CN110359513A - A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder - Google Patents

A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder Download PDF

Info

Publication number
CN110359513A
CN110359513A CN201910601766.8A CN201910601766A CN110359513A CN 110359513 A CN110359513 A CN 110359513A CN 201910601766 A CN201910601766 A CN 201910601766A CN 110359513 A CN110359513 A CN 110359513A
Authority
CN
China
Prior art keywords
bucket
shoulder
scraper bowl
main
trapezoidal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910601766.8A
Other languages
Chinese (zh)
Inventor
孔玉花
孔维龙
谷中林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910601766.8A priority Critical patent/CN110359513A/en
Publication of CN110359513A publication Critical patent/CN110359513A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/025Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with scraper-buckets, dippers or shovels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder, is related to a kind of excavator, more particularly to a kind of power shovel, for there is the excavation of the trapezoidal gutter groove of shoulder, carries out gutter groove using the scraper bowl and once excavates molding.When carrying out trapezoidal gutter channel excavation using ordinary excavator, needs to backfill the earthwork and backfilling of earthwork quality is not easy to control, progress is slow.Main bucket upper board 1, main bucket lower panel 8, main bottom sheet 13, main bucket wallboard 4, bucket epaulement plate 2, bucket shoulder bottom plate 3, bucket shoulder top plate 14, bucket shoulder back plate 12 etc. weld together, form the Contraband font variable cross-section semi-closed structure scraper bowl that a front view is specific shape, excavating groove using the scraper bowl can be with one-pass molding, foundation plane or less the earthwork is not disturbed, ensure gutter satisfactory quality, construction efficiency is higher, and cost is relatively low.

Description

A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder
Technical field
The present invention relates to a kind of excavators, more particularly to a kind of power shovel, for there is the trapezoidal gutter groove of shoulder The scraper bowl of excavation.
Background technique
Must excavate groove before trapezoidal draining channel forming, groove also must be it is trapezoidal, during the channel excavation of gutter, open Digging size and design size should be consistent, and it is bigger than design size to excavate size, then needed in the forming process of gutter at Profile material (such as concrete) filling, this part moulding material of filling cannot participate in measuring, that is to say, that this part moulding material Metering money cannot be taken, causes to waste, cost improves;It is smaller than design size to excavate size, gutter compact dimensions after the completion It is not inconsistent with design size, is not able to satisfy design drawing requirement, it is off quality.
In the trapezoidal groove digging process of undisturbed soil ground, slot bottom original state foundation soil must not be disturbed;It is time-consuming using hand excavation Arduously, inefficiency;It is excavated using ordinary excavator, is unable to complete independently and excavates task, it is necessary to which cooperation is manually excavated, returned It fills out, the section configuration and cross dimensions of design drawing requirement could be formed, when manually being excavated using ordinary excavator cooperation, The following soil body of foundation plane has destroyed, and design section backfilling of earthwork quality below is not easy to control, and excavating efficiency is also not very high.
Summary of the invention
It is an object of the invention to provide a kind of scraper bowls and method for having the trapezoidal gutter channel excavation of shoulder, are carried out using the scraper bowl Trapezoidal gutter channel excavation, it is ensured that trapezoidal gutter groove once excavates molding, guarantees the trapezoidal gutter after the completion of excavating Groove quality is met the requirements.
To achieve the above object, the invention adopts the following technical scheme:
According to the trapezoidal gutter size that design drawing requires, bottom width, the groove both sides of trapezoidal gutter groove are calculated The gradient, the top clear span of groove, shoulder breadth and the vertical height in trapezoidal gutter, it is ensured that: it is main bucket lower panel 8 width dimensions and ladder The bottom width size of shape gutter groove is consistent, main bucket wallboard 4 gradient of vertical direction and trapezoidal gutter groove at scraper bowl mouth The gradient on both sides is consistent, the sum of width dimensions and groove top clear span size and both sides shoulder of main bucket upper board 1 phase Unanimously, the size of bucket shoulder bottom plate 3 and the shoulder breadth size in trapezoidal gutter are consistent, and main bucket upper board 1 is being shoveled with main bucket lower panel 8 The high size of hanging down of vertical range size and trapezoidal gutter at quarrel is consistent.
According to above-mentioned size, related specification requirement and dipper capacity, one piece of main bucket upper board, 1, one piece of main bucket lower panel 8,4, two blocks of the main bucket wallboard of 13, two blocks of the main bottom sheet of one piece of arc-shaped, 2, two pieces of bucket epaulement plate bucket shoulder bottom plate, 3, two pieces of bucket shoulder tops 14, two blocks of bucket shoulder back plates 12 of plate etc. weld together, and form the Contraband font variable cross-section half that a front view is specific shape and seal Close structure scraper bowl.
For the stability and useful life longevity for further strengthening the scraper bowl, two pieces of 9, two pieces of bucket shoulders of interior reinforcing rib that struggle against are welded Reinforcing rib 10 connects two pieces of protective plates 5.
To further increase scraper bowl working efficiency, it is connected with several 7, two side teeth 6 of main bucket tooth.
When using scraper bowl, need to match by the dynamical system of attachment device 11 and excavator.
Before carrying out gutter channel excavation, setting-out is measured first, it is ensured that the linear beauty of ditch body, straight line is straight, curve It is round and smooth;Its cross dimensions must be accurate when channel excavation, and bottom of trench is straight, and without landslide in ditch, no ponding, no-sundries, corner meets Design requirement;To guarantee that excavator central axes and gutter axis essentially coincide in digging process, be convenient for excavator operation, it is ensured that Molding gutter meets the requirements;After molding, it is ensured that the Slope leveling in gutter, stabilization are forbidden to paste slope;It, need to be into after excavation of foundation pit Row bottom of trench elevation repetition measurement;After the completion of excavation, should properly protect measure in time, prevent the disturbance of substrate soil as far as possible.
Compared with prior art, beneficial effects of the present invention are as follows: a kind of scraper bowl having the trapezoidal gutter channel excavation of shoulder And method can once excavate gutter ditch Slot shaping, while excavate gutter shoulder Slot shaping, excavation shaping efficiency is higher, molding There is the cross dimensions of shoulder trapezoidal groove to meet drawing requirement, the exposed sideline for forming shoulder trapezoidal groove is smooth.
Detailed description of the invention
Fig. 1 is that have the trapezoidal gutter design drawing requirement schematic diagram of shoulder.
Fig. 2 is a kind of scraper bowl and method front view for having the trapezoidal gutter channel excavation of shoulder, 1, main bucket upper board in figure, 2, Struggle against epaulement plate, 3, bucket shoulder bottom plate, 4, main bucket wallboard, 5, protective plate, 6, side tooth, 7, main bucket tooth, 8, main bucket lower panel, 9, bucket in plus Strengthening tendons, 10, bucket shoulder reinforcing rib, 11, attachment device.
Fig. 3 is a kind of scraper bowl and method left view for having the trapezoidal gutter channel excavation of shoulder, 1, main bucket upper board in figure, 3, Struggle against shoulder bottom plate, 4, main bucket wallboard, 5, protective plate, 6, side tooth, 7, main bucket tooth, 8, main bucket lower panel, 9, the interior reinforcing rib of bucket, 10, bucket Shoulder reinforcing rib, 11, attachment device, 12, bucket shoulder back plate, 13, main bottom sheet, 14, bucket shoulder top plate.
Specific embodiment
Below with reference to embodiment, the invention will be further described, and purpose, which is only that, more fully understands the content of present invention.
Referring to Fig. 1, Fig. 2, Fig. 3, a kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder, including two pieces of approximations are flat Capable main bucket wallboard 2, quadrangular plan plate, nearly scraper bowl mouth end wall panel width dimensions are maximum, and the width of remote scraper bowl mouth is gradually slightly Reduce, while maximum in the horizontal space of the two blocks of main bucket wallboards 2 in nearly scraper bowl mouth end, remote scraper bowl mouth is gradually slightly reduced, in addition, often For the main bucket wallboard 2 of block in vertical direction flare certain angle, outer dip angle is consistent with there is the side slope angle of the trapezoidal gutter groove of shoulder, Finally, the side of every piece of main bucket remote scraper bowl mouth of wallboard 2 is evagination camber line, convenient and main bottom sheet 13 is connected.
Referring to Fig. 1, Fig. 2, Fig. 3, a kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder, including main bucket upper board 1 and main bucket lower panel 8, main bucket upper board 1 and main bucket lower panel 8 are all quadrangular plan plates, main bucket upper board 1 and main bucket lower part 8 less parallel of plate, the width of main bucket upper board 1 and main bucket lower panel 8 at nearly scraper bowl mouth end is maximum, and main bucket upper board 1 is maximum wide Degree and gutter the top of the groove equivalent width, main 8 maximum width of bucket lower panel is consistent with gutter trench bottom width, remote scraper bowl The width of mouth is gradually slightly reduced, meanwhile, at nearly scraper bowl mouth end, the vertical distance of main bucket upper board 1 and main bucket lower panel 8 is maximum, Remote scraper bowl mouth end is gradually slightly reduced.
Referring to Fig. 1, Fig. 2, Fig. 3, a kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder, including main bottom sheet 13, quadrangle curved slab, two straight lines are connected with main bucket upper board 1 and main bucket lower panel 8 respectively, two curved side difference It is connected with the remote scraper bowl mouth end evagination camber line side of two blocks of main bucket wallboards 2, forms Contraband font variable cross-section semi-closed structure scraper bowl Main body framework.
Referring to Fig. 1, Fig. 2, Fig. 3, a kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder, including bucket epaulement plate 2, Struggle against shoulder bottom plate 3, bucket shoulder back plate 12 and bucket shoulder top plate 14, bucket shoulder top plate 14 be it is main bucket upper board 1 extension, main bucket upper board 1, Main bucket lower panel 8, main bottom sheet 13, main bucket wallboard 4, bucket epaulement plate 2, bucket shoulder bottom plate 3, bucket shoulder top plate 14, bucket shoulder back plate 12 Etc. linking together, the Contraband font variable cross-section semi-closed structure scraper bowl that a front view is specific shape is formed.
Referring to Fig. 1, Fig. 2, Fig. 3, a kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder, including attachment device 11, attachment device and main bucket upper board link together, and attachment device 11 and excavator dynamical system match, and complete excavator Excavation work.
Referring to Fig. 1, Fig. 2, Fig. 3, a kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder, including the interior reinforcing rib that struggles against 9, struggle against shoulder reinforcing rib 10, protective plate 5, main bucket tooth 7, side tooth 6, when playing reinforcing scraper bowl, protection scraper bowl reduction abrasion, cutting soil The effects of reducing soil body resistance.
Survey crew carries out gutter unwrapping wire according to drawing, makes sideline, marks;It is floating to remove surface at gutter Soil, and grinding compacting;Head fall will be arranged according to the routing of water drainage in gutter, and there can be no the high phenomenons in intermediate low both sides, It is smooth beautiful;Excavator axis and gutter axis are overlapped when excavation, and when excavation is less prone to straight degree deviation;Excavator construction Power shovel embedded depth is controlled in the process, it is ensured that gutter ditch shoulder is of the required size;
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (5)

1. a kind of scraper bowl and method for having the trapezoidal gutter channel excavation of shoulder, feature: being formed by welded steel and front view is The scraper bowl of the Contraband font variable cross-section semi-closed structure of specific shape, uses trench Slot shaping of the scraper bowl.
2. a kind of scraper bowl and method for having the trapezoidal gutter channel excavation of shoulder according to claim 1, it is characterised in that: one 13, two blocks of main bottom sheet main bucket wallboards, 4, two pieces of bucket epaulements of main bucket 8, the one pieces of arc-shapeds of lower panel of main 1, one piece of upper board of the bucket of block 2, two blocks of plate, 3, two blocks of bucket shoulder bottom plate, 14, two blocks of bucket shoulder back plates 12 of bucket shoulder top plate etc. weld together, and form a front view For the Contraband font variable cross-section semi-closed structure scraper bowl of specific shape, trench Slot shaping of the scraper bowl is used.
3. a kind of scraper bowl and method for having the trapezoidal gutter channel excavation of shoulder according to claim 1, it is characterised in that: be The stability and useful life longevity for further strengthening the scraper bowl weld two pieces of 9, two pieces of bucket shoulder reinforcing ribs 10 of interior reinforcing rib that struggle against, Connect two pieces of protective plates 5.
4. a kind of scraper bowl and method for having the trapezoidal gutter channel excavation of shoulder according to claim 1, it is characterised in that: main Bucket lower panel is connected with several main bucket tooths 7, is connected with side tooth 6 on main bucket wallboard.
5. a kind of scraper bowl and method for having the trapezoidal gutter channel excavation of shoulder according to claim 1, it is characterised in that: main There is attachment device 11 on bucket upper board, matches for the dynamical system with excavator.
CN201910601766.8A 2019-07-04 2019-07-04 A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder Withdrawn CN110359513A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910601766.8A CN110359513A (en) 2019-07-04 2019-07-04 A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910601766.8A CN110359513A (en) 2019-07-04 2019-07-04 A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder

Publications (1)

Publication Number Publication Date
CN110359513A true CN110359513A (en) 2019-10-22

Family

ID=68218061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910601766.8A Withdrawn CN110359513A (en) 2019-07-04 2019-07-04 A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder

Country Status (1)

Country Link
CN (1) CN110359513A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112902919A (en) * 2021-01-21 2021-06-04 天津视通智能科技有限公司 Method, device, equipment and storage medium for measuring pipe trench section data

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2162873A5 (en) * 1971-10-25 1973-07-20 Pennings Franciscus
CN206693293U (en) * 2017-05-15 2017-12-01 中国葛洲坝集团第一工程有限公司 A kind of gutter standard section excavating device
CN206800417U (en) * 2017-02-06 2017-12-26 中铁十一局集团城市轨道工程有限公司 One kind is excavated and leads wall grab bucket
CN108193728A (en) * 2018-03-01 2018-06-22 河北科工建筑工程集团有限公司 Channel shaping excavation device
CN210857327U (en) * 2019-07-04 2020-06-26 孔维龙 Scraper bowl is used in trapezoidal slot excavation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2162873A5 (en) * 1971-10-25 1973-07-20 Pennings Franciscus
CN206800417U (en) * 2017-02-06 2017-12-26 中铁十一局集团城市轨道工程有限公司 One kind is excavated and leads wall grab bucket
CN206693293U (en) * 2017-05-15 2017-12-01 中国葛洲坝集团第一工程有限公司 A kind of gutter standard section excavating device
CN108193728A (en) * 2018-03-01 2018-06-22 河北科工建筑工程集团有限公司 Channel shaping excavation device
CN210857327U (en) * 2019-07-04 2020-06-26 孔维龙 Scraper bowl is used in trapezoidal slot excavation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112902919A (en) * 2021-01-21 2021-06-04 天津视通智能科技有限公司 Method, device, equipment and storage medium for measuring pipe trench section data

Similar Documents

Publication Publication Date Title
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN210395607U (en) Side slope buried drainage structure
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN110344423A (en) A kind of drop shaft sinking forms the construction method of water level for local deep foundation pit under high water level
CN102635124A (en) Construction method aiming to large open caisson in weak soil area
CN105256854A (en) Excavator bucket suitable for construction of trapezoid channel and construction method
CN102430277B (en) Coarse grid sunk well for physically processing waste water and construction method thereof
CN106837341B (en) A kind of Metro construction construction method of shaft wall
CN104563146A (en) Construction method for open caisson engineering of fixed and direct burial type rainwater and sewage pumping station
CN110359513A (en) A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder
CN205100272U (en) Bucket suitable for construction of trapezoidal channel
CN109989392A (en) Sand construction of diaphragm wall grooving technology
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN109356195A (en) A kind of open cut box culvert advancing method and system across operated subway section
CN209603214U (en) A kind of one-pass molding embankment gutter excavating device
CN211312489U (en) High rich water faces sea area diaphragm wall and connects sealing device
CN105421502A (en) Construction method for man-cargo dual-purpose elevator foundation strengthening of super high-rise building
CN210857327U (en) Scraper bowl is used in trapezoidal slot excavation
CN104846837B (en) The construction method of ultra-deep well in a kind of bright draining foundation ditch
CN106149624B (en) A kind of gravity type quay and its construction method suitable for roadbed of alluvial silt
CN204266164U (en) Concrete veneer and grill-shaped cement soil wall combined type bank protection structure
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN110924407A (en) Construction method for maintaining water and soil on lower slope without disturbance
CN109339133A (en) A kind of embankment gutter excavating device and embankment gutter excavation method
CN110106886A (en) A kind of deep pit digging method of underground high water level

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20191022