CN105839945A - Indoor confined space large scale cultural relic ruin translation method and device - Google Patents
Indoor confined space large scale cultural relic ruin translation method and device Download PDFInfo
- Publication number
- CN105839945A CN105839945A CN201610162500.4A CN201610162500A CN105839945A CN 105839945 A CN105839945 A CN 105839945A CN 201610162500 A CN201610162500 A CN 201610162500A CN 105839945 A CN105839945 A CN 105839945A
- Authority
- CN
- China
- Prior art keywords
- cultural sight
- jacking
- sight
- cultural
- hooping structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/06—Separating, lifting, removing of buildings; Making a new sub-structure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to an indoor confined space large scale cultural relic ruin translation method and device; the device comprises the following elements: a hoop structure surrounding the pedestal of the culture relic ruin, and two sides of the hoop structure are connected with support rods; a first jacking assembly matched with the support rods; a translation guide rail paved along the culture relic ruin and facing a base platform used for displaying the culture relic ruin; a mobile trolley placed on the translation guide rail and fixedly connected with the bottom of the hoop structure; a traction assembly arranged in front of the end portion of the translation guide rail, wherein the traction assembly is connected with the support rods; a second jacking assembly arranged on two sides of the base platform and matched with the support rods. The indoor confined space large scale cultural relic ruin translation method is simple, uses less indoor space, can satisfy the construction environment of the confined indoor space, is small in indoor space damage, can safely and stably translate the culture relic ruin, thus well protecting the culture relic ruin.
Description
Technical field
The present invention relates to the realm of building construction, refer in particular to the large-scale cultural sight of a kind of indoor restricted clearance
Shift method and device.
Background technology
Cultural sight, due to the historical value of its uniqueness, enjoys and values, attractes attention, when needing for showing,
The interior space is limited, and large-scale cultural sight tends not to use hoisting and hanging mode to shift, and now needs to adopt
Taking a kind of Novel translation mode to shift, this shift method is more steady relative to conventional lifting displacement mode
Fixed, less to ruins injury.
Chinese patent 200710061874.8 discloses a kind of method of ancient architecture base integral support and change,
First excavate operation foundation ditch in basal perimeter, use prefabricated rectangle hollow box beam to replace the soil under former basis
Body, uses in box beam during pushing tow and manually cuts the earth by a small margin, cuts the earth in propelling limit, limit;Foundation underpinning
Complete one section, pour a section concrete;Foundation bottom is enclosed in four Mondays after having underpined again and is poured side bar
It is made to be linked to be entirety;The operation of this form of construction work is the most loaded down with trivial details, and indoor have completed the destructiveness in space
Bigger.
Summary of the invention
It is an object of the invention to overcome the defect of prior art, it is provided that a kind of indoor restricted clearance big
The shift method of type cultural sight and device, solve form of construction work in prior art loaded down with trivial details and to indoor
Complete the problem that the destructiveness in space is bigger.
The technical scheme realizing above-mentioned purpose is:
The shift method of the large-scale cultural sight of a kind of indoor restricted clearance of the present invention, including:
Base control line and guide rail control line is shown according to the position to be presented measuring of cultural sight;
According to the construction of described displaying base control line for showing the basic platform of described cultural sight;
Deviate from described basic platform and treat at the corresponding described guide rail control line of far-end of described cultural sight
Construction traction component on the centrage of the translating rails arranged;
Described cultural sight carries out consolidation process, and described consolidation process is included in described cultural sight
Base all around sets hooping structure, and the both sides of described hooping structure are corresponding with described guide rail control line;
In the outside place of the both sides of the corresponding described guide rail control line of described hooping structure, the first jacking is set
Assembly, the outside relative set second in the both sides of the corresponding described guide rail control line of described basic platform is pushed up
Rise assembly;
Support bar, described support bar is connected in the both sides of the corresponding described guide rail control line of described hooping structure
Corresponding described first jacking assembly is arranged;
Utilize support bar described in described first jacking assembly jacking and then by described cultural sight jack-up, and
After in the bottom of described hooping structure along described guide rail control line lay translating rails;
Holding movable dolly on described translating rails, utilizes described first jacking assembly by described historical relic
Ruins are transferred, so that described cultural sight puts off on described mobile dolly, by little for described movement
Car is connected fixing with the bottom of described hooping structure;
Described support bar is connected with described traction component, affects described anchor ear by described traction component
Structure, and then make described cultural sight move to described basic platform along described translating rails;With
And
Utilize support bar described in described second jacking assembly jacking and then by described cultural sight jack-up, and
After described translating rails is removed, recycle described second jacking assembly described cultural sight is transferred with
Described cultural sight is put off on described basic platform, removes described hooping structure.
The present invention, by arranging hooping structure in the surrounding of cultural sight base, then utilizes jacking assembly
After lifting base, bottom hooping structure, lay translating rails, utilize mobile dolly along translating rails
Being translated by cultural sight in place, such construction method is simple, takies the interior space little, it is possible to meet
The construction environment of indoor restricted clearance, and little to the destructiveness of the interior space, it is possible to putting down of safety and steady
Move cultural sight, cultural sight is had preferable protective effect.
Further improvement is that of the shift method of the large-scale cultural sight of indoor of the present invention restricted clearance,
Construction traction component, including:
The centrage excavation work nest of corresponding described translating rails;
Erecting fixing bar in described work nest, the top of described fixing bar protrudes out described work flute profile
Become drawknot section;
In described work nest, casting concrete forms xoncrete structure, and described fixing bar is anchored in described
In xoncrete structure;And
In described drawknot section, connect rope and actuator, pull described rope by described actuator.
Further improvement is that of the shift method of the large-scale cultural sight of indoor of the present invention restricted clearance,
Described consolidation process also includes:
By tight for described cultural sight parcel;
Outer weekly interval in described cultural sight encloses and sets flitch, and utilizes suspender belt described flitch colligation to be existed
Together;
Set steel pipe in the outside of described flitch to reinforce;
Film laying between described steel pipe and described hooping structure, utilizes described thin film by described anchor ear
Internal face and the described steel pipe of structure cover;
On described thin film, casting concrete forms ruggedized construction, and described ruggedized construction is by described anchor ear
Between structure and described cultural sight, space is tamped.
Further improvement is that of the shift method of the large-scale cultural sight of indoor of the present invention restricted clearance,
Base at described cultural sight all around sets hooping structure, including:
Base surrounding in described cultural sight connects a circle H profile steel, welds between described H profile steel
Fixing;And
On described H profile steel, it is welded and fixed channel-section steel, is welded and fixed between described channel-section steel, by institute
State channel-section steel and described H profile steel is formed and encloses the hooping structure setting described cultural sight.
Further improvement is that of the shift method of the large-scale cultural sight of indoor of the present invention restricted clearance,
It is identical with arranging the first jacking assembly to arrange the second jacking assembly, arranges the first jacking assembly and includes:
Centre position and Liang Jiao in the outside of the described guide rail control line described hooping structure side of correspondence
The jacking groove adapting to jack is all excavated in position, portion;
The bottom land of described jacking groove is tamped and casting concrete forms jacking basis;
Jack is placed on described jacking basis.
Present invention also offers the translating device of the large-scale cultural sight of a kind of indoor restricted clearance, bag
Include:
Hooping structure, encloses the base surrounding being located at described cultural sight, is used for reinforcing described cultural sight,
The both sides that described hooping structure is relative connect support bar;
First jacking assembly, corresponding described support bar is arranged, for support bar described in jacking and then pass through
Described hooping structure is by described cultural sight jack-up;
Translating rails, along described cultural sight to the basic platform paving for showing described cultural sight
If the end of described translating rails exceedes described basic platform;
Mobile dolly, is positioned on described translating rails and is connected with the bottom of described hooping structure solid
Fixed;
Traction component, is located at the front of described translating rails end, and described traction component is corresponding described flat
The centrage moving guide rail is arranged, and described traction component is connected with described support bar, by described draw groups
Part affects described hooping structure and then makes described cultural sight move to institute along described translating rails
State basic platform;And
Second jacking assembly, is located at the both sides of described basic platform corresponding with described support bar, uses
In support bar described in jacking so that by described hooping structure by described cultural sight jack-up.
Further improvement is that of the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance,
Described traction component includes work nest, fixing bar, xoncrete structure, rope and actuator, described
The centrage of the corresponding described translating rails of work nest is arranged, and described fixing bar is erected in described work nest
And the top of described fixing bar protrudes out described work nest and forms drawknot section, described concrete structure pouring
Anchoring in described work nest and by described fixing bar, described rope and described actuator are connected to described
Drawknot section, and pull described rope by described actuator.
Further improvement is that of the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance,
Also including the reinforcement assembly for reinforcing described cultural sight, described reinforcement assembly includes wrapping up described literary composition
The covering in thing ruins, enclose be located at the spaced flitch in described cultural sight periphery, enclose be located at described
The steel pipe of flitch periphery, the thin film being layed between described steel pipe and described hooping structure and pour
Ruggedized construction on described thin film, by suspender belt colligation together, described thin film covers described flitch
Being placed on the internal face of described hooping structure and described steel pipe, described ruggedized construction is tamped and is tied in described anchor ear
Space between structure and described cultural sight.
Further improvement is that of the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance,
Described hooping structure includes H profile steel that the base surrounding with described cultural sight is connected and is welded and fixed
Channel-section steel on described H profile steel, is welded and fixed between described H profile steel, welds between described channel-section steel
Connect fixing.
Further improvement is that of the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance,
Described first jacking assembly and described second jacking assembly all include:
It is located at centre position and the Liang Jiao of the corresponding described hooping structure side in outside of described translating rails
The jacking groove of position, portion, the size of described jacking groove adapts to described jack;
Pour the jacking basis in described jacking groove bottom land;
It is positioned over the jack on described jacking basis.
Accompanying drawing explanation
Fig. 1 is the traction component of the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance
Plane graph.
Fig. 2 is the hooping structure of the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance
Plane graph.
Fig. 3 is A-A sectional view in Fig. 2.
Fig. 4 is the jacking assembly of the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance
Plane graph.
Fig. 5 is B-B sectional view in Fig. 4.
Fig. 6 is the hooping structure of the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance
Connect the plane graph of support bar.
Fig. 7 is the enlarged diagram that the H profile steel in hooping structure is connected with support bar.
Fig. 8 is the translating rails of the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance
Plane graph.
Fig. 9 is C-C sectional view in Fig. 8.
Figure 10 is D-D sectional view in Fig. 8.
Figure 11 is the plane graph of the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance.
Detailed description of the invention
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
The invention provides shift method and the device of the large-scale cultural sight of a kind of indoor restricted clearance,
It is applicable to the translation of the less cultural sight of the interior space, and little to the destructiveness of the interior space,
Easy construction.The present invention is by arranging a circle hooping structure, then profit in the surrounding of cultural sight base
With jack lifting cultural sight base, lay translating rails in the lower section of hooping structure, on guide rail
Arranging mobile dolly, the traction component that recycling is arranged on front is steadily mobile in place by cultural sight
Position.Below in conjunction with the accompanying drawings to the shift method of the large-scale cultural sight of indoor of the present invention restricted clearance and
Device illustrates.
Refering to Fig. 1, it is shown that the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance
The plane graph of traction component.Below in conjunction with Fig. 1, the large-scale historical relic of indoor of the present invention restricted clearance is lost
The translating device of location illustrates.
As it is shown in figure 1, the translating device of the large-scale cultural sight of indoor of the present invention restricted clearance is for inciting somebody to action
Cultural sight 10 moves at basic platform 20, and this basic platform 20 is used for showing cultural sight 10,
Shown in Fig. 3, the bottom of this cultural sight 10 is provided with base 101, and this base 101 is steel plate.
Shown in Fig. 2, this translating device includes hooping structure the 30, first jacking assembly, translation
Guide rail, mobile dolly, traction component, the second jacking assembly and reinforcement assembly.
Hooping structure 30 encloses the surrounding of the base 101 being located at cultural sight 10, and hooping structure 30 is used
In reinforcing cultural sight 10, also the translation for cultural sight 10 provides force basis, in conjunction with Fig. 6
Shown in, connecting in the both sides that hooping structure 30 is relative and have support bar 301, this support bar 301 is located at
The both sides that hooping structure 30 is corresponding with translating rails, the every side of support bar 301 connects 3, and
Centre position and two corners, the setting of support bar 301 of hooping structure 30 side be located at by strut 301
The jacking operation being set to jacking assembly provides fulcrum.In conjunction with shown in Fig. 3, hooping structure 30 wraps
Including H profile steel 302 and channel-section steel 303, H profile steel 302 connects with base 101 surrounding of cultural sight 10
Connecing fixing, channel-section steel 303 is fixedly welded on H profile steel 302, two H profile steel being connected it
Between be welded and fixed, be welded and fixed between two channel-section steels being connected.In the present embodiment, this anchor ear knot
Structure 30 is square, and so four limits at base 101 are connected to a H profile steel 302 respectively, four
Individual H profile steel 302 encloses square, and channel-section steel 303 also encloses square.Shown in Fig. 7,
Strut 301 is shorter I-steel, this I-steel when being connected with H profile steel 302, I-steel
One end is inserted in H profile steel 302 interior and with H profile steel 302 web and two wing plates and is all welded and fixed.
In conjunction with the support bar 301 shown in Fig. 4 to Fig. 6, on the first jacking assembly correspondence hooping structure 30
Arranging, historical relic is lost by the first jacking assembly for jacking support bar 301 and then by hooping structure 30
Location 10 jack-up.This first jacking assembly includes jacking groove 401, jacking basis 402 and jack
403, jacking groove 401 is located at the outside of translating rails, and the interposition of corresponding hooping structure 30 side
Putting and two corner positions, the position of this jacking groove 401 is relative with support bar 301, jacking groove 401
Size adapt to jack 403.Jacking basis 402 pours in the bottom land of jacking groove 401, will top
The bottom land rising groove 401 is tamped and pours 20cm thickness C30 concrete to form jacking basis 402.Thousand
Jin top 403 is positioned on jacking basis 402, is moved upward by jack 403, it is achieved lift
Cultural sight 10, moves downward, it is achieved put off cultural sight 10.
In conjunction with shown in Fig. 8 to Figure 10, translating rails 60 shows literary composition along cultural sight 10 to being used for
The basic platform 20 in thing ruins 10 is laid, and the end of translating rails 60 has exceeded basic platform 20,
The top of translating rails 60 have also exceeded hooping structure 30.Translating rails 60 is also adopted by H profile steel.
When laying translating rails 60, utilize the jack 403 of the first jacking assembly by hooping structure 30 and literary composition
Thing ruins 10 are lifted, and then lay translating rails 60, for preventing translating rails 60 from shifting, flat
Moving the outside skewed horizontal load hound 601 of guide rail 60, hound 601 is located at ground and translation is led
Between rail 60, hound 601 serves the effect of reinforcing.Place at the top of translating rails 60 and move
Multiple mobile dolly 40 is placed on dynamic dolly 40, then the translating rails 60 of the same side.Then is utilized
Hooping structure 30 and cultural sight 10 are steadily put off by the jack 403 of one jacking assembly, and anchor ear is tied
Structure 30 is put off on mobile dolly 40, and this is moved the bottom of dolly 40 and hooping structure 30
Connect fixing, preferably use welding.
Shown in Fig. 1, Fig. 9 and Figure 11, before traction component is located at the end of translating rails 60
Side, the centrage of this traction component correspondence translating rails 60 is arranged, this traction component and hooping structure
Support bar 301 on 30 connects, and traction component applies pull strength to support bar 301, affects anchor ear
Structure 30, and then make cultural sight 10 flat along translating rails 60 together along with hooping structure 30
Move at basic platform 20.Traction component includes work nest, fixing bar 501, xoncrete structure
502, rope 503 and actuator 504, the centrage of work nest correspondence translating rails 60 is arranged,
Fixing bar 501 erects in work nest, and the top of fixing bar 501 protrudes out work nest and forms drawknot
Section, this fixing bar 501 is correspondingly arranged on the centrage of translating rails 60, and xoncrete structure 502 waters
Building in work nest and anchored by fixing bar 501, rope 503 and actuator 504 are connected to fixing bar
The drawknot section of 501, actuator 504 pulls rope 503, and this rope 503 is also attached to support bar 301
On, pull rope 503 by actuator 504, support bar 301 is applied pulling force, and then will
Hooping structure 30 is pulled along so that hooping structure 30 moves along translating rails 60.Draw groups
Fixing bar 501 in part can use steel pipe.Actuator 503 can use bottle gouard moved by hands or electronic
Calabash.
Reinforcement assembly is used for reinforcing cultural sight 10, and this reinforcement assembly includes wrapping up cultural sight 10
Covering, enclose and be located at cultural sight 10 periphery and spaced flitch, enclose and be located at outside described flitch
Week steel pipe, the thin film being layed between steel pipe and hooping structure 30 and pour on thin film
Ruggedized construction 701, covering uses plastic sheeting and/or colour bar cloth, is wrapped up by cultural sight 10
Tight.Flitch spacing 500mm being located at cultural sight 10 periphery is arranged, and flitch is around cultural sight
10 arrange a circle, the most again by suspender belt by the flitch colligation of this circle the most together.It is layed in steel pipe
With thin film between hooping structure 30 uses double-deck 0.2mm thickness plastic sheeting, covered rearing with plastic film in
The internal face of hooping structure 30 and steel pipe, separate the follow-up concrete poured by plastic sheeting, logical
Cross on plastic sheeting casting concrete and form ruggedized construction 701, this ruggedized construction 701 tamp in
Space between hooping structure 30 and cultural sight 10.Ruggedized construction 701 and hooping structure 30 and literary composition
Separated by plastic sheeting between thing ruins 10 so that ruggedized construction 701 can play reinforcement effect,
Facilitate again follow-up dismantling operation.
Below the use process of the large-scale cultural sight translating device of indoor of the present invention restricted clearance is entered
Row explanation.
The indoor restricted clearance medium-and-large-sized cultural sight translating device utilizing the present invention is lost to translate historical relic
During location, after cultural sight has been reinforced by reinforcement assembly, first adjust and be arranged on cultural sight initial bit
Putting the jack in first group of jacking assembly of both sides and fixing leveling carries out examination and lifts, examination is lifted without exception
After, again jack is fixed leveling so that all jack in this first group of jacking assembly
It is generally aligned in the same plane, when so synchronizing to carry out jacking, it can be ensured that cultural sight entirety can steadily be lifted
Rise.Utilize jack to synchronize pressure, make cultural sight entirety slowly steadily be raised to away from ground the highest
Degree, this is highly desirable possible for the offer of follow-up laying translating rails, and this can be highly 40cm.Thousand
Jin top by support bar and hooping structure by after cultural sight lifting, according to the position of the translating rails subscribed
Putting, arrange translating rails in the lower section of hooping structure, translating rails uses H250 shaped steel, puts down for every section
Move guide rail and use short steel skewed horizontal load with ground, carry out temperature pier, to prevent translating rails from shifting.
Then arranging mobile dolly between hooping structure and translating rails, first group of jacking assembly is unclamped in unification
Jack so that cultural sight falls smoothly on mobile dolly, by bottom and the shifting of hooping structure
Dynamic dolly welding.Basic platform is laid two-layer geotextiles.Utilize the traction component in front, will lead
Draw the rope in assembly and fix the support bar connection being connected with hooping structure both sides, then by calabash people
Work or the electronic support bar that pulls, and then cultural sight is steadily moved to basic platform, then
Utilize the jack in second group of jacking assembly at basic platform by cultural sight lifting, remove translation
Track, then unclamps the jack in second group of jacking assembly unified, makes cultural sight the most steady
Fall on basic platform, remove reinforcement assembly, abolish hooping structure.
Below restricted clearance medium-and-large-sized cultural sight shift method in indoor of the present invention is illustrated.
The shift method of a kind of indoor medium-and-large-sized cultural sight of restricted clearance of the present invention, including:
As it is shown in figure 1, surveying setting-out: show base according to the position to be presented measuring of cultural sight 10
Plinth control line and guide rail control line 102, this guide rail control line 102 is that follow-up translating rails lays installation
Position, show base control line be construction display platform position.
The basic platform that construction is shown: according to showing that the construction of base control line is positioned at position to be presented
Locate, for showing the basic platform 20 of cultural sight 10.This basic platform 20 is armored concrete
Structure, assembling reinforcement casting concrete are the formation of basic platform 20.
Traction component is constructed: the far-end correspondence guide rail deviating from cultural sight 10 in basic platform 20 controls
Construction traction component on the centrage of translating rails to be placed at line 102;Shown in Figure 11,
Construction traction component includes: the centrage excavation work nest of corresponding translating rails 60, this work nest sets
Put the front at basic platform 20, it is simple to cultural sight is applied pull strength, to be put down by cultural sight
Steady traction is at basic platform 20.The size of this work nest is 50cm long * 50cm width * 100cm
Deeply, work nest is 2, is correspondingly arranged with translating rails respectively.Fixing bar is erected in work nest
501, the top of fixing bar 501 protrudes out work nest and forms drawknot section, and the length of this drawknot section is the lowest
In 0.5 meter, in order to drawknot rope, this fixing bar 501 is correspondingly arranged at the center of translating rails 60
On line, with guarantee the fixing rope of follow-up drawknot when exceptionally straight with the centrage weight of translating rails 60
Close;In work nest, casting concrete forms xoncrete structure 502, and fixing bar 501 is anchored in coagulation
In soil structure 502;In drawknot section, connect rope and actuator, pull rope by actuator.Rope
Rope can use steel wire rope, and actuator can use bottle gouard moved by hands or electric block.
The reinforcing of cultural sight body: cultural sight is carried out consolidation process, in conjunction with Fig. 2 and Fig. 3
Shown in, consolidation process is included in the base 101 of cultural sight 10 and all around sets hooping structure 30, embraces
The both sides of cuff structure 30 are corresponding with guide rail control line, the both sides of hooping structure 30 and translating rails pair
Neat setting.Base at cultural sight all around sets hooping structure and includes: in the end of cultural sight 10
Seat 101 surrounding connects a circle H profile steel 302, is welded and fixed between H profile steel 302;In H profile steel
It is welded and fixed channel-section steel 303 on 302, is welded and fixed between channel-section steel 303, by channel-section steel 303 and H
Shaped steel 302 is formed and encloses the hooping structure 30 setting cultural sight 10.H profile steel 302 uses H250 type
Steel, channel-section steel 303 uses 25a channel-section steel.Consolidation process also includes: is wrapped up by cultural sight tight, adopts
Cultural sight is wrapped up tight with plastic sheeting or colour bar cloth;Outer weekly interval in cultural sight encloses and sets
Flitch, and utilize suspender belt by flitch colligation together, flitch spacing is 500mm;Outside flitch
Around set steel pipe to reinforce;Film laying between steel pipe and hooping structure, utilizes thin film by anchor ear
Internal face and the steel pipe of structure cover;On thin film, casting concrete forms ruggedized construction
701, the concrete poured uses C30 microlith slightly expanded concrete, and anchor ear is tied by ruggedized construction 701
Between structure 30 and cultural sight 10, space is tamped.Spread before casting concrete forms ruggedized construction 701
If thin film, by this thin film, the concrete poured is kept apart with hooping structure and cultural sight, convenient
The operation of follow-up dismounting, it also avoid the destruction to cultural sight, also acts the effect of reinforcing.
Thin film uses the 0.2mm thickness plastic sheeting of double-deck whole.
Jacking foundation construction: combine shown in Fig. 1 and Fig. 4, controls in the corresponding guide rail of hooping structure 30
The outside place of the both sides of line 102 arranges the first jacking assembly, shown in Figure 11, in basic platform
Outside relative set the second jacking assembly of the both sides of 20 corresponding guide rail control lines;First jacking assembly
Identical with the way of the second jacking assembly, illustrate as a example by the first jacking assembly.In conjunction with Fig. 4
Shown in Fig. 5, the first jacking assembly is set and includes: in the outside correspondence hooping structure of guide rail control line
The centre position of side and two corner positions all excavate the jacking groove 401 adapting to jack;By jacking
The bottom land compacting of groove 401 casting concrete form jacking basis 402;On jacking basis 402
Place jack 403.
Translating rails is constructed: connect support bar in the both sides of the corresponding guide rail control line of hooping structure 30
301, the corresponding first jacking assembly of support bar 301 is arranged;This support bar 301 uses short steel, knot
Shown in conjunction Fig. 7, the end of support bar 301 is inserted in the H profile steel 302 of hooping structure 30,
The end face of strut 301 fits with the web of H profile steel 302, the upper lower wing plate of support bar 301
Fit with the upper lower wing plate of H profile steel 302, then by the end face of stay tube 301, a upper bottom wing
Plate is all welded and fixed with H profile steel 302.
Shown in Fig. 1 and Fig. 8, utilize the first jacking assembly jacking support bar 301 and then by historical relic
Ruins 10 jack-up, then lays translating rails in the bottom of hooping structure 30 along guide rail control line
60;The jack 403 utilizing the first jacking assembly carries out jacking when lifting, and adjusts jack 403
And fixing leveling carries out examination and lifts, examination lift without exception after, be again fixed leveling, the first jacking assembly
All jack synchronize pressure so that cultural sight entirety is slowly steadily raised to ground one spacing
From, this distance can be 40cm.After cultural sight lifting, according to the guide rail control line paving subscribed
If translating rails 60, translating rails 60 uses H profile steel, shown in Fig. 9, and every section of translating rails
Using hound 601 to support between 60 and ground, hound 601 selects angle clip, leads translation
Rail 60 carries out temperature pier, to prevent displacement.
Shown in Fig. 9 and Figure 10, holding movable dolly 40 on translating rails 60, utilize
Cultural sight 10 is transferred by one jacking assembly, so that cultural sight puts off at described mobile dolly 40
On, mobile dolly 40 is connected fixing with the bottom of hooping structure 30.Can use and be welded to connect
H profile steel bottom mobile dolly and hooping structure.
Shown in Figure 11, support bar 301 is connected with traction component, is affected by traction component
Hooping structure 30, and then make cultural sight move to basic platform 20 along translating rails 60;Will
Rope 503 in traction component is connected with support bar 301, then affects rope by actuator 504
503 and then support bar 301 is applied pull strength so that cultural sight followed by dolly and leads along translation
Rail 60 moves forward, until moving at basic platform 20.
Basic platform is laid two-layer geotextiles, after cultural sight is in place, utilizes the second jacking group
Part jacking support bar and then by cultural sight jack-up, then removes translating rails, recycling the second top
Rise assembly and cultural sight is transferred so that cultural sight puts off on basic platform, remove hooping structure
With flitch, steel pipe and the thin film arranged during consolidation process, colour bar cloth.
The present invention, by arranging hooping structure in the surrounding of cultural sight base, then utilizes jacking assembly
After lifting base, bottom hooping structure, lay translating rails, utilize mobile dolly along translating rails
Being translated by cultural sight in place, such construction method is simple, takies the interior space little, it is possible to meet
The construction environment of indoor restricted clearance, and little to the destructiveness of the interior space, it is possible to putting down of safety and steady
Move cultural sight, cultural sight is had preferable protective effect.
Above in association with accompanying drawing embodiment, the present invention is described in detail, ordinary skill people in this area
The present invention can be made many variations example by member according to the above description.Thus, some details in embodiment
Should not constitute limitation of the invention, the present invention by the scope that defines using appended claims as this
The protection domain of invention.
Claims (10)
1. the shift method of the large-scale cultural sight of an indoor restricted clearance, it is characterised in that bag
Include:
Base control line and guide rail control line is shown according to the position to be presented measuring of cultural sight;
It is positioned at described position to be presented, described for showing according to the construction of described displaying base control line
The basic platform of cultural sight;
Deviate from described basic platform and treat at the corresponding described guide rail control line of far-end of described cultural sight
Construction traction component on the centrage of the translating rails arranged;
Described cultural sight carries out consolidation process, and described consolidation process is included in described cultural sight
Base all around sets hooping structure, and the both sides of described hooping structure are corresponding with described guide rail control line;
In the outside place of the both sides of the corresponding described guide rail control line of described hooping structure, the first jacking is set
Assembly, the outside relative set second in the both sides of the corresponding described guide rail control line of described basic platform is pushed up
Rise assembly;
Support bar, described support bar is connected in the both sides of the corresponding described guide rail control line of described hooping structure
Corresponding described first jacking assembly is arranged;
Utilize support bar described in described first jacking assembly jacking and then by described cultural sight jack-up, and
After in the bottom of described hooping structure along described guide rail control line lay translating rails;
Holding movable dolly on described translating rails, utilizes described first jacking assembly by described historical relic
Ruins are transferred, so that described cultural sight puts off on described mobile dolly, by little for described movement
Car is connected fixing with the bottom of described hooping structure;
Described support bar is connected with described traction component, affects described anchor ear by described traction component
Structure, and then described cultural sight is translated along described translating rails by described mobile dolly
To described basic platform;And
Utilize support bar described in described second jacking assembly jacking and then by described cultural sight jack-up, and
After described translating rails is removed, recycle described second jacking assembly described cultural sight is transferred with
Described cultural sight is put off on described basic platform, removes described hooping structure.
2. the shift method of the large-scale cultural sight of indoor restricted clearance as claimed in claim 1,
It is characterized in that, traction component of constructing, including:
The centrage excavation work nest of corresponding described translating rails;
Erecting fixing bar in described work nest, the top of described fixing bar protrudes out described work flute profile
Become drawknot section;
In described work nest, casting concrete forms xoncrete structure, and described fixing bar is anchored in described
In xoncrete structure;And
In described drawknot section, connect rope and actuator, pull described rope by described actuator.
3. the translation side of the large-scale cultural sight of indoor restricted clearance as claimed in claim 1 or 2
Method, it is characterised in that described consolidation process also includes:
By tight for described cultural sight parcel;
Outer weekly interval in described cultural sight encloses and sets flitch, and utilizes suspender belt described flitch colligation to be existed
Together;
Set steel pipe in the outside of described flitch to reinforce;
Film laying between described steel pipe and described hooping structure, utilizes described thin film by described anchor ear
Internal face and the described steel pipe of structure cover;
On described thin film, casting concrete forms ruggedized construction, and described ruggedized construction is by described anchor ear
Between structure and described cultural sight, space is tamped.
4. the shift method of the large-scale cultural sight of indoor restricted clearance as claimed in claim 3,
It is characterized in that, the base at described cultural sight all around sets hooping structure, including:
Base surrounding in described cultural sight connects a circle H profile steel, welds between described H profile steel
Fixing;And
On described H profile steel, it is welded and fixed channel-section steel, is welded and fixed between described channel-section steel, by institute
State channel-section steel and described H profile steel is formed and encloses the hooping structure setting described cultural sight.
5. the shift method of the large-scale cultural sight of indoor restricted clearance as claimed in claim 1,
It is characterized in that, it is identical with arranging the first jacking assembly to arrange the second jacking assembly, arranges the first jacking
Assembly includes:
Centre position and Liang Jiao in the outside of the described guide rail control line described hooping structure side of correspondence
The jacking groove adapting to jack is all excavated in position, portion;
The bottom land of described jacking groove is tamped and casting concrete forms jacking basis;
Jack is placed on described jacking basis.
6. the translating device of the large-scale cultural sight of an indoor restricted clearance, it is characterised in that bag
Include:
Hooping structure, encloses the base surrounding being located at described cultural sight, is used for reinforcing described cultural sight,
The both sides that described hooping structure is relative connect support bar;
First jacking assembly, corresponding described support bar is arranged, for support bar described in jacking and then pass through
Described hooping structure is by described cultural sight jack-up;
Translating rails, along described cultural sight to the basic platform paving for showing described cultural sight
If the end of described translating rails exceedes described basic platform;
Mobile dolly, is positioned on described translating rails and is connected with the bottom of described hooping structure solid
Fixed;
Traction component, is located at the front of described translating rails end, and described traction component is corresponding described flat
The centrage moving guide rail is arranged, and described traction component is connected with described support bar, by described draw groups
Part affects described hooping structure and then makes described cultural sight move to institute along described translating rails
State basic platform;And
Second jacking assembly, is located at the both sides of described basic platform corresponding with described support bar, uses
In support bar described in jacking so that by described hooping structure by described cultural sight jack-up.
7. the translating device of the large-scale cultural sight of indoor restricted clearance as claimed in claim 6,
It is characterized in that, described traction component include work nest, fixing bar, xoncrete structure, rope and
Actuator, the centrage of the corresponding described translating rails of described work nest is arranged, and described fixing bar is erected on
In described work nest and the top of described fixing bar protrudes out described work nest and forms drawknot section, described mixed
Xtah Crude Clay structure pours in described work nest and is anchored by described fixing bar, described rope and described driving
Part is connected to described drawknot section, and pulls described rope by described actuator.
The translation dress of the large-scale cultural sight of indoor restricted clearance the most as claimed in claims 6 or 7
Put, it is characterised in that also include the reinforcement assembly for reinforcing described cultural sight, described reinforcing group
Part includes wrapping up the covering of described cultural sight, encloses that to be located at described cultural sight periphery spaced
Flitch, enclose and be located at the steel pipe of described flitch periphery, be layed between described steel pipe and described hooping structure
Thin film and pour the ruggedized construction on described thin film, described flitch is existed by suspender belt colligation
Together, described thin film is covered in the internal face of described hooping structure and described steel pipe, described ruggedized construction
Tamp the space between described hooping structure and described cultural sight.
9. the translating device of the large-scale cultural sight of indoor restricted clearance as claimed in claim 8,
It is characterized in that, described hooping structure includes the H type that the base surrounding with described cultural sight is connected
Steel and be fixedly welded on the channel-section steel on described H profile steel, is welded and fixed between described H profile steel, institute
State and be welded and fixed between channel-section steel.
10. the translating device of the large-scale cultural sight of indoor restricted clearance as claimed in claim 6,
It is characterized in that, described first jacking assembly and described second jacking assembly all include:
It is located at centre position and the Liang Jiao of the corresponding described hooping structure side in outside of described translating rails
The jacking groove of position, portion, the size of described jacking groove adapts to described jack;
Pour the jacking basis in described jacking groove bottom land;
It is positioned over the jack on described jacking basis.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610162500.4A CN105839945B (en) | 2016-03-22 | 2016-03-22 | The shift method and device of the large-scale cultural sight of indoor restricted clearance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610162500.4A CN105839945B (en) | 2016-03-22 | 2016-03-22 | The shift method and device of the large-scale cultural sight of indoor restricted clearance |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105839945A true CN105839945A (en) | 2016-08-10 |
CN105839945B CN105839945B (en) | 2017-11-10 |
Family
ID=56587724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610162500.4A Active CN105839945B (en) | 2016-03-22 | 2016-03-22 | The shift method and device of the large-scale cultural sight of indoor restricted clearance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105839945B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108518081A (en) * | 2018-05-14 | 2018-09-11 | 武大巨成结构股份有限公司 | A kind of construction method increasing the cell underground space newly using synchronization of jacking up shift unit |
CN111058046A (en) * | 2019-11-28 | 2020-04-24 | 上海二十冶建设有限公司 | Method for installing looping car in limited space |
CN113389405A (en) * | 2021-06-22 | 2021-09-14 | 中国建筑第八工程局有限公司 | Integral moving and modifying structure and moving and modifying method for small and medium-sized ancient well structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2366487Y (en) * | 1998-06-10 | 2000-03-01 | 高继良 | Novel integral translation device for building |
CN2375704Y (en) * | 1999-01-18 | 2000-04-26 | 管春梅 | Integral removing device for high building |
CN2674002Y (en) * | 2003-10-27 | 2005-01-26 | 高建华 | Equipment for moving small-sized building |
JP2005076209A (en) * | 2003-08-28 | 2005-03-24 | Kumagai Gumi Co Ltd | Reconstruction method of building |
JP2009127251A (en) * | 2007-11-21 | 2009-06-11 | Takenaka Komuten Co Ltd | Rebuilding method of building |
CN103216114A (en) * | 2013-04-18 | 2013-07-24 | 朱奎 | Translation construction method for building |
-
2016
- 2016-03-22 CN CN201610162500.4A patent/CN105839945B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2366487Y (en) * | 1998-06-10 | 2000-03-01 | 高继良 | Novel integral translation device for building |
CN2375704Y (en) * | 1999-01-18 | 2000-04-26 | 管春梅 | Integral removing device for high building |
JP2005076209A (en) * | 2003-08-28 | 2005-03-24 | Kumagai Gumi Co Ltd | Reconstruction method of building |
CN2674002Y (en) * | 2003-10-27 | 2005-01-26 | 高建华 | Equipment for moving small-sized building |
JP2009127251A (en) * | 2007-11-21 | 2009-06-11 | Takenaka Komuten Co Ltd | Rebuilding method of building |
CN103216114A (en) * | 2013-04-18 | 2013-07-24 | 朱奎 | Translation construction method for building |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108518081A (en) * | 2018-05-14 | 2018-09-11 | 武大巨成结构股份有限公司 | A kind of construction method increasing the cell underground space newly using synchronization of jacking up shift unit |
CN111058046A (en) * | 2019-11-28 | 2020-04-24 | 上海二十冶建设有限公司 | Method for installing looping car in limited space |
CN113389405A (en) * | 2021-06-22 | 2021-09-14 | 中国建筑第八工程局有限公司 | Integral moving and modifying structure and moving and modifying method for small and medium-sized ancient well structure |
CN113389405B (en) * | 2021-06-22 | 2023-02-28 | 中国建筑第八工程局有限公司 | Integral moving and modifying structure and moving and modifying method for small and medium-sized ancient well structure |
Also Published As
Publication number | Publication date |
---|---|
CN105839945B (en) | 2017-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110306524A (en) | The foundation reinforcing structure and method of the Heavy Equipment-hoisting of the unclosed building of proximity | |
CN105239594A (en) | Prestressed pipe pile upright | |
CN205242436U (en) | Supplementary soleplate traded interim bearing structure who props during system was gone along with sb. to guard him to underground complex | |
CN106087746A (en) | A kind of cast-in-situ box girder falsework construction method and bridge | |
CN105839945A (en) | Indoor confined space large scale cultural relic ruin translation method and device | |
CN106013241A (en) | Crown beam foundation trench upright construction and cover-excavation method station combination structural system and construction method | |
CN109056790A (en) | Stake three layers of retaining wall structure of support and construction method | |
CN110486034A (en) | Subway station and construction method based on pile foundation in four pilot tunnel of single layer and middle drift | |
CN205662832U (en) | Under hold formula beiLei beam steel suspension bridge | |
CN110735390A (en) | Support assembly for preventing and treating bump at bridge head and construction method thereof | |
CN102926388B (en) | Earth moving method for deep foundation pit excavation | |
CN104264682A (en) | Anchor traction wall protection pile base layer concrete beam support pouring technology | |
CN102966109A (en) | Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation | |
CN109208627A (en) | Structure and its construction method are protected in high-rise structures strengthening of foundation | |
CN209194589U (en) | A kind of half covers digging subway station bracing members and supports erecting structure | |
JP2015036493A (en) | Method for constructing underground storage tank | |
CN106120853B (en) | A kind of inverted construction method of frame bridge | |
CN104805876B (en) | A kind of method for inclining the vertical pushing tow correction of independent bent columns | |
CN115450262B (en) | Working method for setting construction channel on upper part of post-pouring strip of building structure | |
CN210134292U (en) | Z-shaped retaining wall supporting structure for overhanging road shoulder of high-speed railway foundation | |
JP3345598B2 (en) | Waste landfill stock equipment | |
GB2055130A (en) | Method of raising buildings | |
CN108978481B (en) | Box-body jacking in place after anti-collapse method | |
CN209339176U (en) | Structure is protected in high-rise structures strengthening of foundation | |
CN202882002U (en) | Earth moving device used in deep foundation pit excavation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |