CN220765445U - Municipal public works garbage collection device - Google Patents

Municipal public works garbage collection device Download PDF

Info

Publication number
CN220765445U
CN220765445U CN202322705221.6U CN202322705221U CN220765445U CN 220765445 U CN220765445 U CN 220765445U CN 202322705221 U CN202322705221 U CN 202322705221U CN 220765445 U CN220765445 U CN 220765445U
Authority
CN
China
Prior art keywords
recovery
guide plate
recycling
crushing
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322705221.6U
Other languages
Chinese (zh)
Inventor
何小莹
黄财凤
邬力行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jiangda Construction Engineering Co ltd
Original Assignee
Guangdong Jiangda Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jiangda Construction Engineering Co ltd filed Critical Guangdong Jiangda Construction Engineering Co ltd
Priority to CN202322705221.6U priority Critical patent/CN220765445U/en
Application granted granted Critical
Publication of CN220765445U publication Critical patent/CN220765445U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a municipal public engineering garbage recycling device, which comprises: the device comprises a recovery box, a recovery guide plate, an electromagnetic iron plate, an air cylinder, a collecting tank and a crushing box, wherein one side of the recovery guide plate is rotationally connected to one side in the recovery box, a discharge hole is formed in the opposite side of the recovery guide plate, which is located at the rotational connection position of the recovery guide plate, one end of the air cylinder is rotationally connected to the lower side of the recovery guide plate, the other end of the air cylinder is rotationally connected to the bottom in the recovery box, the crushing box is arranged above one side of the recovery box, which is close to the rotational connection position of the recovery guide plate, the lower side of the crushing box is communicated with the recovery box, a feed hole is formed above the crushing box, the electromagnetic iron plate is obliquely arranged above one side of the recovery box, which is close to the discharge hole, of the recovery guide plate, and the collecting tank is arranged below the lower end of the recovery guide plate in the crushing box; the municipal public engineering garbage recycling device can crush construction garbage and automatically separate and recycle metal and broken stone.

