CN2674002Y - Equipment for moving small-sized building - Google Patents

Equipment for moving small-sized building Download PDF

Info

Publication number
CN2674002Y
CN2674002Y CN 200320101973 CN200320101973U CN2674002Y CN 2674002 Y CN2674002 Y CN 2674002Y CN 200320101973 CN200320101973 CN 200320101973 CN 200320101973 U CN200320101973 U CN 200320101973U CN 2674002 Y CN2674002 Y CN 2674002Y
Authority
CN
China
Prior art keywords
brace summer
channel
track
aedicula
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200320101973
Other languages
Chinese (zh)
Inventor
高建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200320101973 priority Critical patent/CN2674002Y/en
Application granted granted Critical
Publication of CN2674002Y publication Critical patent/CN2674002Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an equipment for moving small-sized building, comprising a concave supporting piece, jacks, a supporting beam, pin rollers and an orbit. A plurality of pin rollers are transversely arranged on the orbit, the supporting beam which is in the same direction with the orbit is arranged on the pin rollers, the concave supporting piece is positioned above the supporting beam, supporting lugs which are extended levelly towards both ends are arranged at both ends of the concave supporting piece, an upright jack is arranged below each supporting lug, and a filling wedge is arranged on the supporting beam. The utility model has the advantages that the filling wedge which is provided between a ground ring beam and the supporting beam below can replace the cement filling in the prior art, and waiting for cement coagulation is not required, so that the working period is greatly shortened, and the cost is decreased.

Description

The aedicula mobile device
Technical field
The utility model relates to a kind of device of mobile building, specifically is a kind of aedicula mobile device, is mainly used in the integral moving of aedicula.
Background technology
Prior art is to be that ZL99114045, name are called the employed device of disclosed a kind of this method in the patent of invention of " moving method of aedicula " in the patent No., this device comprises concave support part, jack, brace summer, roller and track, many rollers laterally place on the track, placement and track brace summer in the same way on roller, the concave support part is positioned at the top of brace summer, the support ear of stretching is held at its two ends oriented two level with both hands, and each places the jack of erectting below each support ear.When using this to install mobile building, earlier the basis under the partly collar tie beam of building is removed, with concave support part and jack the ground collar tie beam is supported, again below lay brace summer, roller and track successively, because the ground collar tie beam is cast by reinforced concrete, its soffit is rough and uneven in surface, the space below it must be filled before unloading jack, so that its supported beam is balancedly supported.Adopt brick the pouring to fill above-mentioned space in the method with cement, just can shed jack and concave support part after waiting cement to solidify fully, with wire rope the ground collar tie beam is connected again, be connected to by the assembly pulley transmission system on the power such as hoist engine or jack and drag, thereby realize that building ground is whole mobile.Owing to adopt brick and cement waters the space of filling between ground collar tie beam and the brace summer, just can shed jack and concave support part after waiting cement to solidify fully, so its shortcoming is to have prolonged the duration, construction is complicated, the cost height.
Summary of the invention
The purpose of this utility model just provides a kind of aedicula mobile device, fills the space below the ground collar tie beam and has prolonged the duration to solve the brick and cement irrigation method of existing usefulness, and construction is complicated, the problem that cost is high.
The technical solution of the utility model is: comprise concave support part, jack, brace summer, roller and track, many rollers laterally place on the track, placement and track brace summer in the same way on roller, the concave support part is positioned at the top of brace summer, the support ear of stretching is held at its two ends oriented two level with both hands, each places the jack of erectting below each support ear, is provided with the filling wedge on described brace summer.
Described filling wedge is wooden wedge, can be combined by several.
Described brace summer is made up of several channel-section steels that be arranged side by side and that opening makes progress, in its mouthful, be filled with flitch and or the slightly little channel-section steel of size, make its channel-section steel mouth concordant with the outside.
To be the channel-section steel that makes progress of opening and upper strata by several bottoms form for the channel-section steel that Open Side Down is overlapping described track.
The utility model has the advantages that the ground collar tie beam and below brace summer between set filling wedge can replace cement of the prior art to fill, do not need to wait for to the cement solidifies, shortened the duration greatly, simplified construction technology, reduced cost.
Description of drawings
Fig. 1 is a general structure front view of the present utility model;
Fig. 2 is the enlarged drawing at C place among Fig. 1;
Fig. 3 is the A-A sectional view of Fig. 2;
Fig. 4 is the B-B sectional view of Fig. 2;
The specific embodiment
Referring to Fig. 1~Fig. 4, the utility model comprises concave support part 6, jack 7, brace summer 3, roller 4 and track 5, many rollers 4 laterally place on the track 5, placement and track 5 brace summer 3 in the same way on roller 4, concave support part 6 is positioned at the top of brace summer 3, the support ear of stretching 61 is held at its two ends oriented two level with both hands, respectively places the jack 7 of a setting below each support ear 61, is provided with to fill wedge 9 on described brace summer 3.The recess of concave support part 6 is propped up the lower end of the ground collar tie beam 2 of building 1.Mark 8 is a ground.
Described filling wedge 9 is wooden wedge, can respectively be combined by number, can be from the inside and outside both sides wedging of ground collar tie beam 2.
Described brace summer 3 is made up of several channel-section steels 31 that be arranged side by side and that opening makes progress, in its mouthful, be filled with flitch and or the slightly little channel-section steel 32 of size, make its opening concordant with channel-section steel 31.
Described track 5 is that channel-section steel and the upper strata that opening makes progress is overlapping the forming of channel-section steel that Open Side Down by several bottoms.

Claims (4)

1, a kind of aedicula mobile device, comprise concave support part, jack, brace summer, roller and track, many rollers laterally place on the track, placement and track brace summer in the same way on roller, the concave support part is positioned at the top of brace summer, the support ear of stretching is held at its two ends oriented two level with both hands, and each places the jack of erectting below each support ear, it is characterized in that: be provided with the filling wedge on described brace summer.
2, aedicula mobile device according to claim 1 is characterized in that: described filling wedge is wooden wedge, can be combined by several.
3, aedicula mobile device according to claim 1, it is characterized in that: described brace summer is made up of several channel-section steels that be arranged side by side and that opening makes progress, in its mouthful, be filled with flitch and or the slightly little channel-section steel of size, make its channel-section steel mouth concordant with the outside.
4, aedicula mobile device according to claim 1 is characterized in that: to be the channel-section steel that makes progress of opening and upper strata by several bottoms constitute for the channel-section steel that Open Side Down is overlapping described track.
CN 200320101973 2003-10-27 2003-10-27 Equipment for moving small-sized building Expired - Fee Related CN2674002Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200320101973 CN2674002Y (en) 2003-10-27 2003-10-27 Equipment for moving small-sized building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200320101973 CN2674002Y (en) 2003-10-27 2003-10-27 Equipment for moving small-sized building

Publications (1)

Publication Number Publication Date
CN2674002Y true CN2674002Y (en) 2005-01-26

Family

ID=34474028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200320101973 Expired - Fee Related CN2674002Y (en) 2003-10-27 2003-10-27 Equipment for moving small-sized building

Country Status (1)

Country Link
CN (1) CN2674002Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956466A (en) * 2010-09-13 2011-01-26 董兰田 Technical method for finishing vertical lifting in integral translation process of building
CN102795554A (en) * 2012-08-10 2012-11-28 中油吉林化建工程有限公司 Mechanism and method for migrating whole fixed tower crane
CN105839945A (en) * 2016-03-22 2016-08-10 中国建筑第八工程局有限公司 Indoor confined space large scale cultural relic ruin translation method and device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956466A (en) * 2010-09-13 2011-01-26 董兰田 Technical method for finishing vertical lifting in integral translation process of building
CN102795554A (en) * 2012-08-10 2012-11-28 中油吉林化建工程有限公司 Mechanism and method for migrating whole fixed tower crane
CN105839945A (en) * 2016-03-22 2016-08-10 中国建筑第八工程局有限公司 Indoor confined space large scale cultural relic ruin translation method and device
CN105839945B (en) * 2016-03-22 2017-11-10 中国建筑第八工程局有限公司 The shift method and device of the large-scale cultural sight of indoor restricted clearance

Similar Documents

Publication Publication Date Title
CN104120877B (en) A kind of hydraulic climbing die block system and climbing form method
CN112459059B (en) Construction method of movable pile sinking
CN2782837Y (en) Integral lifting form-climbing platform system
CN109236331A (en) A kind of steel arch rack trolley suitable for the micro- bench cut method in tunnel
CN111908320B (en) Method for quickly converting steel wire rope for hoisting ultra-deep underground continuous wall
CN211004291U (en) Internal climbing tower crane
CN2674002Y (en) Equipment for moving small-sized building
CN206692230U (en) A kind of skyscraper row is hung
CN106801384A (en) Assembled steel reinforced concrete aliform type culvert opening and construction method
CN110424265B (en) Bridge prefabricated part inter-span beam-lifting direct hoisting device and hoisting process method
CN111379227A (en) Variable-width platform device for hydraulic creeping formwork for quickly constructing double-limb cable tower and construction method
CN212358013U (en) Cable tower operation platform template separation lift system
CN210087319U (en) Intelligent hydraulic lifting sliding module for hanging large-section special-shaped shaft steel strand
CN110886242B (en) Method for installing composite cable saddle in anchor hole of suspension bridge tunnel in mountainous area
CN2440889Y (en) Lifting platform framework turning-over device
CN208717748U (en) A kind of large span steel reinforced concrete combination beam Bridge Erector support leg device
CN2620012Y (en) Lifter for pit parking equipment
CN2466126Y (en) Self-lifting internal creeping lifting-up system
CN111501562A (en) Cable tower operation platform template separation lift system
CN114808723B (en) Concrete pouring platform for ultrahigh and overlong steel pipes
CN2637632Y (en) Single-side sliding form device
CN2459350Y (en) Pile core concrete grouting machine for artificial holing pile
CN218263494U (en) Telescopic platform for variable cross-section hollow high pier construction
CN217479985U (en) Girder installation device adopting bracket and temporary inhaul cable
CN214359970U (en) Adjustable anti-settling well lid installation auxiliary installation leveling equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee