CN105839945B - The shift method and device of the large-scale cultural sight of indoor restricted clearance - Google Patents

The shift method and device of the large-scale cultural sight of indoor restricted clearance Download PDF

Info

Publication number
CN105839945B
CN105839945B CN201610162500.4A CN201610162500A CN105839945B CN 105839945 B CN105839945 B CN 105839945B CN 201610162500 A CN201610162500 A CN 201610162500A CN 105839945 B CN105839945 B CN 105839945B
Authority
CN
China
Prior art keywords
cultural sight
sight
jacking
cultural
hooping structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610162500.4A
Other languages
Chinese (zh)
Other versions
CN105839945A (en
Inventor
丁志强
张健健
鲍建鹏
王昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610162500.4A priority Critical patent/CN105839945B/en
Publication of CN105839945A publication Critical patent/CN105839945A/en
Application granted granted Critical
Publication of CN105839945B publication Critical patent/CN105839945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure

Abstract

The present invention relates to the translating device and method of the medium-and-large-sized cultural sight of indoor restricted clearance, the device includes:Hooping structure, enclose and be connected with support bar located at the base surrounding of the cultural sight and both sides;First jacking component, the corresponding support bar are set;Translating rails, along the cultural sight to for showing that the basic platform of the cultural sight is laid;Moving cart, it is positioned on the translating rails and is connected with the bottom of the hooping structure;Traction component, located at the front of the translating rails end, the traction component is connected with the support bar;And the second jacking component, located at both sides of the basic platform and corresponding with the support bar.The construction method of the present invention is simple, and the occupancy interior space is small, disclosure satisfy that the construction environment of indoor restricted clearance, and to the destructive small of the interior space, be capable of the translation cultural sight of safety and steady, have preferable protective effect to cultural sight.

Description

The shift method and device of the large-scale cultural sight of indoor restricted clearance
Technical field
The present invention relates to the realm of building construction, refer in particular to a kind of large-scale cultural sight of indoor restricted clearance shift method and Device.
Background technology
Cultural sight is enjoyed and is valued, attracted attention due to its unique historical value, is needed when for displaying, the interior space by Limit, large-scale cultural sight are tended not to be shifted using hoisting and hanging mode, now need to take a kind of Novel translation mode to be moved Position, the shift method are more stable, smaller to ruins injury relative to conventional lifting displacement mode.
Chinese patent 200710061874.8 discloses a kind of method of ancient architecture base integral support and change, first on basis Operation foundation ditch is excavated on periphery, replaces the soil body under original basis using prefabricated rectangle hollow box beam, is adopted during pushing tow in box beam Manually cut the earth, cut the earth when promoting by a small margin;Foundation underpinning completes one section, pours a section concrete;Foundation bottom has underpined Cheng Houzai pours side bar in four Mondays circle makes it be linked to be entirety;The operation of this form of construction work is excessively cumbersome, and has completed sky to interior Between it is destructive larger.
The content of the invention
A kind of the defects of it is an object of the invention to overcome prior art, there is provided large-scale cultural sight of indoor restricted clearance Shift method and device, it is cumbersome and interior has been completed the destructive larger of space and asked to solve form of construction work in the prior art Topic.
Realizing the technical scheme of above-mentioned purpose is:
A kind of shift method of the large-scale cultural sight of indoor restricted clearance of the present invention, including:
Position measuring to be presented displaying base control line and guide rail control line according to cultural sight;
Constructed according to the displaying base control line for the basic platform for showing the cultural sight;
In the basic platform translation to be placed at the guide rail control line is corresponded to away from the distal end of the cultural sight Constructed on the center line of guide rail traction component;
Consolidation process is carried out to the cultural sight, the consolidation process is included in the base of the cultural sight all around If hooping structure, the both sides of the hooping structure are corresponding with the guide rail control line;
Corresponded in the hooping structure and the first jacking component is set at the outside of the both sides of the guide rail control line, in described The outside relative set second that basic platform corresponds to the both sides of the guide rail control line jacks component;
The both sides connection support bar of the guide rail control line is corresponded in the hooping structure, the support bar corresponds to described One jacking component is set;
The support bar is jacked using the described first jacking component and then jacks up the cultural sight, and after described armful Translating rails are laid along the guide rail control line in the bottom of cuff structure;
In holding movable dolly on the translating rails, the cultural sight is transferred using the described first jacking component, To cause the cultural sight to put off on the moving cart, the bottom of the moving cart and the hooping structure is connected Connect fixation;
The support bar is connected with the traction component, the hooping structure is affected by the traction component, and then So that the cultural sight moves to the basic platform along the translating rails;And
The support bar is jacked using the described second jacking component and then jacks up the cultural sight, then will be described flat Move guide rail to remove, recycle the second jacking component to transfer the cultural sight to cause the cultural sight to put off in institute State on basic platform, remove the hooping structure.
The present invention sets hooping structure by the surrounding in cultural sight base, then using jacking component lifting base Afterwards, translating rails are laid in hooping structure bottom, is translated cultural sight in place, so along translating rails using moving cart Construction method it is simple, take the interior space it is small, disclosure satisfy that the construction environment of indoor restricted clearance, and the interior space is broken Bad property is small, is capable of the translation cultural sight of safety and steady, has preferable protective effect to cultural sight.
The large-scale cultural sight of the indoor restricted clearance of the present invention shift method further improvement is that, draw groups of constructing Part, including:
The center line of the corresponding translating rails excavates work nest;
In erecting fix bar in the work nest, the top of the fix bar protrudes out the work nest and forms drawknot section;
Concrete structure is formed in casting concrete in the work nest, the fix bar is anchored in the concrete structure It is interior;And
In connecting rope and actuator in the drawknot section, the rope is pulled by the actuator.
The large-scale cultural sight of the indoor restricted clearance of the present invention shift method further improvement is that, at the reinforcing Reason also includes:
Cultural sight parcel is tight;
Enclosed in the outer weekly interval of the cultural sight and set flitch, and using suspender belt by the flitch colligation together;
Steel pipe is set in the outside of the flitch to be reinforced;
The film laying between the steel pipe and the hooping structure, using the film by the inwall of the hooping structure Face and the steel pipe cover;
Casting concrete forms ruggedized construction on the film, and the ruggedized construction is by the hooping structure and described Space is tamped between cultural sight.
The large-scale cultural sight of the indoor restricted clearance of the present invention shift method further improvement is that, in the historical relic The base in ruins all around sets hooping structure, including:
It is welded and fixed between the circle H profile steel of base surrounding connection one of the cultural sight, the H profile steel;And
Channel-section steel is welded and fixed on the H profile steel, is welded and fixed between the channel-section steel, passes through the channel-section steel and the H Shaped steel forms the hooping structure for enclosing and setting the cultural sight.
The large-scale cultural sight of the indoor restricted clearance of the present invention shift method further improvement is that, the second top is set It is identical with setting the first jacking component to rise component, sets the first jacking component to include:
The centre position of the hooping structure side is corresponded in the outside of the guide rail control line and two corner positions are dug Pick adapts to the jacking groove of jack;
The bottom land compacting of the jacking groove and casting concrete are formed into jacking basis;
Jack is placed on the jacking basis.
Present invention also offers a kind of translating device of the large-scale cultural sight of indoor restricted clearance, including:
Hooping structure, the base surrounding located at the cultural sight is enclosed, for reinforcing the cultural sight, the anchor ear knot The relative both sides of structure are connected with support bar;
First jacking component, the corresponding support bar is set, for jacking the support bar and then by the anchor ear knot Structure jacks up the cultural sight;
Translating rails are described flat along the cultural sight to the basic platform laying for showing the cultural sight The end for moving guide rail exceedes the basic platform;
Moving cart, it is positioned on the translating rails and is connected with the bottom of the hooping structure;
Traction component, located at the front of the translating rails end, the traction component is corresponded in the translating rails Heart line is set, and the traction component is connected with the support bar, affects the hooping structure to make by the traction component Obtain the cultural sight and move to the basic platform along the translating rails;And
Second jacking component, it is described for jacking located at both sides of the basic platform and corresponding with the support bar Support bar and then the cultural sight is jacked up by the hooping structure.
The large-scale cultural sight of the indoor restricted clearance of the present invention translating device further improvement is that, the draw groups Part includes work nest, fix bar, concrete structure, rope and actuator, and the work nest is corresponded in the translating rails Heart line is set, and the fix bar is erected in the work nest and the top of the fix bar protrudes out the work nest and formed and drawn Section is tied, the concrete structure pouring anchors in the work nest and by the fix bar, the rope and the actuator The drawknot section is connected to, and the rope is pulled by the actuator.
The large-scale cultural sight of the indoor restricted clearance of the present invention translating device further improvement is that, in addition to be used for The reinforcement assembly of the cultural sight is reinforced, the reinforcement assembly includes wrapping up the covering of the cultural sight, enclosed located at institute The spaced flitch in cultural sight periphery is stated, the steel pipe located at the flitch periphery is enclosed, is layed in the steel pipe and described armful Film between cuff structure and pour ruggedized construction on the film, the flitch by suspender belt colligation together, The film is covered in the internal face of the hooping structure and the steel pipe, the ruggedized construction tamp in the hooping structure and Space between the cultural sight.
The large-scale cultural sight of the indoor restricted clearance of the present invention translating device further improvement is that, the anchor ear knot Structure includes the H profile steel being connected with the base surrounding of the cultural sight and the channel-section steel being fixedly welded on the H profile steel, described It is welded and fixed between H profile steel, is welded and fixed between the channel-section steel.
The large-scale cultural sight of the indoor restricted clearance of the present invention translating device further improvement is that, first top Rising component and the second jacking component includes:
The centre position of the hooping structure side and the top of two corner positions are corresponded to located at the outside of the translating rails Groove is risen, the size of the jacking groove adapts to the jack;
Pour in the jacking basis of the jacking groove bottom land;
The jack being positioned on the jacking basis.
Brief description of the drawings
Fig. 1 is the plan of the traction component of the translating device of the large-scale cultural sight of the indoor restricted clearance of the present invention.
Fig. 2 is the plan of the hooping structure of the translating device of the large-scale cultural sight of the indoor restricted clearance of the present invention.
Fig. 3 is A-A sectional views in Fig. 2.
Fig. 4 is the plan of the jacking component of the translating device of the large-scale cultural sight of the indoor restricted clearance of the present invention.
Fig. 5 is B-B sectional views in Fig. 4.
Fig. 6 is the hooping structure connection support bar of the translating device of the large-scale cultural sight of the indoor restricted clearance of the present invention Plan.
Fig. 7 is the enlarged diagram that the H profile steel in hooping structure is connected with support bar.
Fig. 8 is the plan of the translating rails of the translating device of the large-scale cultural sight of the indoor restricted clearance of the present invention.
Fig. 9 is C-C sectional views in Fig. 8.
Figure 10 is D-D sectional views in Fig. 8.
Figure 11 is the plan of the translating device of the large-scale cultural sight of the indoor restricted clearance of the present invention.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
The invention provides a kind of shift method and device of the large-scale cultural sight of indoor restricted clearance, suitable for interior The translation of the less cultural sight in space, and to the destructive small of the interior space, easy construction.The present invention is by historical relic The surrounding of ruins base sets a circle hooping structure, then using jack lifting cultural sight base, under hooping structure Side's laying translating rails, set moving cart on guide rail, recycle the traction component for being arranged on front that cultural sight is steady It is moved to position in place.Below in conjunction with the accompanying drawings to the shift method and device of the large-scale cultural sight of the indoor restricted clearance of the present invention Illustrate.
Refering to Fig. 1, it is shown that the traction component of the translating device of the large-scale cultural sight of the indoor restricted clearance of the present invention Plan.With reference to Fig. 1, the translating device of the large-scale cultural sight of the indoor restricted clearance of the present invention is illustrated.
As shown in figure 1, the translating device of the large-scale cultural sight of the indoor restricted clearance of the present invention is used for cultural sight 10 Moving at basic platform 20, the basic platform 20 is used to show cultural sight 10, with reference to shown in Fig. 3, the cultural sight 10 Bottom is provided with base 101, and the base 101 is steel plate.
With reference to shown in Fig. 2, the translating device include hooping structure 30, first jack component, translating rails, moving cart, Traction component, the second jacking component and reinforcement assembly.
Hooping structure 30 encloses the surrounding of the base 101 located at cultural sight 10, and hooping structure 30 is used to reinforce cultural sight 10, the also translation for cultural sight 10 provides force basis, with reference to shown in Fig. 6, in the relative both sides connection of hooping structure 30 There is support bar 301, the support bar 301 is located at the both sides corresponding with translating rails of hooping structure 30, and support bar 301 is connected with per side 3, and support bar 301 is located at the centre position and two corners of the side of hooping structure 30, support bar 301 is arranged to jacking group The jacking operation of part provides fulcrum.In conjunction with shown in Fig. 3, hooping structure 30 includes H profile steel 302 and channel-section steel 303, H profile steel 302 It is connected with the surrounding of base 101 of cultural sight 10, channel-section steel 303 is fixedly welded on H profile steel 302, two to be connected H It is welded and fixed between shaped steel, is welded and fixed between two to be connected channel-section steel.In the present embodiment, the hooping structure 30 is side Shape, is so connected to a H profile steel 302 respectively on four sides of base 101, and four H profile steels 302 enclose squarely, channel-section steel 303 Also squarely is enclosed.With reference to shown in Fig. 7, support bar 301 is shorter I-steel, the I-steel when being connected with H profile steel 302, One end of I-steel is inserted in H profile steel 302 and is welded and fixed with the web of H profile steel 302 and two wing plates.
With reference to shown in Fig. 4 to Fig. 6, the support bar 301 that the first jacking component is corresponded on hooping structure 30 is set, the first jacking Component is used to jack support bar 301 and then jack up cultural sight 10 by hooping structure 30.The first jacking component includes top Groove 401, jacking basis 402 and jack 403 are risen, jacking groove 401 is located at the outside of translating rails, and corresponding hooping structure The centre position of 30 sides and two corner positions, the position of the jacking groove 401 is relative with support bar 301, jacks the size of groove 401 Adapt to jack 403.Jacking basis 402 is poured in the bottom land of jacking groove 401, and the bottom land for jacking groove 401 is tamped and poured 20cm thickness C30 concrete jacks basis 402 to be formed.Jack 403 is positioned on jacking basis 402, passes through jack 403 Motion upwards, realization are lifted cultural sight 10, moved downward, and realization puts off cultural sight 10.
With reference to shown in Fig. 8 to Figure 10, translating rails 60 are along cultural sight 10 to the basis for showing cultural sight 10 Platform 20 is laid, and the end of translating rails 60 has exceeded basic platform 20, and the top of translating rails 60 have also exceeded hooping structure 30.Translating rails 60 also use H profile steel.When laying translating rails 60, using the jack 403 of the first jacking component by anchor ear knot Structure 30 and cultural sight 10 lift, and then lay translating rails 60, to prevent translating rails 60 from shifting, in the outer of translating rails 60 Side skewed horizontal load hound 601, hound 601 are located between ground and translating rails 60, and hound 601 serves reinforcing Effect.In the top holding movable dolly 40 of translating rails 60, then multiple moving carts are placed on the translating rails 60 of the same side 40.Then hooping structure 30 and cultural sight 10 are steadily put off using the jack 403 of the first jacking component, hooping structure 30 Put off on moving cart 40, the moving cart 40 and the bottom of hooping structure 30 are connected, preferably using welding.
With reference to shown in Fig. 1, Fig. 9 and Figure 11, traction component is located at the front of the end of translating rails 60, the traction component pair The center line of translating rails 60 is answered to set, the traction component is connected with the support bar 301 on hooping structure 30, and traction component is to branch Strut 301 applies tractive force, affects hooping structure 30, and then causes cultural sight 10 as hooping structure 30 is together along translation Guide rail 60 is moved at basic platform 20.Traction component includes work nest, fix bar 501, concrete structure 502, rope 503 and actuator 504, the center line that work nest corresponds to translating rails 60 is set, and fix bar 501 is erected in work nest, and The top of fix bar 501 protrudes out work nest and forms drawknot section, and the fix bar 501 is correspondingly arranged at the center line of translating rails 60 On, concrete structure 502 pours to be anchored in work nest and by fix bar 501, and rope 503 and actuator 504 are connected to fixation The drawknot section of bar 501, actuator 504 pull rope 503, and the rope 503 is also attached on support bar 301, passes through actuator 504 Rope 503 is pulled, pulling force is applied to support bar 301, and then hooping structure 30 is pulled along so that the edge of hooping structure 30 Translating rails 60 to move.Fix bar 501 in traction component can use steel pipe.Actuator 503 can use bottle gouard moved by hands Or electric block.
Reinforcement assembly is used to reinforce cultural sight 10, and the reinforcement assembly is set including wrapping up the covering of cultural sight 10, enclosing In the periphery of cultural sight 10 and spaced flitch, enclose the steel pipe located at the flitch periphery, be layed in steel pipe and anchor ear knot Film between structure 30 and ruggedized construction 701 on film being poured, covering uses plastic sheeting and/or colour bar cloth, Cultural sight 10 is wrapped up tightly.Flitch spacing 500mm located at the periphery of cultural sight 10 is set, and flitch surrounds cultural sight 10 Set one circle, then again by suspender belt by the flitch colligation enclosed together.It is layed between steel pipe and hooping structure 30 Film uses double-deck 0.2mm thickness plastic sheeting, and covered rearing with plastic film is thin by plastics in the internal face and steel pipe of hooping structure 30 Film separates the concrete subsequently poured, passes through casting concrete formation ruggedized construction 701, the ruggedized construction on plastic sheeting 701 tamp the space between hooping structure 30 and cultural sight 10.Ruggedized construction 701 and hooping structure 30 and cultural sight 10 it Between separated by plastic sheeting so that ruggedized construction 701 can play reinforcement effect, facilitate follow-up dismantling operation again.
The use process of the large-scale cultural sight translating device of the indoor restricted clearance of the present invention is illustrated below.
During using the medium-and-large-sized cultural sight translating device of indoor restricted clearance of the present invention to translate cultural sight, historical relic is lost After the completion of location is reinforced by reinforcement assembly, first adjustment is arranged in first group of jacking component of cultural sight initial position both sides Jack and fixed leveling carry out examination lift, after examination lift is without exception, leveling are fixed to jack again so that first group of top All jack risen in component are generally aligned in the same plane, when so synchronously being jacked, it can be ensured that cultural sight integrally can Steady lifting.Synchronously pressed using jack, cultural sight is integrally slowly steadily raised to away from ground certain altitude, the height Need to provide possibility for follow-up laying translating rails, this highly can be 40cm.Jack will by support bar and hooping structure After cultural sight lifting, according to the position of the translating rails of reservation, translating rails, translating rails are set in the lower section of hooping structure Using H250 shaped steel, every section of translating rails use short steel skewed horizontal load with ground, temperature pier are carried out, to prevent translating rails Displacement.Moving cart is then set between hooping structure and translating rails, the jack of first group of jacking component is unclamped in unification, So that cultural sight smoothly falls in moving cart, the bottom of hooping structure and moving cart are welded.On basic platform Lay two layers of geotextiles.Using the traction component in front, the rope in traction component is fixedly connected with hooping structure both sides Support bar connects, and then by the way that cucurbit is artificial or electronic pulling support bar, and then causes cultural sight to be steadily moved to basis At platform, cultural sight lifting, dismounting are then translated into rail using the jack in second group of jacking component at basic platform Road, then the jack in second group of jacking component of unified release, makes cultural sight slowly steadily fall on basic platform, tears open Except reinforcement assembly, hooping structure is abolished.
The indoor medium-and-large-sized cultural sight shift method of restricted clearance of the present invention is illustrated below.
A kind of shift method of the indoor medium-and-large-sized cultural sight of restricted clearance of the present invention, including:
As shown in figure 1, surveying setting-out:Position measuring to be presented displaying base control line and guide rail according to cultural sight 10 Control line 102, the guide rail control line 102 are the position of follow-up translating rails laying installation, and displaying base control line is construction exhibition Show the position of platform.
The basic platform of construction displaying:According to displaying base control line construction positioned at opening position to be presented, for showing The basic platform 20 of cultural sight 10.The basic platform 20 is reinforced concrete structure, assembling reinforcement and casting concrete is with regard to shape Into basic platform 20.
Traction component is constructed:Wait to set at the distal end corresponding rails control line 102 of cultural sight 10 in basic platform 20 Constructed on the center line for the translating rails put traction component;With reference to shown in Figure 11, construction traction component includes:Corresponding translating rails 60 center line excavates work nest, and the work nest is arranged on the front of basic platform 20, is easy to apply tractive force to cultural sight, So that cultural sight is smoothly drawn to basic platform 20.The size of the work nest is that the wide * 100cm of the long * 50cm of 50cm are deep, work Make groove as 2, be correspondingly arranged respectively with translating rails.In erecting fix bar 501 in work nest, the top of fix bar 501 protrudes out Go out work groove and form drawknot section, the length of the drawknot section is not less than 0.5 meter, and so as to drawknot rope, the fix bar 501 is correspondingly arranged On the center line of translating rails 60, to ensure the center line of rope that follow-up drawknot fixes with translating rails 60 when exceptionally straight Overlap;Concrete structure 502 is formed in casting concrete in work nest, fix bar 501 is anchored in concrete structure 502;In Rope and actuator are connected in drawknot section, rope is pulled by actuator.Rope can use steel wire rope, and actuator can use Bottle gouard moved by hands or electric block.
The reinforcing of cultural sight body:Consolidation process, with reference to shown in Fig. 2 and Fig. 3, consolidation process bag are carried out to cultural sight The base 101 included in cultural sight 10 all around sets hooping structure 30, and the both sides of hooping structure 30 are corresponding with guide rail control line, The both sides of hooping structure 30 are alignd setting with translating rails.All around setting hooping structure in the base of cultural sight includes:Yu Wen H profile steel 302 is enclosed in the surrounding of base 101 connection one in thing ruins 10, is welded and fixed between H profile steel 302;Welded on H profile steel 302 Channel-section steel 303 is fixed, is welded and fixed between channel-section steel 303, is formed by channel-section steel 303 and H profile steel 302 and encloses the anchor ear for setting cultural sight 10 Structure 30.H profile steel 302 uses H250 shaped steel, and channel-section steel 303 uses 25a channel-section steels.Consolidation process also includes:Cultural sight is wrapped up Tightly, cultural sight is wrapped up using plastic sheeting or colour bar cloth tight;Enclosed in the outer weekly interval of cultural sight and set flitch, and Using suspender belt by flitch colligation together, flitch spacing is 500mm;Steel pipe is set in the outside of flitch to be reinforced;In steel pipe The film laying between hooping structure, the internal face of hooping structure and steel pipe are covered using film;Poured on film Build concrete and form ruggedized construction 701, the concrete poured uses C30 microlith slightly expanded concretes, and ruggedized construction 701 is by anchor ear Space is tamped between structure 30 and cultural sight 10.The film laying before casting concrete forms ruggedized construction 701 is thin by this Film keeps apart the concrete poured with hooping structure and cultural sight, facilitates the operation subsequently removed, it also avoid to text The destruction in thing ruins, also act the effect of reinforcing.Film is using double-deck whole 0.2mm thickness plastic sheetings.
Jack foundation construction:With reference to shown in Fig. 1 and Fig. 4, in the outer of the both sides of the corresponding rails control line 102 of hooping structure 30 First jacking component is set at portion, it is corresponding in the outside of the both sides of the corresponding rails control line of basic platform 20 with reference to shown in Figure 11 Second jacking component is set;The way of first jacking component and the second jacking component is identical, is carried out by taking the first jacking component as an example Explanation.With reference to shown in Fig. 4 and Fig. 5, the first jacking component is set to include:Hooping structure side is corresponded in the outside of guide rail control line Centre position and two corner positions excavate the jacking groove 401 for adapting to jack;The bottom land for jacking groove 401 is tamped and poured Build concrete and form jacking basis 402;Jack 403 is placed on jacking basis 402.
Translating rails are constructed:In the both sides connection support bar 301 of the corresponding rails control line of hooping structure 30, support bar 301 Corresponding first jacking component is set;The support bar 301 uses short steel, and with reference to shown in Fig. 7, the end of support bar 301 is inserted in In the H profile steel 302 of hooping structure 30, the web of the end face and H profile steel 302 of support bar 301 fits, support bar 301 it is upper Lower wing plate and the upper lower wing plate of H profile steel 302 fit, then by the end face of support tube 301, upper lower wing plate with H profile steel 302 It is welded and fixed.
With reference to shown in Fig. 1 and Fig. 8, using the first jacking component jacking support bar 301 and then cultural sight 10 is jacked up, and After the bottom of hooping structure 30 translating rails 60 are laid along guide rail control line;Utilize the jack 403 of the first jacking component When carrying out jacking and lifting, adjust jack 403 and fixed leveling carry out examination lift, after examination lift is without exception, leveling is fixed again, All jack of first jacking component synchronously press so that and cultural sight is integrally slowly steadily raised to ground certain distance, The distance can be 40cm.After cultural sight lifting, translating rails 60, translating rails are laid according to the guide rail control line of reservation 60 use H profile steel, with reference to shown in Fig. 9, are supported between every section of translating rails 60 and ground using hound 601, hound 601 selects With angle clip, temperature pier is carried out to translating rails 60, to prevent from shifting.
With reference to shown in Fig. 9 and Figure 10, in holding movable dolly 40 on translating rails 60, component is jacked by historical relic using first Ruins 10 are transferred, to cause cultural sight to put off on the moving cart 40, by moving cart 40 and hooping structure 30 Bottom is connected.It can use and be welded to connect moving cart and the H profile steel of hooping structure bottom.
With reference to shown in Figure 11, support bar 301 is connected with traction component, hooping structure 30 is affected by traction component, entered And cultural sight is caused to move to basic platform 20 along translating rails 60;By the rope 503 in traction component and support bar 301 Connection, then rope 503 is affected to apply tractive force and then to support bar 301 by actuator 504 so that cultural sight followed by Dolly moves forward along translating rails 60, until being moved at basic platform 20.
Two layers of geotextiles is laid on basic platform, after cultural sight is in place, utilizes the second jacking component jacking support Bar and then cultural sight is jacked up, then removed translating rails, recycle the second jacking component to transfer cultural sight so that Obtain cultural sight to put off on basic platform, remove flitch, steel pipe and film, the colour bar set when hooping structure and consolidation process Cloth.
The present invention sets hooping structure by the surrounding in cultural sight base, then using jacking component lifting base Afterwards, translating rails are laid in hooping structure bottom, is translated cultural sight in place, so along translating rails using moving cart Construction method it is simple, take the interior space it is small, disclosure satisfy that the construction environment of indoor restricted clearance, and the interior space is broken Bad property is small, is capable of the translation cultural sight of safety and steady, has preferable protective effect to cultural sight.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State and bright many variations example is made to the present invention.Thus, some details in embodiment should not form limitation of the invention, this Invention will be used as protection scope of the present invention using the scope that appended claims define.

Claims (10)

  1. A kind of 1. shift method of the large-scale cultural sight of indoor restricted clearance, it is characterised in that including:
    Position measuring to be presented displaying base control line and guide rail control line according to cultural sight;
    The opening position to be presented, the basis for showing the cultural sight are located at according to the displaying base control line construction Platform;
    In the basic platform translating rails to be placed at the guide rail control line are corresponded to away from the distal end of the cultural sight Center line on construct traction component;
    To the cultural sight carry out consolidation process, the consolidation process be included in the cultural sight base all around set embrace Cuff structure, the both sides of the hooping structure are corresponding with the guide rail control line;
    Corresponded in the hooping structure and the first jacking component is set at the outside of the both sides of the guide rail control line, in the basis The outside relative set second that platform corresponds to the both sides of the guide rail control line jacks component;
    The both sides connection support bar of the guide rail control line is corresponded in the hooping structure, the support bar corresponds to first top Component is risen to set;
    The support bar is jacked using the described first jacking component and then jacks up the cultural sight, and after the anchor ear knot Translating rails are laid along the guide rail control line in the bottom of structure;
    In holding movable dolly on the translating rails, the cultural sight is transferred using the described first jacking component, so that Obtain the cultural sight to put off on the moving cart, the moving cart is connected admittedly with the bottom of the hooping structure It is fixed;
    The support bar is connected with the traction component, the hooping structure is affected by the traction component, and then cause The cultural sight moves to the basic platform by the moving cart along the translating rails;And
    The support bar is jacked using the described second jacking component and then jacks up the cultural sight, then leads the translation Rail is removed, and recycles the second jacking component to transfer the cultural sight to cause the cultural sight to put off in the base On plinth platform, the hooping structure is removed.
  2. 2. the shift method of the large-scale cultural sight of indoor restricted clearance as claimed in claim 1, it is characterised in that construction is led Draw component, including:
    The center line of the corresponding translating rails excavates work nest;
    In erecting fix bar in the work nest, the top of the fix bar protrudes out the work nest and forms drawknot section;
    Concrete structure is formed in casting concrete in the work nest, the fix bar is anchored in the concrete structure; And
    In connecting rope and actuator in the drawknot section, the rope is pulled by the actuator.
  3. 3. the shift method of the large-scale cultural sight of indoor restricted clearance as claimed in claim 1 or 2, it is characterised in that institute Stating consolidation process also includes:
    Cultural sight parcel is tight;
    Enclosed in the outer weekly interval of the cultural sight and set flitch, and using suspender belt by the flitch colligation together;
    Steel pipe is set in the outside of the flitch to be reinforced;
    The film laying between the steel pipe and the hooping structure, using the film by the internal face of the hooping structure and The steel pipe covers;
    Casting concrete forms ruggedized construction on the film, and the ruggedized construction is by the hooping structure and the historical relic Space is tamped between ruins.
  4. 4. the shift method of the large-scale cultural sight of indoor restricted clearance as claimed in claim 3, it is characterised in that described The base of cultural sight all around sets hooping structure, including:
    It is welded and fixed between the circle H profile steel of base surrounding connection one of the cultural sight, the H profile steel;And
    Channel-section steel is welded and fixed on the H profile steel, is welded and fixed between the channel-section steel, passes through the channel-section steel and the H profile steel Form the hooping structure for enclosing and setting the cultural sight.
  5. 5. the shift method of the large-scale cultural sight of indoor restricted clearance as claimed in claim 1, it is characterised in that set the Two jacking components are identical with setting the first jacking component, set the first jacking component to include:
    In the outside of the guide rail control line correspond to the centre position of the hooping structure side and two corner positions excavate it is suitable Jacking groove assigned in jack;
    The bottom land compacting of the jacking groove and casting concrete are formed into jacking basis;
    Jack is placed on the jacking basis.
  6. A kind of 6. translating device of the large-scale cultural sight of indoor restricted clearance, it is characterised in that including:
    Hooping structure, the base surrounding located at the cultural sight is enclosed, for reinforcing the cultural sight, the hooping structure phase To both sides be connected with support bar;
    First jacks component, and correspondingly the support bar is set, for jacking the support bar and then being incited somebody to action by the hooping structure The cultural sight jacks up;
    Translating rails, along the cultural sight to for showing that the basic platform of the cultural sight is laid, the translation is led The end of rail exceedes the basic platform;
    Moving cart, it is positioned on the translating rails and is connected with the bottom of the hooping structure;
    Traction component, located at the front of the translating rails end, the traction component corresponds to the center line of the translating rails Set, the traction component is connected with the support bar, and the hooping structure and then institute are affected by the traction component State cultural sight and move to the basic platform along the translating rails;And
    Second jacking component, located at both sides of the basic platform and corresponding with the support bar, for jacking the support Bar and then the cultural sight is jacked up by the hooping structure.
  7. 7. the translating device of the large-scale cultural sight of indoor restricted clearance as claimed in claim 6, it is characterised in that described to lead Drawing component includes work nest, fix bar, concrete structure, rope and actuator, and the work nest corresponds to the translating rails Center line set, the fix bar is erected in the work nest and the top of the fix bar protrudes out the work flute profile Into drawknot section, the concrete structure pouring anchors in the work nest and by the fix bar, the rope and the drive Moving part is connected to the drawknot section, and pulls the rope by the actuator.
  8. 8. the translating device of the large-scale cultural sight of indoor restricted clearance as claimed in claims 6 or 7, it is characterised in that also Including the reinforcement assembly for reinforcing the cultural sight, covering of the reinforcement assembly including the parcel cultural sight, Enclose located at the spaced flitch in the cultural sight periphery, enclose the steel pipe located at the flitch periphery, be layed in the steel pipe Film between the hooping structure and ruggedized construction on the film is poured, the flitch is tied up by suspender belt Bind together, the film is covered in the internal face of the hooping structure and the steel pipe, and the ruggedized construction is tamped in described Space between hooping structure and the cultural sight.
  9. 9. the translating device of the large-scale cultural sight of indoor restricted clearance as claimed in claim 8, it is characterised in that described armful Cuff structure includes the H profile steel being connected with the base surrounding of the cultural sight and the channel-section steel being fixedly welded on the H profile steel, It is welded and fixed between the H profile steel, is welded and fixed between the channel-section steel.
  10. 10. the translating device of the large-scale cultural sight of indoor restricted clearance as claimed in claim 6, it is characterised in that described First jacking component and the second jacking component include:
    The centre position of the hooping structure side and the jacking groove of two corner positions are corresponded to located at the outside of the translating rails, The size of the jacking groove adapts to jack;
    Pour in the jacking basis of the jacking groove bottom land;
    The jack being positioned on the jacking basis.
CN201610162500.4A 2016-03-22 2016-03-22 The shift method and device of the large-scale cultural sight of indoor restricted clearance Active CN105839945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610162500.4A CN105839945B (en) 2016-03-22 2016-03-22 The shift method and device of the large-scale cultural sight of indoor restricted clearance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610162500.4A CN105839945B (en) 2016-03-22 2016-03-22 The shift method and device of the large-scale cultural sight of indoor restricted clearance

Publications (2)

Publication Number Publication Date
CN105839945A CN105839945A (en) 2016-08-10
CN105839945B true CN105839945B (en) 2017-11-10

Family

ID=56587724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610162500.4A Active CN105839945B (en) 2016-03-22 2016-03-22 The shift method and device of the large-scale cultural sight of indoor restricted clearance

Country Status (1)

Country Link
CN (1) CN105839945B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518081B (en) * 2018-05-14 2019-11-15 武大巨成结构股份有限公司 A kind of construction method increasing the cell underground space newly using synchronization of jacking up shift unit
CN111058046A (en) * 2019-11-28 2020-04-24 上海二十冶建设有限公司 Method for installing looping car in limited space
CN113389405B (en) * 2021-06-22 2023-02-28 中国建筑第八工程局有限公司 Integral moving and modifying structure and moving and modifying method for small and medium-sized ancient well structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2366487Y (en) * 1998-06-10 2000-03-01 高继良 Equipment for parallel removing of whole building
CN2375704Y (en) * 1999-01-18 2000-04-26 管春梅 Integral removing device for high building
CN2674002Y (en) * 2003-10-27 2005-01-26 高建华 Equipment for moving small-sized building
JP2005076209A (en) * 2003-08-28 2005-03-24 Kumagai Gumi Co Ltd Reconstruction method of building
JP2009127251A (en) * 2007-11-21 2009-06-11 Takenaka Komuten Co Ltd Rebuilding method of building
CN103216114A (en) * 2013-04-18 2013-07-24 朱奎 Translation construction method for building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2366487Y (en) * 1998-06-10 2000-03-01 高继良 Equipment for parallel removing of whole building
CN2375704Y (en) * 1999-01-18 2000-04-26 管春梅 Integral removing device for high building
JP2005076209A (en) * 2003-08-28 2005-03-24 Kumagai Gumi Co Ltd Reconstruction method of building
CN2674002Y (en) * 2003-10-27 2005-01-26 高建华 Equipment for moving small-sized building
JP2009127251A (en) * 2007-11-21 2009-06-11 Takenaka Komuten Co Ltd Rebuilding method of building
CN103216114A (en) * 2013-04-18 2013-07-24 朱奎 Translation construction method for building

Also Published As

Publication number Publication date
CN105839945A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN105839945B (en) The shift method and device of the large-scale cultural sight of indoor restricted clearance
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN105239594A (en) Prestressed pipe pile upright
CN108729458A (en) The underwater propping steel sheet pile cofferdam construction structure of deep water and its construction method
CN110306524A (en) The foundation reinforcing structure and method of the Heavy Equipment-hoisting of the unclosed building of proximity
CN206941325U (en) The newly-built peg board formula roadbed of girder construction system in length and breadth
CN107419802A (en) A kind of Precast Concrete Frame and construction method
CN108004925A (en) Prestress reinforced concrete circular arch tower construction method
CN110486034A (en) Subway station and construction method based on pile foundation in four pilot tunnel of single layer and middle drift
WO2023184679A1 (en) Large-span space special-shaped arch rib flying-swallow type basket steel box arch bridge and rapid construction method
CN105350409B (en) Urban track traffic bolster formula steel spring floating slab road bed railroad switch construction method
WO2022184136A1 (en) Assembly-type subway station full-hoisting construction method in pile-anchor retaining structure system
CN102926388B (en) Earth moving method for deep foundation pit excavation
CN206376981U (en) Lattice tower and the wind power generating set including the lattice tower
CN110042863A (en) Complete combined assembled subway station subterranean wall and prefabricated middle plate node and construction method
CN210855047U (en) Be suitable for transmission material between reverse construction method floor with small-size swing arm formula electric hoist
CN209779640U (en) foundation pit supporting pile top crown beam construction structure
CN106523296A (en) Truss type tower and wind generating set comprising truss type tower
CN106948267A (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing
JP2015036493A (en) Method for constructing underground storage tank
CN205116206U (en) Stress tube stake stand in advance
CN109989395A (en) A kind of large-scale storage tank bored concrete pile assembled pile cover and its construction method
CN108505449A (en) The construction method of holder lifting system in a kind of CFST Arch Bridge water
CN104895058B (en) The all-hydraulic two-tube compound club-footed pile machine of static pressure and its construction method
CN213013857U (en) Height-adjustable simple cable-stayed diversion trench temporary bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant