CN220573584U - Building rubbish recycling and processing device - Google Patents

Building rubbish recycling and processing device Download PDF

Info

Publication number
CN220573584U
CN220573584U CN202321445197.0U CN202321445197U CN220573584U CN 220573584 U CN220573584 U CN 220573584U CN 202321445197 U CN202321445197 U CN 202321445197U CN 220573584 U CN220573584 U CN 220573584U
Authority
CN
China
Prior art keywords
crushing box
crushing
side plates
construction waste
support side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321445197.0U
Other languages
Chinese (zh)
Inventor
黄振波
唐强
宋志兵
张福军
严群
郁连化
田盎然
张健
王军
周宇
许祺
罗新宇
陈芋如
阚德明
卢滟伶
顾凡
黄钰程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sukun Construction Jiangsu Co ltd
Original Assignee
Sukun Construction Jiangsu Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sukun Construction Jiangsu Co ltd filed Critical Sukun Construction Jiangsu Co ltd
Priority to CN202321445197.0U priority Critical patent/CN220573584U/en
Application granted granted Critical
Publication of CN220573584U publication Critical patent/CN220573584U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Disintegrating Or Milling (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a construction waste recycling and processing device, which comprises a crushing box, wherein two crushing rollers are movably arranged in the crushing box through bearings, a sealing plate is arranged near the upper end of a front box body penetrating the crushing box, a slot is formed near the upper end of the inner wall of a back box body penetrating the crushing box, a machine box is fixedly arranged on one side of the crushing box, a dust removal conveying assembly is arranged below the crushing box, support columns are fixedly arranged near both sides of the bottom end of the crushing box, the dust removal conveying assembly comprises a conveying belt, support side plates are arranged on both sides of the conveying belt, a partition plate is fixedly arranged near the front end between the two support side plates, and circulation slots are formed in both sides penetrating the support side plates; the construction waste recycling and processing device can prevent the construction waste from splashing to hurt nearby people in the crushing process, can achieve the dust removal effect while preventing the crushing roller from being corroded by contact with moisture, and can recycle redundant water and save water.

Description

Building rubbish recycling and processing device
Technical Field
The utility model relates to the field of recycling and processing of construction waste, in particular to a recycling and processing device of construction waste.
Background
The construction waste refers to dregs, waste soil, waste materials, sludge and other waste materials generated in the construction process, wherein the waste construction materials can be recycled and processed to be used as raw materials again to produce new construction materials, and the waste materials are required to be crushed in the processing process; when the existing construction waste recycling and processing device is used, in order to reduce dust generated in the crushing process, water needs to be sprayed in advance to wet waste materials or dust is sprayed while crushing, but in the process, the crushing roller contacts moisture, so that the crushing roller is easy to rust, and meanwhile, the construction waste is easy to splash and hurt nearby people in the crushing process.
Disclosure of Invention
The utility model mainly aims to provide a construction waste recycling and processing device which can effectively solve the problems in the background technology.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a processing device is retrieved to building rubbish, includes smashes the case, two crushing rollers are passed through bearing movable mounting to smash the inside of case, runs through the front box of smashing the case and leans on the upper end to install the shrouding, runs through the back box inner wall of smashing the case and leans on the upper end to offer the slot, smashes one side fixed mounting organic case of case, and the below of smashing the case is provided with dust removal conveying component, and the bottom of smashing the case leans on both sides equal fixed mounting to have the support column.
The dust removal conveying assembly comprises a conveying belt, support side plates are arranged on two sides of the conveying belt, a partition plate is fixedly arranged between the two support side plates near the front end, a circulation groove is formed in two sides of the support side plates in a penetrating mode, a spray head is fixedly arranged near the top end of the inner wall of the support side plate in a penetrating mode, an interception net is fixedly arranged at the opening of the circulation groove and located on the inner side of the support side plate, a guide plate is fixedly arranged at the outer side of the support side plate and located at the bottom end of the circulation groove, a water tank is arranged below the conveying belt, a water pipe is fixedly arranged near the front end of the support side plate in a penetrating mode, and a square groove is formed in the upper end and the lower end of the guide plate in a penetrating mode.
As a further scheme of the utility model, a motor is arranged in the machine case, an output shaft of the motor is fixedly connected with a shaft of the crushing roller, and the two crushing rollers are meshed with each other.
As a further scheme of the utility model, the top surface of the conveyor belt is positioned right below the outlet of the crushing box near the front end, and the top surfaces of the supporting side plates and the partition plates are flush with the bottom surface of the crushing box.
As a further scheme of the utility model, the outer surface of the conveyor belt is provided with cambered surfaces at the two sides of the middle height, and the bottom surface of the partition plate is tangent to the top surface of the conveyor belt.
As a further scheme of the utility model, the circulating groove and the guide plate are arranged in a downward inclined mode, the upper end of the water pipe is communicated with the spray head, the water pump is arranged in the water tank, and the bottom end of the water pipe is communicated with the water pump.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, the sealing plate is matched with the slot, the opening of the crushing box is closed after the sealing plate is pushed into the slot, when the crushing roller crushes construction waste, the blocking of the sealing plate prevents the construction waste from splashing to injure nearby people and prevents dust from diffusing outwards in the crushing process, meanwhile, the dust removing transmission assembly is arranged, the water pump is started to be matched with the water pipe to convey clear water in the water tank to the spray head to form water mist for spraying, the crushed waste is moistened and dedusted, redundant water is filtered by the interception net and flows into the circulating groove and flows to the square groove through the guide of the guide plate, and finally falls back into the water tank, so that water is saved, meanwhile, the crushing roller cannot be wetted in the dedusting process, and the crushing roller is corroded due to rust.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a construction waste recycling device according to the present utility model;
FIG. 2 is a schematic view of a dust removal conveying assembly in a construction waste recycling device according to the present utility model;
fig. 3 is a top view of a dust removal conveying assembly in a construction waste recycling device according to the present utility model.
In the figure: 1. a crushing box; 2. a sealing plate; 3. a slot; 4. a pulverizing roller; 5. a chassis; 6. a support column; 7. a dust removal conveying assembly; 701. a conveyor belt; 702. supporting the side plates; 703. a partition plate; 704. a spray head; 705. an interception net; 706. a flow channel; 707. a deflector; 708. a water pipe; 709. a water tank; 710. and (5) a square groove.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
As shown in fig. 1-3, a construction waste recycling and processing device comprises a crushing box 1, wherein two crushing rollers 4 are movably mounted in the crushing box 1 through bearings, a sealing plate 2 is mounted at the upper end of a front box body penetrating through the crushing box 1, a slot 3 is formed at the upper end of the inner wall of a back box body penetrating through the crushing box 1, an organic box 5 is fixedly mounted on one side of the crushing box 1, a dust removal conveying assembly 7 is arranged below the crushing box 1, and support columns 6 are fixedly mounted at the two sides of the bottom end of the crushing box 1.
The dust removal conveying assembly 7 comprises a conveying belt 701, support side plates 702 are arranged on two sides of the conveying belt 701, a partition 703 is fixedly arranged near the front end between the two support side plates 702, circulation grooves 706 are formed in two sides of the penetrating support side plates 702, spray heads 704 are fixedly arranged near the top ends of the inner walls of the penetrating support side plates 702, interception nets 705 are fixedly arranged at openings of the circulation grooves 706 located on the inner sides of the support side plates 702, a guide plate 707 is fixedly arranged on the outer sides of the support side plates 702 and located at the bottom ends of the circulation grooves 706, a water tank 709 is arranged below the conveying belt 701, a water pipe 708 is fixedly arranged near the front end of the bottom end of the penetrating support side plates 702, square grooves 710 are formed in the upper ends and the lower ends of the penetrating guide plate 707, and dust removal and conveying are carried out on crushed building rubbish through the dust removal conveying assembly 7.
The motor is arranged in the machine case 5, an output shaft of the motor is fixedly connected with a shaft of the crushing roller 4, the two crushing rollers 4 are meshed with each other, the motor is started to drive the crushing roller 4 to rotate, and the construction waste poured into the crushing case 1 is crushed.
The top surface of conveyer belt 701 is located the front end and is located crushing case 1 exit under, supports curb plate 702 and the top surface of baffle 703 and crushing case 1's bottom surface parallel and level, falls on conveyer belt 701 after construction waste is smashed, blocks through supporting curb plate 702 and baffle 703, avoids building waste after smashing to drop from conveyer belt 701.
The outer surface of the conveyor belt 701 is provided with cambered surfaces at the two sides with the middle height, the bottom surface of the partition 703 is tangent to the top surface of the conveyor belt 701, and the water mist sprayed by the spray nozzle 704 removes dust from the crushed construction waste and flows into the circulation groove 706 through the guide of the conveyor belt 701.
The circulation groove 706 and the guide plate 707 are all in downward sloping setting, and the upper end and the shower nozzle 704 of water pipe 708 communicate each other, and the internally mounted of water tank 709 has the water pump, and the bottom and the water pump of water pipe 708 communicate each other, and after the water pump starts, draws in the clear water in the water tank 709 into water pipe 708, and the rethread water pipe 708 carries to shower nozzle 704 department and forms the water smoke blowout, removes dust to the construction waste after smashing.
In the construction waste recycling and processing device, when the construction waste recycling and processing device is used, the sealing plate 2 is supported by the support columns 6, clean water is poured into the water tank 709 at first, then the construction waste is poured into the crushing box 1, the sealing plate 2 is pushed and clamped into the slot 3 to seal the top surface of the crushing box 1, and then the motor in the machine case 5, the water pump in the water tank 709 and the conveyor belt 701 are started;
the motor is started to drive the two crushing rollers 4 to rotate so as to crush the construction waste, when the construction waste is crushed, the opening of the crushing box 1 is blocked by the sealing plate 2, so that the damage to nearby people caused by splashing of the construction waste in the crushing process is avoided, dust generated in the crushing process is blocked, clear water in the water tank 709 is conveyed to the water pipe 708 after the water pump is started, and then the clear water is conveyed to the spray nozzle 704 through the water pipe 708 so as to form water mist to spray;
the crushed construction waste falls onto the conveyor belt 701, the crushed construction waste is blocked by the supporting side plates 702 and the partition plates 703, meanwhile, the sprayed water mist wets and removes dust to the crushed construction waste, redundant water flows to two sides of the conveyor belt 701, is filtered by the interception net 705, flows into the circulation groove 706, flows into the flow guide plate 707, and falls back into the water tank 709 through the square groove 710, and the conveyor belt 701 simultaneously conveys the crushed construction waste out from the lower part of the crushing box 1.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a processing apparatus is retrieved to construction waste which characterized in that: the device comprises a crushing box (1), wherein two crushing rollers (4) are movably mounted in the crushing box (1) through bearings, a sealing plate (2) is mounted at the upper end of a front box body penetrating through the crushing box (1), a slot (3) is formed at the upper end of the inner wall of a back box body penetrating through the crushing box (1), a case (5) is fixedly mounted at one side of the crushing box (1), a dust removal conveying assembly (7) is arranged below the crushing box (1), and support columns (6) are fixedly mounted at the two sides of the bottom end of the crushing box (1);
the dust removal conveying assembly (7) comprises a conveying belt (701), support side plates (702) are arranged on two sides of the conveying belt (701), a partition plate (703) is fixedly arranged between the two support side plates (702) near the front end, circulation grooves (706) are formed in two sides of the penetrating support side plates (702), spray heads (704) are fixedly arranged on the inner walls of the penetrating support side plates (702) near the top ends, interception nets (705) are fixedly arranged at openings of the circulation grooves (706) on the inner sides of the support side plates (702), guide plates (707) are fixedly arranged on the outer sides of the support side plates (702) and the bottom ends of the circulation grooves (706), water tanks (709) are arranged below the conveying belt (701), water pipes (708) are fixedly arranged near the front ends of the penetrating support side plates (702), and square grooves (710) are formed in the upper ends and the lower ends of the penetrating guide plates (707).
2. The construction waste recycling apparatus according to claim 1, wherein: the inside of the case (5) is provided with a motor, an output shaft of the motor is fixedly connected with a shaft of the crushing rollers (4), and the two crushing rollers (4) are meshed with each other.
3. The construction waste recycling apparatus according to claim 1, wherein: the top surface of the conveyor belt (701) is positioned right below the outlet of the crushing box (1) near the front end, and the top surfaces of the supporting side plates (702) and the partition plates (703) are flush with the bottom surface of the crushing box (1).
4. The construction waste recycling apparatus according to claim 1, wherein: the outer surface of the conveyor belt (701) is arranged in a cambered surface manner with the middle high and the bottoms at the two sides, and the bottom surface of the partition plate (703) is tangent to the top surface of the conveyor belt (701).
5. The construction waste recycling apparatus according to claim 1, wherein: the circulation groove (706) and the guide plate (707) are all arranged in a downward inclined mode, the upper end of the water pipe (708) is communicated with the spray head (704), the water pump is installed in the water tank (709), and the bottom end of the water pipe (708) is communicated with the water pump.
CN202321445197.0U 2023-06-08 2023-06-08 Building rubbish recycling and processing device Active CN220573584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321445197.0U CN220573584U (en) 2023-06-08 2023-06-08 Building rubbish recycling and processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321445197.0U CN220573584U (en) 2023-06-08 2023-06-08 Building rubbish recycling and processing device

Publications (1)

Publication Number Publication Date
CN220573584U true CN220573584U (en) 2024-03-12

Family

ID=90122716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321445197.0U Active CN220573584U (en) 2023-06-08 2023-06-08 Building rubbish recycling and processing device

Country Status (1)

Country Link
CN (1) CN220573584U (en)

Similar Documents

Publication Publication Date Title
CN108856243B (en) Waste recovery process for automobile disassembly
CN111659676B (en) All-round automatic spray device of pipe fitting
CN113578444A (en) Building rubbish reducing mechanism capable of reducing dust
CN220573584U (en) Building rubbish recycling and processing device
CN211027400U (en) Steel sandblast rust cleaning room system convenient to it is clean
CN211026568U (en) High-efficient reducing mechanism of regeneration aggregate
CN219024486U (en) Building waste recovery device
CN217663733U (en) Waste recovery device is used in road engineering construction
CN217554900U (en) Slack coal screen discharging guide device for coal washing plant
CN111939704B (en) Dust collector for building engineering
CN213166344U (en) Plastic refuse reducing mechanism for environmental protection
CN212120139U (en) Automatic processing apparatus of building rubbish
CN209443048U (en) A kind of ferroalloy smelting cooling forming device
CN210299285U (en) Automatic desquamation device for fish processing
CN113059009A (en) Rolling mill with spray system having anti-splash function
CN219502910U (en) Stone material reducing mechanism for construction
CN218901978U (en) Construction waste crushing and packing device
CN218107784U (en) Breaker dust device is used in aggregate production
CN220835864U (en) Automatic breaker of dust removal
CN219169058U (en) Circulation belt cleaning device that garbage crusher used
CN219028112U (en) Abandonment agricultural film retrieves reducing mechanism
CN215655675U (en) Novel high-efficient civil engineering construction waste material shredding equipment
CN215466443U (en) Dust collector is used in glass bead production
CN220091674U (en) Impurity treatment mechanism of ore washer
CN211801095U (en) Waste treatment device for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant