CN2884135Y - Settlement obsergvation positioning rod set - Google Patents

Settlement obsergvation positioning rod set Download PDF

Info

Publication number
CN2884135Y
CN2884135Y CN 200520135441 CN200520135441U CN2884135Y CN 2884135 Y CN2884135 Y CN 2884135Y CN 200520135441 CN200520135441 CN 200520135441 CN 200520135441 U CN200520135441 U CN 200520135441U CN 2884135 Y CN2884135 Y CN 2884135Y
Authority
CN
China
Prior art keywords
observation
screw
settlement
port
settlement observation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200520135441
Other languages
Chinese (zh)
Inventor
佘振阳
杨俊强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Keyuan Architecture Tech Detection Co., Ltd., Shanxi
China Shanxi Sijian Group Co Ltd
Original Assignee
KEYUAN ARCHITECTURE TECH DETECTION Co Ltd SHANXI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEYUAN ARCHITECTURE TECH DETECTION Co Ltd SHANXI filed Critical KEYUAN ARCHITECTURE TECH DETECTION Co Ltd SHANXI
Priority to CN 200520135441 priority Critical patent/CN2884135Y/en
Application granted granted Critical
Publication of CN2884135Y publication Critical patent/CN2884135Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The utility model relates to a detection device of the construction field, in particular to a settlement observation positioning bar group, solving the problems in the prior art, for example, settlement observation points tend to be covered or discarded, which influences accuracy of detection value, which comprises an observation pole with a threaded hole on one end, an observation screw fitted with the thread and a forcing-off screw of a hexagon socket countersunk head cap screw, the forcing-off screw closes the port to prevent dust entering the port or man-made destroy of a port thread. An outer wall is provided with screw thread protrusion, so the observation pole is embedded in a structural entity more stably. A spherical cap is arranged on the non-threaded end of the observation screw. The utility model has the advantages of good protection effect on observation points, accurate measured value, simple processing, and low cost.

Description

Settlement observation backstay group
Technical field
The utility model relates to a kind of building field pick-up unit, particularly a kind of settlement observation backstay group.
Background technology
In recent years along with the development of building industry, the raising that engineering process requires, it is elegant in appearance that exterior decoration is tending towards.Settlement observation point is essential as the necessary project of the engineering construction and the back settlement observation that is delivered for use.But adopt simple and easy coarse settlement observation point now in the engineering construction, affect in the exterior decoration construction of engineering later stage, the while covers the settlement observation point of former setting inevitably or scraps, and is bigger to the detection influence of settlement observation.
Summary of the invention
The utility model influences the problems such as accuracy of detected value in order to solve in the prior art settlement observation point and easily to cover or scrapping, and a kind of high settlement observation backstay group of accuracy of observing is provided.
The utility model is to adopt following technical scheme to realize: settlement observation backstay group is provided with the observation base bar of threaded hole by an end, and forms with the observation screw rod of its threaded engagement.
Settlement observation bar group described in the utility model is provided with the observation base bar of threaded hole by an end, and forms with the observation screw rod and the jackscrew of its threaded engagement.Jackscrew prevents dirt bits entry port or artificial destruction port screw thread with port closed.Outer wall is established the screw-like projection, makes the basic bar of observation implant infrastructure entity more stably.The non-threaded end of observation screw rod is provided with spherical caps.Jackscrew is a hexagon socket countersunk flat cap head screw.
The beneficial effects of the utility model are as follows: 1, effective to the observation station protection, measured value is accurate; 2, processing is simple, with low cost.
Description of drawings
Settlement observation backstay group synoptic diagram when Fig. 1 is observation
Settlement observation backstay group synoptic diagram when Fig. 2 is non-observation
Among the figure: 1-observes basic bar, and 2-observes screw rod, 3-countersunk head jackscrew, 4-projection, 5-spherical caps.
Embodiment
In conjunction with the accompanying drawings embodiment of the present utility model is described further, present embodiment is to be used for illustrating of the present utility model, rather than the utility model is done any restriction.
Settlement observation backstay group is provided with the observation base bar 1 of threaded hole by an end, and forms with the observation screw rod 2 and the jackscrew 3 of its threaded engagement.Observe basic bar 1 outer wall establish screw-like projection 4.Observation screw rod 2 non-threaded ends are provided with spherical caps 5.Jackscrew 3 is a hexagon socket countersunk flat cap head screw.
Observe basic bar 1 adopt HRB335 Φ 25 or Φ 28 reinforcing bars, length is scraped in the hope of attractive in appearance to exposed parts according to demand processing in the actual engineering, and at the threaded hole of end processing M12 of scraping, the screw degree of depth 50~70mm.After the base bar machine-shaping, at body of rod port with the interior hexagonal countersunk head jackscrew 3 of corresponding 30~70mm with port closed, prevent dirt bits entry port or artificial destruction port screw thread, the back is installed observes at every turn and finishing using also in time with port closed.
Observation screw rod 2 adopts the M12 specification, two kinds of specifications of length branch: 100mm, 150mm, and the termination screw thread is 50~70mm, according to using needs to select different observation screw rods 2.Observation screw rod 2 terminations are the spherical caps 5 of D=18mm.Must guarantee that spherical caps is coaxial with observation screw rod 2 bodies of rod, the accuracy of numerical value when measuring with assurance.
During installation,, determine the position of observation station and the length of the basic bar 1 of observation according to the demand of buildings and furring.Specification pore-forming according to the settlement observation bar group base bar of selecting for use 1 is set at need on the structural solid at settlement observation point position, and dust in the hole is cleaned out.Adopt structure glue will observe on the basic bar 1 implant infrastructure entity, clean out, install back with supporting countersunk head jackscrew 3 closed ports.Take the certain protection measure after installing, can use after waiting for a week.
Earlier the sealing countersunk head jackscrew 3 of observation station port is back-outed during observation, the demand when measuring is installed observation screw rod 2, installs whether coaxial with the basic bar of observation 1 splash screw rod 2 at once, the accuracy of data when guaranteeing that observation detects.Standing up Sopwith staff after installing on the spherical termination of observation screw rod 2 can observe.After finishing, observation will observe screw rod 2 unload immediately, with countersunk head jackscrew 3 closed ports from observing basic bar 1.

Claims (5)

1, a kind of settlement observation backstay group is characterized in that settlement observation backstay group is provided with the observation base bar (1) of threaded hole by an end, and forms with the observation screw rod (2) of its threaded engagement.
2, settlement observation backstay group according to claim 1 is characterized in that settlement observation backstay group is provided with the observation base bar (1) of threaded hole by an end, and forms with the observation screw rod (2) and the jackscrew (3) of its threaded engagement.
3, settlement observation backstay group according to claim 1 and 2 is characterized in that observing basic bar (1) outer wall to establish screw-like projection (4).
4, settlement observation backstay group according to claim 1 and 2 is characterized in that observing the non-threaded end of screw rod (2) that spherical caps (5) is set.
5, settlement observation backstay group according to claim 2 is characterized in that jackscrew (3) is a hexagon socket countersunk flat cap head screw.
CN 200520135441 2005-12-20 2005-12-20 Settlement obsergvation positioning rod set Expired - Lifetime CN2884135Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520135441 CN2884135Y (en) 2005-12-20 2005-12-20 Settlement obsergvation positioning rod set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520135441 CN2884135Y (en) 2005-12-20 2005-12-20 Settlement obsergvation positioning rod set

Publications (1)

Publication Number Publication Date
CN2884135Y true CN2884135Y (en) 2007-03-28

Family

ID=37957196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520135441 Expired - Lifetime CN2884135Y (en) 2005-12-20 2005-12-20 Settlement obsergvation positioning rod set

Country Status (1)

Country Link
CN (1) CN2884135Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706270B (en) * 2009-11-05 2011-05-25 河海大学 Device for measuring embankment settlement and measuring method
CN102721414A (en) * 2012-06-28 2012-10-10 中建八局第二建设有限公司 Embedded part on settlement observation point and application method thereof
CN103453895A (en) * 2013-08-20 2013-12-18 中国建筑第六工程局有限公司 Embedding method of settlement observation mark in concrete structure
CN105318859A (en) * 2014-08-01 2016-02-10 上海凯盾工程技术有限公司 Method for directly measuring and monitoring sedimentation deformation of underground pipeline and building structure and device of method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706270B (en) * 2009-11-05 2011-05-25 河海大学 Device for measuring embankment settlement and measuring method
CN102721414A (en) * 2012-06-28 2012-10-10 中建八局第二建设有限公司 Embedded part on settlement observation point and application method thereof
CN103453895A (en) * 2013-08-20 2013-12-18 中国建筑第六工程局有限公司 Embedding method of settlement observation mark in concrete structure
CN105318859A (en) * 2014-08-01 2016-02-10 上海凯盾工程技术有限公司 Method for directly measuring and monitoring sedimentation deformation of underground pipeline and building structure and device of method
CN105318859B (en) * 2014-08-01 2019-06-25 上海凯盾工程技术有限公司 Directly measurement monitoring underground utilities and building structure sedimentation and deformation method and device thereof

Similar Documents

Publication Publication Date Title
CN2884135Y (en) Settlement obsergvation positioning rod set
CN210221848U (en) Underground pipeline surveys device
CN102721414A (en) Embedded part on settlement observation point and application method thereof
CN112816552A (en) Building engineering quality safety risk management device
CN204174911U (en) A kind of scaffold connecting device
CN204612719U (en) A kind of settlement observer
CN210953357U (en) Detection fixing device of building engineering scaffold
CN204186058U (en) A kind of multipurpose wall-connecting piece
CN208415519U (en) A kind of metope pre-embedded formula connection component
CN202734828U (en) Novel settlement observation point embedded element
CN212645619U (en) Real-time monitoring system for building assembly
CN202614228U (en) Cuttage type building embedded settlement observation device
CN210221061U (en) Settlement observation point mounting structure
CN204174910U (en) A kind of wall-connecting device of scaffold
CN212405959U (en) Electronic plastering trowel convenient to use
CN201187018Y (en) Preset fastener bolt sleeve for railway grey sleeper and railway grey sleeper
CN208518220U (en) A kind of colored steel roof water-tight device
CN205139252U (en) On -line monitoring system of high temperature fused salt conductivity
CN209120324U (en) A kind of electronic monitoring equipment with warning function
CN210427562U (en) Environmental soil detection device
CN2697217Y (en) Connector for multi-section flagpole
CN210922582U (en) Level mark
CN203572477U (en) Assembled settlement observation point
CN210372293U (en) Adjusting type water supply pipe internal thread elbow positioning tool
CN211817249U (en) Make things convenient for curtain installation and can quick replacement curtain's connecting piece

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANXI SIJIAN GROUP CO., LTD.; PATENTEE

Free format text: FORMER OWNER: KEYUAN ARCHITECTURE TECH DETECTION CO., LTD., SHANXI

Effective date: 20070914

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20070914

Address after: 030012 No. 7 sports North Street, Shanxi, Taiyuan

Co-patentee after: Keyuan Architecture Tech Detection Co., Ltd., Shanxi

Patentee after: Shanxi Sijian Group Co., Ltd.

Address before: 030006 Shanxi Province, Taiyuan city and State Road two West Lane No. 8

Patentee before: Keyuan Architecture Tech Detection Co., Ltd., Shanxi

CX01 Expiry of patent term

Granted publication date: 20070328

EXPY Termination of patent right or utility model