CN202734828U - Novel settlement observation point embedded element - Google Patents
Novel settlement observation point embedded element Download PDFInfo
- Publication number
- CN202734828U CN202734828U CN 201220305010 CN201220305010U CN202734828U CN 202734828 U CN202734828 U CN 202734828U CN 201220305010 CN201220305010 CN 201220305010 CN 201220305010 U CN201220305010 U CN 201220305010U CN 202734828 U CN202734828 U CN 202734828U
- Authority
- CN
- China
- Prior art keywords
- embedded sleeve
- observation point
- settlement observation
- sleeve barrel
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model provides a novel settlement observation point embedded element, which consists of an embedded sleeve, a bolt and a screw plug, wherein the inside of the embedded sleeve is provided with a hollow cylinder, the inner wall of the embedded sleeve is provided with a sleeve thread, the embedded sleeve is arranged in a building wall or a column at the settlement observation point, and the ends of the bolt and the screw plug are provided with sleeve threads fitted with the embedded sleeve. Compared with the prior art, the novel settlement observation point embedded element has the advantages that the flushness between an outer cover of the embedded sleeve and the outer cover of the building wall or the column is ensured, the safety of the settlement observation point is ensured during non-observation period, the effect on person walking caused by the exposure of the traditional embedded sleeve is avoided, the artificial destroy factor is reduced, and the appearance of the settlement observation point is attractive.
Description
1, technical field
The utility model relates to building field, specifically a kind of Novel settlement observation point built-in fitting.
2, background technology
In order accurately to reflect the accurate sedimentation situation of buildings, equally distributed settlement observation point need to be set in the member of buildings, because existing settlement observation point apparatus mostly is exposed, affect very much personnel's walking, also affect greatly the attractive in appearance of buildings, and be subject to easily artificial destruction in construction period.
3, summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and a kind of Novel settlement observation point built-in fitting is provided.
The technical solution of the utility model realizes that in the following manner its structure is made of embedded sleeve barrel, bolt and plug, and embedded sleeve barrel inside is set to hollow cylinder, and inwall is provided with mantle fiber, and embedded sleeve barrel is arranged in the building wall, post at settlement observation point place; The end of bolt and plug is provided with the mantle fiber that adapts with embedded sleeve barrel.
The same building wall of above-mentioned embedded sleeve barrel crust, post crust are concordant.
The end end that above-mentioned bolt is provided with mantle fiber is the taper setting.
The arranged outside of above-mentioned bolt has air discharge duct.
The outer wall of above-mentioned embedded sleeve barrel is provided with 2-5 road groove.
The utility model has the advantages that:
A kind of Novel settlement observation point built-in fitting of the present utility model is compared with existing technology, the embedded sleeve barrel protruded length is improved, and in embedded sleeve barrel, screw in plug during having increased non-observation, building wall at the settlement observation point place, before the post deposit concrete, embedded sleeve barrel is pre-buried, guarantee the same building wall of sleeve crust, the post crust is concordant, guarantee the safety of settlement observation point position during the non-observation, the long personnel's of the impact walking of the embedded sleeve barrel of having avoided tradition to expose, reduced the artificial destruction factor, and so that settlement observation point is more attractive in appearance, on follow-up Decorating Project without any impact, during non-observation, adopt the form be screwed into plug, guaranteed during the long-term non-observation in the getting rusty of embedded sleeve barrel, pollute the problems such as rubbish filling.Avoid embedded sleeve barrel to become flexible so that observation station is damaged, at sleeve outer wall groove is set, to increase the anchor force of embedded sleeve barrel and xoncrete structure, so that embedded sleeve barrel is more firm, permanance is better, and measurement data is more accurate.It is taper that bolt screws in sleeve inner minute tip designs, and has increased air discharge duct, so that bolt is when rotating into embedded sleeve barrel, in time with the Bas Discharged in the embedded sleeve barrel, so that bolt more thoroughly rotates to the end, and has guaranteed and the fitting tightly of embedded sleeve barrel.
4, description of drawings
Fig. 1 is the cut-open view of embedded sleeve barrel;
Structural representation when Fig. 2 is embedded sleeve barrel and bolt installation;
Fig. 3 is embedded sleeve barrel and bolt mounted configuration synoptic diagram;
Structural representation when Fig. 4 is embedded sleeve barrel and plug installation;
Fig. 5 is embedded sleeve barrel and plug mounted configuration synoptic diagram;
Mark in the accompanying drawing represents respectively: 1, embedded sleeve barrel; 2, building wall, post; 3, bolt; 4, air discharge duct; 5, plug.
5, embodiment
Below in conjunction with accompanying drawing a kind of Novel settlement observation point built-in fitting of the present utility model is described in detail below.Shown in Fig. 1-5, a kind of its structure of Novel settlement observation point built-in fitting of the present utility model is made of embedded sleeve barrel 1, bolt 3 and plug 5, embedded sleeve barrel 1 inside is set to hollow cylinder, inwall is provided with mantle fiber, indulge conflicting of muscle for reducing embedded sleeve barrel 1 with structure, embedded sleeve barrel 1 diameter is defined as 27mm; The end of bolt 3 and plug 5 is provided with the mantle fiber that adapts with embedded sleeve barrel 1, and bolt 3 and plug 5 are screwed in the embedded sleeve barrel 1 by mantle fiber; The end end that bolt 3 is provided with mantle fiber is the taper setting, its arranged outside has 2 air discharge ducts that road 2mm is wide, 1mm is dark 4, so that bolt 3 is when being screwed into embedded sleeve barrel 1, in time with the Bas Discharged in the embedded sleeve barrel 1, bolt 3 more thoroughly rotates to the end, and has guaranteed and the fitting tightly of embedded sleeve barrel 1.
The using method of settlement observation point built-in fitting is as follows:
(1), before needs arrange the building wall, post 2 deposit concretes at settlement observation point place, then carry out concreting to corresponding settlement observation point position with embedded sleeve barrel 1 is pre-buried, guarantee that the same building wall of embedded sleeve barrel 1 crust, post 2 crusts are concordant;
(2), when not carrying out settlement point observation, plug 5 is screwed in the embedded sleeve barrel 1;
(3), need to carry out settlement point observation time, back out plug 5, bolt 3 is screwed in the embedded sleeve barrel 1, carry out settlement point observation.
Embedded sleeve barrel 1 diameter, be of convenient length, the requirement of bearing load in the time of can satisfying settlement observation, can satisfy again structure construction during embedded sleeve barrel 1 do not conflict with vertical muscle.It is wide that the outer wall of embedded sleeve barrel 1 is provided with 3 road 6mm, and the groove that 2mm is dark is to increase the anchor force of embedded sleeve barrel 1 and building wall, post 2; so that embedded sleeve barrel 1 firm stable more; the settlement observation point protection is better, and measurement data is more continuous accurately, can satisfy preferably long needs of settlement observation cycle.
A kind of its processing and fabricating of Novel settlement observation point built-in fitting of the present utility model is very simple and convenient, can process shown in the accompanying drawing to specifications.
Except the described technical characterictic of instructions, be the known technology of those skilled in the art.
Claims (5)
1. a Novel settlement observation point built-in fitting is characterized in that being made of embedded sleeve barrel, bolt and plug, and embedded sleeve barrel inside is set to hollow cylinder, and inwall is provided with mantle fiber, and embedded sleeve barrel is arranged in the building wall, post at settlement observation point place; The end of bolt and plug is provided with the mantle fiber that adapts with embedded sleeve barrel.
2. a kind of Novel settlement observation point built-in fitting according to claim 1 is characterized in that the same building wall of embedded sleeve barrel crust, post crust are concordant.
3. a kind of Novel settlement observation point built-in fitting according to claim 1 is characterized in that the end end that bolt is provided with mantle fiber is the taper setting.
4. according to claim 1 or 3 described a kind of Novel settlement observation point built-in fittings, it is characterized in that the arranged outside of bolt has air discharge duct.
5. a kind of Novel settlement observation point built-in fitting according to claim 1 is characterized in that the outer wall of embedded sleeve barrel is provided with 2-5 road groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220305010 CN202734828U (en) | 2012-06-28 | 2012-06-28 | Novel settlement observation point embedded element |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220305010 CN202734828U (en) | 2012-06-28 | 2012-06-28 | Novel settlement observation point embedded element |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202734828U true CN202734828U (en) | 2013-02-13 |
Family
ID=47660518
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220305010 Expired - Fee Related CN202734828U (en) | 2012-06-28 | 2012-06-28 | Novel settlement observation point embedded element |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202734828U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103983243A (en) * | 2014-05-23 | 2014-08-13 | 宁波浙东地质器材制造有限责任公司 | Settlement mark header for monitoring |
CN104482926A (en) * | 2014-12-09 | 2015-04-01 | 常州市安贞建设工程检测有限公司 | Device for protecting hidden-bolt sedimentation observation point |
CN107738340A (en) * | 2017-11-15 | 2018-02-27 | 安徽宝业建工集团有限公司 | A kind of PC wallboard moulds for concrete prefabricated element production line |
-
2012
- 2012-06-28 CN CN 201220305010 patent/CN202734828U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103983243A (en) * | 2014-05-23 | 2014-08-13 | 宁波浙东地质器材制造有限责任公司 | Settlement mark header for monitoring |
CN104482926A (en) * | 2014-12-09 | 2015-04-01 | 常州市安贞建设工程检测有限公司 | Device for protecting hidden-bolt sedimentation observation point |
CN107738340A (en) * | 2017-11-15 | 2018-02-27 | 安徽宝业建工集团有限公司 | A kind of PC wallboard moulds for concrete prefabricated element production line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102721414A (en) | Embedded part on settlement observation point and application method thereof | |
CN202734828U (en) | Novel settlement observation point embedded element | |
CN104074367A (en) | Mounting adjustment device for prefabricated wall panel | |
CN203097307U (en) | Horizontal adjuster for adjusting outer wallboard in installation of assembling type outer wallboard | |
CN203961322U (en) | Prefabricated panel installation adjusting device | |
CN206667880U (en) | A kind of electric power line pole tower Anti-inclining monitoring device | |
CN207728008U (en) | A kind of concrete column curing means | |
CN210221061U (en) | Settlement observation point mounting structure | |
CN2884135Y (en) | Settlement obsergvation positioning rod set | |
CN202614228U (en) | Cuttage type building embedded settlement observation device | |
CN203893859U (en) | Telescopic building settlement observation label | |
BR102014017561A2 (en) | swivel bearing with a through hole and plug | |
CN210067060U (en) | Telescopic observation point embedded part | |
CN204282650U (en) | A kind of to support member | |
CN205449049U (en) | Device for observing subsidence of building | |
CN2697217Y (en) | Connector for multi-section flagpole | |
CN203274731U (en) | Telescopic settlement observation device | |
CN207289995U (en) | A kind of license plate decoration screw installation tool | |
CN204202616U (en) | Concrete structure settlement monitoring mark | |
CN204942180U (en) | A kind of plastic dowel sleeve | |
CN204418614U (en) | mortar plane applicator | |
CN203669367U (en) | Energy-saving water stopping screw | |
CN203891431U (en) | Wall painting roller device | |
CN204164116U (en) | A kind of spring expansion anchor screw detachably repeatedly utilized | |
CN203193078U (en) | Installation screw fixation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130213 Termination date: 20200628 |
|