CN220487048U - Building installation scaffold - Google Patents

Building installation scaffold Download PDF

Info

Publication number
CN220487048U
CN220487048U CN202321479328.7U CN202321479328U CN220487048U CN 220487048 U CN220487048 U CN 220487048U CN 202321479328 U CN202321479328 U CN 202321479328U CN 220487048 U CN220487048 U CN 220487048U
Authority
CN
China
Prior art keywords
wall
rod
mounting
installation
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321479328.7U
Other languages
Chinese (zh)
Inventor
韩秋石
刘澜超
张敏
杨科
廖超
诸仁彬
谷萌萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202321479328.7U priority Critical patent/CN220487048U/en
Application granted granted Critical
Publication of CN220487048U publication Critical patent/CN220487048U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a building installation scaffold, which relates to the technical field of building construction and comprises a main body device, wherein the main body device comprises a moving unit, an auxiliary unit and a using unit, the moving unit comprises a round rod, a roller, a movable rod and a movable ring, the auxiliary unit comprises a fixed column, an auxiliary ring, an installation block, a hook, a tool box, a safety hook, a fixed ring, an anti-skid block and an auxiliary rod, the using unit comprises a first installation rod, a third installation rod, a transverse plate, a rectangular plate, a supporting plate and a transverse rod, the first installation rod is positioned at the top of the supporting plate, the round rod is positioned at the bottom of the installation block, and the transverse plate is positioned at the bottom of the first installation rod. The utility model provides a building installation scaffold, which achieves the effect of flexible movement by matching a round rod, a movable rod, a hook, a tool box and a safety hook, solves the problem of inconvenient movement, and improves the flexibility and convenience of the device.

Description

Building installation scaffold
Technical Field
The utility model relates to the technical field of building construction, in particular to a building installation scaffold.
Background
At present, in high-rise building construction, the outer wall operation platform adopts the lifting scaffold that steel pipe and adapting unit set up more, and this kind of lifting scaffold adopts rigid fixed connection, needs constructor to build at the job site with an independent steel pipe, builds with demolishing all to need the instrument, and the degree of difficulty is high, speed is slow, inefficiency, influences the construction progress. And square timber is used as a stress supporting system: and binding moso bamboo or log with aluminum wires to form a support system or scaffold. The support system or the scaffold has the defects of large raw material consumption and low efficiency, and the fasteners are carried and installed by workers, have high labor intensity, are laborious and time-consuming, are easy to lose, and bring certain hidden trouble to construction safety.
In the prior art, a Chinese patent with a publication number of CN101597955B is proposed to solve the technical problems, and the technical scheme disclosed in the patent document is as follows: the utility model relates to a safety scaffold, which comprises a bracket formed by overlapping a cross rod and upright rods, and a pedal assembly positioned on the bracket, wherein the cross rod comprises a transverse rod body, and the rod body and sleeving parts positioned at two ends of the rod body are fixed into a whole and are used for connecting the upright rods; a supporting frame is connected below the vertical rod; the pedal combination comprises a transverse pedal and hook combinations positioned at two transverse ends of the pedal; the hook combination consists of a hook for hooking the cross rod, a locking piece and a rivet for fixing the locking piece on the side surface of the hook; the periphery of the pedal is fixed by a side U-shaped inner protection frame and an outer protection frame. The novel fastener and the novel plug connector are adopted in the safety scaffold, so that the structure is simplified, the construction efficiency can be remarkably improved, the applicability is high, the number of parts is remarkably reduced, the materials are saved, and the cost is reduced.
Although the device solves the problems that the supporting systems or scaffolds have a plurality of defects, some of the supporting systems or scaffolds consume a large amount of raw materials and have low efficacy, some fasteners are carried and installed by workers, have high labor intensity and time consumption, are easy to lose and bring a certain hidden trouble to construction safety, the device is extremely inconvenient to move when in use, has long splicing time consumption and lacks protection devices, thereby reducing the driving practicability of the device
Disclosure of Invention
The utility model aims to provide a building installation scaffold which solves the problems in the background technology.
In order to solve the technical problems, the utility model adopts the following technical scheme:
a building installation scaffold comprising a body arrangement comprising a movement unit, an auxiliary unit and a use unit.
The motion unit includes round bar, gyro wheel, movable rod and expansion link, the auxiliary unit includes fixed column, auxiliary ring, installation piece, couple, tool holder, safety hook, solid fixed ring, non slipping spur and auxiliary rod, the use unit includes first installation pole, second installation pole, third installation pole, diaphragm, rectangular plate, backup pad and transverse rod.
The first mounting rod is located at the top of the supporting plate, the round rod is located at the bottom of the mounting block, and the transverse plate is located at the bottom of the first mounting rod.
Adopt above-mentioned technical scheme, utilize round bar, gyro wheel, movable rod, expansion ring in this scheme, fixed column, auxiliary ring, installation piece, couple, tool holder, safety hook, fixed ring, non slipping spur, auxiliary rod, first installation pole, second installation pole, third installation pole, diaphragm, rectangular plate, backup pad and transverse rod cooperation use, improved the mobility of device, practiced thrift the time that the concatenation consumed, improved device protectiveness and flexibility and strengthened the practicality of device.
The technical scheme of the utility model is further improved as follows: the outer wall of the first installation rod is fixedly installed with the inner wall of the third installation rod, the outer wall of the first installation rod is movably installed with the inner wall of the safety hook, one side of the safety hook is fixedly installed with the outer wall of the fixed ring, and the outer wall of the first installation rod is movably installed with the inner wall of the movable ring.
By adopting the technical scheme, the first mounting rod, the third mounting rod, the safety hook and the fixing ring are matched for use in the scheme, so that the height of the foot rest can be adjusted at any time during operation, the time consumed by manual lap joint is avoided, and meanwhile, the convenience of the device is improved.
The technical scheme of the utility model is further improved as follows: the inner wall of expansion ring with the inner wall movable mounting of rectangular plate, the top of rectangular plate with the top fixed mounting of toolbox, the outer wall of third installation pole with the inner wall fixed mounting of auxiliary ring, the inner wall of auxiliary ring with the outer wall fixed mounting of fixed column, the outer wall of third installation pole with the inner wall movable mounting of installation piece, the inner wall of installation piece with the outer wall movable mounting of expansion link.
By adopting the technical scheme, the movable ring, the rectangular plate, the tool box, the auxiliary ring and the fixing column are matched for use in the scheme, convenience is provided for a user in use, the waste of physical strength and time due to reciprocating movement of the user is avoided, and the convenience of the device is enhanced.
The technical scheme of the utility model is further improved as follows: the inner wall of movable rod with the outer wall fixed mounting of second installation pole, the outer wall of third installation pole with the inner wall movable mounting of round bar, the bottom of round bar with the top fixed mounting of gyro wheel, the inner wall of third installation pole with the outer wall fixed mounting of auxiliary rod.
The technical scheme of the utility model is further improved as follows: the inner wall of auxiliary rod with the outer wall movable mounting of transverse rod, the outer wall of transverse rod with the inner wall movable mounting of couple, one side of couple with one side fixed mounting of backup pad, the top of backup pad with the bottom fixed mounting of non slipping spur.
The technical scheme of the utility model is further improved as follows: the outer wall of backup pad with the inner wall fixed mounting of diaphragm, the outer wall of expansion ring pass through the rectangular plate with the top fixed mounting of toolbox, the outer wall of safety hook pass through first installation pole with the inner wall movable mounting of third installation pole.
The technical scheme of the utility model is further improved as follows: the outer wall of the movable rod is movably mounted with the outer wall of the third mounting rod through the mounting block, one side of the movable rod is movably mounted with the inner wall of the auxiliary ring through the third mounting rod, and the top of the roller is movably mounted with the outer wall of the third mounting rod through the round rod.
By adopting the technical scheme, the movable rod, the third mounting rod, the auxiliary ring and the idler wheels are matched for use in the scheme, so that the firmness is enhanced when the device is used, potential safety hazards caused by shaking are avoided, and the stability and the practicability of the device are improved.
By adopting the technical scheme, compared with the prior art, the utility model has the following technical progress:
1. the utility model provides a building installation scaffold, which is used by matching a round rod, a roller, a movable rod, a movable ring, a hook, a tool box and a safety hook, so that the effect of flexible movement is achieved, the problem of inconvenient movement is solved, and the flexibility and the convenience of the device are improved.
2. The utility model provides a building installation scaffold, which is matched with a hook, a tool box, a safety hook, a fixed ring, an anti-skid block and an auxiliary rod to use, so that the effect of less splicing time consumption is achieved, the problem of longer splicing time consumption is solved, and the practicability of the device is enhanced.
3. The utility model provides a building installation scaffold, which achieves the effect of good protection by matching an installation block, a hook, a tool box, a safety hook, a transverse plate, a rectangular plate, a supporting plate and a transverse rod, solves the problem of lack of a protection device, avoids the careless falling of a user, and improves the protection of the device.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic top view of the present utility model;
FIG. 3 is a schematic view of the bottom view structure of the present utility model;
fig. 4 is a left side schematic view of the present utility model.
In the figure: 1. a main body device; 2. a first mounting bar; 3. a second mounting bar; 4. a round bar; 5. a roller; 6. fixing the column; 7. an auxiliary ring; 9. a third mounting bar; 10. a mounting block; 11. a cross plate; 12. a hook; 13. a movable rod; 14. a movable ring; 15. a rectangular plate; 16. a tool box; 17. a safety hook; 18. a fixing ring; 20. a support plate; 21. an anti-skid block; 22. a transverse bar; 23. an auxiliary rod.
Detailed Description
The utility model is further illustrated by the following examples:
example 1
As shown in fig. 1 to 4, the present utility model provides a building installation scaffold including a body device 1, the body device 1 including a moving unit, an auxiliary unit, and a using unit.
The moving unit comprises a round rod 4, a roller 5, a movable rod 13 and a movable ring 14, the auxiliary unit comprises a fixed column 6, an auxiliary ring 7, a mounting block 10, a hook 12, a tool box 16, a safety hook 17, a fixed ring 18, a non-slip block 21 and an auxiliary rod 23, and the using unit comprises a first mounting rod 2, a second mounting rod 3, a third mounting rod 9, a transverse plate 11, a rectangular plate 15, a support plate 20 and a transverse rod 22.
