CN109056790A - Stake three layers of retaining wall structure of support and construction method - Google Patents

Stake three layers of retaining wall structure of support and construction method Download PDF

Info

Publication number
CN109056790A
CN109056790A CN201811218245.6A CN201811218245A CN109056790A CN 109056790 A CN109056790 A CN 109056790A CN 201811218245 A CN201811218245 A CN 201811218245A CN 109056790 A CN109056790 A CN 109056790A
Authority
CN
China
Prior art keywords
retaining wall
layer
campshed
cushion cap
layer retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811218245.6A
Other languages
Chinese (zh)
Inventor
吴震
吴贞瑶
胡鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811218245.6A priority Critical patent/CN109056790A/en
Publication of CN109056790A publication Critical patent/CN109056790A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls

Abstract

The present invention relates to slope supporting construction applications, three layers of retaining wall structure of a support are disclosed to be placed on the outside of welding with filler wire, ground line or less is placed in including basis and wall extends the first layer retaining wall (or breast boards) of the ground line or more, basis is placed in ground line or less and the ground line is extended to push up contour pile foundation up to the first layer retaining wall (or breast boards) in upper end, the cushion cap being attached thereto at the top of the pile foundation, there is the armoured concrete slab coupled with cushion cap on the inside of cushion cap, on the cushion cap and the second layer retaining wall that is attached on the outside of the welding with filler wire, platform is set at second layer retaining wall top surface, third layer retaining wall is set on the inside of the platform.Compared with prior art, the present invention plays the role of preferable supporting and retaining system to superelevation welding with filler wire, and than the retaining Wall of large section, pile plate wall, anchor cable pile plate wall project cost be low, highly-safe, short time limit, easily construction.

Description

Stake three layers of retaining wall structure of support and construction method
Technical field
The present invention relates to three layers of retaining wall structure of slope supporting technical field of structures more particularly to stake support and construction parties Method.
Background technique
Currently, the retaining structure suitable for super tall earth fill mainly has the superelevation of large section in geotechnical engineering field Retaining wall, pile plate wall, anchor cable pile plate wall etc., but there are certain shortcomings for these retaining structures, such as the superelevation of large section Retaining Wall Engineering amount is larger, and cost is higher, high to ground requirement for bearing capacity, and the probability to go wrong is also higher;Pile plate wall is because wherein Friction pile sectional dimension it is bigger than normal, can not using mechanical hole building construct, not only the duration is longer but also working security is low;Anchor cable Pile plate wall some locations because anchor cable pore-forming is difficult, can not find anchoring section due to be difficult to carry out.
Summary of the invention
Technical problem: the purpose of the present invention is to provide three layers of retaining wall structure of stake support and construction methods, it is intended to solve existing There is the retaining Wall project amount of large section in technology larger, cost is higher, and high to ground requirement for bearing capacity, what is gone wrong is general Rate is also higher;Friction pile sectional dimension in pile plate wall is bigger than normal, can not use mechanical execution;Anchor cable pile plate wall some locations because Anchor cable pore-forming is difficult, the problems such as can not find anchoring section and being difficult to carry out.
Technical solution: the invention is realized in this way, three layers of retaining wall structure of stake support are placed on the outside of side slope, including basis is set Below ground line and wall extends the first layer retaining wall (or breast boards) of the ground line or more, and basis is placed in ground line Below and the ground line is extended to push up contour pile foundation up to the first layer retaining wall (or breast boards) in upper end, The cushion cap being attached thereto at the top of the pile foundation, there is the armoured concrete slab coupled with the cushion cap on the inside of the cushion cap, Above the cushion cap and the second layer retaining wall that is attached on the outside of the welding with filler wire, placement in layers is filled out after second layer retaining wall Expect and be densified to second layer earth-retaining wall top, platform is set at second layer retaining wall top surface, third is set on the inside of the platform Layer retaining wall, placement in layers filler and is densified to third layer earth-retaining wall top after third layer retaining wall.
Further, the pile foundation includes preceding campshed and rear campshed, and the middle and lower part between preceding campshed and rear campshed One or multi-channel reinforced concrete coupling beams are arranged in appropriate location, and the cushion cap is placed in the preceding campshed and heel row stake top portion.
Further, first layer retaining wall (or breast boards) basis is placed in ground line hereinafter, and first layer gear Cob wall (or breast boards) wall extends the ground line up to contour with the pile foundation top surface.
Further, on the inside of the cushion cap with the armoured concrete slab that there is the cushion cap to couple.
Further, the second layer retaining wall is placed at the top of the cushion cap, and is set at the top of the second layer retaining wall Platform sets third layer retaining wall again on the inside of the platform.
Further, the construction method of three layers of retaining wall structure of stake support:
Construction method in all new embankment locations:
S1, the smooth location on original ground reserve for the construction of preceding campshed, rear campshed and first layer retaining wall (or breast boards) Operation platform;
S2, construct on operation platform preceding campshed and rear campshed so that the upper end of preceding campshed and rear campshed extend ground line with On, and between preceding campshed and rear campshed middle and lower part appropriate location construction together or several reinforced concrete coupling beams, keep reinforcing bar mixed The preceding campshed and rear campshed are closely attached into an entirety by solidifying soil coupling beam;
S3, it constructs first layer retaining wall (or breast boards) on operation platform, so that first layer retaining wall (or breast boards) wall Upper end extend ground line with up to contour with preceding campshed and heel row stake top end, first layer retaining wall (or breast boards) left and right two Side and preceding campshed close-coupled;
Filler on the inside of S4, backfill embankment side slope, and layered rolling is closely knit to first layer retaining wall (or breast boards) top;
S5, applied on preceding campshed and heel row stake top platform cushion cap and with the armoured concrete slab that couples on the inside of cushion cap;
S6, second layer retaining wall of constructing on cushion cap;
Filler on the inside of S7, backfill embankment side slope, and layered rolling is closely knit to second layer retaining wall top;
S8, platform is set at the top of second layer retaining wall;
S9, third layer retaining wall is set on the inside of the platform;
Filler on the inside of S10, backfill embankment side slope, and layered rolling is closely knit to third layer retaining wall top.
Only top is the construction method in new embankment location:
S1, the smooth location on original ground, for preceding campshed, rear campshed and cushion cap, the armored concrete coupled with cushion cap inside The construction of plate reserves operation platform;
S2, construct on operation platform preceding campshed and rear campshed, so that ground line is extended extremely in the upper end of preceding campshed and rear campshed Cushion cap absolute altitude;
S3, on the stake top platform of preceding campshed and rear campshed construction bearing platform and with the armoured concrete slab that couples on the inside of cushion cap;
S4, second layer retaining wall of constructing on cushion cap;
Filler on the inside of S5, backfill embankment side slope, and layered rolling is closely knit to second layer retaining wall top;
S6, platform is set at the top of second layer retaining wall;
S7, third layer retaining wall is applied on the inside of the platform;
Filler on the inside of S8, backfill embankment side slope, and layered rolling is closely knit to third layer retaining wall top.
S9, cushion cap is excavated with slope, construct first layer retaining wall (or breast boards), so that first layer retaining wall (or gear Native plate) wall upper end extend ground line with up to cushion cap bottom absolute altitude, at left and right sides of first layer retaining wall (or breast boards) With preceding campshed close-coupled.
The utility model has the advantages that compared with prior art, the earth-retaining height of three layers of retaining wall structure of stake support of the present invention and construction method It is higher than common retaining wall, it can be stably placed on welding with filler wire lateral surface, to be played preferably to superelevation welding with filler wire Supporting and retaining system effect, and than the retaining Wall of large section, pile plate wall, anchor cable pile plate wall project cost be low, the highly-safe, duration Short, easy construction.
Detailed description of the invention
Fig. 1 is three layers of retaining wall structure of stake support and construction method sectional schematic diagram (first layer provided in an embodiment of the present invention Retaining wall plate retaining wall between stake, second layer retaining wall are counterfort wall, or balance weight retaining wall, third layer gear Cob wall is also counterfort wall, or balance weight retaining wall).
Fig. 2 is three layers of retaining wall structure of stake support provided in an embodiment of the present invention and construction method elevational schematic view.
Fig. 3 is that three layers of retaining wall structure of stake support provided in an embodiment of the present invention and construction method pile foundation are shown with cushion cap plane It is intended to.
Have in figure: between 1-preceding campshed, 2-rear campsheds, 3-preceding campsheds and rear campshed middle and lower part together or several steel Reinforced concrete coupling beam, 4-first layer retaining walls (or breast boards), 5-cushion caps, 6-armoured concrete slabs, 7-second layer earth-retainings Wall, 8-the first and second layer of retaining walls carry on the back filler, 9-second layer retaining walls roof panels, 10-third layer retaining walls, 11-the Ground line before three layers of retaining walls back filler, 12-third layer retaining walls roof panels, 13-embankment side slopes, 14-wall.
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, with reference to the accompanying drawings and embodiments, to this Invention is described in further detail, it should be understood that and the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the limitation present invention.
Specific embodiment
The present invention provides three layers of retaining wall structures of stake support to be placed on the outside of welding with filler wire, including basis is placed in ground line or less And wall extends the first layer retaining wall (or breast boards) of the ground line or more, basis is placed in ground line or less and upper end is prolonged The ground line is stretched out to push up contour pile foundation, campshed before pile foundation point up to the first layer retaining wall (or breast boards) With rear campshed, the appropriate location of middle and lower part is applied together between the preceding campshed and rear campshed or several armored concrete connects Beam makes the preceding campshed and rear campshed connect into an entirety, has the cushion cap being attached thereto at the top of the pile foundation, in cushion cap Armoured concrete slab is applied by versant, on the cushion cap and is attached on the outside of the welding with filler wire and applies second layer retaining wall, Platform is set in second layer earth-retaining wall top, third layer retaining wall is applied on the inside of the platform.
In the present invention, foundation soil Lack of support, three layers of retaining wall of stake support can be overcome the problems, such as using pile foundation It is higher than the earth-retaining height of common retaining wall, and can be stably placed on welding with filler wire lateral surface, second layer retaining wall wall top Platform and armoured concrete slab can play the role of top soil pressure and only seldom partially transmit downwards, to make first and second The soil pressure of layer retaining wall greatly reduces, and then so that three layers of retaining wall structure of a support is played preferable supporting and retaining system to welding with filler wire and make With.
Realization of the invention is described in detail below in conjunction with specific attached drawing.
It as shown in Figure 1, Figure 2, Figure 3 shows, is a preferred embodiment provided by the invention.
Three layers of retaining wall structure of stake support provided by the invention are set to 13 outside of embankment side slope, are used for supporting and retaining system embankment side slope 13, Supporting and retaining system is served to embankment side slope 13.
Three layers of retaining wall structure of stake support provided in this embodiment include preceding campshed 1 and rear campshed 2 and preceding campshed and rear campshed Between the one or multi-channel reinforced concrete coupling beams 3 of middle and lower part appropriate location, first layer retaining wall (or breast boards) 4, cushion cap 5, Armoured concrete slab 6, the second layer retaining wall 7 being placed on cushion cap 5, in the platform 9 of second layer earth-retaining wall top, in platform 9 Third layer retaining wall 10.
With three layers of retaining wall structure of above-mentioned stake support, 4 basis of first layer retaining wall (or breast boards) be placed in ground line 14 with Under, its wall extend ground line 14 with up to 5 lower end of cushion cap, 6 bottom of armoured concrete slab and 5 bottom of cushion cap of 5 inside of cushion cap It is contour, second layer retaining wall 7 is set in 5 upper end of cushion cap, platform 9 is set in 7 wall top of second layer retaining wall, is set on the inside of platform 9 Third layer retaining wall 10 is set, the height that three layers of retaining wall structure of support can in this way adapted to is higher than common retaining wall, relative to The retaining Wall of large section, three layers of retaining wall structure of stake support can save bricklaying, improve safety, engineering is greatly reduced makes Valence;A diameter can be reduced relative to pile plate wall and stake is long, pile foundation is convenient for mechanized construction, shortens the construction period, and improves safety, reduces work Journey cost;The problem of anchor cable pore-forming difficulty is not present, can not find anchoring section or be difficult to carry out relative to anchor cable pile plate wall.
Above-mentioned pile foundation includes the preceding campshed 1 being set side by side and rear campshed 2, between preceding campshed 1 and rear campshed 2 under The appropriate location in portion is set together or several reinforced concrete coupling beams 3, preceding campshed 1 and the afterwards top of campshed 2, should equipped with cushion cap 5 The top of campshed 1 and rear campshed 2 before cushion cap 5 is separately connected, and connect the basis of second layer retaining wall 7, first layer retaining wall The basis of (or breast boards) 4 is placed in 14 or less ground line, its wall extends ground line 14 with up to 5 lower end of cushion cap, and left and right Campshed 1 before both ends are close to, in this way, first layer retaining wall (or breast boards) 4 and preceding campshed 1, rear campshed 2, reinforced concrete coupling beams 3 An overall structure is connected into, second layer retaining wall 7 passes through cushion cap 5 and preceding campshed 1 and rear campshed 2, reinforced concrete coupling beams 3 An overall structure is connected into, third layer retaining wall 10 is set to 7 wall top platform of second layer retaining wall, 9 inside, and the second layer is kept off Armoured concrete slab 6 is set on the inside of cushion cap 7 under 7 basis of cob wall, the soil pressure on third layer retaining wall can be made to only have in this way Very little is partially transferred within the scope of second layer retaining wall, and the soil pressure on second layer retaining wall only has very little to be partially transferred to first Within the scope of layer retaining wall, so that the earth-retaining height of three layers of retaining wall structure of support be made to greatly improve.
Preceding campshed 1 among the above and rear campshed 2 have respectively it is multiple, multiple preceding campshed 1 and it is multiple after campshed 2 along embankment 13 outside of side slope is arranged in order, should be maintained a certain distance between certain preceding campshed 1 and rear campshed 2, preceding campshed 1 and rear campshed The appropriate location of middle and lower part sets one or several reinforced concrete coupling beams 3 between 2, and the size of distance and coupling beam is big between practical stake It is small to be determined according to the stress size of stake.
To be completely embedded between first layer retaining wall (or breast boards) 4 and preceding campshed 1, rear campshed 2, first layer earth-retaining The basis of wall (or breast boards) 4 should be placed in the enough firm stratum of 14 or less bearing capacity of ground line, prevent it from occurring uneven Sedimentation;To be connected firmly between second layer retaining wall 7 and preceding campshed 1 and rear campshed 2, preceding campshed 1 and rear campshed 2 and second Cushion cap 5 is equipped between layer retaining wall 7, the lower end of the cushion cap 5 connects on preceding campshed 1 and rear campshed 2, and the upper end is then connected to second Layer retaining wall 7, armoured concrete slab 6 is connected on the inside of cushion cap 5.
To make third layer retaining wall 10 firm, it is closely knit that second layer retaining walls should carry on the back to 8 layered rolling of filler, and by the The setting width of two layers of retaining walls roof panel 9 meets stability Calculation requirement.
In the actual construction process, the construction method of above-mentioned three layers of retaining wall structure of stake support is as follows:
Construction method in all new embankment locations:
S1, the smooth location on original ground 14, for applying for preceding campshed 1, rear campshed 2 and first layer retaining wall (or breast boards) 4 Work reserves operation platform;
S2, construct on operation platform preceding campshed 1 and rear campshed 2, so that ground is extended in the upper end of preceding campshed 1 and rear campshed 2 14 or more, and between preceding campshed 1 and rear campshed 2 middle and lower part appropriate location construction together or several reinforced concrete coupling beams 3;
S3, first layer retaining wall (or breast boards) 4 of constructing on operation platform, so that 4 wall of first layer retaining wall (or breast boards) Extend ground 14 up to, first layer retaining wall (or breast boards) 4 contour with preceding campshed 1 and 2 top of rear campshed in the upper end of body The left and right sides and preceding 1 close-coupled of campshed;
Filler 8 on the inside of S4, backfill embankment side slope, layered rolling are closely knit to 4 top of first layer retaining wall (or breast boards);
S5, cushion cap 5 and armoured concrete slab 6 are applied on 2 stake top platform of preceding campshed 1 and rear campshed;
S6, second layer retaining wall 7 of constructing on cushion cap 5;
Filler 8 on the inside of S7, backfill embankment side slope, and layered rolling is closely knit to 7 top of second layer retaining wall;
S8, platform 9 is applied at the top of second layer retaining wall;
S9, setting applies third layer retaining wall 10 on the inside of platform 9;
Filler 11 on the inside of S10, backfill embankment side slope, and layered rolling is closely knit to 10 top of third layer retaining wall.
Only top is the construction method in new embankment location:
S1, the smooth location on original ground 14 stay for the construction of preceding campshed 1, rear campshed 2 and cushion cap 5, armoured concrete slab 6 Operation platform out;
S2, construct on operation platform preceding campshed 1 and rear campshed 2, so that ground is extended in the upper end of preceding campshed 1 and rear campshed 2 14 to 5 bottom absolute altitude of cushion cap;
S3, in the stake top platform construction cushion cap 5 and armoured concrete slab 6 of preceding campshed 1 and rear campshed 2;
S4, second layer retaining wall 7 of constructing on cushion cap 5;
Filler 8 on the inside of S5, backfill embankment side slope, and layered rolling is closely knit to 7 top of second layer retaining wall;
S6, platform 9 is applied at the top of second layer retaining wall 7;
S7, third layer retaining wall 10 is applied on the inside of platform 9;
Filler 11 on the inside of S8, backfill embankment side slope, and layered rolling is closely knit to 10 top of third layer retaining wall.
S9, excavation cushion cap 5 are with slope, first layer retaining wall (or breast boards) 4 of constructing, so that first layer retaining wall (or Breast boards) 4 walls upper end extend ground line 14 with up to 5 bottom absolute altitude of cushion cap, first layer retaining wall (or breast boards) 4 is left Right two sides and preceding 1 close-coupled of campshed.
The foregoing is merely present pre-ferred embodiments, are not intended to restrict the invention, all in spirit of the invention With any modifications, equivalent replacements, and improvements made within principle etc., should all be included in the protection scope of the present invention.

Claims (10)

1. three layers of retaining wall structure of support and construction method, it is characterised in that be placed in ground line or less including basis and wall extends First layer retaining wall (or breast boards) more than the ground line out, basis is placed in ground line or less and upper end is extended describedly Upper thread is attached thereto at the top of the pile foundation with pushing up contour pile foundation up to the first layer retaining wall (or breast boards) Cushion cap, the armoured concrete slab coupled on the inside of the cushion cap with the cushion cap on the cushion cap and is attached at described Second layer retaining wall on the outside of welding with filler wire placement in layers filler and is densified to second layer retaining wall after second layer retaining wall Platform is arranged in top at second layer retaining wall top surface, third layer retaining wall is arranged on the inside of the platform, in third layer retaining wall Placement in layers filler and it is densified to third layer earth-retaining wall top afterwards.
2. three layers of retaining wall structure of as described in claim 1 support and construction method, it is characterised in that before the pile foundation includes Campshed and rear campshed, and one or multi-channel armored concrete is arranged in the appropriate location of middle and lower part between preceding campshed and rear campshed Coupling beam, the cushion cap are placed in the preceding campshed and heel row stake top portion.
3. three layers of retaining wall structure of as described in claim 1 support and construction method, it is characterised in that the first layer earth-retaining Wall (or breast boards) basis be placed in ground line hereinafter, and the first layer retaining wall (or breast boards) wall extend the ground Line is up to contour with the pile foundation top surface.
4. three layers of retaining wall structure of as described in claim 1 support and construction method, it is characterised in that the first layer earth-retaining Wall (or breast boards) left and right ends and the pile foundation close-coupled.
5. three layers of retaining wall structure of as described in claim 1 support and construction method, it is characterised in that the second layer earth-retaining Wall is placed on the cushion cap top surface.
6. three layers of retaining wall structure of as described in claim 1 support and construction method, it is characterised in that on the inside of cushion cap with have The armoured concrete slab of cushion cap connection.
7. three layers of retaining wall structure of as described in claim 1 support and construction method, it is characterised in that on the inside of the platform Third layer retaining wall is set again.
8. three layers of retaining wall structure of as described in claim 1 support and construction method, it is characterised in that all new embankments The construction method of section:
S1, the smooth location on original ground reserve for the construction of preceding campshed, rear campshed and first layer retaining wall (or breast boards) Operation platform;
S2, construct on operation platform preceding campshed and rear campshed so that the upper end of preceding campshed and rear campshed extend ground line with On, and between preceding campshed and rear campshed middle and lower part appropriate location construction together or several reinforced concrete coupling beams, keep reinforcing bar mixed The preceding campshed and rear campshed are closely attached into an entirety by solidifying soil coupling beam;
S3, it constructs first layer retaining wall (or breast boards) on operation platform, so that first layer retaining wall (or breast boards) wall Upper end extend ground line with up to contour with preceding campshed and heel row stake top end, first layer retaining wall (or breast boards) left and right two Side and preceding campshed close-coupled;
Filler on the inside of S4, backfill embankment side slope, and layered rolling is closely knit to first layer retaining wall (or breast boards) top;
S5, applied on preceding campshed and heel row stake top platform cushion cap and with the armoured concrete slab that couples on the inside of cushion cap;
S6, second layer retaining wall of constructing on cushion cap;
Filler on the inside of S7, backfill embankment side slope, and layered rolling is closely knit to second layer retaining wall top;
S8, platform is set at the top of second layer retaining wall;
S9, third layer retaining wall is set on the inside of the platform;
Filler on the inside of S10, backfill embankment side slope, and layered rolling is closely knit to third layer retaining wall top.
9. two layers of retaining wall structure of as described in claim 1 support and construction method, it is characterised in that only top is new embankment The construction method in location:
S1, the smooth location on original ground, for preceding campshed, rear campshed and cushion cap, the armored concrete coupled with cushion cap inside The construction of plate reserves operation platform;
S2, construct on operation platform preceding campshed and rear campshed, so that ground line is extended extremely in the upper end of preceding campshed and rear campshed Cushion cap absolute altitude;
S3, on the stake top platform of preceding campshed and rear campshed construction bearing platform and with the armoured concrete slab that couples on the inside of cushion cap;
S4, second layer retaining wall of constructing on cushion cap;
Filler on the inside of S5, backfill embankment side slope, and layered rolling is closely knit to second layer retaining wall top;
S6, platform is set at the top of second layer retaining wall;
S7, third layer retaining wall is applied on the inside of the platform;
Filler on the inside of S8, backfill embankment side slope, and layered rolling is closely knit to third layer retaining wall top.
10.S9, cushion cap is excavated with slope, construct first layer retaining wall (or breast boards), so that first layer retaining wall (or earth-retaining Plate) wall upper end extend ground line with up to cushion cap bottom absolute altitude, at left and right sides of first layer retaining wall (or breast boards) with Preceding campshed close-coupled.
CN201811218245.6A 2018-10-19 2018-10-19 Stake three layers of retaining wall structure of support and construction method Pending CN109056790A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811218245.6A CN109056790A (en) 2018-10-19 2018-10-19 Stake three layers of retaining wall structure of support and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811218245.6A CN109056790A (en) 2018-10-19 2018-10-19 Stake three layers of retaining wall structure of support and construction method

Publications (1)

Publication Number Publication Date
CN109056790A true CN109056790A (en) 2018-12-21

Family

ID=64764209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811218245.6A Pending CN109056790A (en) 2018-10-19 2018-10-19 Stake three layers of retaining wall structure of support and construction method

Country Status (1)

Country Link
CN (1) CN109056790A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119232A (en) * 2020-01-23 2020-05-08 贵州星隆迪岩土工程有限公司 Improved pile-support two-layer retaining wall structure and construction method
CN111199070A (en) * 2020-01-27 2020-05-26 贵州星隆迪岩土工程有限公司 Design method of pile-supported two-layer retaining wall
CN111206617A (en) * 2020-03-25 2020-05-29 贵州星隆迪岩土工程有限公司 High pile bearing platform retaining wall and construction method
CN112922298A (en) * 2021-01-28 2021-06-08 中国建筑股份有限公司 Construction platform, construction platform building method and construction engineering construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06341153A (en) * 1993-05-31 1994-12-13 Maeda Corp Earth retaining wall for tree-planting
CN107916676A (en) * 2017-04-17 2018-04-17 吴震 Stake two layers of retaining wall structure of support and construction method
CN207436092U (en) * 2017-10-25 2018-06-01 中铁二院工程集团有限责任公司 Multistage pin-connected panel L-type greening barricade construction
CN108570994A (en) * 2018-07-12 2018-09-25 中国电力工程顾问集团西北电力设计院有限公司 Deep earthen fill zone gravity type and reinforced earth bulkhead combined support structure
CN209040151U (en) * 2018-10-19 2019-06-28 吴震 Stake three layers of retaining wall structure of support

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06341153A (en) * 1993-05-31 1994-12-13 Maeda Corp Earth retaining wall for tree-planting
CN107916676A (en) * 2017-04-17 2018-04-17 吴震 Stake two layers of retaining wall structure of support and construction method
CN207436092U (en) * 2017-10-25 2018-06-01 中铁二院工程集团有限责任公司 Multistage pin-connected panel L-type greening barricade construction
CN108570994A (en) * 2018-07-12 2018-09-25 中国电力工程顾问集团西北电力设计院有限公司 Deep earthen fill zone gravity type and reinforced earth bulkhead combined support structure
CN209040151U (en) * 2018-10-19 2019-06-28 吴震 Stake three layers of retaining wall structure of support

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119232A (en) * 2020-01-23 2020-05-08 贵州星隆迪岩土工程有限公司 Improved pile-support two-layer retaining wall structure and construction method
CN111199070A (en) * 2020-01-27 2020-05-26 贵州星隆迪岩土工程有限公司 Design method of pile-supported two-layer retaining wall
CN111206617A (en) * 2020-03-25 2020-05-29 贵州星隆迪岩土工程有限公司 High pile bearing platform retaining wall and construction method
CN112922298A (en) * 2021-01-28 2021-06-08 中国建筑股份有限公司 Construction platform, construction platform building method and construction engineering construction method
CN112922298B (en) * 2021-01-28 2022-07-12 中国建筑股份有限公司 Construction platform, construction platform building method and construction engineering construction method

Similar Documents

Publication Publication Date Title
CN109056790A (en) Stake three layers of retaining wall structure of support and construction method
CN103452147B (en) Self-balancing anchor counterweight broken pile forced-landing tilt correcting method
CN106522270B (en) A kind of the pile foundation barricade antidetonation retaining structure and construction method of the buffer layer containing EPS
CN105525627A (en) Two-way anchorage plate retaining wall and construction method thereof
CN111502674A (en) Advanced support structure and construction method for shallow-buried underground tunnel in water-rich and impurity-filled soil area
CN110374134A (en) A kind of combined member increased suitable for retaining wall and construction method
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN202865855U (en) Stabilizing plate type anchoring pile retaining structure
CN102839686A (en) Stabilizing plate type anchor pile retaining structure
CN109322313B (en) Foundation pit enclosure structure system and its construction method
CN101215840B (en) Airplane-type foundation reinforcement given-force construction method
CN101418574B (en) Construction method for reinforcing grade beam
CN204919602U (en) Compound anchored retaining wall by tie rods
CN212611713U (en) Bearing platform type pile plate wall structure
CN201771514U (en) Concealed tunneling structure with pile foundation
CN209040151U (en) Stake three layers of retaining wall structure of support
CN106758559B (en) A kind of construction method of high-speed railway silt, flour sand embankment structure
CN207878441U (en) A kind of ruggedized construction of soft soil foundation
CN105696701A (en) Along-slope shear wall building development platform and construction method thereof
CN205259051U (en) Railway existing line large -span crossbeam system of making somebody a mere figurehead
CN208363065U (en) Separate wall lock chamber structure
CN109056502B (en) Combined bridge abutment and construction method thereof
CN105464128A (en) Assembly-type protective construction method for slab-pile wall through pre-stressed anchor cables
CN206157490U (en) Moderate -low speed magnetic levitation double -line location supporting beam of pile foundation framing type support rail girder construction of filling
CN219137649U (en) Pile plate structure suitable for hillside fill side slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination