CN2426390Y CN 00223285 CN00223285U CN2426390Y CN 2426390 Y CN2426390 Y CN 2426390Y CN 00223285 CN00223285 CN 00223285 CN 00223285 U CN00223285 U CN 00223285U CN 2426390 Y CN2426390 Y CN 2426390Y
Authority
CN
China
Prior art keywords
hydraulic cylinder
lifting
utility
cooling bed
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 00223285
Other languages
English (en)
Inventor
王梓寿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Erzhong Group Deyang Heavy Industries Co Ltd
Original Assignee
CHINA NO 2 HEAVY MACHINERY GRO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA NO 2 HEAVY MACHINERY GRO filed Critical CHINA NO 2 HEAVY MACHINERY GRO
Priority to CN 00223285 priority Critical patent/CN2426390Y/zh
Application granted granted Critical
Publication of CN2426390Y publication Critical patent/CN2426390Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

本实用新型提供了一种平移式厚板冷床。它是将结构相同的两套步进梁机构交错组装在一起,分别用抬升液压缸和移动液压缸通过连杆与步进梁铰连连接。实现了被冷钢板在冷床上的无抬升平移运动,从而降低功耗,避免了抬升和下降的冲击负荷对步进机构的损害。它不仅适合冷却面积大承载载荷重的轧件使用,还适合厚板坯、异型坯连铸坯车间的冷床,步进式加热炉的炉底机构及其它轧材的步进式冷床使用。

Description

平移式厚板冷床
本实用新型涉及轧钢厂厚板冷床的改进,特别是一种平移式厚板冷床,不仅适合于冷却面积很大、冷却面积上承受的被冷厚板总重量在千吨以上的轧件使用,也适用于厚板坯、异型坯连铸坯车间的冷床,步进式加热炉的炉底机构及其它的步进式冷床。
据申请人专业生产及设计研究所知:目前采用的较先进的冷床为步进式冷床。它采用步进梁与固定梁交替作用,实现被冷钢板的步进运动。但这种冷床的步进梁要将冷床上的被冷钢板全部抬起,前进一个步距后,将被冷钢板全部放下到固定梁上。这种运移使得重量很大的厚板抬起、放下,作了很多无用的功耗,同时这么大的重量在抬升和下降时的冲击负荷,对冷床的机件和机构容易造成损坏。
本实用新型的目的在于克服上述现有技术的缺点,设制出一种被冷钢厚板在冷床上只平移而不抬升、下降的平移式厚板冷床。
本实用新型的目的是采用这种方式实现的:即包括由步进梁,抬升机构和平移机构组成,其特征在于:横向交错布置的双步进梁机构具有相同的结构,均分别用抬升液压缸和移动液压缸通过连杆与步进梁铰连连接,交替协调动作。
所述移动液压缸装设有用PLC和设定按钮控制的位置传感器。
由于采用两套结构相同的步进梁机构交替式工作,使被冷钢板相互交接在同一水平而内进行,故本实用新型具有节能及有效保护厚板冷床等优点。
下面结合附图详述。
图1是本实用新型的主视结构简图。
参照图1,采用两套结构相同的步进梁(A和B)机构横向交错组装在一起,均分别用抬升液压缸5,移动液压缸1通过连杆(6、7、8、9、10)和连杆(2、3)与步进梁A及步进梁B铰连连接。
操作时,如步进梁B支承全部钢板11,则步进梁A下降如图位置,然后液压缸1缩回使步进梁A在低位后退到双点划线位置。接着,液压缸5缩回、通过连杆6、7、8、9、10抬升步进梁A到与步进梁B相同高度的位置。再接着,步进梁B下降,被冷钢板11在同一水平上被步进梁A支承,步进梁A在液压缸1伸出时通过连杆2、3作用带着被冷钢板11向前平移一个步距。步进梁B下位后退,抬升后,再使步进梁A下降,被冷钢板11也是在同一水平高度内交接到由步进梁B支承,步进梁B再带着被冷钢板11前进一个步距……如此交替进行,从而达到本实用新型的目的。本实用新型中移动液压缸1可装设位置传感器,用PLC和设定按钮控制可以实现变步距运行。还可以利用双步进梁(A和B)的抬升机构(液压缸5)交替动作,而移动液压缸1不动作,实现步进梁A和步进梁B在被冷钢板(轧件)下面踏步。即全部钢板11在冷床上不动,而它与步进梁A、B的接触点却可以定期的交替变化,使被冷钢板11的各处冷却效果趋于均匀,也有利于步进梁本身的冷却。另外,还可以实现整个冷床上钢板向后退方向运行等等。

Claims (2)

1.一种平移式厚板冷床,包括由步进梁,抬升机构及平移机构组成,其特征在于:横向交错布置的双步进梁机构具有相同的结构,均分别用抬升液压缸和移动液压缸通过连杆与步进梁铰连连接。
2.根据权利要求1所述的平移式厚板冷床,其特征在于:移动液压缸装设有用PLC和设定按钮控制的位置传感器。
CN 00223285 2000-06-14 2000-06-14 平移式厚板冷床 Expired - Lifetime CN2426390Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00223285 CN2426390Y (zh) 2000-06-14 2000-06-14 平移式厚板冷床

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00223285 CN2426390Y (zh) 2000-06-14 2000-06-14 平移式厚板冷床

Publications (1)

Publication Number Publication Date
CN2426390Y true CN2426390Y (zh) 2001-04-11

Family

ID=33587863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00223285 Expired - Lifetime CN2426390Y (zh) 2000-06-14 2000-06-14 平移式厚板冷床

Country Status (1)

Country Link
CN (1) CN2426390Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1311923C (zh) * 2004-06-11 2007-04-25 李力行 双梁牵引式步进冷床
CN106607462A (zh) * 2017-01-09 2017-05-03 山东钢铁集团日照有限公司 一种炉卷轧机生产线装置
CN109564064A (zh) * 2016-07-28 2019-04-02 自动工程公司 传送通过炉

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1311923C (zh) * 2004-06-11 2007-04-25 李力行 双梁牵引式步进冷床
CN109564064A (zh) * 2016-07-28 2019-04-02 自动工程公司 传送通过炉
CN109564064B (zh) * 2016-07-28 2020-12-25 自动工程有限公司 传送通过炉
CN106607462A (zh) * 2017-01-09 2017-05-03 山东钢铁集团日照有限公司 一种炉卷轧机生产线装置
CN106607462B (zh) * 2017-01-09 2019-03-05 山东钢铁集团日照有限公司 一种炉卷轧机生产线装置

Similar Documents

Publication Publication Date Title
CN202045146U (zh) 轧制线调整装置
CN207344791U (zh) 一种新型的砌块成型装置
CN2426390Y (zh) 平移式厚板冷床
CN108273856B (zh) 一种带自动分钢功能的液压步进式方坯上料装置
CN204817965U (zh) 一种用于板坯重压下的扇形段
CN201463588U (zh) 一种倾角式电解锌片自动推料机
CN114130888A (zh) 一种用于中频炉炉壳外壁的打孔校准装置
CN213165963U (zh) 一种大型耐火砖的成型模具
CN208933438U (zh) 钢坯加热炉
CN216881070U (zh) 一种热轧型钢冷床裙板升降耐磨结构
CN201322531Y (zh) 一种大型圆坯加热炉
CN2378701Y (zh) 一种加热炉用滑轨滑块
CN212175455U (zh) 一种桥梁支座
CN204470319U (zh) 一种步进式压平装置
CN201566153U (zh) 一种框架式液压机
CN201558873U (zh) 一种热装热送下钢坯装置
CN212686569U (zh) 一种钢厂烧结矿降破碎率的溜槽
CN202853387U (zh) 一种热处理工业炉料垫过渡轨道桥
CN201186493Y (zh) 一种四柱压力机
CN2925812Y (zh) 一种双浮动模具
CN210705253U (zh) 一种生产rh炉炉衬砖的模具
CN205119816U (zh) 梁式加热炉炉底组件
CN220393246U (zh) 一种移动升降平台
CN217098883U (zh) 大型热成型炉下加热平台的移出滚轮机构
CN217432990U (zh) 一种板簧式小板坯引锭杆

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DUAL GROUP (DEYANG) HEAVY EQUIPMENT CORP.

Free format text: FORMER OWNER: CHINA SECOND HEAVY MACHINERY GROUP CO

Effective date: 20071109

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20071109

Address after: 618013 No. 460 Zhujiang West Road, Sichuan, Deyang

Patentee after: Erzhong Group Deyang Heavy Equipment Co., Ltd.

Address before: 618013 Deyang city of Sichuan Province, No. 1 Zhujianglu Road Erzhong Group Company Chief Engineer Office of ancient ammonia conversion

Patentee before: China Second Heavy Machinery Group Co

C17 Cessation of patent right
CX01 Expiry of patent term

Granted publication date: 20010411