CN102795554A - Mechanism and method for migrating whole fixed tower crane - Google Patents
Mechanism and method for migrating whole fixed tower crane Download PDFInfo
- Publication number
- CN102795554A CN102795554A CN2012102829284A CN201210282928A CN102795554A CN 102795554 A CN102795554 A CN 102795554A CN 2012102829284 A CN2012102829284 A CN 2012102829284A CN 201210282928 A CN201210282928 A CN 201210282928A CN 102795554 A CN102795554 A CN 102795554A
- Authority
- CN
- China
- Prior art keywords
- slideway
- tower crane
- jack
- vertical jack
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The invention discloses a mechanism for migrating a whole fixed tower crane, comprising a bracket girder, a vertical jack, a horizontal jack, a sleeper, and a steel plate slideway, wherein the bracket girder is used as a slideway base, the steel plate slideway that comprises two layers of steel plates and rolling shafts arranged between the two layers of steel plates is arranged on the slideway base, the vertical jack is arranged on the steel plate slideway, the horizontal jack leans against one side of the base through the sleeper for moving the tower crane. The invention further discloses a migrating method, comprising the following steps: firstly confirming a position after migration by the mechanism, then scooping off the earth of the original base position, the new base position, the slideway base and the path; constructing the slideway base, and installing the steel plate slideway on the slideway; arranging the horizontal jack and the vertical jack; loading the horizontal jack and the vertical jack to slide to the new base position; observing the verticality of the tower crane by using a theodolite, and adjusting by using the vertical jack, after meeting the requirement, replacing the vertical jack with a short steel section to remove the vertical jack; and filling up the base bottom by using fine aggregate concrete or grout, and then backfilling. According to the invention, the construction period caused by the migration is shortened, the cost is low, and the safety risk is greatly reduced.
Description
Technical field
The present invention relates to build Transport Machinery, especially relate to a kind of fixed type tower crane and underpin bulk migration mechanism and moving method.
Background technology
The fixed type tower crane is that present building industry is used maximum vertical transportation machineries, because a variety of causes need happen occasionally the thing of just moving to new location in the tower crane short range of operation.Method commonly used at present is exactly a newly-built basis, again organizes upright to new place fixed type tower crane dismounting back again.This method is tradition relatively, the technical maturity easy master.But the cost that produces is high, owing to need the dismounting crane, does the basis again in addition, needs the long period, influences the duration.
Summary of the invention
The purpose of this invention is to provide a kind of fixed type tower crane and underpin bulk migration mechanism and moving method,, reduce laid down cost, reduce security risk to save the duration.
For realizing above-mentioned purpose; The present invention provides a kind of fixed type tower crane whole transport mechanism, it is characterized in that: comprise underpining beam, vertical jack, level jack, sleeper, steel plate slideway, underpin beam and do the slideway basis; Be provided with above the slideway basis by accompanying the steel plate slideway that roller bearing constitutes between the two-layered steel plates; Be provided with vertical jack above the steel plate slideway, level jack leans against a side through sleeper, is used for moving tower crane.
A kind of fixed type tower crane whole moving method is characterized in that comprising the following steps:
1, the position after at first definite migration, the soil with former basic position, new base position, slideway basis and course digs out then;
2, construction slideway basis, and on the slideway basis, install the steel plate slideway;
3, layout level, vertical jack;
4, give level, vertical jack loading, slide into new base position;
5, with the squareness of theodolite observation tower crane, and with vertical jack adjustment, reach requirement after, replace vertical jack with lacking shaped steel, withdraw from vertical jack;
6, with pea gravel concreten or grouting material foundation bottom is filled, then back fill.
Advantage of the present invention is following:
1, in the process of whole tower crane migration, tower crane can both normal operation, does not influence normal construction, can shorten the duration that causes because of migration greatly.
2, the present invention does not need large-scale level and vertical transportation machinery in implementation process, does not need to do in addition the basis, and is with low cost, only is about 10% of conventional approach cost.
3, the present invention in force the overwhelming majority be Ground Operation, do not have aloft work, can reduce security risk greatly.
Description of drawings
Fig. 1 is a tower crane translation construction scheme drawing;
Fig. 2 is a tower crane translation front elevation view;
Fig. 3 is a tower crane translation side elevational view;
Fig. 4 is tower crane translated plane figure.
The specific embodiment
With reference to Fig. 1,2,3,4; Former tower crane 1; Underpin beam 2 and make slideway basis, vertical jack 3, level jack 4, steel plate 5, roller bearing 6, be provided with by accompanying the steel plate slideway that roller bearing constitutes between the two-layered steel plates above the slideway basis, be provided with vertical jack above the steel plate slideway; Level jack leans against a basic side through sleeper 7, is used for moving tower crane.
Translation construction concrete steps of the present invention are following:
1, at first confirm position after the migration, the soil with former basic position 8, new base position 9 and slideway basis and course digs out then;
2, construction is dragged and is changed beam 2 and do the slideway basis, and on the slideway basis, install steel plate 5 successively, steel plate slideway that roller bearing 6, steel plate 5 are combined into;
3, vertical jack is arranged, and begin basis 1 synchronous loading after full load, is begun to arrange sleeper 7 and level jack 4, and makes level jack 4 stressed;
4, through 4 pairs of basis 1 loadings of level jack,, constantly switch steel plate slideway and sleeper 7, slide into new base position up to tower crane along with the steady reach of tower crane;
5, after tower crane arrives new base position, with the squareness of theodolite observation tower crane, and with vertical jack 3 adjustment, reach requirement after, replace vertical jack with lacking shaped steel, withdraw from vertical jack;
6, with pea gravel concreten or grouting material foundation bottom is filled, then back fill.
The present invention has adopted two to underpin beam temporarily and do the slideway basis, the steel plate slideway of auxiliary two rollers, make fixed type tower crane pulsation-free move to new location from original position after, back fill after centering, the slip casting is accomplished whole transition processes.
Test Example 1
300,000 tons of/year alcohol fuel private station camp sites in the Jilin are because position MEASURING QUASI not during upright tower crane.Find to influence the revolution of other unit crane after using, approximately need about migration 3m.Because the duration is tight especially, on-the-spot place is narrower and small again, and large-scale crane, wooden handcart are difficult to get into, and that has therefore adopted method success of the present invention has moved 3.5m with tower crane, the equal normal operation of tower crane in whole process.
The tower crane of migration is the QTZ5011 type, high 25m, and deadweight adds counterweight 61 t.Underpinning is two 1000mmx600mm (height) reinforced concrete foundations; Slideway adopts two-layer 10mm steel plate folder Φ 25 mm round steel 200mm; Vertical 4 the 30t jacks of every side that adopt evenly arrange, level has adopted two 100t jack jack back two-layer sleeper.
Shoveling has been used a week with the foundation construction in early stage, and formal migration has used two day time to arrive estimating position, and a template has been poured into a mould the big flowing concrete of C30, backfill then behind the centering.Tower crane normally uses engineering later on to be finished.
Test Example 2
In logical steel camp site, it is back fill that half basic bottom is arranged when constructing because of tower crane, do not find at that time, and back tower crane run-off the straight, centering still tilts several times, therefore adopts the present invention with basic translation 2.5m.Method is identical with last example, and the not run-off the straight again of migration back tower crane normally uses engineering and finishes.
Claims (2)
1. fixed type tower crane whole transport mechanism; It is characterized in that: comprise underpining beam, vertical jack, level jack, sleeper, steel plate slideway; Underpin beam and do the slideway basis, be provided with by accompanying the steel plate slideway that roller bearing constitutes between the two-layered steel plates above the slideway basis, be provided with vertical jack above the steel plate slideway; Level jack leans against a side through sleeper, is used for moving tower crane.
2. utilize the method for the described fixed type tower crane whole of claim 1 transport mechanism, it is characterized in that comprising the following steps: the migration of fixed type tower crane whole
(1) position after at first definite migration, the soil with former basic position, new base position, slideway basis and course digs out then;
(2) construction slideway basis, and on the slideway basis, install the steel plate slideway;
(3) layout level, vertical jack;
(4) give level, vertical jack loading, slide into new base position;
(5) with the squareness of theodolite observation tower crane, and with vertical jack adjustment, reach requirement after, replace vertical jack with lacking shaped steel, withdraw from vertical jack;
(6) with pea gravel concreten or grouting material foundation bottom is filled, then back fill.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102829284A CN102795554A (en) | 2012-08-10 | 2012-08-10 | Mechanism and method for migrating whole fixed tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102829284A CN102795554A (en) | 2012-08-10 | 2012-08-10 | Mechanism and method for migrating whole fixed tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102795554A true CN102795554A (en) | 2012-11-28 |
Family
ID=47194902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102829284A Pending CN102795554A (en) | 2012-08-10 | 2012-08-10 | Mechanism and method for migrating whole fixed tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102795554A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115321304A (en) * | 2022-07-12 | 2022-11-11 | 中建一局集团第五建筑有限公司 | Construction elevator non-back jacking method arranged on garage top plate |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1089008A (en) * | 1993-10-09 | 1994-07-06 | 阮蔚文 | Method for moving house |
JPH09144050A (en) * | 1995-11-24 | 1997-06-03 | Mitsui Constr Co Ltd | Upward pushing method of construction |
CN1262366A (en) * | 1999-01-27 | 2000-08-09 | 高亚平 | Method for displacing small building |
EP0788572B1 (en) * | 1995-08-17 | 2001-07-11 | Roland Beck | Building underpinning process |
CN2674002Y (en) * | 2003-10-27 | 2005-01-26 | 高建华 | Equipment for moving small-sized building |
CN101429820A (en) * | 2007-11-07 | 2009-05-13 | 上海天演建筑物移位工程有限公司 | Integral shift method for buildings |
CN202831000U (en) * | 2012-08-10 | 2013-03-27 | 中油吉林化建工程有限公司 | Fixed tower crane overall moving mechanism |
-
2012
- 2012-08-10 CN CN2012102829284A patent/CN102795554A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1089008A (en) * | 1993-10-09 | 1994-07-06 | 阮蔚文 | Method for moving house |
EP0788572B1 (en) * | 1995-08-17 | 2001-07-11 | Roland Beck | Building underpinning process |
JPH09144050A (en) * | 1995-11-24 | 1997-06-03 | Mitsui Constr Co Ltd | Upward pushing method of construction |
CN1262366A (en) * | 1999-01-27 | 2000-08-09 | 高亚平 | Method for displacing small building |
CN2674002Y (en) * | 2003-10-27 | 2005-01-26 | 高建华 | Equipment for moving small-sized building |
CN101429820A (en) * | 2007-11-07 | 2009-05-13 | 上海天演建筑物移位工程有限公司 | Integral shift method for buildings |
CN202831000U (en) * | 2012-08-10 | 2013-03-27 | 中油吉林化建工程有限公司 | Fixed tower crane overall moving mechanism |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115321304A (en) * | 2022-07-12 | 2022-11-11 | 中建一局集团第五建筑有限公司 | Construction elevator non-back jacking method arranged on garage top plate |
CN115321304B (en) * | 2022-07-12 | 2023-08-15 | 中建一局集团第五建筑有限公司 | Construction lifter anti-returning method arranged on garage top plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101886479B (en) | Underground storey-adding process of frame structural building by one-by-one independent foundation underpinning method | |
CN109778721A (en) | Synchronization of jacking up bridge top and the bottom structure carries out the method that bridge increases transformation | |
CN101725357B (en) | Construction method for lower section of underground tunnel | |
CN105133856B (en) | A kind of method that integral shift is carried out to building using assembled trailer | |
CN111560976B (en) | Two system conversion pile foundation underpins structure | |
CN103628422B (en) | A kind of anti-force type dragging suspension basket prepressing device and implementation method thereof | |
CN108894258B (en) | Method for testing pile-soil load sharing ratio of pile group foundation | |
CN105953078A (en) | Protection device and protection method of high-pressure gas pipeline | |
CN102758441A (en) | Relay unearthing method and structure for deep foundation pit platform under reverse construction condition | |
CN201635410U (en) | Temporary reinforcing device for concrete structure for bearing hoisting construction load | |
CN111021440A (en) | CPT integrated geotechnical packaging granular pile indoor model test device and method | |
CN202831000U (en) | Fixed tower crane overall moving mechanism | |
CN103306204B (en) | Three-way positioning device for base steel anchor box | |
CN101949215A (en) | Mounting construction method of steel structure support seat | |
CN102733406B (en) | Railway construction method of solid concrete roadbed in large-size industrial plant | |
CN104631486A (en) | Independent plinth construction method in narrow environment | |
CN110725349B (en) | Bearing platform replacement construction device and method for high-speed rail station canopy column | |
CN102795554A (en) | Mechanism and method for migrating whole fixed tower crane | |
CN205088982U (en) | Whole on -vehicle system of underpining that shifts of building | |
CN203891060U (en) | Permanent steel pipe column positioning system of major structure of cover and excavation top-down station | |
CN101476338A (en) | Construction process for miniature steel pipe pile reinforced sedimentation base | |
CN104074370B (en) | A kind of building with brick-concrete structure entirety cross the river shift method and special support changing device thereof | |
CN203113515U (en) | Slip form jacking integrated device | |
CN106241234A (en) | A kind of self-propelled for prefabricated pipe gallery transports assembly car | |
CN106812065A (en) | A kind of concrete freely-supported pre-stressed box girder construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121128 |