled factory building is characterized in that: be provided with three vestibules (3) that are used to carry aluminium water between two potrooms that are arranged parallel to each other (1).
3. the configuration structure of potroom according to claim 1 and casting shop's assembled factory building is characterized in that: the aluminium liquid pouring operation plane absolute altitude of casting shop (2) is identical with the operation planar absolute altitude of potroom (1).
4. the configuration structure of potroom according to claim 1 and casting shop's assembled factory building is characterized in that: the length of casting shop (2) is 85-100 rice, and width is a 42-63 rice.
5. the configuration structure of potroom according to claim 1 and casting shop's assembled factory building is characterized in that: be provided with outside workshop lead the way (4) in casting shop (2) side.
CN 200620200203 2006-02-24 2006-02-24 Arrangement structure for combined factory building of electrolysis shop and casting shop Expired - Fee Related CN2890242Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620200203 CN2890242Y (en) 2006-02-24 2006-02-24 Arrangement structure for combined factory building of electrolysis shop and casting shop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620200203 CN2890242Y (en) 2006-02-24 2006-02-24 Arrangement structure for combined factory building of electrolysis shop and casting shop

Publications (1)

Publication Number Publication Date
CN2890242Y true CN2890242Y (en) 2007-04-18

Family

ID=38020900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620200203 Expired - Fee Related CN2890242Y (en) 2006-02-24 2006-02-24 Arrangement structure for combined factory building of electrolysis shop and casting shop

Country Status (1)

Country Link
CN (1) CN2890242Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184473A (en) * 2011-12-27 2013-07-03 贵阳铝镁设计研究院有限公司 Arrangement method for core area workshop of aluminium electrolysis plant and core area workshop
CN104652862A (en) * 2013-11-25 2015-05-27 贵阳铝镁设计研究院有限公司 Method for improving aluminum oxide and aluminum ingot loading efficiency and warehousing structure
CN109202054A (en) * 2018-10-10 2019-01-15 广东华劲金属型材有限公司 A kind of die casting molten aluminum intelligence transportation system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184473A (en) * 2011-12-27 2013-07-03 贵阳铝镁设计研究院有限公司 Arrangement method for core area workshop of aluminium electrolysis plant and core area workshop
CN104652862A (en) * 2013-11-25 2015-05-27 贵阳铝镁设计研究院有限公司 Method for improving aluminum oxide and aluminum ingot loading efficiency and warehousing structure
CN109202054A (en) * 2018-10-10 2019-01-15 广东华劲金属型材有限公司 A kind of die casting molten aluminum intelligence transportation system

Similar Documents

Publication Publication Date Title
CN205243003U (en) Prefabricated U -shaped segment girder template of stub matching
CN205743924U (en) A kind of multifunctional modular single track PC beam forms
CN204024676U (en) A kind of novel tunnel concrete steel form carrier
CN2890242Y (en) Arrangement structure for combined factory building of electrolysis shop and casting shop
CN204266124U (en) The pre-assembled moulding bed of large sections steel box-girder
CN105401719A (en) Aluminum alloy stair step template
CN105697036A (en) Multi-functional modular monorail PC beam template and construction method of PC beam
CN2890243Y (en) Arrangement structure for aluminium-electrolysis shop and aluminium-oxidation storehouse and casting factory building
CN211736310U (en) Movable hanging basket for bridge
CN202946166U (en) 'Bracket-lining' integrated cast forming type template trolley used for large tunnel
CN1884626A (en) Combined workshop collocation method for electrolytic aluminium production
CN1844465A (en) Combined arrangement method for electrolytic plant and tank back shop
CN103754770B (en) Hoisting device for reinforcement cage
CN1329299C (en) Alumina factory wet method system centralized layout mode using pipe strip as link
CN2893064Y (en) Layout structure for electrolytic aluminium factory simple anode assembling workshop and electrolytic plant building
CN202628118U (en) Formwork trolley for long and large box culvert
CN210850737U (en) Precast beam quick detach type line production steel form
CN204414302U (en) A kind of T plate mould
CN103498559A (en) Splicing movable bridge frame of steel structure industrial factory building and construction method for applying splicing movable bridge frame to roof construction
CN201334526Y (en) Arrangement structure of electrolysis room and casting room
CN2926260Y (en) Arrangement structure for assembled factory building of electrolytic aluminum workshop and cast workshop
CN202610698U (en) Medium and small span modularization aluminum pedestrian bridge within single span of 30 m
CN202559264U (en) Steel-structure assembled-type framework for erecting traffic signal devices
CN201224623Y (en) Radiating layered transfer device for different materials
CN204238951U (en) Three-dimensional space curved surface combined type top die set device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE C

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110525

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110525

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070418

Termination date: 20140224