A kind of embankment gutter excavating device and embankment gutter excavation method
Technical field
The present invention relates to technical field of road construction more particularly to a kind of embankment gutter excavating device and embankment gutter to excavate
Method.
Background technique
Currently, in order to be drained to rainfall, sewage etc., being generally required in embankment two in different kinds of roads construction project
Drainage ditch is excavated in side, for guiding rainfall, sewage discharge to avoid the road that destroys by rush of water to region is formulated, or even cause mud-rock flow
Etc. natural calamities, in the prior art, in construction embankment irrigation canals and ditches, it is often necessary to employ a large amount of manpower and material resources, user
Work method is excavated, and region only more open in road extended segment could use some general machinery equipments to be excavated, this
Kind of mode needs to put into a large amount of manpower and material resources, and the irrigation canals and ditches excavated often can not one-pass molding, it is also necessary to put into manpower into
Row finishing, working time is long, large labor intensity, and often construction speed is more slow.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of embankment gutter excavating device and embankment gutter excavation sides
Method.
The present invention is achieved by the following technical programs.
The present invention provides a kind of embankment gutter excavating device, and embankment gutter excavating device includes absolute altitude limit steel plate, described
Absolute altitude limit upper surface of steel plate is welded with otic placode, and the absolute altitude limit lower surface of steel plate is welded with the sizing bucket case of a side opening,
The sizing bucket box opening direction is parallel with absolute altitude limit steel plate width direction, and it is described fixed that the absolute altitude limit steel plate is greater than
Type bucket case width.
The sizing bucket box opening end margin is provided with cutting edge.
Absolute altitude limit upper surface of steel plate is also welded with " T " font earth-retaining component, plate, earth-retaining component by with the absolute altitude
Limit the parallel lateral breast boards in steel plate width direction and the longitudinal breast boards parallel with absolute altitude limit steel plate length direction
It is welded to form.
The earth-retaining component further includes stiffener plate, and two sides of stiffener plate limit table on steel plate with the absolute altitude respectively
Face, longitudinal breast boards weld together.
The transverse direction breast boards intersects with absolute altitude limit upper surface of steel plate inclination.
The otic placode length direction is parallel with absolute altitude limit steel plate width direction.
The otic placode quantity is two pieces, and is respectively in the two sides of the absolute altitude limit steel plate length central cross-section.
The sizing bucket case is by being arranged in the side steel plate of the left and right sides, being arranged in parallel below absolute altitude limit steel plate
The rear steel plate that bottom steel plate and setting are arranged in below the absolute altitude limit steel plate, which surrounds, welds together composition.
Several ventholes are provided on steel plate after described.
In addition, the present invention also provides a kind of embankment gutter excavation method using the embankment gutter excavating device, packet
Include following steps:
Step 1: along road embankment flush edge ground, and all impurity on ground are removed;
Step 2: a basialveolar line is drawn out along road embankment edge according to user demand;
Step 3: selecting the sizing bucket case of convenient width and height according to user demand, by the otic placode by the road
Dike gutter excavating device is mounted on big arm of digger, then lifts 4 locating rods at left and right sides of the excavator on outer wall;
Step 4: operation excavator makes the locating rod end installed on excavator phase vertical with basialveolar line described in step 2
It hands over, excavates the earthwork along the basialveolar line, excavate an embankment gutter at road embankment edge.
The beneficial effects of the present invention are: technical solution provided by the invention is used, in use, incite somebody to action this by otic placode first
The excavating device that invention provides is lifted on big arm of digger, is limited steel plate by absolute altitude and is carried out to the depth of the irrigation canals and ditches excavated
Limit is contained in the soil excavated in sizing bucket case, due to being limited steel plate by absolute altitude in a mining process
The limitation at edge is consistent each excavating depth, sizing bucket case profile inner space and irrigation canals and ditches cross-sectional profile profile
It is consistent, and the general machinery equipment of the soil quality that struggles against and can accommodate in case compared to the prior art of being formed is more, thus
Make irrigation canals and ditches excavation of earthwork one-pass molding, substantially increase embankment gutter digging efficiency, without to excavate molding gutter again into
Row finishing, reduces the investment of manpower and material resources, improves working condition, accelerate construction speed.
Detailed description of the invention
Fig. 1 is positive axis geodesic structure schematic diagram of the invention;
Fig. 2 is back axis geodesic structure schematic diagram of the present invention;
Fig. 3 is the process flow chart of embankment gutter excavation method of the present invention.
In figure: 1- sizing bucket case, 2- case supports steel plate, 3- absolute altitude limit steel plate, 4- earth-retaining component, 5- stiffener plate,
6- otic placode, 7- venthole, the side 101- steel plate, the bottom 102- steel plate, steel plate after 103-, 401- transverse direction breast boards, the longitudinal direction 402- earth-retaining
Plate.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
The present invention provides a kind of embankment gutter excavating device, and as shown in Figure 1 and Figure 2, including absolute altitude limits steel plate 3, absolute altitude limit
Position 3 upper surface of steel plate is welded with otic placode 6, and absolute altitude limit 3 lower surface of steel plate is welded with the sizing bucket case 1 of a side opening, sizing bucket
1 opening direction of case is parallel with absolute altitude limit 3 width direction of steel plate.
Using technical solution provided by the invention, in use, excavating device provided by the invention is hung by otic placode first
On big arm of digger, steel plate is limited by absolute altitude, the depth of the irrigation canals and ditches excavated is limited, in a mining process
In, it is contained in the soil excavated in sizing bucket case, due to being limited by absolute altitude limit steel plate edge, makes to dig every time
Pick depth is consistent, and sizing bucket case profile inner space is consistent with irrigation canals and ditches cross-sectional profile profile, and the case that struggles against of being formed
The interior soil quality general machinery equipment compared to the prior art that can be accommodated is more, thus make irrigation canals and ditches excavation of earthwork once at
Type substantially increases embankment gutter digging efficiency, without modifying again to the molding gutter of excavation, reduces manpower and material resources
Investment, improves working condition, accelerates construction speed.
Further, sizing bucket 1 open end edge of case is provided with cutting edge.In general, sizing bucket 1 open end edge of case does not have
When being provided with cutting edge, the present apparatus is only applicable to be that relatively soft sand loam soil is constructed, and works as the sizing bucket opening end edge of case 1
When edge is provided with cutting edge, the present apparatus is made to be applicable to the soil horizon compared with hard, is conducive to improve digging efficiency.
Further, absolute altitude limit 3 upper surface of steel plate is also welded with " T " font earth-retaining component 4, plate, earth-retaining component 4 by with
Absolute altitude limits the parallel lateral breast boards 401 of 3 width direction of steel plate and the longitudinal gear parallel with absolute altitude limit 3 length direction of steel plate
Native plate 402 is welded to form.Earth-retaining component 4 further includes stiffener plate 5, and 5 two sides of stiffener plate limit steel plate 3 with absolute altitude respectively
Upper surface, longitudinal breast boards 402 weld together.Lateral breast boards 401 intersects with absolute altitude limit 3 upper surface of steel plate inclination.It adopts
With technical solution of the present invention, by earth-retaining component 4, the extra earthwork generated in usage mining can overflow along earth-retaining component 4
It flows and goes out, and avoid and reenter in the irrigation canals and ditches excavated, so as to improve irrigation canals and ditches Mining Quality, improve digging efficiency.
Further, 6 length direction of otic placode is parallel with absolute altitude limit 3 width direction of steel plate.6 quantity of otic placode is two pieces, and
And it is respectively in the two sides in absolute altitude limit 3 lengthwise centers section of steel plate.It using the technical solution, facilitate device can by otic placode 6
Ground is lifted on big arm of digger, facilitates the mechanical excavation of progress and use.
Further, by being arranged in, the side steel plate 101 of the left and right sides, be arranged in parallel limits steel plate 3 in absolute altitude to sizing bucket case 1
The rear steel plate 103 that the bottom steel plate 102 of lower section and setting are arranged in 3 lower section of absolute altitude limit steel plate, which surrounds, welds together composition.
Sizing bucket case 1 further includes case supports steel plate 2, the two sides parallel with respect to each other. of case supports steel plate 2 respectively with bottom steel plate 102,
Absolute altitude limit 3 lower surface of steel plate welds together.Using the technical solution, be conducive to the structural strength for improving sizing bucket case,
In mining process, irrigation canals and ditches one-pass molding can be made, and be suitable for the soil horizon of more hard, improve digging efficiency.
Further, several ventholes 7 are provided on rear steel plate 103.By the way that venthole 7 is arranged, sizing bucket ensure that
Case excavates every time can fill soil, and avoiding air from entering wherein causes soil to contain discontented situation appearance, improves
Digging efficiency.
In addition, the present invention also provides a kind of embankment gutter excavation methods using embankment gutter excavating device, such as Fig. 3 institute
Show, comprising the following steps:
Step 1: along road embankment flush edge ground, and all impurity on ground are removed;
Step 2: a basialveolar line is drawn out along road embankment edge according to user demand;
Step 3: selecting the sizing bucket case 1 of convenient width and height according to user demand, by otic placode 6 by embankment gutter
Excavating device is mounted on big arm of digger, then lifts 4 locating rods at left and right sides of the excavator on outer wall;Further,
Positioning pole length is 0.5 meter to 1 meter, and locating rod installation site must assure that digging machine driver is easy observation, and digging machine guarantees when walking
It hangs to hang down and walk along sideline.
Step 4: operation excavator makes the locating rod end installed on excavator intersect vertically with step 2 basialveolar line, edge
Basialveolar line excavate the earthwork, excavate an embankment gutter at road embankment edge.
Further, digging machine walking line is by foundation trench line traffic control, when turnaround section occurs in basialveolar line, then needs encryption arrangement sizing
Bucket tap point keeps excavated gutter curvilinear circular suitable;In addition, the earthwork excavated, which is dug out, transports when gutter excavates
From construction site, side slot depth need to be measured, and be removed in the gutter excavated along basialveolar line every 20 meters of excavation
Ponding.
Economic and Efficiency Analysis: practical according to construction, using traditional handicraft, about 100 meters of gutter foundation trench of construction, needs to configure daily
5~6 workers carry out the finishing of foundation trench ditch side and bottom of trench, and in manual amendment, machinery is idle, and operation rate of machinery is lower.With
Embankment gutter once excavates molding construction technology, can construct daily about 500 meters of gutter foundation trench, only need to configure 1 worker and apply
The cleaning of work rubbish and foundation trench finishing, for machinery almost without idle situation, operation rate of machinery is higher.Comparing traditional digging mode can save
About cost of labor about 80%, machine cost is greatly reduced.The primary forming technique that excavates also has the characteristics that speed of application is fast, adopts
Embankment gutter speed of application about 40% can be improved with the technology.Meanwhile it is smoothly beautiful to excavate molding foundation trench line style, absolute altitude control
Strictly.