CN209011140U - A kind of excavation slope safeguard structure - Google Patents

A kind of excavation slope safeguard structure Download PDF

Info

Publication number
CN209011140U
CN209011140U CN201821294959.0U CN201821294959U CN209011140U CN 209011140 U CN209011140 U CN 209011140U CN 201821294959 U CN201821294959 U CN 201821294959U CN 209011140 U CN209011140 U CN 209011140U
Authority
CN
China
Prior art keywords
vertical plate
earth
excavation slope
column
safeguard structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821294959.0U
Other languages
Chinese (zh)
Inventor
郎欢
赵瑞芳
许成伟
刘文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Zhonglin Geologic Investing & Design Co Ltd
Original Assignee
Yunnan Zhonglin Geologic Investing & Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Zhonglin Geologic Investing & Design Co Ltd filed Critical Yunnan Zhonglin Geologic Investing & Design Co Ltd
Priority to CN201821294959.0U priority Critical patent/CN209011140U/en
Application granted granted Critical
Publication of CN209011140U publication Critical patent/CN209011140U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of excavation slope safeguard structure, the excavation slope safeguard structure includes at least two reinforced concrete pile, at least two columns for being placed in right above the reinforced concrete pile and extending upwardly to the excavation slope top of the slope along the alternate setting of the excavation slope slope foot, and the column bottom is fixedly connected with the upper end of the reinforced concrete pile by connector;Earth-retaining vertical plate is equipped between two columns, the excavation slope safeguard structure further includes multiple anchor poles;It is adaptable to geological conditions using concrete-pile, it is readily transported and installs using modular anchor pole, reduce transport disorders and transportation cost, earth-retaining vertical plate bottom there are gap, avoid causing device to damage because of precipitation, the earth-retaining vertical plate with drainpipe, facilitate the ponding in discharge foundation pit, alleviate device pressure in time, is cooperated and supported using anchor pole and support rod, so that the protection of excavation slope is safer, construction is more felt at ease, the BIM locating plate ease of assembly.

Description

A kind of excavation slope safeguard structure
Technical field
The utility model relates to Base hole supporting technology fields, more particularly to a kind of excavation slope safeguard structure.
Background technique
Pattern foundation pit supporting structure is the safety to guarantee Underground Construction and foundation pit surrounding environment, to foundation pit side-wall and surrounding enviroment Supporting and retaining system, reinforcing and the safeguard measure of use.In the project of foundation pit construction, engineering water-bearing layer part more than slot bottom, therefore Suspension water may be formed in Slope wall after earth excavation to slot bottom to flow into foundation pit;In addition engineering construction may be undergone Rainy season, pattern foundation pit supporting structure in the prior art are not easy to drain mostly, influence being normally carried out for engineering, between this, are badly in need of a kind of band Be conducive to the pattern foundation pit supporting structure of discharge structure.
Utility model content
In view of above-mentioned deficiencies of the prior art, the purpose of this utility model is to provide a kind of excavation slope safeguard structures.
The technical solution of the utility model is specific as follows: a kind of excavation slope safeguard structure, the excavation slope protection knot Structure include at least two along the alternate setting of the excavation slope slope foot reinforced concrete pile, at least two to be placed in the reinforcing bar mixed Solidifying soil stake surface and the column for extending upwardly to the excavation slope top of the slope, the column bottom are fixedly connected by connector The upper end of the reinforced concrete pile;
Earth-retaining vertical plate is equipped between two columns, the column and the earth-retaining vertical plate are slidably connected and the column Two sides correspond to the sliding slot that earth-retaining vertical plate two sides are equipped with matching sliding;
The excavation slope safeguard structure further includes multiple anchor poles, and the column is equipped with backwards to the side of the excavation slope The column through hole for allowing the anchor pole to pass through, the earth-retaining vertical plate is equipped with backwards to the side of the excavation slope allows the anchor The earth-retaining vertical plate through hole that bar passes through.
Further, a drainage pipeline for ponding inside exclusion foundation pit in time is provided inside the earth-retaining vertical plate, One end of the drainage pipeline is placed at the top of the earth-retaining vertical plate, and the other end is placed in earth-retaining vertical plate bottom.
Further, the drainpipe is placed in the water inlet end of the external suction pump in one end at the top of the earth-retaining vertical plate, institute It states drainpipe and is placed in one end of earth-retaining vertical plate bottom equipped with filter screen.
Further, the drainpipe is placed in earth-retaining vertical plate bottom and sets there are two water inlet, described two water inlets It is equipped with the filter screen, described two water inlets are placed in one end at the earth-retaining vertical plate top position with the drainpipe Connection.
Further, described anchor pole one end is end of burying, and the other end is to tap end, and the end of burying is a cutting-edge structure; The percussion end of the anchor pole is integrally in the form of annular discs, and the diameter for tapping end is all larger than the column through hole and the earth-retaining The aperture of vertical plate through hole.
Further, the both ends of the column through hole and the both ends of the earth-retaining vertical plate through hole are equal in the vertical direction One high and one low state is presented.
Further, the column is equipped with annulus backwards to the side of the excavation slope, and the annulus hinged one is for branch One end of the support rod of the column is supportted, the support rod is placed in backfill far from one end of the annulus, and the support The stable structure of a triangle is formed between bar and the column.
Further, the sliding slot bottom is equipped with fixing seat, and the fixing seat vertical height is 3-5cm, and the earth-retaining is vertical Plate is placed in gap of the bottom there are 3-5cm for draining when between the column.
The utility model has the following beneficial effects: using concrete-pile, it is adaptable to geological conditions, using modular anchor Bar is readily transported and installs, and reduces transport disorders and transportation cost, earth-retaining vertical plate bottom there are gap, avoid because by force Precipitation causes device to damage, the earth-retaining vertical plate with drainpipe, can facilitate the ponding in discharge foundation pit, alleviate device pressure in time Power is cooperated using anchor pole and support rod and is supported, so that the protection of excavation slope is safer, construction is more felt at ease, this reality Half assembling structure install convenient is used with novel;The BIM locating plate, facilitates and is assembled.
Detailed description of the invention
Fig. 1 is a kind of main schematic diagram of excavation slope safeguard structure provided by the utility model;
Fig. 2 connect perspective view with the earth-retaining vertical plate for column described in the utility model;
Fig. 3 is vertical plate cross-sectional view described in the utility model;
Fig. 4 is a kind of main schematic diagram of another state of excavation slope safeguard structure provided by the utility model;
In figure, label 1 be reinforced concrete pile, 11 be connector, 2 be column, 21 be column through hole, 22 be sliding slot, 23 it is support rod, 24 be annulus, 3 is that anchor pole, 31 for end of burying, 32 are percussion end, 4 are earth-retaining vertical plate, 41 are that earth-retaining vertical plate passes through Perforation, 5 be drainage pipeline, 51 be filter screen, 6 be backfill.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, is explained in further detail the utility model.It should be appreciated that specific embodiment described herein is used only for explaining The utility model is not used to limit the utility model.
On the contrary, the utility model cover it is any be defined by the claims do in the spirit and scope of the utility model Substitution, modification, equivalent method and scheme.Further, right below in order to make the public have a better understanding the utility model It is detailed to describe some specific detail sections in the datail description of the utility model.Do not have for a person skilled in the art The utility model can also be understood completely in the description of these detail sections.With reference to the accompanying drawing with specific embodiment, to this reality With novel further explanation.
It as shown in Figures 1 and 2, is a kind of excavation slope safeguard structure provided by the utility model, the excavation slope Safeguard structure includes at least two being respectively placed in two along the reinforced concrete pile 1 and at least two of the alternate setting of excavation slope slope foot A reinforced concrete pile surface and the column 2 for extending upwardly to top of the slope, 2 bottom of column is arranged by one described The connector 11 at 2 top of reinforced concrete pile is fixedly connected, and the reinforced concrete pile 1 and 2 vertical direction of column exist On same straight line, connector 5 described herein is that in the prior art commonly use can be realized the technological means being fixedly connected, example Such as threaded connection or concaveconvex structure cooperation clamping, herein and it is not especially limited.
The column 2 is equipped with annulus 24 in contrast to the side towards the excavation slope, and the annulus 24 hinged one is used for One end of the support rod 23 of the column 2 is supported, the support rod 23 is placed in backfill 6 far from one end of the annulus 24, The backfill 6 forms one three for being compacted, fixing the support rod 23 between the support rod 23 and the column 2 Angular stable structure.
The excavation slope safeguard structure further includes multiple anchor poles 3, and described 3 one end of anchor pole is end 31 of burying, and the other end is End 32 is tapped, the end 31 of burying is a cutting-edge structure, facilitates the anchor pole 3 to be inserted into inside the excavation slope, by right The beating for end 32 of percussion facilitates the anchor pole 3 to be inserted into inside the excavation slope.
The side that the column 2 is equipped with the annulus 24 is equipped with the column through hole 21 passed through for the anchor pole 3, described Through hole 21 is located at the top of the annulus 24 in the vertical direction, and the both ends of the column through hole 21 are in the vertical direction One high and one low state is presented.
Be equipped with earth-retaining vertical plate 4 between two columns 3, two columns 3 be slidably connected with the earth-retaining vertical plate 4 and Two 3 two sides of column correspond to the sliding slot 22 that 3 two sides of earth-retaining vertical plate are equipped with matching sliding;22 bottom of sliding slot Equipped with fixed block 221, the vertical height of the fixed block 221 is 3-5cm, this design is conducive to the connection of earth-retaining vertical plate 3 two It keeps avoiding causing device to damage because of precipitation, rain being discharged in time at a distance from 3-5cm with bottom of foundation ditch when a column 2 The pressure of water alleviation excavation slope safeguard structure.
The earth-retaining vertical plate 4 is equipped with the earth-retaining vertical plate through hole 41 for allowing the anchor pole 3 to pass through, and the earth-retaining vertical plate runs through One high and one low state is presented in the both ends in hole 41 in the vertical direction.
The percussion end 32 of the anchor pole 3 is whole in the form of annular discs, and the diameter for tapping end 32 is all larger than the column and passes through The aperture of perforation 21 and the earth-retaining vertical plate through hole 41.
As shown in figure 3, being the cross-sectional view of earth-retaining vertical plate described in the utility model, a use is provided inside the earth-retaining vertical plate In the drainage pipeline 5 for excluding ponding inside foundation pit in time, one end of the drainage pipeline 5 is placed in 4 top of earth-retaining vertical plate, separately One end is placed in 4 bottom of earth-retaining vertical plate, and the drainpipe 5 is placed in the external suction pump in one end at 4 top of earth-retaining vertical plate Water inlet end, the drainpipe 5 be placed in 4 bottom of earth-retaining vertical plate one end be equipped with filter screen 51.
In the second embodiment of the utility model, the drainpipe 5 is placed in there are two 4 bottom of earth-retaining vertical plate sets Water inlet, described two water inlets are equipped with the filter screen 51, and described two water inlets are placed in the drainpipe described One end connection at 4 top position of earth-retaining vertical plate, improves the efficiency of draining.
As shown in figure 4, being a kind of main schematic diagram of another state of excavation slope safeguard structure provided by the utility model; The end 31 of burying of the anchor pole 3 is entered inside the excavation slope by 21 oblique cutting of column through hole, and column 2 described herein is logical Cross the cooperation of the anchor pole 3 and the support rod 23 by the column being fixed on the excavation slope steadily.
The end 31 of burying of the anchor pole 3 is entered inside the excavation slope by 41 oblique cutting of earth-retaining vertical plate through hole, this Locate the earth-retaining vertical plate 4 and the earth-retaining vertical plate 4 steadily is fixed on by the base by the anchor pole 3 and the realization of the column 2 It cheats in side slope.
In another embodiment of the utility model, according to foundation pit size, excavation slope safeguard structure has been produced in advance, BIM locating plate is equipped with before factory on the concrete-pile 1, column 2 and earth-retaining vertical plate 4, the BIM locating plate is two Code or three-dimension code are tieed up, the BIM locating plate carries location information, facilitates on-site assembly.
Pass through above structure provided by the utility model: it is adaptable to geological conditions using concrete-pile, using assembling The anchor pole of formula is readily transported and installs, and reduces transport disorders and transportation cost, earth-retaining vertical plate bottom there are gap, keep away Exempt to cause device to damage because of precipitation, the earth-retaining vertical plate with drainpipe, the ponding in discharge foundation pit can be facilitated, alleviate dress in time Pressure is set, is cooperated and is supported using anchor pole and support rod, so that the protection of excavation slope is safer, construction is more felt at ease, The utility model uses half assembling structure install convenient.

Claims (8)

1. a kind of excavation slope safeguard structure, which is characterized in that the excavation slope safeguard structure includes at least two along described The reinforced concrete pile of the alternate setting of excavation slope slope foot, at least two are placed in right above the reinforced concrete pile and prolong upwards The column of the excavation slope top of the slope is extended to, the column bottom is fixedly connected with the upper of the reinforced concrete pile by connector End;
Earth-retaining vertical plate is equipped between two columns, the column and the earth-retaining vertical plate are slidably connected and the column two sides Corresponding earth-retaining vertical plate two sides are equipped with the sliding slot of matching sliding;
The excavation slope safeguard structure further includes multiple anchor poles, and the column is equipped with backwards to the side of the excavation slope to be allowed The column through hole that the anchor pole passes through, the earth-retaining vertical plate is equipped with backwards to the side of the excavation slope allows the anchor pole to wear The earth-retaining vertical plate through hole crossed.
2. a kind of excavation slope safeguard structure according to claim 1, which is characterized in that provided inside the earth-retaining vertical plate One drainage pipeline for ponding inside exclusion foundation pit in time, one end of the drainage pipeline is placed in earth-retaining vertical plate top Portion, the other end are placed in earth-retaining vertical plate bottom.
3. a kind of excavation slope safeguard structure according to claim 2, which is characterized in that the drainpipe is placed in the gear The water inlet end of the external suction pump in one end at the top of native vertical plate, one end that the drainpipe is placed in earth-retaining vertical plate bottom is equipped with Filter screen.
4. a kind of excavation slope safeguard structure according to claim 3, which is characterized in that the drainpipe is placed in the gear Native vertical plate bottom is set there are two water inlet, and described two water inlets are equipped with the filter screen, and described two water inlets are and institute State one end connection that drainpipe is placed at the earth-retaining vertical plate top position.
5. a kind of excavation slope safeguard structure according to claim 1, which is characterized in that described anchor pole one end is to bury End, the other end are to tap end, and the end of burying is a cutting-edge structure;The percussion end of the anchor pole is integrally in the form of annular discs and described The diameter for tapping end is all larger than the aperture of the column through hole and the earth-retaining vertical plate through hole.
6. a kind of excavation slope safeguard structure according to claim 1, which is characterized in that the both ends of the column through hole And one high and one low state is presented in the both ends of the earth-retaining vertical plate through hole in the vertical direction.
7. a kind of excavation slope safeguard structure according to claim 1, which is characterized in that the column is backwards to the foundation pit The side of side slope is equipped with annulus, and the annulus hinged one is used to support one end of the support rod of the column, and the support rod is remote One end from the annulus is placed in backfill, and the stable knot of a triangle is formed between the support rod and the column Structure.
8. a kind of excavation slope safeguard structure according to claim 1, which is characterized in that the sliding slot bottom, which is equipped with, to be fixed Seat, the fixing seat vertical height are 3-5cm, and the earth-retaining vertical plate is placed in when between the column that there are 3-5cm to be used for for bottom The gap of draining.
CN201821294959.0U 2018-08-13 2018-08-13 A kind of excavation slope safeguard structure Expired - Fee Related CN209011140U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821294959.0U CN209011140U (en) 2018-08-13 2018-08-13 A kind of excavation slope safeguard structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821294959.0U CN209011140U (en) 2018-08-13 2018-08-13 A kind of excavation slope safeguard structure

Publications (1)

Publication Number Publication Date
CN209011140U true CN209011140U (en) 2019-06-21

Family

ID=66830880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821294959.0U Expired - Fee Related CN209011140U (en) 2018-08-13 2018-08-13 A kind of excavation slope safeguard structure

Country Status (1)

Country Link
CN (1) CN209011140U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331737A (en) * 2019-07-24 2019-10-15 安徽金江建筑规划设计有限公司 A kind of vertical soil-baffling structure and its construction method
CN111778986A (en) * 2020-05-31 2020-10-16 路成云 Foundation pit support structure convenient to measure and method
CN113089688A (en) * 2021-05-18 2021-07-09 湖北工业大学 Safety support device is used in civil engineering construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331737A (en) * 2019-07-24 2019-10-15 安徽金江建筑规划设计有限公司 A kind of vertical soil-baffling structure and its construction method
CN111778986A (en) * 2020-05-31 2020-10-16 路成云 Foundation pit support structure convenient to measure and method
CN111778986B (en) * 2020-05-31 2021-11-30 浙江蟠龙工程管理有限公司 Foundation pit support structure convenient to measure and method
CN113089688A (en) * 2021-05-18 2021-07-09 湖北工业大学 Safety support device is used in civil engineering construction

Similar Documents

Publication Publication Date Title
CN209011140U (en) A kind of excavation slope safeguard structure
CN101126242A (en) Method and system for controlling water-level for underground building
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN108951649B (en) Foundation pit supporting structure
CN109695247B (en) Deep foundation pit temporary pipeline comprehensive arrangement system and construction method
CN110004935A (en) A kind of locally deep pit drain measure trench system and construction method
CN206328765U (en) A kind of water drainage of deep foundation pit structure
CN109356180A (en) A kind of Mine production slope drainage system and its construction method
CN204715364U (en) A kind of foundation pit support device
CN105696611A (en) Foundation pit dewatering device for sand layer with high water permeability
CN209555956U (en) Drop and drainage structure is secretly buried in a kind of drainage
CN209686426U (en) Foundation pit faces side bumper drainage system
CN204418194U (en) For high water-permeability layer of sand foundation pit dewatering device
CN207863045U (en) A kind of industrial bank height stake support water plant
CN110468853A (en) Large-scale friction pile present tube band drainage system and construction method
JP2020105877A (en) Tomb with drainage mechanism and repair method thereof
KR100758231B1 (en) Environmentally friendly sloped block structure for landscaping
CN210482333U (en) Large-scale slide-resistant pile preset pipe belt drainage system
CN208201900U (en) A kind of precipitation mechanism and raft plate water cut off device device
CN111287205A (en) Deep multi-stage dynamic foundation pit dewatering system and dewatering method thereof
CN208455654U (en) Base pit dewatering device
CN205475255U (en) Wear two walls unification foundation ditch enclosure system under road
CN216007010U (en) Sand gravel section leading pipe well precipitation construction structure
CN218148371U (en) Deep foundation pit supporting drainage structure
CN109487886A (en) The siphon drainge system of underground garage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190621