CN210953357U - Detection fixing device of building engineering scaffold - Google Patents
Detection fixing device of building engineering scaffold Download PDFInfo
- Publication number
- CN210953357U CN210953357U CN201921869555.4U CN201921869555U CN210953357U CN 210953357 U CN210953357 U CN 210953357U CN 201921869555 U CN201921869555 U CN 201921869555U CN 210953357 U CN210953357 U CN 210953357U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- objective table
- fixed
- connecting block
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model relates to a detection fixing device of a scaffold for building engineering, which relates to the field of detection equipment for building engineering and solves the problem that the scaffold is inconvenient to install and fix when the strength of the existing scaffold is detected, it is including being fixed in subaerial press body, install the objective table on the press body, fixedly connected with connecting block on the press objective table, one side that the connecting block is close to the objective table is provided with and supplies scaffold steel pipe to insert fixed half groove, one side that the objective table is close to the connecting block is seted up and is supplied scaffold steel pipe to insert and with the corresponding slot of fixed half groove, one side that the objective table is close to ground with the connecting block all is provided with the fixed block of plugging up slot and fixed half groove, threaded fixation has the spliced pole with objective table thread tightening on the connecting block, one side that the objective table is close to the connecting block is seted up and is supplied spliced pole thread. The utility model discloses when having the scaffold frame intensity test, fixed scaffold frame effect more convenient.
Description
Technical Field
The utility model belongs to the technical field of building engineering check out test set and specifically relates to a detection fixing device of building engineering scaffold frame is related to.
Background
The scaffold is various supports erected for workers to operate and solve vertical and horizontal transportation on a construction site, and mainly aims to meet the requirements of constructors on constructing a working platform, externally hanging a safety net enclosure, supporting a concrete formwork, installing members at high altitude and the like. Along with the frequent occurrence of various safety accidents of the fastener type scaffold, the fastener type scaffold is paid attention to and researched by broad scholars, and the quality of the fastener performance of the member type scaffold needs to be detected by a quality inspection station before use, so that the mechanical performance test of the fastener type scaffold is widely developed.
The existing test for detecting the stability of the scaffold is to fix the scaffold on a press through a steel wire and then perform pressure test on the scaffold through the press so as to measure whether the maximum pressure which can be borne by the scaffold meets the requirement of industrial production.
The above prior art solutions have the following drawbacks: because when carrying out pressure test to scaffold, need fix scaffold through the steel wire, after detecting the completion, need dismantle the steel wire, the loaded down with trivial details complicacy of process of installation and dismantlement, operating personnel's working strength is big and work efficiency is low, improved space in addition.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a detection fixing device of building engineering scaffold frame can be fast and stable fix the scaffold frame on the press, improves operating personnel's work efficiency.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a detection fixing device of building engineering scaffold, is including being fixed in subaerial press body, installing the objective table on the press body, fixedly connected with connecting block on the press objective table, one side that the connecting block is close to the objective table is provided with and supplies scaffold steel pipe to insert fixed half groove, one side that the objective table is close to the connecting block is seted up and is supplied scaffold steel pipe to insert and the slot corresponding with fixed half groove, one side that the objective table is close to ground with the connecting block all is provided with the fixed block of plugging up slot and fixed half groove, thread tightening has the spliced pole with objective table thread tightening on the connecting block, one side that the objective table is close to the connecting block is seted up the fixed orifices that supplies spliced pole thread tightening.
Through adopting the above technical scheme, the connecting block mutually supports with the objective table, when installing scaffold frame, only need to insert the scaffold steel pipe in fixed half groove and slot, the fixed action of rethread spliced pole, fix the connecting block on the objective table stably, thereby fix the scaffold steel pipe between connecting block and objective table, compare in the mode that uses the steel wire to fix scaffold steel pipe, it is convenient and simple to operate more, the efficiency of fixed scaffold steel pipe is improved, and also convenient and fast more in the time of dismantling, further improve staff's work efficiency.
The utility model discloses further set up to: the anti-skid device is characterized in that anti-skid protrusions are integrally arranged on the connecting blocks, the anti-skid protrusions are located on the side walls of the fixed half grooves, and fixed grains are integrally arranged on the side walls of the insertion grooves of the object stage.
Through adopting above-mentioned technical scheme, fixed line and the bellied setting of antiskid, after the scaffold steel pipe is fixed in fixed half groove and slot, because the extrusion force that the connecting block was fixed on the objective table is unchangeable, so the extrusion force that the scaffold steel pipe received can not change, and fixed line and the bellied setting of antiskid, the area of contact of scaffold steel pipe with fixed half groove cell wall and slot cell wall has been reduced, thereby make the pressure increase that the scaffold steel pipe received, guarantee that the scaffold steel pipe is fixed and is difficult for droing more steadily in fixed half groove and slot, improve the stability of scaffold steel pipe installation.
The utility model discloses further set up to: one side fixedly connected with of press body near the objective table compresses tightly the pressure piece of scaffold steel pipe, one side an organic whole that the pressure piece is close to the press body is provided with the screw thread post, set up the screw hole that supplies screw thread post thread tightening on the press body.
Through adopting above-mentioned technical scheme, the setting of pressure piece for the pressure of press can be stable be on the scaffold steel pipe, and when guaranteeing on pressing the scaffold steel pipe, the scaffold steel pipe can not take place the contact with other positions of press, makes the pressure value that actually records more accurate, improves the accuracy of experimental result.
The utility model discloses further set up to: one side that the pressure piece is close to the scaffold steel pipe is seted up and is supplied scaffold steel pipe joint and prevent the joint groove that the scaffold steel pipe rocked.
Through adopting above-mentioned technical scheme, the pressure is great when carrying out the pressure experiment to scaffold steel pipe, can make scaffold steel pipe take place to warp and break away from even out the pressure piece, and the setting in joint groove for scaffold steel pipe also is difficult for taking off from the joint groove when receiving the extrusion of press, improves the effect of the stability of scaffold steel pipe installation.
The utility model discloses further set up to: fixedly connected with mounting bracket on the objective table, be provided with metal protection network on the mounting bracket.
Through adopting above-mentioned technical scheme, because the scaffold steel pipe is receiving the extruded in-process of extruder, the pressure that receives is great, and great pressure makes the scaffold fastener take place to take off easily, and bolt and nut on the scaffold fastener receive the extrusion and splash easily and injure the people, and the setting of metal protection network for the bolt that splashes and nut are difficult for flying out from metal anti-skidding net, have protected the operating personnel of working in the periphery of press, improve the security of work.
The utility model discloses further set up to: the metal protection net is provided with an installation door, and one side edge of the installation door is rotatably connected to the installation frame through a hinge.
Through adopting above-mentioned technical scheme, the setting of installation door, can be more convenient install and change scaffold frame, need not pull down metal protection network when actual operation, alleviate staff's the degree before the work when changing the scaffold frame, improve the work efficiency of changing the scaffold frame.
The utility model discloses further set up to: one side that hinge was kept away from to the installation door is provided with the joint post, be provided with the fixed cover that supplies joint post joint to fix on the mounting bracket.
Through adopting above-mentioned technical scheme, the setting of joint post and fixed cover when will installing the door and fix on the mounting bracket, only need rotate the installation door for the joint post on the installation door inserts the joint to fixed cover in, can fix the installation door on the mounting bracket, easy operation improves the efficiency that the installation door was closed.
The utility model discloses further set up to: one side that the installation door was kept away from to the joint post is provided with the joint ring, be provided with on the fixed cover and supply joint ring joint fixed joint hole.
Through adopting above-mentioned technical scheme, insert the in-process of joint to fixed cover when the joint post, the joint ring can block in the joint hole for joint post joint is more stable in fixed cover, improves the stability that fixed cover joint post was fixed in fixed cover, thereby improves the installation door and fixes more stably on the mounting bracket.
To sum up, the utility model discloses a beneficial technological effect does:
1. the object stage is matched with the connecting block, so that the scaffold steel pipe can be more quickly fixed on the press machine, and the mounting stability of the scaffold is improved;
2. the arrangement of the pressure block enables the scaffold steel pipe to be more stably fixed on the press machine, and the stability of the scaffold steel pipe installation is improved;
3. due to the arrangement of the metal protective net, the safety of socket personnel in scaffold detection tests is improved.
Drawings
Fig. 1 is a schematic structural view of a mounting frame, a metal protection net and a mounting door.
Fig. 2 is a schematic structural view of a mounting frame, a metal protection net, and a mounting door, wherein the mounting door is in an open state.
Fig. 3 is an enlarged view of the portion a of the snap post and snap ring of fig. 2.
Fig. 4 is a schematic structural diagram of the mounting frame and the metal protective net.
Fig. 5 is an enlarged view of the fixing sleeve and the engaging hole of the portion B of fig. 4.
Fig. 6 is a schematic structural diagram of the object stage and the connection block.
Fig. 7 is an exploded view of the carrier and attachment block.
Fig. 8 is an enlarged view of the C-slot, the fixing block, the fixing hole and the fixing pattern shown in fig. 7.
Fig. 9 is a schematic view of the structure of the connection block.
Fig. 10 is an exploded view of a pressure block.
Fig. 11 is an enlarged schematic view of the pressure block of fig. 10 at the D-section.
In the figure, 1, a press body; 2. an object stage; 3. connecting blocks; 4. fixing the half groove; 5. a slot; 6. a fixed block; 7. connecting columns; 8. a fixing hole; 9. fixing the lines; 10. anti-skid projections; 11. a pressure block; 14. a threaded post; 15. a threaded hole; 16. a clamping groove; 17. a mounting frame; 18. a metal protective net; 19. installing a door; 21. a clamping column; 22. fixing a sleeve; 23. a snap ring; 24. a clamping hole; 25. scaffold steel pipe.
Detailed Description
The present invention will be described in further detail with reference to the accompanying fig. 1 to 11.
Referring to fig. 1 and 2, the detection fixing device for the scaffold in the building engineering disclosed by the invention comprises a press machine body 1 fixed on the ground, wherein a mounting frame 17 is fixed on the press machine body 1 by welding, the mounting frame 17 is arranged in a shape like a Chinese character 'kou' and is welded on the press machine body 1, four mounting frames 17 are welded on the mounting frame 17, and a metal protective net 18 is welded on the mounting frame 17; one of the mounting frames 17 is further welded with a mounting door 19, one side of the mounting door 19 is rotatably connected to the mounting frame 17 through a hinge (not shown), and the mounting door 19 is also welded with a metal protection net 18.
Referring to fig. 2 and 3, one side of the mounting door 19, which is far away from the hinge, is fixedly provided with a clamping column 21 through welding, the clamping column 21 is made of cylindrical metal, and a clamping ring 23 is integrally arranged on one side of the clamping column 21, which is far away from the mounting door 19.
Referring to fig. 4 and 5, a fixing sleeve 22 for clamping and fixing the clamping column 21 is fixedly welded on the mounting frame 17, the fixing sleeve 22 is in a metal cylindrical shape, and when the mounting door 19 is closed, the clamping column 21 is inserted into the cylindrical fixing sleeve 22; the fixed sleeve 22 is provided with a clamping hole 24 for clamping and fixing the clamping ring 23; when the in-process of joint post 21 inserting to fixed section of thick bamboo, joint ring 23 joint is in to joint hole 24, increases the damping effect that joint post 21 was fixed in fixed cover 22 for installation door 19 is difficult for opening, improves the stability of installation door 19 installation.
Referring to fig. 6, a stage 2 is provided on the press body 1, a connecting block 3 is fixedly connected to the stage 2, and the connecting block 3 fixes the scaffold steel tube 25 to the stage 2 by a fixing action with the stage 2.
Referring to fig. 7 and 8, a slot 5 for inserting a scaffold steel pipe 25 is formed in one side, close to the connecting block 3, of the object stage 2, the slot 5 is a semicircular slot into which the scaffold steel pipe 25 can be inserted, the slot 5 does not penetrate through the object stage 2, and a fixing block 6 is integrally arranged at the position, located in the slot 5, of the object stage 2; and be provided with fixed line 9 on objective table 2 is located slot 5 lateral wall, and fixed line 9 is a plurality of vertical stripe structures, and when scaffold steel pipe 25 inserted in slot 5, scaffold steel pipe 25 contradicts with fixed line 9.
Referring to fig. 8 and 9, one side of the connecting block 3 close to the object stage 2 is provided with a fixed half groove 4 for inserting the scaffold steel pipe 25, the fixed half groove 4 and the slot 5 are mutually matched to form a circular groove, the scaffold steel pipe 25 can be inserted and fixed, the connecting block 3 is integrally provided with an anti-skid bump 10, the anti-skid bump 10 is of a semicircular structure, when the scaffold steel pipe 25 is fixed in the fixed half groove 4 and the slot 5, the anti-skid bump 10 and the fixed texture 9 are arranged, and the installation stability of the scaffold steel pipe 25 is improved. The connecting block 3 is also integrally provided with a fixing block 6 which is positioned at the groove bottom of the fixing half groove 4 and used for preventing the scaffold steel pipe 25 from falling.
Threaded fixation has spliced pole 7 with 2 threaded fixation of objective table on connecting block 3, and objective table 2 is close to one side of connecting block 3 and sets up the fixed orifices 8 that supply spliced pole 7 threaded fixation, and spliced pole 7 is provided with two, when installing connecting block 3 to objective table 2, only need pass connecting block 3 with spliced pole 7, again with spliced pole 7 threaded fixation in fixed orifices 8 with scaffold steel pipe 25 fixed can.
Referring to fig. 10 and 11, a pressure block 11 for pressing the scaffold steel tube 25 is fixedly connected to one side of the press body 1 close to the stage 2, and the pressure block 11 is arranged in an Contraband shape; one side of the pressure block 11 close to the press body 1 is integrally provided with a threaded column 14, a threaded hole 15 for fixing the threaded column 14 in a threaded manner is formed in the press body 1, and when the pressure block 11 is installed on the press body 1, the threaded column 14 is only required to be fixed in the threaded hole 15 in a threaded manner. One side of the pressure block 11 close to the scaffold steel pipe 25 is provided with a clamping groove 16 for clamping the scaffold steel pipe 25 and preventing the scaffold steel pipe 25 from shaking. The clamping groove 16 is semicircular, so that the pressure block 11 is pressed on the scaffold steel pipe 25 and then is more stable and is not easy to shake.
The installation process comprises the following steps:
1. inserting the scaffold steel pipe 25 into the slot 5, and fixing the scaffold steel pipe 25 in the slot 5 and the fixing half-slot 4 by the fixing connecting block 3;
2. fixing the pressure block 11 on the press body 1 by screw threads;
3. the installation door 19 is closed to perform the operation.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. The utility model provides a detection fixing device of building engineering scaffold, is including being fixed in subaerial press body (1), installing objective table (2) on press body (1), its characterized in that: fixedly connected with connecting block (3) on objective table (2), one side that connecting block (3) are close to objective table (2) is provided with and supplies scaffold steel pipe to insert fixed half groove (4), one side that objective table (2) are close to connecting block (3) is seted up and is supplied scaffold steel pipe to insert and with fixed half groove (4) corresponding slot (5), one side that objective table (2) and connecting block (3) are close to ground all is provided with fixed block (6) of plugging up slot (5) and fixed half groove (4), threaded fixation has spliced pole (7) with objective table (2) threaded fixation on connecting block (3), fixed orifices (8) that supply spliced pole (7) threaded fixation are seted up to one side that objective table (2) are close to connecting block (3).
2. The inspection fixing device of a construction scaffold according to claim 1, wherein: the anti-skid device is characterized in that anti-skid protrusions (10) are integrally arranged on the connecting block (3), the anti-skid protrusions (10) are located on the side wall of the fixed half groove (4), and the object stage (2) is located on the side wall of the slot (5) and integrally provided with fixed grains (9).
3. The inspection fixing device of a construction scaffold according to claim 1, wherein: one side fixedly connected with that press body (1) is close to objective table (2) compresses tightly pressure block (11) of scaffold steel pipe, one side an organic whole that press block (11) is close to press body (1) is provided with screw thread post (14), set up on press body (1) and supply screw thread post (14) thread tightening's screw hole (15).
4. The inspection fixing device of the scaffold for construction engineering according to claim 3, wherein: one side that pressure piece (11) are close to the scaffold steel pipe is seted up and is supplied scaffold steel pipe joint and prevent joint groove (16) that the scaffold steel pipe rocked.
5. The inspection fixing device of a construction scaffold according to claim 1, wherein: fixedly connected with mounting bracket (17) on objective table (2), be provided with metal protection net (18) on mounting bracket (17).
6. The inspection fixing device of a construction engineering scaffold according to claim 5, wherein: the metal protection net (18) is provided with an installation door (19), and one side edge of the installation door (19) is rotatably connected to the installation frame (17) through a hinge.
7. The inspection fixing device of a construction engineering scaffold according to claim 6, wherein: one side of the mounting door (19) far away from the hinge (20) is provided with a clamping column (21), and a fixing sleeve (22) for clamping and fixing the clamping column (21) is arranged on the mounting frame (17).
8. The inspection fixing device of a construction scaffold according to claim 7, wherein: one side that installation door (19) were kept away from in joint post (21) is provided with joint ring (23), be provided with on fixed cover (22) and supply joint ring (23) fixed joint hole (24) of joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921869555.4U CN210953357U (en) | 2019-11-01 | 2019-11-01 | Detection fixing device of building engineering scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921869555.4U CN210953357U (en) | 2019-11-01 | 2019-11-01 | Detection fixing device of building engineering scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210953357U true CN210953357U (en) | 2020-07-07 |
Family
ID=71395617
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921869555.4U Active CN210953357U (en) | 2019-11-01 | 2019-11-01 | Detection fixing device of building engineering scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210953357U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112284725A (en) * | 2020-10-22 | 2021-01-29 | 无锡恒久安泰智能制造有限公司 | Motor and speed reducer test equipment |
CN112284726A (en) * | 2020-10-28 | 2021-01-29 | 无锡恒久安泰智能制造有限公司 | Chain wheel test bed |
-
2019
- 2019-11-01 CN CN201921869555.4U patent/CN210953357U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112284725A (en) * | 2020-10-22 | 2021-01-29 | 无锡恒久安泰智能制造有限公司 | Motor and speed reducer test equipment |
CN112284726A (en) * | 2020-10-28 | 2021-01-29 | 无锡恒久安泰智能制造有限公司 | Chain wheel test bed |
CN112284726B (en) * | 2020-10-28 | 2021-10-01 | 无锡恒久安泰智能制造有限公司 | Chain wheel test bed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210953357U (en) | Detection fixing device of building engineering scaffold | |
CN105435391A (en) | Safety belt hanging device | |
CN210195199U (en) | Assembled climbing frame for building | |
CN209817385U (en) | Cantilever beam for cantilever scaffold | |
CN211173080U (en) | Early-dismantling formwork support frame connecting device for building construction | |
CN106760585A (en) | China Democratic National Construction Association house floor levels hole provisional protection column and installation method | |
CN205822759U (en) | Scaffold upright rod anti-slip positioning device | |
CN205314530U (en) | Section bar is fixed to be detained | |
CN204983399U (en) | Section of hanging down is transferred to testing column steel pipe | |
CN209874657U (en) | Keep off with keeping apart to construction | |
CN208202527U (en) | Overhang the outer bearing apparatus of I-steel external scaffolding head step upright bar footing positioning | |
CN205421892U (en) | Even wall scaffold for building | |
CN208072905U (en) | Construction support for shuttering | |
CN204001673U (en) | Expanded metal lath fastening devices | |
CN204940900U (en) | A kind of building operations protection guardrail | |
CN217503273U (en) | Transmission line control support | |
CN215859259U (en) | Clamp for fast dismantling curtain wall unit body plate | |
CN221524204U (en) | Dismounting structure based on climbing cone type wall connecting piece | |
CN205858910U (en) | Excavator revolving support attachment means | |
CN219569506U (en) | Construction frame for constructional engineering | |
CN214042863U (en) | Recyclable monitoring mark | |
CN211949702U (en) | Construction edge safety barrier convenient to install and dismantle | |
CN221095835U (en) | Constructional column template convenient to dismouting | |
CN220395121U (en) | Detachable building engineering scaffold | |
CN212507328U (en) | Scaffold wall connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |