CN220486587U - Drainage system excavation leveling integrated construction device - Google Patents

Drainage system excavation leveling integrated construction device Download PDF

Info

Publication number
CN220486587U
CN220486587U CN202321441420.4U CN202321441420U CN220486587U CN 220486587 U CN220486587 U CN 220486587U CN 202321441420 U CN202321441420 U CN 202321441420U CN 220486587 U CN220486587 U CN 220486587U
Authority
CN
China
Prior art keywords
plate
soil
drainage system
excavation
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321441420.4U
Other languages
Chinese (zh)
Inventor
张智红
陈雨龙
张永
叶家谱
柯尊双
温建红
熊静
金敏
周敏宇
袁密
遆亮亮
杨丹璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Original Assignee
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Three Gorges Construction Engineering Co Ltd filed Critical China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority to CN202321441420.4U priority Critical patent/CN220486587U/en
Application granted granted Critical
Publication of CN220486587U publication Critical patent/CN220486587U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Shovels (AREA)

Abstract

The utility model provides an excavation and leveling integrated construction device for a drainage system, which comprises an excavation box main body, wherein the long side of the excavation box main body is hinged with a slope ratio adjusting plate through a plurality of hinges respectively, the top end of the slope ratio adjusting plate is supported and installed with a top leveling plate through a plurality of groups of bolt assemblies, the tail part of the excavation box main body is provided with an arc-shaped soil outlet plate, the top leveling plate is provided with a rectangular opening which is positioned right above the arc-shaped soil outlet plate, the periphery of the rectangular opening is provided with a soil retaining plate, and one side of the soil retaining plate is provided with a soil outlet. The one-time standardized excavation molding can be carried out according to the design size and the slope ratio of the drainage system, and a large amount of manpower and material resources can be saved; meanwhile, the soil outlet at the top can stack the excavated soil on the appointed side of the drainage system in a long ridge shape, so that dust pollution caused by random stacking of waste soil is reduced.

Description

Drainage system excavation leveling integrated construction device
Technical Field
The utility model relates to the technical field of engineering construction equipment, in particular to an excavation and leveling integrated construction device for a drainage system.
Background
Drainage systems on construction sites are a critical project that function to drain surface water or intercept slope water, pool and drain into nearby existing water systems. In the practical construction, the manual work is usually adopted to be matched with the excavator for excavating, then the designed slope ratio is trimmed, the manpower and material resources are excessively consumed for the construction in the mode, the design size of a drainage system is difficult to strictly control, particularly the slope ratio is controlled, and dust pollution is usually caused by random piling of excavated soil.
Disclosure of Invention
Aiming at the problems in the prior art, the utility model provides an excavation and leveling integrated construction device for a drainage system, which can perform one-time standardized excavation and molding according to the design size and slope ratio of the drainage system after assembling a main body of an excavation box, a slope ratio adjusting plate, a top leveling plate, an arc-shaped soil outlet plate, a top soil retaining plate and a mechanical arm joint member, so that a large amount of manpower and material resources can be saved; meanwhile, the soil outlet at the top can stack the excavated soil on the appointed side of the drainage system in a long ridge shape, so that dust pollution caused by random stacking of waste soil is reduced.
In order to achieve the technical characteristics, the aim of the utility model is realized in the following way: the utility model provides a drainage system excavates and levels integral type construction device, it includes digs the case main part, and the long limit side of digging the case main part articulates respectively through a plurality of hinges has slope ratio regulating plate, and the top of slope ratio regulating plate is supported through multiunit bolt assembly and is installed the top and level the board, and the afterbody of digging the case main part is provided with the arc board that goes out, and the top is leveled on the board to be located being provided with the rectangle mouth directly over the arc board that goes out, the periphery of rectangle mouth is provided with the retaining board, and one side of retaining board is provided with the soil body export.
The front end opening side of the digging box main body is provided with a blade type box head.
And a mechanical arm joint used for being connected with the mechanical arm of the excavator is fixed at the center of the top end of the top leveling plate.
And a plurality of rows of reserved bolt holes for installing the bolt assemblies are symmetrically machined on the top leveling plate.
The top end of the slope ratio adjusting plate is provided with a threaded hole for connecting the bolt component.
The utility model has the following beneficial effects:
1. the utility model can perform one-time standardized excavation molding according to the design size and slope ratio of the drainage system, and can save a great deal of manpower and material resources; meanwhile, the soil outlet at the top can stack the excavated soil on the appointed side of the drainage system in a long ridge shape, so that dust pollution caused by random stacking of waste soil is reduced.
2. The blade type box head is adopted, soil can be conveniently scooped up in the excavation process, the soil resistance during excavation is reduced, and the excavation efficiency is improved.
3. Can be convenient link to each other with dig quick-witted arm through the arm joint, and then drive whole dig case main part through the arm and remove.
4. Through adopting the multiseriate bolt hole of reserving, can be convenient adjust the installation position of slope ratio regulating plate between the smooth board in top, and then reach the purpose of adjusting the smooth board angle in top, and then can adapt to the excavation demand of different slopes.
5. The screw holes facilitate fixing the top leveling plate through the bolt assembly.
Drawings
The utility model is further described below with reference to the drawings and examples.
Fig. 1 is a top view of the device of the present utility model.
Fig. 2 is a front view of the device of the present utility model.
Fig. 3 is a side view of the device of the present utility model.
Fig. 4 is a three-dimensional view of the device of the present utility model.
In the figure: the soil box comprises a digging box main body 1, a slope ratio adjusting plate 2, a top leveling plate 3, an arc-shaped soil outlet plate 4, a soil retaining plate 5, a mechanical arm joint 6, a hinge 7, a reserved bolt hole 8, a bolt assembly 9, a blade type box head 10 and a rectangular opening 11.
Detailed Description
Embodiments of the present utility model will be further described with reference to the accompanying drawings.
Referring to fig. 1-4, a drainage system excavates and levels integral type construction device, it includes digs case main part 1, dig the long limit side of case main part 1 and articulated respectively through a plurality of hinges 7 have slope ratio regulating plate 2, slope ratio regulating plate 2's top is supported through multiunit bolt assembly 9 and is installed top and levels board 3, dig the afterbody of case main part 1 and be provided with arc play board 4, on the top levels board 3 to be located and be provided with rectangular mouth 11 directly over the arc play board 4, rectangular mouth 11's periphery is provided with retaining board 5, and one side of retaining board 5 is provided with soil body export 12. The construction device can perform one-time standardized excavation molding according to the design size and the slope ratio of the drainage system, and a large amount of manpower and material resources can be saved; meanwhile, the soil outlet at the top can stack the excavated soil on the appointed side of the drainage system in a long ridge shape, so that dust pollution caused by random stacking of waste soil is reduced. In the concrete use, can adjust the supporting angle of the flat board 3 in top according to slope ratio through the slope ratio regulating plate 2 of symmetrical arrangement, and then make it can adapt to different slopes, then drive whole dig case main part 1 forward movement in-process through the arm, carry out the shovel to the soil body to discharge the soil body through arc play soil board 4 and rectangle mouth 11 and retaining board 5.
Further, a blade type case head 10 is provided on the front end opening side of the case body 1. By adopting the blade type box head 10, soil can be conveniently scooped up in the excavation process, so that the soil resistance during excavation is reduced, and the excavation efficiency is improved.
Further, a mechanical arm joint 6 for connecting with the mechanical arm of the excavator is fixed at the center of the top end of the top leveling plate 3. The mechanical arm connector 6 can be conveniently connected with a mechanical arm of the excavator, and the mechanical arm drives the whole excavator box main body 1 to move.
Further, a plurality of rows of reserved bolt holes 8 for installing the bolt assemblies 9 are symmetrically machined in the top leveling plate 3. Through adopting the multiseriate bolt hole 8 of reserving, can be convenient adjust the installation position of slope ratio regulating plate 2 between the flat board 3 in top, and then reach the purpose of adjusting the flat board 3 angle in top, and then can adapt to the excavation demand of different slopes.
Further, a threaded hole for connecting the bolt assembly 9 is formed in the top end of the slope ratio adjusting plate 2. The fixing of the top flattening plate 3 by the bolt assembly 9 is facilitated by the threaded holes as described above.
The working process and principle of the utility model are as follows:
in a specific use process, the installation position between the slope ratio adjusting plate 2 and the top leveling plate 3 is adjusted according to the slope ratio, so that the top leveling plate 3 is consistent with the slope;
then, the device after adjustment is connected with a mechanical arm, the mechanical arm drives the whole digging box main body 1 to move along a slope, and soil is shoveled up through the blade type box head 10 in the moving process;
the soil body moves backwards along the channel formed by the digging box main body 1, the slope ratio adjusting plate 2 and the top leveling plate 3, and after the soil body moves to the arc-shaped soil outlet plate 4, the shoveled soil body is discharged along the rectangular opening 11 and the soil retaining plate 5 through the arc-shaped soil outlet plate 4, so that the original soil on two sides is leveled while the drainage system is dug, and secondary ditch cleaning caused by entering of surrounding earth and stone impurities is prevented;
in addition, during construction operation, the excavated soil can be discharged to the appointed side through the soil outlet for long-ridge stacking, so that the pollution of dust emission on a construction site caused by non-civilized construction due to random stacking can be avoided; meanwhile, the drainage system excavation leveling integrated construction device is simple to manufacture and can be reused in drainage system construction.

Claims (5)

1. Drainage system excavates and levels integral type construction equipment, its characterized in that: the soil-retaining device comprises a digging box main body (1), wherein the long side of the digging box main body (1) is hinged with a slope ratio adjusting plate (2) through a plurality of hinges (7), the top of the slope ratio adjusting plate (2) is supported and provided with a top leveling plate (3) through a plurality of groups of bolt assemblies (9), the tail of the digging box main body (1) is provided with an arc-shaped soil-out plate (4), the top leveling plate (3) is positioned on the arc-shaped soil-out plate (4), a rectangular opening (11) is arranged right above the arc-shaped soil-out plate (4), the periphery of the rectangular opening (11) is provided with a soil-retaining plate (5), and one side of the soil-retaining plate (5) is provided with a soil outlet (12).
2. The drainage system excavation leveling integrated construction equipment according to claim 1, wherein: a blade type box head (10) is arranged on the front end opening side of the box digging main body (1).
3. The drainage system excavation leveling integrated construction equipment according to claim 1, wherein: and a mechanical arm joint (6) used for being connected with the mechanical arm of the excavator is fixed at the center part of the top end of the top leveling plate (3).
4. The drainage system excavation leveling integrated construction equipment according to claim 1, wherein: the top leveling plate (3) is symmetrically provided with a plurality of rows of reserved bolt holes (8) for installing bolt assemblies (9).
5. The drainage system excavation leveling integrated construction equipment according to claim 1, wherein: screw holes for connecting the bolt assemblies (9) are formed in the top end of the slope ratio adjusting plate (2).
CN202321441420.4U 2023-06-07 2023-06-07 Drainage system excavation leveling integrated construction device Active CN220486587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321441420.4U CN220486587U (en) 2023-06-07 2023-06-07 Drainage system excavation leveling integrated construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321441420.4U CN220486587U (en) 2023-06-07 2023-06-07 Drainage system excavation leveling integrated construction device

Publications (1)

Publication Number Publication Date
CN220486587U true CN220486587U (en) 2024-02-13

Family

ID=89840901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321441420.4U Active CN220486587U (en) 2023-06-07 2023-06-07 Drainage system excavation leveling integrated construction device

Country Status (1)

Country Link
CN (1) CN220486587U (en)

Similar Documents

Publication Publication Date Title
US6928758B1 (en) Trenching tool
US4896444A (en) Excavation bucket
CN115853048A (en) Trapezoidal bucket of many slopes slot excavation
CN220486587U (en) Drainage system excavation leveling integrated construction device
CN206736876U (en) Once excavate the repacking bucket device of shaping in a kind of trapezoidal ditch
CN210766942U (en) Shaping and excavating device for drainage ditch
CN209603214U (en) A kind of one-pass molding embankment gutter excavating device
US5416990A (en) Excavation bucket
CN211421211U (en) Excavator for rapidly digging groove and soil cutting plate thereof
CN212534274U (en) Scraping and shoveling type dredging machine tool of environment-friendly cutter suction dredger
CN210315739U (en) Reservoir desilting in severe cold district winter is with agitator on broken frozen layer
CN218911565U (en) Excavation device of water conservancy inverted trapezoid groove excavator
CN211257122U (en) Quick excavation device of escape canal slot
US4365428A (en) Bucket mounted footing tool
CN109024727B (en) Scraper bowl structure of bull-dozer
CN217352688U (en) A scraper bowl structure that is used for clear excavator of soil of foundation ditch
CN220768213U (en) Novel embankment side ditch excavation device
CN218374105U (en) Excavator bucket suitable for scale excavation
CN210288526U (en) Rich water building foundation slope earth excavation device
CN217630186U (en) Water supply and drainage slotting device for building engineering
CN111877429B (en) Grooving device, grooving machine and grooving method suitable for construction of local diaphragm wall under cable trench
CN211057891U (en) Remote control miniature cable ditching manipulator
CN218813950U (en) Land leveling device for excavator bucket
CN208363157U (en) A kind of trapezoidal gutter excavation digging machine bucket
CN110359513A (en) A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant