CN220486695U - Concealed drainage device - Google Patents

Concealed drainage device Download PDF

Info

Publication number
CN220486695U
CN220486695U CN202322277273.8U CN202322277273U CN220486695U CN 220486695 U CN220486695 U CN 220486695U CN 202322277273 U CN202322277273 U CN 202322277273U CN 220486695 U CN220486695 U CN 220486695U
Authority
CN
China
Prior art keywords
well
well body
pipe
drain pipe
mounting frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322277273.8U
Other languages
Chinese (zh)
Inventor
杨光
宋永威
刘全军
冯国俊
刘敏
赵颖超
霍婷婷
白岩岩
杨思远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN202322277273.8U priority Critical patent/CN220486695U/en
Application granted granted Critical
Publication of CN220486695U publication Critical patent/CN220486695U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a field of buried drain well construction technique especially relates to a buried drain device, and it is including seting up in the well body and the well lid on ground, the well body is the upper shed setting, the well lid closes in the opening of the well body, the vertical well pipe that has inserted in well body bottom, be provided with the drain pipe in the well body, the immersible pump is installed to drain pipe one end and stretches into in the well pipe, the mount is installed to the well pipe, the mount is used for fixing the drain pipe. The convenience of work progress can be improved to this application, shortens construction cycle simultaneously.

Description

Concealed drainage device
Technical Field
The application relates to the field of buried drainage well construction technology, in particular to a buried drainage device.
Background
Nowadays, in order to meet the requirements of building construction or other drainage requirements, a buried drainage well is often built on the ground, so that the drainage well has a certain drainage function and better safety when being put into use.
The buried drain well comprises a well body and a well cover, wherein the well body is arranged on the ground, the well body is provided with an upper opening, the well cover is covered on the opening of the well body, a drain pipe is further arranged at the bottom of the well body, and the drain pipe penetrates through the ground. In actual construction, the side wall of the bottom of the well body is often required to be drilled, so that the drain pipe can be installed in the hole in a penetrating manner, or a drain channel is excavated on the side wall of the bottom of the well body, so that the construction process is relatively complicated, the construction process is easy to be limited by an operation space, and the construction period is long.
Disclosure of Invention
In order to improve the convenience of work progress, shorten construction cycle simultaneously, this application provides a buried drainage device.
The application provides a secretly bury formula drainage device adopts following technical scheme:
the utility model provides a secretly bury formula drainage device, includes and sets up in the well body and the well lid on ground, the well body is the upper shed setting, the well lid closes in the opening of the well body, the vertical well pipe that has inserted in well body bottom, be provided with the drain pipe in the well body, immersible pump is installed to drain pipe one end and stretches into in the well pipe.
By adopting the technical scheme, water flow on the ground can permeate the well cover and be collected in the well body and the well pipe, and when the water level in the well body is higher or other requirements exist, the submersible pump can be operated to discharge the water in the well body, so that the water flow can be conveniently collected later, and a better use effect is ensured; the well pipe can effectively increase the water collection amount in the well body, so that the overall use effect is better; in addition, in the actual construction process, the side wall of the well body is not required to be perforated, so that the whole construction is relatively convenient, and the construction period is shortened.
Optionally, the well pipe is provided with a fixing frame, and the fixing frame is used for fixing the drain pipe.
Through adopting above-mentioned technical scheme, the mount that sets up can be to the drain pipe location for have better steadiness when the drain pipe uses.
Optionally, the mount includes mounting bracket, two splint and a plurality of connecting bolt, the mounting bracket is fixed in the well pipe, splint are installed in the mounting bracket, the drain pipe is held between two splint, connecting bolt is fixed two splint mutually.
Through adopting above-mentioned technical scheme, during the installation, install the mount in the well pipe earlier, wear to locate the drain pipe between two splint afterwards, fastening connecting bolt at last, and then through two splint with the drain pipe centre gripping, realize doing the purpose of location to the drain pipe.
Optionally, the mounting bracket is fixed with a plurality of slide bars, one splint is fixed in the mounting bracket, another splint cover is established and is slided and connect in the slide bar.
Through adopting above-mentioned technical scheme, one of them splint when sliding in order to hold the drain pipe, the slide bar that sets up can do direction and support splint for the steadiness when the drain pipe is held is better.
Optionally, the mounting bracket is fixed with the lantern ring, the lantern ring cover is located well pipe and butt in well body diapire.
Through adopting above-mentioned technical scheme, during the mounting bracket installation, only need with the lantern ring cover locate the well pipe can for the installation of mounting bracket is comparatively convenient, and the lantern ring of setting still has the location effect to the mounting bracket, can reduce the mounting bracket and take place the possibility of removal, and then ensures the location effect to the drain pipe.
Optionally, a reinforcing layer is paved on the side wall of the well body.
Through adopting above-mentioned technical scheme, the steadiness of well body lateral wall can be improved to the reinforcement layer that sets up, and then in the use, well body lateral wall receives when rainwash or well body ground receive rolling around, reduces the possibility that the soil property dropped or collapsed appears in well body lateral wall.
Optionally, a reinforcement foundation is laid on the bottom wall of the well body, and the reinforcement layer is abutted to the upper end face of the reinforcement foundation.
By adopting the technical scheme, the arranged reinforcement foundation can reinforce the bottom wall of the well body, so that the possibility of water and soil loss at the bottom of the well body is reduced, and the possibility that the stability of well pipe installation is influenced is further reduced; simultaneously, the reinforcement foundation can also support the reinforcement layer, reduces the possibility that the settlement appears in the reinforcement layer, improves the steadiness of reinforcement layer.
Optionally, the opening border of the well body is fixed with the reinforcing ring, the well lid is installed in the reinforcing ring.
Through adopting above-mentioned technical scheme, the reinforcement circle of setting can consolidate the opening border of the well body, reduces the likelihood that the cracking appears at well body opening border, increases the steadiness when well lid simultaneously.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the water flow on the ground can penetrate through the well cover and be collected in the well body and the well pipe, and the submersible pump can be operated to discharge the water in the well body, so that the water flow can be collected conveniently, and a better use effect is ensured; furthermore, in the actual construction process, the side wall of the well body does not need to be perforated, so that the whole construction is relatively convenient, and the construction period is shortened;
2. the reinforcement layer that sets up can improve the steadiness of well body lateral wall, and then in the use, the well body lateral wall receives when rainwash or the well body is ground around receives rolling, reduces the well body lateral wall and appears the possibility that the soil property dropped or collapsed.
Drawings
FIG. 1 is a schematic diagram of an embodiment of the present application;
fig. 2 is an enlarged schematic view of the portion a in fig. 1.
Reference numerals illustrate: 1. a well body; 2. a well cover; 3. a well pipe; 4. a drain pipe; 5. a fixing frame; 51. a mounting frame; 511. a slide bar; 512. a collar; 52. a clamping plate; 53. a connecting bolt; 6. a reinforcing layer; 7. reinforcing a foundation; 8. and (5) reinforcing the ring.
Detailed Description
The present application is described in further detail below in conjunction with figures 1-2.
The embodiment of the application discloses a buried drainage device. Referring to fig. 1, a buried drainage device includes a well body 1 and a well lid 2, wherein the well body 1 is provided with an upper opening, the well lid 2 is covered on the opening of the well body 1 and is detachably provided, the well body 1 can be further covered or opened, and the well lid 2 is provided with a plurality of water permeable holes. Meanwhile, the well pipe 3 is vertically inserted at the bottom of the well body 1, the drain pipe 4 is arranged in the well body 1, one end of the drain pipe 4 is provided with the submersible pump and extends into the well pipe 3, so that the submersible pump can convey water flow in the well pipe 3 towards the inside of the drain pipe 4, and the other end of the drain pipe 4 is used for extending to surrounding water pools, rivers or urban water areas.
When the well lid is used, water flow on the ground can permeate the well lid 2 and be collected in the well body 1 and the well pipe 3, when the water level in the well body 1 is higher, the submersible pump can be operated to discharge water in the well body 1, so that the water flow can be collected conveniently, and a better using effect is ensured. The well pipe 3 can effectively increase the water collection amount in the well body 1, so that the overall use effect is better; in addition, in the actual construction process, the side wall of the well body is not required to be perforated, so that the whole construction is relatively convenient, and the construction period is shortened.
Referring to fig. 1 and 2, the well pipe 3 is mounted with a fixing frame 5, and the fixing frame 5 comprises a mounting frame 51, two clamping plates 52 and a number of connecting bolts 53. The mounting bracket 51 is fixed on the pipe orifice at the upper end of the well pipe 3, the mounting bracket 51 is fixed with a plurality of slide bars 511, one clamping plate 52 is fixed on the mounting bracket 51, the other clamping plate 52 is sleeved and slidingly connected with the slide bars 511, the drain pipe 4 is clamped between the two clamping plates 52, and the connecting bolt 53 is simultaneously penetrated through the two clamping plates 52 to fix the two clamping plates 52.
During installation, the fixing frame 5 is firstly arranged on the well pipe 3, then the drain pipe 4 is arranged between the two clamping plates 52 in a penetrating mode, finally the connecting bolt 53 is fastened, and then the drain pipe 4 is clamped through the two clamping plates 52, so that the purpose of positioning the drain pipe 4 is achieved, and the drain pipe 4 has better stability during use. In addition, the clamping plate 52 can guide and support the clamping plate 52 by the sliding rod 511 when clamping the drain pipe 4, and the stability of the drain pipe 4 when clamped is better.
Referring to fig. 2, the mounting bracket 51 is fixed with a collar 512, the collar 512 is sleeved on the upper end of the well pipe 3, and the collar 512 abuts against the bottom wall of the well body 1. When the mounting frame 51 is mounted, the collar 512 is only required to be sleeved on the well pipe 3, and the mounting frame 51 is provided with a positioning effect by the collar 512, so that the possibility of movement of the mounting frame 51 can be reduced, and the positioning effect on the drain pipe 4 is ensured.
In the actual installation, if the installation stability of the installation frame 51 needs to be further increased, a plurality of tightening bolts can be threaded on the collar 512, and the tightening bolts can be tightened on the circumference of the well pipe 3.
Referring to fig. 1, the side wall of the well body 1 is provided with a reinforcing layer 6, and the reinforcing layer 6 is made of red machine bricks, but can be made of concrete. And then can improve the steadiness of well body 1 lateral wall for in the use, can reduce the possibility that the soil property appears dropping or collapsing in well body 1 lateral wall when rainwash or well body 1 ground receive rolling around.
Referring to fig. 1, a reinforcement foundation 7 is laid on the bottom wall of a well body 1, and a reinforcement layer 6 is abutted against the upper end face of the reinforcement foundation 7; the opening edge of the well body 1 is fixed with a reinforcing ring 8, and the well cover 2 is detachably arranged on the reinforcing ring 8. The reinforced foundation 7 and the reinforced ring 8 are made of concrete, and the well lid 2 can be lapped on the reinforced ring 8 or one end of the well lid 2 is hinged on the reinforced ring 8, so that the well lid 2 can be detachably installed.
The bottom wall of the well body 1 can be reinforced by the reinforcing foundation 7, so that the possibility of water and soil loss at the bottom of the well body 1 is reduced, and the possibility that the stability of the well pipe 3 is affected is further reduced; simultaneously, the reinforcement foundation 7 can also support the reinforcement layer 6, reduces the possibility that the settlement occurs in the reinforcement layer 6, and improves the stability of the reinforcement layer 6. The reinforcing ring 8 that sets up can consolidate the opening border of the well body 1, reduces the likelihood that the cracking appears in the well body 1 opening border, increases the steadiness when well lid 2 lid simultaneously.
The implementation principle of the buried drainage device in the embodiment of the application is as follows: during the use, the rivers on ground can permeate well lid 2 and collect in well body 1 and well pipe 3, when the water level is higher in the well body 1, can operate the immersible pump in order to discharge the water in the well body 1 to be convenient for follow-up collect rivers, and ensure to have better result of use, and in actual construction process, need not to carry out the trompil to the well body lateral wall, it is comparatively convenient to make the overall construction, shortens construction cycle. The stability of the side wall of the well body 1 can be improved by the aid of the reinforcing layer 6, so that the possibility that soil falls or collapses on the side wall of the well body 1 can be reduced when rain wash or the ground around the well body 1 is rolled in the use process.
The foregoing are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in any way, therefore: all equivalent changes in structure, shape and principle of this application should be covered in the protection scope of this application.

Claims (6)

1. The utility model provides a secretly bury formula drainage device, includes and offers in the well body (1) and well lid (2) on ground, the opening setting is presented to well body (1), well lid (2) lid closes in the opening of well body (1), its characterized in that: a well pipe (3) is vertically inserted into the bottom of the well body (1), a drain pipe (4) is arranged in the well body (1), and a submersible pump is arranged at one end of the drain pipe (4) and extends into the well pipe (3); the well pipe (3) is provided with a fixing frame (5), and the fixing frame (5) is used for fixing the drain pipe (4); the fixing frame (5) comprises a mounting frame (51), two clamping plates (52) and a plurality of connecting bolts (53), wherein the mounting frame (51) is fixed on the well pipe (3), the clamping plates (52) are mounted on the mounting frame (51), the drain pipe (4) is clamped between the two clamping plates (52), and the two clamping plates (52) are fixed by the connecting bolts (53).
2. A buried drain according to claim 1, wherein: the mounting frame (51) is fixed with a plurality of sliding rods (511), one clamping plate (52) is fixed on the mounting frame (51), and the other clamping plate (52) is sleeved and glidingly connected to the sliding rods (511).
3. A buried drain according to claim 1, wherein: the mounting frame (51) is fixedly provided with a collar (512), and the collar (512) is sleeved on the well pipe (3) and is abutted to the bottom wall of the well body (1).
4. A buried drain according to claim 1, wherein: the side wall of the well body (1) is paved with a reinforcing layer (6).
5. The underdrain apparatus of claim 4, wherein: the well body (1) diapire has laid and has consolidated basis (7), the butt of reinforcement layer (6) is in the up end of consolidating basis (7).
6. A buried drain according to claim 1, wherein: the well lid (2) is mounted on the reinforcing ring (8).
CN202322277273.8U 2023-08-23 2023-08-23 Concealed drainage device Active CN220486695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322277273.8U CN220486695U (en) 2023-08-23 2023-08-23 Concealed drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322277273.8U CN220486695U (en) 2023-08-23 2023-08-23 Concealed drainage device

Publications (1)

Publication Number Publication Date
CN220486695U true CN220486695U (en) 2024-02-13

Family

ID=89824900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322277273.8U Active CN220486695U (en) 2023-08-23 2023-08-23 Concealed drainage device

Country Status (1)

Country Link
CN (1) CN220486695U (en)

Similar Documents

Publication Publication Date Title
CN203546888U (en) Infiltration type rainwater filter well
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN209194556U (en) Lock station drainage of foundation pit system
CN108914944B (en) Sandbar high water level pipeline foundation pit excavation supporting dewatering system and construction method
CN110080260A (en) A kind of foundation pit drop and drainage structure
CN201896317U (en) Construction device for complex soil sinking open caisson by undrained dredging
CN111778794A (en) Construction structure and construction method for roadbed earthwork engineering in rainy season
CN110409420A (en) Meet the diaphram wall that pitted surface has precipitation function concurrently
CN209011140U (en) A kind of excavation slope safeguard structure
CN112921978B (en) Excavation construction structure and method for small foundation pit close to excavated main foundation pit
CN220486695U (en) Concealed drainage device
CN108798775A (en) A kind of jacking construction active well
CN106759788B (en) A kind of sponge city Flood Pondage Action reclaiming system and its construction method
CN110924251A (en) Road structure with pipe gallery arranged at bottom
CN212612560U (en) Foundation ditch lateral wall diversion device
CN114032937B (en) Foundation pit drainage device and construction method thereof
CN214116927U (en) Roadbed drainage structure for municipal road construction
CN215669618U (en) Waterproof structure of underground continuous wall
CN213358632U (en) Soil body reinforcing apparatus for deep and large foundation ditch under finite space
CN211171997U (en) Collapsible loess excavation supporting construction
CN209040780U (en) A kind of environmental-friendly circulation device of hardened place prospecting
KR20020033686A (en) Drainage System using Hexa-Tube Connector
CN218466553U (en) Energy-saving drainage structure for foundation pit construction
CN218148371U (en) Deep foundation pit supporting drainage structure
CN105350638A (en) Water-draining residue soil collecting pit and application thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant