CN203893859U - Telescopic building settlement observation label - Google Patents
Telescopic building settlement observation label Download PDFInfo
- Publication number
- CN203893859U CN203893859U CN201420326462.8U CN201420326462U CN203893859U CN 203893859 U CN203893859 U CN 203893859U CN 201420326462 U CN201420326462 U CN 201420326462U CN 203893859 U CN203893859 U CN 203893859U
- Authority
- CN
- China
- Prior art keywords
- settlement
- label
- thread sleeve
- observation
- internal thread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004062 sedimentation Methods 0.000 claims description 19
- 238000010276 construction Methods 0.000 abstract description 11
- 238000005034 decoration Methods 0.000 abstract description 6
- 238000005259 measurement Methods 0.000 abstract description 2
- 230000001681 protective effect Effects 0.000 abstract 4
- 230000006378 damage Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 239000013077 target material Substances 0.000 description 1
Landscapes
- Door And Window Frames Mounted To Openings (AREA)
Abstract
The utility model discloses a telescopic building settlement observation label which comprises a settlement label and is characterized in that the settlement label is a screw rod (2) of which the end is connected with a drum type end; the settlement label also comprises an internal thread sleeve (1) which is in screwed connection with the screw rod of the settlement label and a protective box (5), and one side wall of the protective box (5) a door (8) is arranged; one end of the internal thread sleeve penetrates through and is fixedly connected to a side wall opposite to the door of the protective box. The internal thread sleeve is embedded into a building under construction, the length of the settlement label can stretch in the internal thread sleeve, the settlement label is difficult to be damaged when a building main body structure is constructed, the settlement label is not covered during decoration and construction, the accuracy of the position of the settlement observation point and the observation and measurement data is guaranteed, the protective box and various wall surfaces are simply closed up, and the settlement label is attractive in appearance and practical.
Description
Technical field
The utility model belongs to building engineering field, relates to a kind of building subsidence observation mark.
Background technology
In order to guarantee the security of normal service life and the buildings of buildings, current national codes requirement, in building structure construction process and buildings come into operation a period of time, to carry out settlement observation to it, instruct rational working procedure, there is non-uniform settling in prevention, avoid causing because of sedimentation reason the crack of the destruction of constructure body structure or the structure that exerts an influence use function in work progress, causes huge economic loss.The way of prior art is, according to national regulation require spacing and position, when main structure construction, settlement observation staff one end is directly embedded in concrete post (body of wall), the other end stretches out xoncrete structure, as the sedimentation viewpoint of buildings.Because the cycle of settlement observation is longer, in order to meet the settlement observation after building (structure) thing comes into operation, consider the construction of later stage exterior wall surface decorative, often to stretch out physical dimension longer for sedimentation mark, just can avoid it not covered by decoration of exterior wall.But during main body construction, construction environment is comparatively complicated, through sedimentation mark often occurring by the phenomenon of artificial damage, causes accuracy of observation deviation larger, even causes carrying out follow-up observation.
Utility model content
The purpose of this utility model is to overcome the easy artificial damage of building settlement mark of prior art existence or the defect being covered by decoration of exterior wall surface layer, and simply constructed a kind of telescopic building subsidence observation mark is provided.
The technical solution of the utility model is summarized as follows:
A kind of telescopic building subsidence observation mark; comprise sedimentation mark; described sedimentation mark is the lead screw 2 that an end is connected with drum type termination; one with the inner thread sleeve 1 of described sedimentation target lead screw screwed connection and a sidewall on be provided with the protection box 5 of door 8, inner thread sleeve one end is run through and is fixedly connected on the sidewall that the door of protection box is relative.
Advantage of the present utility model:
The utility model inner thread sleeve is embedded in buildings; sedimentation mark length can be stretched in inner thread sleeve; when major structure of construction is constructed, be difficult for destroyed; during decoration construction, be uncovered; the position that has guaranteed settlement observation point is accurate with observation measurement data; protection box and various metope close up simple, both artistic and practical.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is that the utility model is used view.
Embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
A telescopic building subsidence observation mark, comprises sedimentation mark, and described sedimentation mark is the lead screw 2 that an end is connected with drum type termination, and lead screw length is greater than the thickness of decoration of exterior wall layer; One with the inner thread sleeve 1 of described sedimentation target lead screw screwed connection and a sidewall on be provided with the protection box 5 of door 8, inner thread sleeve one end is run through and is fixedly connected on the sidewall that the door of protection box is relative.
When main structure construction, inner thread sleeve of the present utility model is embedded in concrete 6, sedimentation target lead screw is partly screwed in inner thread sleeve, when need carry out settlement observation, sedimentation target lead screw can be met to the length of observation from back-outing in inner thread sleeve, after having observed, then sedimentation target lead screw is screwed in inner thread sleeve.When engineering is carried out the decoration construction of wall face, the surrounding of protection box and decorated wall surface 7 are fixing, and inner thread sleeve is protected.After completion of works comes into operation, while carrying out building subsidence observation, can open the door 8 adjustment sedimentation target lead screw length of protection box and carry out the settlement observation of buildings, guarantee continuity and the precision of observation data.
Sedimentation target material can be selected steel.
Claims (1)
1. a telescopic building subsidence observation mark; comprise sedimentation mark; it is characterized in that described sedimentation mark is the lead screw (2) that an end is connected with drum type termination; one with the inner thread sleeve (1) of described sedimentation target lead screw screwed connection and a sidewall on be provided with the protection box (5) of door (8), inner thread sleeve one end is run through and is fixedly connected on the sidewall that the door of protection box is relative.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420326462.8U CN203893859U (en) | 2014-06-18 | 2014-06-18 | Telescopic building settlement observation label |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420326462.8U CN203893859U (en) | 2014-06-18 | 2014-06-18 | Telescopic building settlement observation label |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203893859U true CN203893859U (en) | 2014-10-22 |
Family
ID=51720253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420326462.8U Expired - Lifetime CN203893859U (en) | 2014-06-18 | 2014-06-18 | Telescopic building settlement observation label |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203893859U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104864844A (en) * | 2015-05-25 | 2015-08-26 | 福建省盛威建设发展有限公司 | Mechanism and method for statically and dynamically observing building |
CN113267433A (en) * | 2021-05-18 | 2021-08-17 | 浙江众城检测技术有限公司 | Novel building settlement measuring device |
-
2014
- 2014-06-18 CN CN201420326462.8U patent/CN203893859U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104864844A (en) * | 2015-05-25 | 2015-08-26 | 福建省盛威建设发展有限公司 | Mechanism and method for statically and dynamically observing building |
CN113267433A (en) * | 2021-05-18 | 2021-08-17 | 浙江众城检测技术有限公司 | Novel building settlement measuring device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2541330A (en) | Crack resistant cement composition | |
AR099591A1 (en) | PASSIVE CEMENT ACCELERATOR | |
BR112017007980A2 (en) | well profiling method and tool | |
CN203893859U (en) | Telescopic building settlement observation label | |
CN204612719U (en) | A kind of settlement observer | |
MX367895B (en) | Method for producing a precast concrete segment of a wind turbine tower, and a precast concrete tower segment formwork. | |
CN204137308U (en) | A kind of buoyancy tank position regulator | |
CN202734828U (en) | Novel settlement observation point embedded element | |
CN204299191U (en) | Anchor plate fast fixing tool | |
CA2923800C (en) | Wellbore fluids comprising hydrated inorganic oxide materials and associated methods | |
CN204831308U (en) | Novel settlement observation point device | |
CN203337134U (en) | Building settlement measuring point protective device | |
CN204202616U (en) | Concrete structure settlement monitoring mark | |
CN204609477U (en) | A kind of column building enclosing | |
CN204059891U (en) | Motar strikes off instrument | |
CN204252172U (en) | The protector with stone bolt fixed by a kind of shaft tower | |
CN203932907U (en) | A kind of protective casing of protecting penetration pipe for architectural electricity installation Embedment Construction | |
CN204127058U (en) | A kind of steel nail | |
CN204807085U (en) | L type subsides sign | |
CN203654180U (en) | Excessive-clamping-preventive clamping mechanism of cable robot | |
CN203929065U (en) | The perpendicularity correction standard apparatus of electric pole | |
CN205637651U (en) | Spacing roller bearing of house translation | |
CN204402046U (en) | Building structure | |
CN204788350U (en) | Building settlement observation ware | |
Jia et al. | Discussion on Control of Facade Styles and Features during Restoration of Huizhou Traditional Buildings: With the Working Method of Wall Surface, Doors and Windows and Fire-Sealing Wall as the Example |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20230320 Granted publication date: 20141022 |
|
CX01 | Expiry of patent term |
Granted publication date: 20141022 |
|
PD01 | Discharge of preservation of patent |
Date of cancellation: 20240618 Granted publication date: 20141022 |