CN2841769Y - 复合桩帽 - Google Patents

复合桩帽 Download PDF

Info

Publication number
CN2841769Y
CN2841769Y CN 200520025045 CN200520025045U CN2841769Y CN 2841769 Y CN2841769 Y CN 2841769Y CN 200520025045 CN200520025045 CN 200520025045 CN 200520025045 U CN200520025045 U CN 200520025045U CN 2841769 Y CN2841769 Y CN 2841769Y
Authority
CN
China
Prior art keywords
pile
pile cover
cover
big
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520025045
Other languages
English (en)
Inventor
杨印旺
王学章
郭伟林
王晓刚
曹笃义
安明
杨绍华
刘淑芳
殷俊宏
党向红
崔宝峰
岳效宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Mechanization Construction Group Co Ltd
Original Assignee
Shanxi Mechanization Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Mechanization Construction Group Co Ltd filed Critical Shanxi Mechanization Construction Group Co Ltd
Priority to CN 200520025045 priority Critical patent/CN2841769Y/zh
Application granted granted Critical
Publication of CN2841769Y publication Critical patent/CN2841769Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本实用新型属于建筑地基工程用桩帽的技术领域,具体是一种复合桩帽。本实用新型解决了现有技术中存在的打桩过程能量损失较大、易造成桩头破碎和断桩等问题。本实用新型包括大桩帽和小桩帽,大桩帽内套装有小桩帽,大桩帽一般由柴油锤出厂所带的桩帽改制而成,小桩帽一端外部形状与大桩帽内部形状相同,尺寸比大桩帽内部尺寸略小;小桩帽内部形状与预制桩桩头形状相同,尺寸比桩径略大。本实用新型有效降低柴油锤打预制桩施工中的桩头破碎和断桩率;降低了施工难度,提高了施工效率;减少了缓冲材料的用量,降低了成本。

Description

复合桩帽
技术领域
本实用新型属于建筑地基工程用桩帽的技术领域,具体涉及一种复合桩帽。
背景技术
在柴油打桩锤打钢筋混凝土预制桩施工过程中,经常出现桩头破碎和断桩现象,不仅造成经济损失,而且还影响工程的顺利进行。造成这种现象的原因很复杂,其中柴油打桩锤和钢筋混凝土预制桩联接部位设计不合理是一个重要原因。现在市面上柴油锤和钢筋混凝土预制桩联接部位一般是由单个桩帽与预制桩联接,桩帽固定在柴油锤上,由于预制桩戴入桩帽的过程需要在高空完成,所以桩帽尺寸需大于桩头尺寸,以方便施工。在打桩过程中,柴油锤击打的动载不能沿桩的轴心线传递,一方面造成能量损失,降低施工效率,另一方面易造成桩头破碎和断桩。如何减小桩帽与桩头的间隙,使二者能紧密联接,同时又降低施工难度,一直是困扰施工单位的难题。
发明内容
本实用新型针对现有技术中存在的能量损失、易造成桩头破碎和断桩等问题,提供了一种复合桩帽。
本实用新型所采用的技术方案:复合桩帽包括大桩帽和小桩帽,大桩帽内套装有小桩帽,大桩帽一般由柴油锤出厂所带的桩帽改制而成,小桩帽一端外部形状与大桩帽内部形状相同,尺寸比大桩帽内部尺寸略小;小桩帽内部形状与预制桩桩头形状相同,尺寸比桩径略大。小桩帽内部形状可制为方形、圆形等。
采用复合桩帽技术主要是将原本在高空完成的桩与桩帽的联接过程部分转移到地面完成,即先用小桩帽与预制桩联接,再通过小桩帽与大桩帽联接。由于将小桩帽套到预制桩头的过程是在地面完成的,所以小桩帽与预制桩联接的比较紧密,有利于打桩时的动载沿桩的轴心线向下传递,减少桩头破碎和断桩现象,降低能量损失,提高施工效率。同时预制桩与大桩帽在高空的联接过程通过小桩帽完成,较大幅度地降低了联接难度,方便了操作施工。
本实用新型的有益效果:1、有效降低柴油锤打预制桩施工中的桩头破碎和断桩率;2、降低了施工难度,提高了施工效率;3、减少了缓冲材料的用量,降低了成本。
附图说明
图1为复合桩帽结构示意图
图2为大桩帽主视图
图3为大桩帽俯视图
图4为小桩帽主视图
图5为小桩帽仰视图
图中:1、大桩帽,2、小桩帽。
具体实施方式
结合附图对本实用新型的实施方式进行进一步描述,本实施例是用来说明本实用新型的,而不是对本实用新型做任何限制。
复合桩帽包括大桩帽1和小桩帽2,大桩帽1内套装有小桩帽2,大桩帽1一般由柴油锤出厂所带的桩帽改制而成,小桩帽2一端外部形状与大桩帽1内部形状相同,尺寸比大桩帽1内部尺寸略小;小桩帽2内部形状与预制桩桩头形状相同,尺寸比桩径略大。施工时大桩帽1用钢丝和柴油锤相联接,在小桩帽2内垫入20~30cm的硬纸片作为缓冲材料,把小桩帽2套在预制桩头,然后打桩机起吊预制桩,将预制桩通过小桩帽2套入大桩帽1。通常大桩帽1的形状和尺寸一般不作改变,小桩帽2的下口径则需要根据施工所使用的预制桩进行调整。

Claims (3)

1、一种复合桩帽,其特征在于大桩帽(1)内套装有小桩帽(2),小桩帽(2)一端外部形状与大桩帽(1)内部形状相同,小桩帽(2)内部形状与预制桩桩头形状相同。
2、根据权利要求1所述的复合桩帽,其特征在于小桩帽(2)内部形状为方形。
3、根据权利要求1所述的复合桩帽,其特征在于小桩帽(2)内部形状为圆形。
CN 200520025045 2005-10-12 2005-10-12 复合桩帽 Expired - Fee Related CN2841769Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520025045 CN2841769Y (zh) 2005-10-12 2005-10-12 复合桩帽

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520025045 CN2841769Y (zh) 2005-10-12 2005-10-12 复合桩帽

Publications (1)

Publication Number Publication Date
CN2841769Y true CN2841769Y (zh) 2006-11-29

Family

ID=37445656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520025045 Expired - Fee Related CN2841769Y (zh) 2005-10-12 2005-10-12 复合桩帽

Country Status (1)

Country Link
CN (1) CN2841769Y (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009076858A1 (zh) * 2007-12-14 2009-06-25 Jiangwei Xue 一种带箍的桩
CN102267179A (zh) * 2010-05-10 2011-12-07 株式会社第一产机 具备凸缘形挂线构件的混凝土桩用桩帽
CN103074889A (zh) * 2013-01-27 2013-05-01 西安科技大学 一种复合地基柔性桩帽
CN103321227A (zh) * 2013-05-24 2013-09-25 中国海洋石油总公司 一种海上隔水导管打桩帽装置
CN105317038A (zh) * 2014-06-26 2016-02-10 中国二十冶集团有限公司 Phc管桩缓冲桩帽

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009076858A1 (zh) * 2007-12-14 2009-06-25 Jiangwei Xue 一种带箍的桩
CN102267179A (zh) * 2010-05-10 2011-12-07 株式会社第一产机 具备凸缘形挂线构件的混凝土桩用桩帽
CN103074889A (zh) * 2013-01-27 2013-05-01 西安科技大学 一种复合地基柔性桩帽
CN103074889B (zh) * 2013-01-27 2014-08-13 西安科技大学 一种复合地基柔性桩帽
CN103321227A (zh) * 2013-05-24 2013-09-25 中国海洋石油总公司 一种海上隔水导管打桩帽装置
CN105317038A (zh) * 2014-06-26 2016-02-10 中国二十冶集团有限公司 Phc管桩缓冲桩帽

Similar Documents

Publication Publication Date Title
CN2841769Y (zh) 复合桩帽
CN204212145U (zh) 一种预制混凝土组合板桩
CN2841963Y (zh) 一种井壁加固装置
CN203222809U (zh) 一种输电线路杆塔预应力混凝土管桩基础
CN202989924U (zh) 混凝土管桩专用施工桩帽
CN2828146Y (zh) 水冲气举沉桩施工设备
CN100406651C (zh) 液压打桩锤
CN202326482U (zh) 液压破碎锤换向阀
CN211228688U (zh) 一种轮式挖掘机油门控制机构
CN1167855C (zh) 打桩工程液压锤
CN211690508U (zh) 一种分体式液压锤机芯
CN2830499Y (zh) 一种路面破碎机的破碎装置
CN2921106Y (zh) 一种液压顶管成孔设备
CN2828143Y (zh) 管桩专用桩尖
CN202099798U (zh) 一种螺旋桩
CN201080607Y (zh) 开口型打头管桩
CN201206248Y (zh) 锚杆施工用单根张拉后卡式千斤顶零配件
CN2587933Y (zh) 加劲水泥土复合桩
CN201321612Y (zh) 建筑用预应力管桩
CN2153578Y (zh) 高效地桩
CN201292761Y (zh) 一种高风压潜孔冲击器
CN205012336U (zh) 一种带下料仓的打桩机
CN200955145Y (zh) 建筑基础桩
CN2373488Y (zh) 新型预制桩
CN212896541U (zh) 一种挖机破碎打拔多用炮头

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee