CN209670368U - Building engineering construction platform - Google Patents

Building engineering construction platform Download PDF

Info

Publication number
CN209670368U
CN209670368U CN201822178584.8U CN201822178584U CN209670368U CN 209670368 U CN209670368 U CN 209670368U CN 201822178584 U CN201822178584 U CN 201822178584U CN 209670368 U CN209670368 U CN 209670368U
Authority
CN
China
Prior art keywords
guide rail
crane girder
extension board
fluting
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822178584.8U
Other languages
Chinese (zh)
Inventor
刘峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Shengwang Construction Engineering Co Ltd
Original Assignee
Sichuan Shengwang Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Shengwang Construction Engineering Co Ltd filed Critical Sichuan Shengwang Construction Engineering Co Ltd
Priority to CN201822178584.8U priority Critical patent/CN209670368U/en
Application granted granted Critical
Publication of CN209670368U publication Critical patent/CN209670368U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of building engineering construction platforms, it includes guide rail, pulley, crane girder and hanging box, the first fluting is provided with above guide rail, pulley passes through the first fluting by strut and is connected with support plate, hydraulic cylinder is connected in support plate, first sliding groove is provided on crane girder, a pair of of idler wheel is symmetrically arranged with below hanging box, motor is installed on hanging box, crane girder both ends wear respectively and slidably connect extension board, crane girder both ends, which are respectively perpendicular, is connected with vertical bar, the sleeve being slidably connected with it is socketed on vertical bar, the cylinder gone up and down for drive sleeve along vertical bar is provided on vertical bar, second fluting parallel with first sliding groove is offered above crane girder, sleeve passes through the second fluting by connecting rod and connect with extension board, the both ends of connecting rod are rotatablely connected with sleeve and extension board respectively, second sliding slot is provided on extension board, for Extension board extends first sliding groove after skidding off outward.The utility model has the effect of extending crane beam length.

Description

Building engineering construction platform
Technical field
The utility model relates to technical field of building construction more particularly to building engineering construction platforms.
Background technique
It in construction, needs to build platform and constructs, be all the foot by manually building in construction at present Hand cradle either particular kind of machine transports construction material, but due to the limitation of construction environment, many construction materials are inconvenient to transport It is defeated, a large amount of time is wasted, and cannot arbitrarily adjust the height of operation platform.
In existing technology, Authorization Notice No. is the Chinese patent of CN207032894U, discloses a kind of architectural engineering and applies Work platform comprising two support plates, support plate bottom side of the wall are equipped with link block, and link block bottom side of the wall is equipped with installation Case, installs case lower section is equipped with sliding rail, and sliding rail passes through pulley and is slidably connected with installs case, and two support plate upper surfaces are perpendicular It is directly equipped with column, and column is hollow structure, is equipped with rack gear in two columns vertically, and rack gear is set through the upper end of the column side wall It sets, two column side walls are transversely provided with sleeve, and sleeve is hollow structure, is equipped with bull stick in two sleeves, and bull stick passes through Wear the side wall setting of cylinder and column, bull stick one end in column is equipped with the gear to match with rack gear, two rack gears it Between be transversely provided with crane girder, crane girder upper surface is equipped with hanging box, and hanging box is slidably connected with crane girder.
Prior art among the above, which has the following deficiencies:, ought need being slidably connected on crane girder by hanging box to incite somebody to action When construction material is transported to designated position, because of the limited length of crane girder, so that the position that construction material is fallen may be with finger Positioning is set apart from each other.
Utility model content
The purpose of this utility model is to provide a kind of building engineering construction platforms, have and extend the excellent of crane beam length Point.
The above-mentioned purpose of the utility model has the technical scheme that
A kind of building engineering construction platform, including guide rail, pulley, crane girder and hanging box are set straight down in the hanging box There is suspension hook, the guide rail is set as two sections, and the pulley is embedded in the guide rail and rolls with it and connect, above the guide rail It is provided with the first fluting, the pulley passes through first fluting by strut and is connected with support plate, connects in the support plate There is the hydraulic cylinder for driving the crane girder lifting, is provided on the crane girder and mutually hangs down with it along the guide rail direction of motion Straight first sliding groove, be symmetrically arranged with below the hanging box with the first sliding groove roll a pair of of idler wheel of connection respectively with it is described First sliding groove rolls connection, and the motor for driving the idler wheel rotation is equipped on the hanging box, and the crane girder is interior along it Both ends on length direction wear respectively and slidably connect extension board, and the both ends of the crane girder along its length are hung down respectively It is direct-connected to be connected to vertical bar, it is socketed with the sleeve being slidably connected with it on the vertical bar, is provided on the vertical bar described for driving The cylinder that sleeve is gone up and down along the vertical bar, the crane girder top offer second fluting parallel with the first sliding groove, institute State sleeve by connecting rod pass through it is described second slot and connect with the extension board, the both ends of the connecting rod respectively with the sleeve It is rotatablely connected with extension board, is provided with second sliding slot on the extension board, after being skidded off outward for the extension board described in extension First sliding groove.
Implement above-mentioned technical proposal, when hanging box is sling construction material by suspension hook and is transported along guide rail, Driven by Hydraulic Cylinder Crane girder rises, and construction material is driven to rise, and when needing to transfer construction material to construction location, starts motor, motor band Dynamic idler wheel is rolled along first sliding groove, when the length of crane girder is inadequate, when construction material can not be transported to designated position, starts gas Cylinder, the length direction of the piston rod of cylinder with moving sleeve along vertical bar glide, and the downslide of sleeve is by connecting rod drive extension board from hanging It is skidded off outward in bicycle beam, so that the second sliding slot of extension board extends first sliding groove after skidding off outward, so that hanging box is logical The first sliding groove crossed after extending slides into the position of construction material decentralization, then is declined by Driven by Hydraulic Cylinder crane girder, thus complete The decentralization of pairs of construction material has the advantages that extend crane beam length.
The utility model is further arranged to, described second be recessed on the crane girder outward it is not open-minded.
Implement above-mentioned technical proposal, during extension board slides in and out in crane girder, after sliding into certain distance, Extension board is abutted at the rotation connection of connecting rod with the end of the second fluting, prevents extension board from falling off out of crane girder.
The utility model is further arranged to, and the guide rail is detachably formed by multistage, and the guide rail is detachably connected on On ground.
Implement above-mentioned technical proposal, multistage guide rail needs the distance transported to be configured according to construction material, then passing through can The mode of disassembly links together multistage guide rail, can be convenient the length that construction personnel extends or shorten at any time guide rail, will lead Rail is detachably connected on ground, and on the one hand guide rail is fixed, on the other hand convenient to mount and dismount to guide rail.
The utility model is further arranged to, there are two the pulley is embedded in the guide rail and is arranged in parallel, two institutes It states and is provided with link block between pulley, the strut is vertically connected on the link block.
Implement above-mentioned technical proposal, by the way that two pulleys are arranged in parallel in guide rail, the company of being provided between two pulleys Block is connect, is on the one hand that strut is facilitated directly to be connected by being connected on link block with two pulleys, is on the other hand by two The setting of pulley is embedded in sliding rail connect with support plate by strut after so that support plate is more stable.
The utility model is further arranged to, and the fastening screw of first fluting is provided through on the link block, The fastening nut for pushing against the guide rail outer surface is threaded on the fastening screw.
Implement above-mentioned technical proposal, when crane girder moves near construction location along the length direction of guide rail, by twisting Fastening nut is moved, so that fastening nut pushes against guide rail outer surface, the rolling of pulley is limited, guarantees the progress that construction is normal, safe.
The utility model is further arranged to, and is provided with turning handle on the fastening nut.
Implement above-mentioned technical proposal, by being provided with turning handle on fastening nut, construction personnel is facilitated to pass through rotation turning handle Fastening nut is turned.
The utility model is further arranged to, and is provided with clump weight between the support plate and the hydraulic cylinder.
Implement above-mentioned technical proposal, by the way that clump weight is arranged, reduces the center of gravity of operation platform, prevent hanging box on crane girder When sliding, operation platform is toppled over.
The utility model is further arranged to, and the drag hook for tractor traction is provided on the clump weight.
Implement above-mentioned technical proposal, facilitates tractor to be articulated on drag hook for traction construction platform, save manpower.
In conclusion the utility model has the following beneficial effects:
One, start cylinder, length direction of the piston rod of cylinder with moving sleeve along vertical bar glides, and the downslide of sleeve passes through company Bar drives extension board to skid off outward from crane girder, slides so that the second sliding slot of extension board extends first after skidding off outward Slot so that hanging box slides into the position of construction material decentralization by the first sliding groove after extending, then passes through Driven by Hydraulic Cylinder Crane girder decline has the advantages that extend crane beam length to complete the decentralization to construction material;
Two, during extension board slides in and out in crane girder, after sliding into certain distance, extension board and connecting rod It is abutted at rotation connection with the end of the second fluting, prevents extension board from falling off out of crane girder.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model embodiment building engineering construction platform;
Fig. 2 is the portion the A enlarged drawing in Fig. 1;
Fig. 3 is the structural schematic diagram of the utility model embodiment hanging box;
Fig. 4 is the attachment structure schematic diagram of the utility model embodiment pulley and support plate.
Appended drawing reference: 1, guide rail;2, pulley;3, crane girder;4, hanging box;5, suspension hook;6, the first fluting;7, strut;8, it props up Fagging;9, hydraulic cylinder;10, first sliding groove;11, idler wheel;12, motor;13, extension board;14, vertical bar;15, sleeve;16, cylinder; 17, the second fluting;18, connecting rod;19, second sliding slot;20, link block;21, fastening screw;22, fastening nut;23, turning handle;24, Clump weight;25, drag hook.
Specific embodiment
Below in conjunction with attached drawing, the technical solution of the utility model embodiment is described.
Embodiment
In conjunction with Fig. 1 and Fig. 4, a kind of building engineering construction platform, including guide rail 1, pulley 2, crane girder 3 and hanging box 4, hanging box Suspension hook 5 is equipped in 4 straight down.Guide rail 1 is set as two sections, and every section guide rail 1 is bolted by more piece, and guide rail 1 and ground It is bolted.There are two pulley 2 is embedded in guide rail 1 and is arranged in parallel, link block 20 is provided between two pulleys 2, strut 7 hangs down Directly it is welded on link block 20.The top of guide rail 1 offers the first fluting 6 along its length, and pulley 2 passes through the by strut 7 One fluting 6 is welded with support plate 8, and the hydraulic cylinder 9 for driving crane girder 3 to go up and down, support plate 8 and liquid are connected in support plate 8 It is provided with clump weight 24 between cylinder pressure 9, the drag hook 25 for tractor traction is welded on clump weight 24.Screw thread on link block 20 It is connected with the fastening screw 21 across the first fluting 6, is threaded on fastening screw 21 for pushing against the tight of 1 outer surface of guide rail Gu nut 22 is welded with turning handle 23 on fastening nut 22.
The first sliding groove 10 perpendicular along 1 direction of motion of guide rail with it is provided on crane girder 3 combined with Figure 1 and Figure 2, is hung In bicycle beam 3 along its length on both ends wear respectively and slidably connect extension board 13.Crane girder 3 is along its length Both ends, which are respectively perpendicular, is welded with vertical bar 14, and the sleeve 15 being slidably connected with it is socketed on vertical bar 14, is installed on vertical bar 14 useful In the cylinder 16 that drive sleeve 15 is gone up and down along vertical bar 14.Second fluting parallel with first sliding groove 10 is offered above crane girder 3 17, the second fluting 17 is not open-minded outward on crane girder 3.Sleeve 15 passes through the second fluting 17 and and extension board by connecting rod 18 13 connections, the both ends of connecting rod 18 are rotatablely connected with sleeve 15 and extension board 13 respectively, in the present embodiment, are rotatablely connected as hinge It connects.It is provided with second sliding slot 19 on extension board 13, extends first sliding groove 10 after skidding off outward for extension board 13.
A pair of of idler wheel 11 of connection is rolled respectively with the with first sliding groove 10 as shown in figure 3, being symmetrically arranged with below hanging box 4 One sliding slot 10 rolls connection, and the electricity for driving idler wheel 11 to be rotated along 10 length direction of first sliding groove is equipped on hanging box 4 Machine 12.
Specific work process: multistage guide rail 1 is first carried out bolt according to the distance that construction material needs to transport by construction personnel Connection, and every section guide rail 1 is fixed on the ground.When hanging box 4 is sling construction material and is transported along guide rail 1 by suspension hook 5, liquid Cylinder pressure 9 drives crane girder 3 to rise, and construction material is driven to rise.Tractor draws building engineering construction platform by drawstring It is dynamic, pull the region constructed.Fastening nut 22 is driven to rotate by rotation turning handle 23 again, so that fastening nut 22 supports Tightly 1 outer surface of guide rail limits the rolling of pulley 2, guarantees the progress that construction is normal, safe.
When needing to transfer construction material to construction location, start motor 12, motor 12 drives idler wheel 11 sliding along first Slot 10 rolls.When the length of crane girder 3 is inadequate, when construction material can not be transported to designated position, start cylinder 16, cylinder 16 Length direction of the piston rod with moving sleeve 15 along vertical bar 14 glide, the downslide of sleeve 15 by connecting rod 18 drive extension board 13 from It skids off in crane girder 3, so that the second sliding slot 19 of extension board 13 extends first sliding groove 10 after skidding off outward, and makes outward Hanging box 4 slides into the position of construction material decentralization by the first sliding groove 10 after extending, then drives crane girder 3 by hydraulic cylinder 9 Decline, to complete the decentralization to construction material.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (8)

1. a kind of building engineering construction platform, including guide rail (1), pulley (2), crane girder (3) and hanging box (4), the hanging box (4) In be equipped with suspension hook (5) straight down, which is characterized in that the guide rail (1) is set as two sections, and the pulley (2) is embedded in described It rolls in guide rail (1) and with it and connect, be provided with the first fluting (6) above the guide rail (1), the pulley (2) passes through strut (7) it passes through first fluting (6) to be connected with support plate (8), be connected on the support plate (8) for driving the crane girder (3) hydraulic cylinder (9) gone up and down, be provided on the crane girder (3) with its along the guide rail (1) direction of motion it is perpendicular first Sliding slot (10), hanging box (4) lower section are symmetrically arranged with a pair of of idler wheel (11) point that connection is rolled with the first sliding groove (10) It does not roll and connects with the first sliding groove (10), the electricity for driving the idler wheel (11) to rotate is installed on the hanging box (4) Machine (12), in the crane girder (3) along its length on both ends wear and slidably connect extension board (13) respectively, it is described The both ends of crane girder (3) along its length, which are respectively perpendicular, to be connected with vertical bar (14), is socketed on the vertical bar (14) and is slided with it The sleeve (15) of connection is moved, is provided on the vertical bar (14) for driving the sleeve (15) to go up and down along the vertical bar (14) Cylinder (16), crane girder (3) top offer second fluting (17) parallel with the first sliding groove (10), the sleeve (15) second fluting (17) is passed through by connecting rod (18) and connect with the extension board (13), the both ends of the connecting rod (18) It is rotatablely connected with the sleeve (15) and extension board (13), is provided with second sliding slot (19) on the extension board (13) respectively, used Extend the first sliding groove (10) after the extension board (13) skids off outward.
2. building engineering construction platform according to claim 1, which is characterized in that second fluting (17) is hung described It is not open-minded outward in bicycle beam (3).
3. building engineering construction platform according to claim 1, which is characterized in that the guide rail (1) is detachable by multistage It forms, the guide rail (1) is detachably connected on ground.
4. building engineering construction platform according to claim 1, which is characterized in that the pulley (2) is embedded in described lead It there are two being arranged in parallel in rail (1), is provided with link block (20) between two pulleys (2), the strut (7) vertically connects On the link block (20).
5. building engineering construction platform according to claim 4, which is characterized in that be provided with and wear on the link block (20) The fastening screw (21) of first fluting (6) is crossed, is threaded on the fastening screw (21) for pushing against the guide rail (1) fastening nut (22) of outer surface.
6. building engineering construction platform according to claim 5, which is characterized in that be provided on the fastening nut (22) Turning handle (23).
7. building engineering construction platform according to claim 1, which is characterized in that the support plate (8) with it is described hydraulic Clump weight (24) are provided between cylinder (9).
8. building engineering construction platform according to claim 7, which is characterized in that be arranged on the clump weight (24) useful In the drag hook (25) of tractor traction.
CN201822178584.8U 2018-12-24 2018-12-24 Building engineering construction platform Expired - Fee Related CN209670368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822178584.8U CN209670368U (en) 2018-12-24 2018-12-24 Building engineering construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822178584.8U CN209670368U (en) 2018-12-24 2018-12-24 Building engineering construction platform

Publications (1)

Publication Number Publication Date
CN209670368U true CN209670368U (en) 2019-11-22

Family

ID=68563253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822178584.8U Expired - Fee Related CN209670368U (en) 2018-12-24 2018-12-24 Building engineering construction platform

Country Status (1)

Country Link
CN (1) CN209670368U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117923355A (en) * 2024-03-25 2024-04-26 贵州省公路工程集团有限公司 Method and device for reducing friction and positioning by longitudinally moving hoisting roller of heavy component of suspension bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117923355A (en) * 2024-03-25 2024-04-26 贵州省公路工程集团有限公司 Method and device for reducing friction and positioning by longitudinally moving hoisting roller of heavy component of suspension bridge
CN117923355B (en) * 2024-03-25 2024-06-04 贵州省公路工程集团有限公司 Method and device for reducing friction and positioning by longitudinally moving hoisting roller of heavy component of suspension bridge

Similar Documents

Publication Publication Date Title
CN111877722A (en) Steel constructs scaffold
CN104444840A (en) Mining hydraulic lifting device
CN105133825B (en) A kind of Multifunctional decoration platform
CN205714038U (en) A kind of full automatic truck carried pipe racking device
CN109826631A (en) A telescopically adjustable tunnel trolley and its working method
CN103510864B (en) One kind three saves hydraulically extensible suit derrick
CN1039844C (en) Hydraulic pressure step-type pile driver
CN209670368U (en) Building engineering construction platform
CN205712146U (en) A kind of side slope construction hoistable platform
CN205000914U (en) Pulling type power cat equipment of saying
CN201330565Y (en) Semi-trailing drilling platform for oil drilling and repairing equipment
CN212689504U (en) A construction scaffolding for easy transportation of materials
CN204983582U (en) Multi -functional fitment platform
CN108867388A (en) Multifunction working platform vehicle
CN211549703U (en) A split tunnel construction trolley
CN205381915U (en) Portable hoisting support
CN211596364U (en) A multifunctional anti-collision wall construction trolley
CN110526129B (en) Portal crane for roads and bridges
CN209554686U (en) A kind of GRC plate hangs drawing auxiliary installation device
CN217676406U (en) Rear supporting leg forward moving rail moving lifting appliance of beam erecting machine
CN217102709U (en) Special crane for hoisting rubber pipe
CN218150028U (en) Novel building outrigger packway structure
CN214935462U (en) A segmented lift bridge crane
CN205277444U (en) Disconnect -type underground cavern lining cutting platform truck
CN211895867U (en) Pipeline lifting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191122

Termination date: 20201224

CF01 Termination of patent right due to non-payment of annual fee