Description

Municipal public works garbage collection device
Technical Field
The utility model relates to the technical field of municipal construction, in particular to a municipal public engineering garbage recycling device.
Background
Municipal public works refer to various buildings, structures, equipment and the like which are arranged in the planning construction range of urban areas and towns (villages) and provide paid or gratuitous public products and services for residents based on government responsibility and obligations. Various public infrastructure constructions matched with urban life belong to the category of municipal engineering, such as common urban roads, bridges and subways, and various pipelines closely related to life: rainwater, sewage, water supply, reclaimed water, electric power (outside red line), telecommunications, heating power, fuel gas and the like, as well as squares, urban greening and the like, belong to the field of municipal engineering. A large amount of construction waste can be produced in the municipal public engineering construction process, and some of the construction waste can be crushed and recycled, so that the construction waste recycling device is arranged, and some of the construction waste recycling device utilizes electromagnets to suck steel bars, iron nails and other metals from crushed stone, but the existing construction waste recycling device cannot automatically collect and recycle the sucked metals uniformly, and the collection and recycling are needed manually, so that the construction waste recycling device is very troublesome.
Disclosure of Invention
The utility model aims to provide a municipal public engineering garbage recycling device which can crush construction garbage and automatically separate and recycle metal and broken stone.
To achieve the purpose, the utility model adopts the following technical scheme:
provided is a municipal utility waste recycling device, comprising: the recycling bin, retrieve baffle, electromagnetism iron plate, cylinder, collecting vat and crushing case, retrieve one side rotation of baffle connect in one side in the recycling bin, the recycling bin is located retrieve the opposite side of baffle rotation junction and be provided with the discharge gate, retrieve the below rotation of baffle be connected with the one end of cylinder, the other end rotation of cylinder connect in the bottom in the recycling bin, retrieve the case be close to retrieve the one side top of baffle rotation junction and be provided with crushing case, the below intercommunication of crushing case the recycling bin, the top of crushing case is provided with the feed inlet, it is provided with to smash one side top slope that the incasement is close to the discharge gate electromagnetic iron plate is located retrieve the top of baffle, just retrieve the baffle rotate to with when the parallel position of electromagnetic iron plate, retrieve the lower extreme of baffle be located the discharge gate department, it is provided with to smash the incasement to be located retrieve the below of baffle lower extreme.
As a preferable scheme of the municipal public engineering garbage recycling device, a scraping plate is arranged above the recycling guide plate in the recycling bin, and the scraping plate is arranged between the crushing bin and the electromagnetic iron plate.
As a preferable scheme of the municipal public engineering garbage recycling device, a vibrator is arranged below the recycling guide plate.
As a preferred scheme of municipal public works rubbish recovery unit, the recovery tank is located the below of recovery baffle lower extreme is provided with and is used for placing the mounting groove of collecting vat, the mounting groove is located one side of discharge gate is provided with the drawer mouth, the collecting vat passes through drawer mouth slidable mounting in the mounting groove.
As a preferable scheme of the municipal public engineering garbage recycling device, the roller is arranged below the collecting tank.
As a preferable scheme of the municipal public engineering garbage recycling device, a handle is rotatably connected to one side of the collecting tank, which is positioned at the drawer opening.
As a preferred scheme of municipal public works rubbish recovery unit, the recovery tank is located the outside of discharge gate is provided with the protection casing, the bottom of protection casing and be close to one side of discharge gate are open structure.
As a preferable scheme of the municipal public engineering garbage recycling device, the crushing box is rotationally connected with two parallel crushing rollers and driven by a motor.
As a preferred scheme of municipal public works rubbish recovery unit, be located in the collection box retrieve the one side below of the rotation junction of baffle and be provided with the instrument room, one side of instrument room is provided with gets to put the mouth, get to put the mouth rotate be connected with get and put mouth assorted switch door.
As a preferable scheme of the municipal public engineering garbage recycling device, the outer side of the switch door is rotatably connected with a handle.
The utility model has the beneficial effects that: according to the municipal public engineering garbage recycling device, the recycling guide plate is rotationally connected in the recycling bin and driven by the air cylinder, when the municipal public engineering garbage recycling device works, the recycling guide plate is rotated to the position, the lower end of the recycling guide plate is located at the discharge hole, engineering construction garbage is added into the crushing bin from the feed inlet to be crushed, the crushed construction garbage falls onto the recycling guide plate and slides downwards along the recycling guide plate, the electromagnetic iron plate sucks up metals in the construction garbage, other construction garbage is led out from the discharge hole, constructors can regularly and automatically collect and recycle the metals adsorbed by the electromagnetic iron plate, the recycling guide plate is rotated to the position, the lower end of the electromagnetic iron plate is located above the collecting groove, the electromagnetic iron plate is powered off, and the adsorbed metals fall onto the recycling guide plate and slide into the collecting groove, so that the functions of crushing the construction garbage, separating metals from crushed stone and recycling the metals are achieved automatically.
Drawings
In order to more clearly illustrate the technical solution of the embodiments of the present utility model, the drawings that are required to be used in the embodiments of the present utility model will be briefly described below. It is evident that the drawings described below are only some embodiments of the present utility model and that other drawings may be obtained from these drawings without inventive effort for a person of ordinary skill in the art.
Fig. 1 is a schematic side view of a municipal utility waste recycling apparatus according to an embodiment of the utility model.
Fig. 2 is a schematic side view of a municipal utility waste recycling apparatus according to another embodiment of the utility model.
Fig. 3 is a schematic view of a collecting tank according to an embodiment of the present utility model.
In the figure:
1. a recovery box; 2. recovering the guide plate; 3. an electromagnetic iron plate; 4. a cylinder; 5. a collection tank; 6. a crushing box; 7. a feed inlet; 8. a discharge port; 9. a scraping plate; 10. a vibrator; 11. a handle; 12. a protective cover; 13. a tool room; 14. opening and closing a door; 15. and (3) a crushing roller.
Detailed Description
Embodiments of the present disclosure are described in detail below with reference to the accompanying drawings.
Other advantages and effects of the present disclosure will become readily apparent to those skilled in the art from the following disclosure, which describes embodiments of the present disclosure by way of specific examples. It will be apparent that the described embodiments are merely some, but not all embodiments of the present disclosure. The disclosure may be embodied or practiced in other different specific embodiments, and details within the subject specification may be modified or changed from various points of view and applications without departing from the spirit of the disclosure. It should be noted that the following embodiments and features in the embodiments may be combined with each other without conflict. All other embodiments, which can be made by one of ordinary skill in the art without inventive effort, based on the embodiments in this disclosure are intended to be within the scope of this disclosure.
Referring to fig. 1-3, one embodiment of the present utility model provides a municipal utility waste recycling apparatus comprising: the recovery box 1, retrieve baffle 2, electromagnetic iron plate 3, cylinder 4, collecting vat 5 and crushing case 6, one side of retrieving baffle 2 rotates and connects in one side in recovery box 1, the opposite side that recovery box 1 is located recovery baffle 2 rotation junction is provided with discharge gate 8, the below rotation of retrieving baffle 2 is connected with the one end of cylinder 4, the other end rotation of cylinder 4 is connected in the bottom in recovery box 1, the recovery box 1 is close to the one side top of retrieving baffle 2 rotation junction and is provided with crushing case 6, the below intercommunication recovery box 1 of crushing case 6, the top of crushing case 6 is provided with feed inlet 7, the one side top slope of smashing in the case 6 and being close to discharge gate 8 is provided with electromagnetic iron plate 3, electromagnetic iron plate 3 is located the top of retrieving baffle 2, and when retrieving baffle 2 rotates to the position parallel with electromagnetic iron plate 3, the lower extreme of retrieving baffle 2 is located discharge gate 8 departments, the below that is located recovery baffle 2 lower extreme in the crushing case 6 is provided with collecting vat 5.
In the technical scheme, when the construction waste is recycled, the lower end of the recycling guide plate 2 is rotated by the air cylinder 4 to be positioned at the position of the discharge hole 8, the electromagnetic iron plate 3 is electrified, the construction waste is added into the crushing box 6 from the feed hole 7 for crushing, the crushed construction waste falls onto the recycling guide plate 2 and slides downwards along the recycling guide plate 2, the electromagnetic iron plate 3 sucks up metal in the construction waste, the rest of the construction waste is led out from the discharge hole 8, a constructor can place a trolley for loading the crushed construction waste at the discharge hole 8, and the like, and then the crushed construction waste is conveyed to a corresponding construction site for recycling crushed broken stone; the constructor can collect and recycle the metal adsorbed by the electromagnetic iron plate 3 periodically or after the construction waste is crushed, the recycling guide plate 2 is rotated to a position with the lower end positioned above the collecting tank 5 through the air cylinder 4, the electromagnetic iron plate 3 is powered off, and the adsorbed metal falls onto the recycling guide plate 2 and slides into the collecting tank 5, so that the functions of crushing the construction waste and automatically separating and recycling the metal and broken stone are realized; is more convenient.
In some embodiments, a scraper 9 is disposed above the recovery guide 2 in the recovery tank 1, and the scraper 9 is located between the crushing tank 6 and the electromagnetic iron plate 3. The scraping plate 9 is used for scraping the construction waste falling on the recycling guide plate 2, preventing the construction waste from sliding downwards in a stacked mode, affecting the metal adsorption of the electromagnetic iron plate 3, and ensuring that the electromagnetic iron plate 3 can completely separate the metal in the construction waste.
In some embodiments, a vibrator 10 is provided below the recovery guide 2. The vibration action of the vibrator 10 can effectively prevent building waste from accumulating on the recovery guide 2 and failing to smoothly slide downward.
In some embodiments, a mounting groove for placing the collecting groove 5 is arranged below the lower end of the recovery guide plate 2 of the recovery box 1, a drawer opening is arranged on one side of the collecting groove, which is positioned at the discharge opening 8, and the collecting groove 5 is slidably arranged in the mounting groove through the drawer opening. This structural scheme design makes collecting vat 5 pass through drawer type pull structure and installs in collection box 1, makes things convenient for the staff to take out collecting vat 5 or install to be convenient for take out the recovery with the metal in the collecting vat 5.
In some embodiments, rollers are provided below the collection trough 5. The roller makes the drawing of the collecting tank 5 smoother and more labor-saving.
In some embodiments, a handle 11 is rotatably connected to the side of the collecting trough 5 at the drawer opening. The handle 11 facilitates the pulling out of the work piece collecting tank 5.
In some embodiments, the recycling bin 1 is provided with a protective cover 12 at the outer side of the discharge hole 8, and the bottom of the protective cover 12 and one side close to the discharge hole 8 are of an opening structure. The protective cover 12 plays a role in safety protection, prevents the building rubble from sliding out of the recovery guide plate 2 from being too fast, accidentally injures staff, and is convenient for collecting and recovering the rubble waste materials led out from the discharge port 8.
In some embodiments, two parallel pulverizing rollers 15 are rotatably connected to the pulverizing box 6 and driven by a motor. The construction waste falls between two pulverizing rollers 15 to be pulverized.
In some embodiments, a tool room 13 is arranged below one side of the recovery box 1, which is positioned at the rotation connection position of the recovery guide plate 2, one side of the tool room 13 is provided with a picking and placing opening, and the picking and placing opening is rotationally connected with a switch door 14 matched with the picking and placing opening. Specifically, the upper end of the switch door 14 is rotatably connected above the picking and placing port, and under the action of gravity, the switch door 14 can be automatically closed; the tool room 13 is used for storing articles such as tools.
Specifically, a handle 11 is rotatably connected to the outside of the opening/closing door 14. The handle 11 facilitates the operator to open the opening and closing door 14.
In the description of the present utility model, it should be understood that the terms "middle," "length," "upper," "lower," "front," "rear," "vertical," "horizontal," "inner," "outer," "radial," "circumferential," and the like indicate an orientation or a positional relationship based on that shown in the drawings, merely for convenience of description and to simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the utility model.
In the present utility model, unless expressly stated or limited otherwise, a first feature "on" a second feature may be that the first and second features are in direct contact, or that the first and second features are in indirect contact via an intervening medium.
The meaning of "a plurality of" means at least two, e.g., two, three, etc., unless explicitly defined otherwise.
In the present utility model, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "secured," and the like are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally formed; may be mechanically connected, may be electrically connected or may be in communication with each other; either directly or indirectly, through intermediaries, or both, may be in communication with each other or in interaction with each other, unless expressly defined otherwise. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
The above description is for the purpose of illustrating the embodiments of the present utility model and is not to be construed as limiting the utility model, but is intended to cover all modifications, equivalents, improvements and alternatives falling within the spirit and principles of the utility model.

Claims (10)

1. A municipal utility waste recycling device, comprising: recovery case (1), recovery baffle (2), electromagnetism iron plate (3), cylinder (4), collecting vat (5) and crushing case (6), one side of recovery baffle (2) rotate connect in one side in recovery case (1), recovery case (1) are located recovery baffle (2) rotate opposite side of junction and are provided with discharge gate (8), the below rotation of recovery baffle (2) is connected with one end of cylinder (4), the other end rotation of cylinder (4) connect in the bottom in recovery case (1), recovery case (1) is close to recovery baffle (2) rotate one side top of junction be provided with crushing case (6), the below intercommunication of crushing case (6) recovery case (1), the top of crushing case (6) is provided with feed inlet (7), be close to in the crushing case (6) one side top slope of discharge gate (8) is provided with electromagnetism iron plate (3), electromagnetism iron plate (3) are located recovery baffle (2) top just be located recovery baffle (2) in parallel to discharge gate (8), the collecting tank (5) is arranged below the lower end of the recovery guide plate (2) in the crushing box (6).
2. Municipal utility waste recycling device according to claim 1, characterized in that a scraper plate (9) is arranged in the recycling bin (1) above the recycling guide plate (2), and the scraper plate (9) is arranged between the crushing bin (6) and the electromagnetic iron plate (3).
3. Municipal utility waste reclamation device according to claim 1, characterized in that a vibrator (10) is arranged below the reclamation guide (2).
4. Municipal utility waste recycling device according to claim 1, characterized in that the recycling bin (1) is provided with a mounting groove for placing the collecting groove (5) below the lower end of the recycling guide plate (2), the mounting groove is provided with a drawer opening at one side of the discharge opening (8), and the collecting groove (5) is slidably mounted in the mounting groove through the drawer opening.
5. Municipal utility waste reclamation device according to claim 4, characterized in that rollers are arranged below the collection tank (5).
6. Municipal utility waste reclamation device according to claim 5, characterized in that the side of the collection trough (5) at the drawer opening is rotatably connected with a handle (11).
7. The municipal utility waste recycling device according to claim 1, wherein the recycling bin (1) is arranged at the outer side of the discharge hole (8) and is provided with a protective cover (12), and the bottom of the protective cover (12) and one side close to the discharge hole (8) are of an opening structure.
8. Municipal utility waste reclamation device according to claim 1, characterized in that the comminution box (6) is rotatably connected with two juxtaposed comminution rollers (15) and driven by a motor.
9. The municipal utility waste recycling device according to claim 1, wherein a tool room (13) is arranged below one side of the recycling bin (1) which is positioned at the rotating connection part of the recycling guide plate (2), a picking and placing opening is arranged on one side of the tool room (13), and a switch door (14) matched with the picking and placing opening is rotationally connected to the picking and placing opening.
10. Municipal utility waste recycling device according to claim 9, characterized in that the outside of the switch door (14) is rotatably connected with a handle (11).
CN202322705221.6U 2023-10-09 2023-10-09 Municipal public works garbage collection device Active CN220765445U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322705221.6U CN220765445U (en) 2023-10-09 2023-10-09 Municipal public works garbage collection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322705221.6U CN220765445U (en) 2023-10-09 2023-10-09 Municipal public works garbage collection device

Publications (1)

Publication Number Publication Date
CN220765445U true CN220765445U (en) 2024-04-12

Family

ID=90612674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322705221.6U Active CN220765445U (en) 2023-10-09 2023-10-09 Municipal public works garbage collection device

Country Status (1)

Country Link
CN (1) CN220765445U (en)

Similar Documents

Publication Publication Date Title
CN101716586B (en) Module-assembly type domestic waste sorting device
CN105668070A (en) Miniature garbage treatment equipment
CN110644404B (en) Road surface leaf automatic collection equipment for sanitation
CN217857974U (en) Construction waste sorting and recycling device
CN220765445U (en) Municipal public works garbage collection device
CN211334740U (en) Building rubbish treatment device for civil engineering construction
CN211099406U (en) Multifunctional waste battery recovery device
CN111266150A (en) Engineering construction waste treatment device with environment-friendly dust removal function and processing method thereof
CN208612714U (en) Moveable fallen leaves collecting and pulverizing device
CN217432574U (en) Container formula construction waste recovery plant suitable for building site environment
CN110918609A (en) Building rubbish cleaning device
CN109225522A (en) A kind of building rubbish treatment device
CN216261245U (en) Broken recovery unit of rubbish is built in room
CN210794499U (en) Processing station for collecting, classifying and recycling garbage
CN212309693U (en) Construction waste classification treatment equipment
CN109606978B (en) Road garbage environment-friendly treatment device and construction method thereof
CN107282611A (en) A kind of environment-friendly type municipal garbage recycles car
CN216987833U (en) Waste recycling device
CN112403654A (en) Building rubbish reducing mechanism for building
CN213493905U (en) Municipal works refuse treatment device
CN215964607U (en) Prevent building material sieving mechanism for construction of jam
CN216137385U (en) Solid waste collecting equipment
CN220789574U (en) Environmental sanitation cleaning device
CN213922506U (en) Building engineering garbage collection device
CN220028164U (en) Urban garbage fuel storage pre-crushing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant