CN202734828U - Novel settlement observation point embedded element - Google Patents

Novel settlement observation point embedded element Download PDF

Info

Publication number
CN202734828U
CN202734828U CN 201220305010 CN201220305010U CN202734828U CN 202734828 U CN202734828 U CN 202734828U CN 201220305010 CN201220305010 CN 201220305010 CN 201220305010 U CN201220305010 U CN 201220305010U CN 202734828 U CN202734828 U CN 202734828U
Authority
CN
China
Prior art keywords
embedded sleeve
observation point
settlement observation
sleeve barrel
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220305010
Other languages
Chinese (zh)
Inventor
毕磊
高善友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN 201220305010 priority Critical patent/CN202734828U/en
Application granted granted Critical
Publication of CN202734828U publication Critical patent/CN202734828U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a novel settlement observation point embedded element, which consists of an embedded sleeve, a bolt and a screw plug, wherein the inside of the embedded sleeve is provided with a hollow cylinder, the inner wall of the embedded sleeve is provided with a sleeve thread, the embedded sleeve is arranged in a building wall or a column at the settlement observation point, and the ends of the bolt and the screw plug are provided with sleeve threads fitted with the embedded sleeve. Compared with the prior art, the novel settlement observation point embedded element has the advantages that the flushness between an outer cover of the embedded sleeve and the outer cover of the building wall or the column is ensured, the safety of the settlement observation point is ensured during non-observation period, the effect on person walking caused by the exposure of the traditional embedded sleeve is avoided, the artificial destroy factor is reduced, and the appearance of the settlement observation point is attractive.

Description

A kind of Novel settlement observation point built-in fitting
1, technical field
The utility model relates to building field, specifically a kind of Novel settlement observation point built-in fitting.
2, background technology
In order accurately to reflect the accurate sedimentation situation of buildings, equally distributed settlement observation point need to be set in the member of buildings, because existing settlement observation point apparatus mostly is exposed, affect very much personnel's walking, also affect greatly the attractive in appearance of buildings, and be subject to easily artificial destruction in construction period.
3, summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and a kind of Novel settlement observation point built-in fitting is provided.
The technical solution of the utility model realizes that in the following manner its structure is made of embedded sleeve barrel, bolt and plug, and embedded sleeve barrel inside is set to hollow cylinder, and inwall is provided with mantle fiber, and embedded sleeve barrel is arranged in the building wall, post at settlement observation point place; The end of bolt and plug is provided with the mantle fiber that adapts with embedded sleeve barrel.
The same building wall of above-mentioned embedded sleeve barrel crust, post crust are concordant.
The end end that above-mentioned bolt is provided with mantle fiber is the taper setting.
The arranged outside of above-mentioned bolt has air discharge duct.
The outer wall of above-mentioned embedded sleeve barrel is provided with 2-5 road groove.
The utility model has the advantages that:
A kind of Novel settlement observation point built-in fitting of the present utility model is compared with existing technology, the embedded sleeve barrel protruded length is improved, and in embedded sleeve barrel, screw in plug during having increased non-observation, building wall at the settlement observation point place, before the post deposit concrete, embedded sleeve barrel is pre-buried, guarantee the same building wall of sleeve crust, the post crust is concordant, guarantee the safety of settlement observation point position during the non-observation, the long personnel's of the impact walking of the embedded sleeve barrel of having avoided tradition to expose, reduced the artificial destruction factor, and so that settlement observation point is more attractive in appearance, on follow-up Decorating Project without any impact, during non-observation, adopt the form be screwed into plug, guaranteed during the long-term non-observation in the getting rusty of embedded sleeve barrel, pollute the problems such as rubbish filling.Avoid embedded sleeve barrel to become flexible so that observation station is damaged, at sleeve outer wall groove is set, to increase the anchor force of embedded sleeve barrel and xoncrete structure, so that embedded sleeve barrel is more firm, permanance is better, and measurement data is more accurate.It is taper that bolt screws in sleeve inner minute tip designs, and has increased air discharge duct, so that bolt is when rotating into embedded sleeve barrel, in time with the Bas Discharged in the embedded sleeve barrel, so that bolt more thoroughly rotates to the end, and has guaranteed and the fitting tightly of embedded sleeve barrel.
4, description of drawings
Fig. 1 is the cut-open view of embedded sleeve barrel;
Structural representation when Fig. 2 is embedded sleeve barrel and bolt installation;
Fig. 3 is embedded sleeve barrel and bolt mounted configuration synoptic diagram;
Structural representation when Fig. 4 is embedded sleeve barrel and plug installation;
Fig. 5 is embedded sleeve barrel and plug mounted configuration synoptic diagram;
Mark in the accompanying drawing represents respectively: 1, embedded sleeve barrel; 2, building wall, post; 3, bolt; 4, air discharge duct; 5, plug.
5, embodiment
Below in conjunction with accompanying drawing a kind of Novel settlement observation point built-in fitting of the present utility model is described in detail below.Shown in Fig. 1-5, a kind of its structure of Novel settlement observation point built-in fitting of the present utility model is made of embedded sleeve barrel 1, bolt 3 and plug 5, embedded sleeve barrel 1 inside is set to hollow cylinder, inwall is provided with mantle fiber, indulge conflicting of muscle for reducing embedded sleeve barrel 1 with structure, embedded sleeve barrel 1 diameter is defined as 27mm; The end of bolt 3 and plug 5 is provided with the mantle fiber that adapts with embedded sleeve barrel 1, and bolt 3 and plug 5 are screwed in the embedded sleeve barrel 1 by mantle fiber; The end end that bolt 3 is provided with mantle fiber is the taper setting, its arranged outside has 2 air discharge ducts that road 2mm is wide, 1mm is dark 4, so that bolt 3 is when being screwed into embedded sleeve barrel 1, in time with the Bas Discharged in the embedded sleeve barrel 1, bolt 3 more thoroughly rotates to the end, and has guaranteed and the fitting tightly of embedded sleeve barrel 1.
The using method of settlement observation point built-in fitting is as follows:
(1), before needs arrange the building wall, post 2 deposit concretes at settlement observation point place, then carry out concreting to corresponding settlement observation point position with embedded sleeve barrel 1 is pre-buried, guarantee that the same building wall of embedded sleeve barrel 1 crust, post 2 crusts are concordant;
(2), when not carrying out settlement point observation, plug 5 is screwed in the embedded sleeve barrel 1;
(3), need to carry out settlement point observation time, back out plug 5, bolt 3 is screwed in the embedded sleeve barrel 1, carry out settlement point observation.
Embedded sleeve barrel 1 diameter, be of convenient length, the requirement of bearing load in the time of can satisfying settlement observation, can satisfy again structure construction during embedded sleeve barrel 1 do not conflict with vertical muscle.It is wide that the outer wall of embedded sleeve barrel 1 is provided with 3 road 6mm, and the groove that 2mm is dark is to increase the anchor force of embedded sleeve barrel 1 and building wall, post 2; so that embedded sleeve barrel 1 firm stable more; the settlement observation point protection is better, and measurement data is more continuous accurately, can satisfy preferably long needs of settlement observation cycle.
A kind of its processing and fabricating of Novel settlement observation point built-in fitting of the present utility model is very simple and convenient, can process shown in the accompanying drawing to specifications.
Except the described technical characterictic of instructions, be the known technology of those skilled in the art.

Claims (5)

1. a Novel settlement observation point built-in fitting is characterized in that being made of embedded sleeve barrel, bolt and plug, and embedded sleeve barrel inside is set to hollow cylinder, and inwall is provided with mantle fiber, and embedded sleeve barrel is arranged in the building wall, post at settlement observation point place; The end of bolt and plug is provided with the mantle fiber that adapts with embedded sleeve barrel.
2. a kind of Novel settlement observation point built-in fitting according to claim 1 is characterized in that the same building wall of embedded sleeve barrel crust, post crust are concordant.
3. a kind of Novel settlement observation point built-in fitting according to claim 1 is characterized in that the end end that bolt is provided with mantle fiber is the taper setting.
4. according to claim 1 or 3 described a kind of Novel settlement observation point built-in fittings, it is characterized in that the arranged outside of bolt has air discharge duct.
5. a kind of Novel settlement observation point built-in fitting according to claim 1 is characterized in that the outer wall of embedded sleeve barrel is provided with 2-5 road groove.
CN 201220305010 2012-06-28 2012-06-28 Novel settlement observation point embedded element Expired - Fee Related CN202734828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220305010 CN202734828U (en) 2012-06-28 2012-06-28 Novel settlement observation point embedded element

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220305010 CN202734828U (en) 2012-06-28 2012-06-28 Novel settlement observation point embedded element

Publications (1)

Publication Number Publication Date
CN202734828U true CN202734828U (en) 2013-02-13

Family

ID=47660518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220305010 Expired - Fee Related CN202734828U (en) 2012-06-28 2012-06-28 Novel settlement observation point embedded element

Country Status (1)

Country Link
CN (1) CN202734828U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103983243A (en) * 2014-05-23 2014-08-13 宁波浙东地质器材制造有限责任公司 Settlement mark header for monitoring
CN104482926A (en) * 2014-12-09 2015-04-01 常州市安贞建设工程检测有限公司 Device for protecting hidden-bolt sedimentation observation point
CN107738340A (en) * 2017-11-15 2018-02-27 安徽宝业建工集团有限公司 A kind of PC wallboard moulds for concrete prefabricated element production line

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103983243A (en) * 2014-05-23 2014-08-13 宁波浙东地质器材制造有限责任公司 Settlement mark header for monitoring
CN104482926A (en) * 2014-12-09 2015-04-01 常州市安贞建设工程检测有限公司 Device for protecting hidden-bolt sedimentation observation point
CN107738340A (en) * 2017-11-15 2018-02-27 安徽宝业建工集团有限公司 A kind of PC wallboard moulds for concrete prefabricated element production line

Similar Documents

Publication Publication Date Title
CN102721414A (en) Embedded part on settlement observation point and application method thereof
CN202734828U (en) Novel settlement observation point embedded element
CN104074367A (en) Mounting adjustment device for prefabricated wall panel
CN203097307U (en) Horizontal adjuster for adjusting outer wallboard in installation of assembling type outer wallboard
CN203961322U (en) Prefabricated panel installation adjusting device
CN206667880U (en) A kind of electric power line pole tower Anti-inclining monitoring device
CN207728008U (en) A kind of concrete column curing means
CN210221061U (en) Settlement observation point mounting structure
CN2884135Y (en) Settlement obsergvation positioning rod set
CN202614228U (en) Cuttage type building embedded settlement observation device
CN203893859U (en) Telescopic building settlement observation label
BR102014017561A2 (en) swivel bearing with a through hole and plug
CN210067060U (en) Telescopic observation point embedded part
CN204282650U (en) A kind of to support member
CN205449049U (en) Device for observing subsidence of building
CN2697217Y (en) Connector for multi-section flagpole
CN203274731U (en) Telescopic settlement observation device
CN207289995U (en) A kind of license plate decoration screw installation tool
CN204202616U (en) Concrete structure settlement monitoring mark
CN204942180U (en) A kind of plastic dowel sleeve
CN204418614U (en) mortar plane applicator
CN203669367U (en) Energy-saving water stopping screw
CN203891431U (en) Wall painting roller device
CN204164116U (en) A kind of spring expansion anchor screw detachably repeatedly utilized
CN203193078U (en) Installation screw fixation structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130213

Termination date: 20200628

CF01 Termination of patent right due to non-payment of annual fee