CN204238951U - Three-dimensional space curved surface combined type top die set device - Google Patents

Three-dimensional space curved surface combined type top die set device Download PDF

Info

Publication number
CN204238951U
CN204238951U CN201420708990.XU CN201420708990U CN204238951U CN 204238951 U CN204238951 U CN 204238951U CN 201420708990 U CN201420708990 U CN 201420708990U CN 204238951 U CN204238951 U CN 204238951U
Authority
CN
China
Prior art keywords
cross
arc
formwork
section
curved surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420708990.XU
Other languages
Chinese (zh)
Inventor
曾明
李友华
詹剑霞
廖湘辉
杨富瀛
张俊霞
冯晓琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
China Gezhouba Group Co Ltd
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Original Assignee
China Three Gorges University CTGU
China Gezhouba Group Co Ltd
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU, China Gezhouba Group Co Ltd, China Gezhouba Group Three Gorges Construction Engineering Co Ltd filed Critical China Three Gorges University CTGU
Priority to CN201420708990.XU priority Critical patent/CN204238951U/en
Application granted granted Critical
Publication of CN204238951U publication Critical patent/CN204238951U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种三维空间曲面组合式顶模架装置,单组顶模架下共用一截面横支梁,截面横支梁上有多根竖向支撑和截面斜撑并支撑其上部的中部两组第一横向弧形檩条,截面横支梁两侧有多根轴向斜撑支撑其上两侧的第二横向弧形檩条,第一和第二横向弧形檩条沿纵向呈圆弧布置,之间连接有多根纵向弧形檩条,第一、第二横向弧形檩条与纵向弧形檩条之间互相交错成网格状。本装置按弯段弧度等分成与门架榀数相同的若干组,模块化制作,单组组件之间、组与组之间通过螺栓连接,安装位置可以互相替换。本装置结构简单对称,加工方便,受力良好,也可以实现在吊装空间不足,没有大型吊装机构的情况下人为快速安装,特别适用于复杂三维空间曲面结构的钢模台车。

A three-dimensional space curved surface combined top formwork device, a single set of top formwork shares a cross-section cross-beam, and the cross-section cross-beam has multiple vertical supports and cross-section diagonal braces and supports the upper middle two groups of first Horizontal arc-shaped purlins, there are multiple axial diagonal braces on both sides of the cross-section cross-bracing to support the second transverse arc-shaped purlins on both sides above it, the first and second transverse arc-shaped purlins are arranged in arcs along the longitudinal direction, and connected There are multiple longitudinal arc-shaped purlins, and the first and second transverse arc-shaped purlins and the longitudinal arc-shaped purlins are interlaced to form a grid. The device is divided into several groups with the same number as the gantry according to the curvature of the curved section, and is modularized. The components of a single group and between groups are connected by bolts, and the installation positions can be replaced with each other. The structure of the device is simple and symmetrical, easy to process, and good in force. It can also be quickly installed manually when there is insufficient hoisting space and no large hoisting mechanism. It is especially suitable for steel formwork trolleys with complex three-dimensional curved surface structures.

Description

三维空间曲面组合式顶模架装置Three-dimensional space curved surface combined top formwork device

技术领域 technical field

本实用新型涉及隧洞混凝土衬砌钢模台车领域,具体为一种三维空间曲面边顶拱式混凝土衬砌钢模台车顶模架装置。 The utility model relates to the field of a concrete lining steel formwork trolley for tunnels, in particular to a three-dimensional space curved surface side top arch type concrete lining steel formwork platform roof formwork device.

背景技术 Background technique

目前市场上存在一些用于二维曲面、平缓定坡度条件下隧洞浇筑作业的钢模台车,所述钢模台车的顶模结构包括顶模面板和顶模架,顶模架升降通过安装在支撑系统门架上的液压缸完成。这种顶模架一般先通过焊接或螺栓连接成大型组件,再通过大型吊装机构吊装到门架上进行安装,并且只适用于曲面结构简单,横截面恒定的钢模台车。同时,顶模架的吊装也需要足够大的吊装空间。对于吊装空间有限,例如弯管段复杂三维空间曲面的钢模台车,这种顶模架无法配用。 At present, there are some steel formwork trolleys on the market that are used for tunnel pouring operations on two-dimensional curved surfaces and gentle slopes. The top mold structure of the steel formwork trolley includes a top mold panel and a top mold frame. Hydraulic cylinders on the support system mast complete. This kind of top formwork is generally connected into large components by welding or bolts, and then hoisted to the door frame by a large hoisting mechanism for installation, and is only suitable for steel formwork trolleys with simple curved surface structure and constant cross section. At the same time, the hoisting of the top formwork also requires a large enough hoisting space. For steel formwork trolleys with limited hoisting space, such as complex three-dimensional space curved pipe sections, this type of top formwork cannot be used.

发明内容 Contents of the invention

本实用新型要解决的技术问题是提供一种三维空间曲面钢模台车组合式顶模架装置,这种组合式顶模架结构简单对称,加工方便,模块化制作,可以实现在吊装空间不足,没有大型吊装机构的情况下人为快速安装,并且配用按理论曲线制作而非折线拟合的顶模面板。 The technical problem to be solved by the utility model is to provide a three-dimensional space curved surface steel formwork trolley combined top formwork device. This combined top formwork structure is simple and symmetrical, easy to process, modularized, and can be realized when the hoisting space is insufficient. , without a large hoisting mechanism, it can be installed quickly, and it is equipped with a top form panel that is made according to a theoretical curve rather than a broken line.

一种三维空间曲面组合式顶模架装置,包括顶模架,多组顶模架组合连接构成三维空间曲面钢模台车顶模支撑架,单组顶模架与单榀钢模台车门架一一对应并通过顶模升降油缸连接,所述的顶模架为三维空间结构,单组顶模架由四块标准块组成,单组顶模架下共用一截面横支梁,截面横支梁上有多根竖向支撑和截面斜撑并支撑其上部的中部两组第一横向弧形檩条,截面横支梁两侧有多根轴向斜撑支撑其上两侧的第二横向弧形檩条,所述的第一横向弧形檩条和第二横向弧形檩条沿纵向呈圆弧布置,之间连接有多根纵向弧形檩条,第一横向弧形檩条、第二横向弧形檩条与纵向弧形檩条之间互相交错成网格状。 A three-dimensional space curved surface combined top formwork device, including a top formwork, multiple sets of top formworks are combined and connected to form a three-dimensional curved surface steel mold trolley top form support frame, a single set of top formwork and a single steel formwork trolley door frame One-to-one correspondence and connection through the lifting cylinder of the top mold. The top mold frame is a three-dimensional space structure. There are multiple vertical braces and cross-section diagonal braces on the beam to support the two sets of first horizontal arc-shaped purlins in the middle of the upper part, and there are multiple axial diagonal braces on both sides of the cross-section cross-bracing beam to support the second horizontal arc on both sides of the beam. Purlins, the first horizontal arc purlins and the second horizontal arc purlins are arranged in circular arcs along the longitudinal direction, and there are multiple longitudinal arc purlins connected between them, the first horizontal arc purlins, the second transverse arc purlins Interlaced with the longitudinal curved purlins to form a grid.

上述单组顶模架的四块标准块之间可以通用互换并用螺栓组拼连接。 The four standard blocks of the above-mentioned single-group top formwork can be universally interchanged and connected by bolts.

上述多组顶模架之间可以通用互换并用螺栓组拼连接。 The above-mentioned multiple sets of top formworks can be universally interchanged and connected by bolts.

本实用新型有如下有益效果: The utility model has the following beneficial effects:

本实用新型提供的一种三维空间曲面钢模台车组合式顶模架装置,按弯段弧度等分成与门架榀数相同的若干组,顶模架为三维空间结构,模块化制作,单组组件之间、组与组之间通过螺栓连接,安装位置可以互相替换。本实用新型结构简单对称,加工方便,受力良好,也可以实现在吊装空间不足,没有大型吊装机构的情况下人为快速安装。特别适用于复杂三维空间曲面结构的钢模台车。 The utility model provides a three-dimensional space curved surface steel mold trolley combined top formwork device, which is divided into several groups with the same number of door frames according to the curvature of the curved section. The top formwork is a three-dimensional space structure and is modularized. The group components and groups are connected by bolts, and the installation positions can be replaced with each other. The utility model has the advantages of simple and symmetrical structure, convenient processing, and good force bearing, and can also be artificially and quickly installed when the hoisting space is insufficient and there is no large-scale hoisting mechanism. It is especially suitable for steel formwork trolleys with complex three-dimensional curved surface structures.

附图说明 Description of drawings

下面结合附图和实施例对本实用新型作进一步说明: Below in conjunction with accompanying drawing and embodiment the utility model is further described:

图1为本实用新型及与门架的装配关系主视图; Fig. 1 is the front view of the utility model and its assembly relationship with the door frame;

图2为本实用新型及与门架的装配关系侧视图; Fig. 2 is a side view of the utility model and its assembly relationship with the door frame;

图3为图2的A-A剖视图; Fig. 3 is A-A sectional view of Fig. 2;

图4为模块化的顶模架标准块正视图; Fig. 4 is the front view of the modular top formwork standard block;

图5为模块化的顶模架标准块侧视图。 Fig. 5 is a side view of the modular top formwork standard block.

具体实施方式 Detailed ways

如图1-3中,一种三维空间曲面组合式顶模架装置,包括顶模架1,多组顶模架1组合连接构成三维空间曲面钢模台车顶模支撑架,单组顶模架1与单榀钢模台车门架2一一对应并通过顶模升降油缸3连接。 As shown in Fig. 1-3, a three-dimensional space curved surface combined top formwork device includes a top formwork 1, and multiple sets of top formworks 1 are combined and connected to form a three-dimensional space curved surface steel formwork trolley top form support frame, and a single set of top formwork Frame 1 is in one-to-one correspondence with the door frame 2 of the single steel formwork trolley and is connected by the lifting cylinder 3 of the top mold.

所述顶模架1为三维空间结构,单组由四块标准块组成,并共用一组截面横支梁4,截面横支梁4上有多根竖向支撑5和截面斜撑6并支撑其上部的两组中部第一横向弧形檩条7-1,截面横支梁4两侧有多根轴向斜撑9支撑其上两侧的第二横向弧形檩条7-2。 The top formwork 1 is a three-dimensional space structure, a single group is composed of four standard blocks, and shares a group of cross-section cross-beams 4, and there are multiple vertical supports 5 and cross-section diagonal braces 6 on the cross-section cross-beams 4 to support There are two sets of first transverse arc-shaped purlins 7-1 in the middle of the upper part, and there are multiple axial diagonal braces 9 on both sides of the cross-section cross beam 4 to support the second transverse arc-shaped purlins 7-2 on both sides.

所述的第一横向弧形檩条和第二横向弧形檩条沿纵向呈圆弧布置,之间连接有多根纵向弧形檩条8,两者间互相交错成网格状。 The first transverse arc-shaped purlins and the second transverse arc-shaped purlins are arranged in circular arcs along the longitudinal direction, and a plurality of longitudinal arc-shaped purlins 8 are connected between them, and the two are interlaced to form a grid.

需要说明的是,采用本实用新型结构形式,单组顶模架共用一组截面横支梁4,截面横支梁4与钢模台车门架2对应,是保证顶部荷载合理对称的传递到钢模台车门架2上,使顶模架1和钢模台车整体受力结构均匀对称。 It should be noted that, with the structural form of the utility model, a single group of top formwork shares a set of cross-section cross-support beams 4, and the cross-section cross-support beams 4 correspond to the door frame 2 of the steel formwork trolley, so as to ensure that the top load is transmitted to the steel formwork reasonably and symmetrically. On the door frame 2 of the mold platform, the overall stress structure of the top mold frame 1 and the steel formwork trolley is uniform and symmetrical.

如图4-5中顶模架标准块由竖向支撑5、截面斜撑6、第一横向弧形檩条7-1和第二横向弧形檩条7-2、纵向弧形檩条8和轴向斜撑9组成,檩条之间互相交错成网格状并与三维空间曲面顶模面板匹配。竖向支撑5-1和截面斜撑6-1分别从截面横支梁4的点B和点C出发与檩条7-1交于点E;竖向支撑5-2从截面横支梁4的点C出发与檩条7-1交于点F;截面斜撑6-2和竖向支撑5-3分别从截面横支梁4的点C和点D出发与檩条7-1交于点G;轴向斜撑9-1从截面横支梁4的点A出发与檩条7-2交于点H;轴向斜撑9-2从截面横支梁4的点B出发与檩条7-2交于点I;轴向斜撑9-3从截面横支梁4的点C出发与檩条7-2交于点J;轴向斜撑9-4从截面横支梁4的点D出发与檩条7-2交于点K。所述点ABCDEFGHIJK均为三维空间曲面点。 As shown in Figure 4-5, the top formwork standard block is composed of vertical support 5, cross-sectional diagonal brace 6, first transverse arc purlin 7-1 and second transverse arc purlin 7-2, longitudinal arc purlin 8 and axial Composed of 9 diagonal braces, the purlins are interlaced to form a grid and matched with the three-dimensional space curved top form panel. The vertical support 5-1 and the cross-section diagonal brace 6-1 respectively start from point B and point C of the cross-section beam 4 and intersect with the purlin 7-1 at point E; the vertical support 5-2 starts from the cross-section beam 4 Point C starts from point C and intersects purlin 7-1 at point F; section diagonal brace 6-2 and vertical support 5-3 respectively start from point C and point D of section cross beam 4 and intersect purlin 7-1 at point G; Axial brace 9-1 starts from point A of cross-section beam 4 and intersects purlin 7-2 at point H; axial brace 9-2 starts from point B of cross-section beam 4 and intersects purlin 7-2 at point I; the axial diagonal brace 9-3 starts from point C of the cross-section beam 4 and intersects with the purlin 7-2 at point J; the axial diagonal brace 9-4 starts from point D of the cross-section beam 4 and intersects with the purlin 7-2 intersects at point K. The points ABCDEFGHIJK are all three-dimensional space surface points.

优选地,所述单组顶模架1的四块标准块之间可以通用互换并用螺栓组拼连接。所述多组顶模架1之间可以通用互换并用螺栓组拼连接。采用螺栓组拼连接形式是方便顶模架各构件的组装和拆除,利于模块化组合。 Preferably, the four standard blocks of the single-set top formwork 1 can be universally interchanged and connected by bolts. The multiple sets of top formworks 1 can be universally interchanged and connected by bolts. The use of bolted joints facilitates the assembly and dismantling of each component of the top formwork, and facilitates modular combination.

本新型的安装拆除方法,其特征在于包括以下步骤: The novel installation and removal method is characterized in that it comprises the following steps:

一、牵引钢丝绳将钢模台车行走至弯管段10与平直段11的交叉口,腾出平直段11洞顶天锚12正下方的场地,并将台车门架2的夹轨器与轨道加紧,保证台车稳定不移位; 1. Pull the steel wire rope to move the steel mold trolley to the intersection of the curved pipe section 10 and the straight section 11, free up the space directly below the sky anchor 12 on the top of the straight section 11, and place the rail clamp of the trolley gantry 2 It is tightened with the track to ensure that the trolley is stable and does not shift;

二、选用小型起重设备,将第一、二段顶模架1在天锚12正下方的场地上拼装成一体,用天锚12和卷扬机13将拼装的两段顶模架1吊高到台车门架2高度以上; 2. Select small lifting equipment to assemble the first and second sections of top formwork 1 on the site directly below the sky anchor 12, and use the sky anchor 12 and hoist 13 to lift the assembled two sections of top formwork 1 to The height of the door frame of the trolley is more than 2;

三、收紧牵引钢丝绳,将钢模台车行走至天锚12正下方对准第一、二段顶模架1安装位置,用电葫芦将第一、二段顶模架1与台车门架2固定,连接顶模架1与台车门架2的升降油缸3,使门架2移动过程中顶模架1不会发生移动和倾倒。 3. Tighten the traction wire rope, move the steel formwork trolley to the right below the sky anchor 12 and align it with the installation position of the first and second section top formwork 1, and use an electric hoist to connect the first and second section top formwork 1 with the door frame of the trolley 2 is fixed, and connects the lifting cylinder 3 of the top mold frame 1 and the trolley door frame 2, so that the top mold frame 1 will not move and topple over during the movement of the door frame 2.

四、按上述二、三步骤完成剩余顶模架的安装,拆除步骤与之相反。 4. Follow the steps 2 and 3 above to complete the installation of the remaining top formwork, and the removal steps are the opposite.

通过以上方法实现顶模架的洞内安装和拆除。 The installation and removal in the hole of the top formwork is realized by the above method.

Claims (2)

1.一种三维空间曲面组合式顶模架装置,包括顶模架(1),其特征在于,多组顶模架(1)组合连接构成三维空间曲面钢模台车顶模支撑架,单组顶模架(1)与单榀钢模台车门架(2)一一对应并通过顶模升降油缸(3)连接,所述的顶模架(1)为三维空间结构,单组顶模架由四块标准块组成,单组顶模架下共用一截面横支梁(4),截面横支梁(4)上有多根竖向支撑(5)和截面斜撑(6)并支撑其上部的中部两组第一横向弧形檩条(7-1),截面横支梁(4)两侧有多根轴向斜撑(9)支撑其上两侧的第二横向弧形檩条(7-2),所述的第一横向弧形檩条和第二横向弧形檩条沿纵向呈圆弧布置,之间连接有多根纵向弧形檩条(8),第一横向弧形檩条、第二横向弧形檩条与纵向弧形檩条之间互相交错成网格状,所述多组顶模架(1)之间可以通用互换并用螺栓组拼连接。 1. A three-dimensional space curved surface combined top formwork device, comprising a top formwork (1), characterized in that multiple sets of top formworks (1) are combined and connected to form a three-dimensional space curved surface steel formwork trolley top formwork support frame, a single The group top formwork (1) is in one-to-one correspondence with the single steel formwork platform door frame (2) and is connected through the top mold lifting cylinder (3). The above top formwork (1) is a three-dimensional space structure, and the single set of top formwork The frame is composed of four standard blocks, and a single cross-section beam (4) is shared under a single set of top formwork, and there are multiple vertical supports (5) and cross-section diagonal braces (6) on the cross-section beam (4). There are two groups of first transverse arc-shaped purlins (7-1) in the middle part of the upper part, and there are multiple axial diagonal braces (9) on both sides of the cross-section transverse beam (4) to support the second transverse arc-shaped purlins ( 7-2), the first horizontal arc-shaped purlin and the second horizontal arc-shaped purlin are arranged in an arc along the longitudinal direction, and there are multiple longitudinal arc-shaped purlins (8) connected between them, the first horizontal arc-shaped purlin, the second The two transverse arc-shaped purlins and the longitudinal arc-shaped purlins are interlaced to form a grid, and the multiple sets of top formwork (1) can be universally interchanged and connected by bolts. 2.根据权利要求1所述的三维空间曲面组合式顶模架装置,其特征是:所述单组顶模架(1)的四块标准块之间可以通用互换并用螺栓组拼连接。 2. The three-dimensional space curved surface combined top formwork device according to claim 1, characterized in that: the four standard blocks of the single set top formwork (1) can be universally interchanged and connected by bolts.
CN201420708990.XU 2014-11-24 2014-11-24 Three-dimensional space curved surface combined type top die set device Expired - Fee Related CN204238951U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420708990.XU CN204238951U (en) 2014-11-24 2014-11-24 Three-dimensional space curved surface combined type top die set device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420708990.XU CN204238951U (en) 2014-11-24 2014-11-24 Three-dimensional space curved surface combined type top die set device

Publications (1)

Publication Number Publication Date
CN204238951U true CN204238951U (en) 2015-04-01

Family

ID=52768464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420708990.XU Expired - Fee Related CN204238951U (en) 2014-11-24 2014-11-24 Three-dimensional space curved surface combined type top die set device

Country Status (1)

Country Link
CN (1) CN204238951U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389624A (en) * 2014-11-24 2015-03-04 中国葛洲坝集团股份有限公司 Three-dimensional curved surface combined top formwork device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389624A (en) * 2014-11-24 2015-03-04 中国葛洲坝集团股份有限公司 Three-dimensional curved surface combined top formwork device and method

Similar Documents

Publication Publication Date Title
CN108330842B (en) Bridge girder erection machine for erection construction of large-span reinforced concrete composite girder and construction method
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN105803947B (en) A kind of cast-in-situ box girder gate-type full framing whole lateral moving system and method for traversing
CN201297036Y (en) Discharging platform
CN109162437B (en) Integral steel platform for multi-tube steel plate shear wall and its construction method
CN109629449B (en) Mounting and positioning support and alignment method for steel-concrete combined section of arch foot of steel box arch bridge
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN105484168B (en) Rotary hoisting equipment for stiffening beam of suspension bridge and erecting method of stiffening beam
CN204676881U (en) Large span intersection truss steel structure supporting system
CN112832368A (en) Quick construction process for cantilever beam at ultrahigh position
CN204238951U (en) Three-dimensional space curved surface combined type top die set device
CN211775667U (en) Power transmission line crossing tower assembly high-altitude construction platform
CN210341665U (en) Installation device for corrugated steel web of suspension casting bridge
CN101695984B (en) Assembly method and assembly lifting appliance of vertical beam and horizontal beam under arc of midheight deck steel pipe concrete arch bridge
CN104389624A (en) Three-dimensional curved surface combined top formwork device and method
CN207878284U (en) Bailey beam cable saddle hoisting bracket
CN207277679U (en) Air-entrained concrete building block and armored concrete outline border integral wall
CN107905379B (en) Totally-enclosed layer construction method in super high-rise building Core Walls Structure
CN104453199A (en) Elevator shaft construction operation platform
CN205576759U (en) Symmetrical propulsion system of synchronization of bridge cantilever crane dress in -process
CN102518041A (en) Support system for overhead continuous beam form-erecting falsework and construction method thereof
CN204326490U (en) A kind of construction of lift well operating platform
CN209741672U (en) two-width parallel viaduct central anti-collision guardrail simultaneous construction formwork
CN108252167A (en) Suitable for covering rail plate-type ballastless track plate paver on steel truss girder bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150401

Termination date: 20201124