The first mounting bar 2 is located at the top of the support plate 20, the first mounting bar 2 supports and secures the movable ring 14, the round bar 4 is located at the bottom of the mounting block 10, the cross plate 11 is located at the bottom of the first mounting bar 2, and the cross plate 11 supports and connects the tool box 16.
The outer wall of the first installation pole 2 and the inner wall fixed mounting of the third installation pole 9, the outer wall of the first installation pole 2 and the inner wall movable mounting of the safety hook 17, the safety hook 17 and the safety wear cooperation of user dress ensure user's safety, one side of the safety hook 17 and the outer wall fixed mounting of the fixed ring 18, the outer wall of the first installation pole 2 and the inner wall movable mounting of the loose ring 14, fixed ring 18 is connected and fixes the rope.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: preferably, the inner wall of the movable ring 14 is movably mounted with the inner wall of the rectangular plate 15, the top of the rectangular plate 15 is fixedly mounted with the top of the tool box 16, the tool box 16 stores and collects tools, the outer wall of the third mounting rod 9 is fixedly mounted with the inner wall of the auxiliary ring 7, the auxiliary ring 7 assists the first mounting rod 2 to rise and fall, the inner wall of the auxiliary ring 7 is fixedly mounted with the outer wall of the fixed column 6, the outer wall of the third mounting rod 9 is movably mounted with the inner wall of the mounting block 10, the inner wall of the mounting block 10 is movably mounted with the outer wall of the movable rod 13, and the mounting block 10 is mounted and fixes the second mounting rod 3.
The inner wall of movable rod 13 and the outer wall fixed mounting of second installation pole 3, the outer wall of third installation pole 9 and the inner wall movable mounting of round bar 4, the bottom of round bar 4 and the top fixed mounting of gyro wheel 5, gyro wheel 5 removes and adjusting device's position, the inner wall of third installation pole 9 and the outer wall fixed mounting of auxiliary rod 23.
The inner wall of the auxiliary rod 23 is movably mounted with the outer wall of the transverse rod 22, the auxiliary rod 23 supports and connects the transverse rod 22, the outer wall of the transverse rod 22 is movably mounted with the inner wall of the hook 12, one side of the hook 12 is fixedly mounted with one side of the supporting plate 20, the top of the supporting plate 20 is fixedly mounted with the bottom of the anti-skid block 21, and the supporting plate 20 supports a user to stand and work.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: preferably, the outer wall of the supporting plate 20 is fixedly mounted with the inner wall of the transverse plate 11, the outer wall of the movable ring 14 is fixedly mounted with the top of the tool box 16 through the rectangular plate 15, and the outer wall of the safety hook 17 is movably mounted with the inner wall of the third mounting rod 9 through the first mounting rod 2.
The outer wall of movable rod 13 passes through installation piece 10 and the outer wall movable mounting of third installation pole 9, and one side of movable rod 13 passes through the inner wall movable mounting of third installation pole 9 and auxiliary ring 7, and round bar 4 supports and fixes third installation pole 9 through round bar 4 and the outer wall movable mounting of third installation pole 9 at the top of gyro wheel 5.
The working principle of the building installation scaffold is specifically described below.
As shown in fig. 1 to 4, in use, the auxiliary rod 23 is mounted at the bottom of the third mounting rod 9 through the round rod 4 and the roller 5, the auxiliary rod 23 is mounted at the inner part of the third mounting rod 9, the transverse rod 22 is spliced at the outer wall of the auxiliary rod 23, then the supporting plate 20 is spliced at the inner wall of the transverse plate 11, the hook 12 is hooked at the outer wall of the transverse rod 22 to be fixed, the auxiliary ring 7 and the fixed column 6 are matched and fixed at the outer wall of the third mounting rod 9, the first mounting rod 2 is mounted at the inner wall of the auxiliary ring 7, then the movable ring 14 is mounted on the surface of the first mounting rod 2, the rectangular plate 15 and the tool box 16 are fixed at the outer wall of the movable ring 14, the mounting block 10 is fixed at the outer wall of the third mounting rod 9 through the movable rod 13, finally the first mounting rod 2 is fixed at the inner part of the mounting block 10, the movable rod 13 is rotated to disassemble the mounting block 10 during disassembly, the hook 12 is detached from the inner wall of the auxiliary ring 7 through rotating the first mounting rod 2, finally the hook 12 is taken from the surface of the transverse rod 22, and finally the disassembled parts are stored and collected.
The foregoing utility model has been generally described in great detail, but it will be apparent to those skilled in the art that modifications and improvements can be made thereto. Accordingly, it is intended to cover modifications or improvements within the spirit of the inventive concepts.

Claims (7)

1. Building installation scaffold, including main part device (1), its characterized in that: the main body device (1) comprises a movement unit, an auxiliary unit and a use unit;
the motion unit comprises a round rod (4), a roller (5), a movable rod (13) and a movable ring (14), the auxiliary unit comprises a fixed column (6), an auxiliary ring (7), a mounting block (10), a hook (12), a tool box (16), a safety hook (17), a fixed ring (18), an anti-skid block (21) and an auxiliary rod (23), and the use unit comprises a first mounting rod (2), a second mounting rod (3), a third mounting rod (9), a transverse plate (11), a rectangular plate (15), a support plate (20) and a transverse rod (22);
the first mounting rod (2) is located at the top of the supporting plate (20), the round rod (4) is located at the bottom of the mounting block (10), and the transverse plate (11) is located at the bottom of the first mounting rod (2).
2. A building installation scaffolding according to claim 1, wherein: the outer wall of the first installation rod (2) is fixedly installed with the inner wall of the third installation rod (9), the outer wall of the first installation rod (2) is movably installed with the inner wall of the safety hook (17), one side of the safety hook (17) is fixedly installed with the outer wall of the fixed ring (18), and the outer wall of the first installation rod (2) is movably installed with the inner wall of the movable ring (14).
3. A building installation scaffolding according to claim 1, wherein: the inner wall of expansion ring (14) with the inner wall movable mounting of rectangular plate (15), the top of rectangular plate (15) with the top fixed mounting of toolbox (16), the outer wall of third installation pole (9) with the inner wall fixed mounting of auxiliary ring (7), the inner wall of auxiliary ring (7) with the outer wall fixed mounting of fixed column (6), the outer wall of third installation pole (9) with the inner wall movable mounting of installation piece (10), the inner wall of installation piece (10) with the outer wall movable mounting of expansion link (13).
4. A building installation scaffolding according to claim 1, wherein: the inner wall of movable rod (13) with the outer wall fixed mounting of second installation pole (3), the outer wall of third installation pole (9) with the inner wall movable mounting of round bar (4), the bottom of round bar (4) with the top fixed mounting of gyro wheel (5), the inner wall of third installation pole (9) with the outer wall fixed mounting of auxiliary rod (23).
5. A building installation scaffolding according to claim 1, wherein: the inner wall of auxiliary rod (23) with the outer wall movable mounting of transverse rod (22), the outer wall of transverse rod (22) with the inner wall movable mounting of couple (12), one side of couple (12) with one side fixed mounting of backup pad (20), the top of backup pad (20) with the bottom fixed mounting of non slipping spur (21).
6. A building installation scaffolding according to claim 1, wherein: the outer wall of backup pad (20) with the inner wall fixed mounting of diaphragm (11), the outer wall of expansion ring (14) pass through rectangular plate (15) with the top fixed mounting of toolbox (16), the outer wall of safety hook (17) pass through first installation pole (2) with the inner wall movable mounting of third installation pole (9).
7. A building installation scaffolding according to claim 1, wherein: the outer wall of the movable rod (13) is movably mounted with the outer wall of the third mounting rod (9) through the mounting block (10), one side of the movable rod (13) is movably mounted with the inner wall of the auxiliary ring (7) through the third mounting rod (9), and the top of the roller (5) is movably mounted with the outer wall of the third mounting rod (9) through the round rod (4).
CN202321479328.7U 2023-06-12 2023-06-12 Building installation scaffold Active CN220487048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321479328.7U CN220487048U (en) 2023-06-12 2023-06-12 Building installation scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321479328.7U CN220487048U (en) 2023-06-12 2023-06-12 Building installation scaffold

Publications (1)

Publication Number Publication Date
CN220487048U true CN220487048U (en) 2024-02-13

Family

ID=89825933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321479328.7U Active CN220487048U (en) 2023-06-12 2023-06-12 Building installation scaffold

Country Status (1)

Country Link
CN (1) CN220487048U (en)

Similar Documents

Publication Publication Date Title
CN105133825A (en) Multifunctional decoration platform
CN204738226U (en) Arched bridge main arch bottom plate rail formula tool car
CN220487048U (en) Building installation scaffold
CN212957538U (en) Roof flower frame beam and outer wall decoration construction movable operation platform
CN110284701A (en) A kind of convenient and fast new type scaffold assembly and connection device
CN204983582U (en) Multi -functional fitment platform
CN205840316U (en) Large span Zhongting hanging structure form bracing system
CN208105827U (en) A kind of construction scaffolding structure
CN210439649U (en) Die carrier construction platform for construction
CN202899588U (en) Assembling scaffold structure
CN203022329U (en) Nacelle frame without balancing weight
CN201802060U (en) Novel scaffold
CN211037748U (en) Novel construction scaffold without fastener
CN209670368U (en) Building engineering construction platform
CN201310183Y (en) Convenient support device for cornice on silo roof
CN211114732U (en) Portable movable reinforcement operation platform
CN203582338U (en) Balance arm platform and stock platform device
CN216553728U (en) Portable removes work platform
CN220867993U (en) Pier surface artificial painting platform
CN207109614U (en) A kind of Hanging Basket for building
CN216947882U (en) Movable construction platform device in narrow limited space
CN212773354U (en) Novel building engineering scaffold
CN211569862U (en) Prefabricated hoist and mount piece of building convenient to dismouting
CN220203345U (en) Detachable and assembled portable climbing support
CN220814851U (en) Safety hanging basket for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant