CN105256854A CN201510630735.7A CN201510630735A CN105256854A CN 105256854 A CN105256854 A CN 105256854A CN 201510630735 A CN201510630735 A CN 201510630735A CN 105256854 A CN105256854 A CN 105256854A
Authority
CN
China
Prior art keywords
channel
construction
facade
trapezoidal
bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510630735.7A
Other languages
Chinese (zh)
Inventor
李新星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510630735.7A priority Critical patent/CN105256854A/en
Publication of CN105256854A publication Critical patent/CN105256854A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses an excavator bucket suitable for construction of a trapezoid channel and a construction method and belongs to the field of engineering machinery. The excavator bucket is formed by an upper plane, a right vertical face, a left vertical face, a right bevel, a left bevel, a rear vertical face, a rear bevel and a lower plane in an enclosed mode. One face of the excavator bucket is open and toward an excavator. The outer end face of the upper plane is connected with an excavator arm base and outer reinforcing ribs. The lower end of an excavator front arm is connected with the arm base. The excavator bucket and the construction method are very suitable for excavation of the water channel with an inverted trapezoidal section. The water channel is formed in one time, so that earth of the side slopes of the channel is free of disturbance and damage, and accordingly the manual workload of post backfill, leveling, solid patting etc. for repairing the side slopes and a channel bottom is greatly reduced. The shape of the channel is flat, straight, regular, neat and uniform. The frost-resistant and the anti-seepage abilities of the channel are enhanced. The construction progress and the quality are significantly improved. Manpower is saved. The labor intensity is relieved. The service life of the channel is prolonged by above 40%. The construction cost is reduced by above 30%.

Description

Be applicable to bucket and the construction method of trapezoidal channel construction
Technical field
Of the present invention be applicable to trapezoidal channel construction bucket and construction method belong to engineering machinery field, particularly relate to a kind of excavator bucket.
Background technology
Construction of water conservancy works excavation water channel is the engineering of main peak discharge, utilizes excavator to excavate water channel very general.Because general excavator bucket is in bending staff shape, and water channel section is inverted trapezoidal, therefore at the bottom of the water channel canal that excavated of excavator and two side slopes still need manually to backfill in a large number, make real, the unnecessary earthwork of pruning, just can make it to be shaped, both labor intensive, the quality of water channel also cannot ensure.
Summary of the invention
The object of the invention is to propose a kind of bucket being applicable to trapezoidal channel construction, it disposablely can dig out the water channel of inverted trapezoidal section, and without the need to backfill, make real, it is regular standardized that canal shape is straight.The freeze proof seepage capability of channel is strengthened, and construction speed and quality significantly improve, and saves and manually reduces labor intensity, and increases channel service life, saves construction cost.Another object of the present invention is to propose a kind of construction method being suitable for this bucket.
An object of the present invention is to realize like this:
One, the structure of bucket and shape:
The bucket being applicable to trapezoidal channel construction is enclosed formed by upper plane, right facade, left facade, right tilted surface, left tilted surface, rear facade, back bevel, lower plane six plane, one side is uncovered towards excavator, wherein, upper and lower plane is rectangle, about upper plane, two minor faces are connected with the top of vertical right facade, left facade respectively, being connected with the right tilted surface of opposite tilt, the top of left tilted surface respectively below of right facade, left facade, being connected with two minor faces of lower plane respectively below of right tilted surface, left tilted surface.Rear facade is vertical hexagon, and parallel below on it, the upper length of side is short below, and the side first half is vertically, Lower Half opposite tilt.The rear long limit of upper plane is connected with the top of rear facade, and the top of the following and back bevel of rear facade is connected.Two vertical sides of rear facade are connected with the rear minor face of right facade, left facade respectively, and the side of two opposite tilts of rear facade is connected with the back of right tilted surface, left tilted surface respectively.Back bevel is inverted trapezoidal, and its two waist is connected with the back of right tilted surface, left tilted surface respectively.Lower plane two minor face is connected with right tilted surface, the following of left tilted surface respectively.Interior ribs is connected with at upper plane inner face, rear facade, back bevel, interval, lower plane upper surface.Be connected with excavator arm seat and outer ribs in upper plane outer face, excavator forearm lower end is even contained on arm seat.
Another object of the present invention is achieved in that
Construction method:
It is 1:1.5-1:1.25 gradient that trapezoidal bucket is applicable to side slope, channel height 45-200cm, the excavation of the trapezoidal channel of bottom width 40-200cm, can according to the different section size of design channel, excavator steering angle and excavator power, the trapezoidal bucket of the different size that changes the outfit.
Construction method one:
1. by ground levelling, by designing requirement, the above place mat earthwork in ground layer, all use road roller compacting for every layer, single monolayer thick controls at 30cm, the total place mat thickness after compacting reaches 60-80% of the profile height of design channel.Execute picture channel center line, sideline, both sides at the earthwork layer of topmost, excavator is installed corresponding trapezoidal bucket and is carried out excavation construction, one-shot forming;
2. artificial at the bottom of canal and both sides side slope to be repaired, make it the planeness reaching design;
3. at the bottom of canal and the side slope lay polystyrene board heat-insulatation material of both sides, benzene plate unit weight 18-20kg/m 3, cement mortar laid by benzene plate, puts cement pre-fabricated panel on mortar upper berth, jointing, do shrinkage joint process.
Construction method two:
1. construction method one is same as 1.;
2. construction method one is same as 2.;
3. at the bottom of canal and the side slope lay polystyrene board heat-insulatation material of both sides, benzene plate unit weight 16-22kg/m 3, the concrete that directly cast-in-place 8-12cm is thick on benzene plate, floating, conventional maintenance.
Construction method three:
1. by ground levelling, by designing requirement, ground above place mat gravel cubic meter of stone layer, all use road roller compacting for every layer, single monolayer thick controls at 30cm, and the total place mat thickness after compacting reaches the profile height of design channel.Execute picture channel center line, sideline, both sides at the gravel cubic meter of stone layer of topmost, the trapezoidal bucket that corresponding band bucket tooth installed by excavator carries out excavation construction, one-shot forming;
2. artificial at the bottom of canal and both sides side slope to be repaired, make it the planeness reaching design specifications;
3. at the bottom of canal and both sides side slope lay cement pre-fabricated panel, jointing, do shrinkage joint process; Or the thick concrete of cast-in-place 8-12cm, floating on the face of the gravel cubic meter of stone, jointing, do shrinkage joint process, conventional maintenance.
Above-mentioned construction method is all carried out according to following step: during excavation trapezoidal channel, must carry out according to the center line of channel setting-out and sideline, first excavate the canal bottom part at channel center ,stage excavation, cutting depth controls at 20-30cm, and excavation length controls at 3-5m.When the trapezoidal channel cross dimensions excavated is greater than trapezoidal bucket, must slope construction be carried out, first dig out one section of shaping channel, begin from the tail end left side bearing of this shaping channel, continue and to excavate by the order at left side bearing, right side bearing, center.In operation, the upper plane of trapezoidal bucket will remain level.
Owing to carrying out technique scheme, this bucket is just made to be very suitable for the excavation of inverted trapezoidal section water channel, it is once-forming, and the channel side slopes earthwork is destroyed from disturbance, greatly reduce the artificial later stage backfill, scabble, patch work amount at the bottom of the side slope to make real etc. and canal.It is regular standardized that canal shape is straight, and the freeze proof seepage capability of channel is strengthened, and construction speed and quality significantly improve, and save and manually reduce labor intensity, channel increases by more than 40% service life, and construction cost saves more than 30%.
Accompanying drawing illustrates: concrete structure of the present invention is provided by following drawings and Examples:
Fig. 1 is the bucket Facad structure schematic diagram being applicable to trapezoidal channel construction;
Fig. 2 is applicable to the bucket structure schematic diagram of trapezoidal channel construction.
Legend: 1, excavator forearm, 2, arm seat, 3, outer ribs, 4, right facade, 5, rear facade, 6, right tilted surface, 7, back bevel, 8, interior ribs, 9, lower plane, 10, left tilted surface, 11, upper plane, 12, left facade.
Detailed description of the invention: the present invention by the restriction of following embodiment, can not determine concrete embodiment according to technical scheme of the present invention and actual conditions.
Embodiment:
One, the structure of bucket and shape:
As Fig. 1, shown in 2, be applicable to the bucket of trapezoidal channel construction by upper plane 11, right facade 4, left facade 12, right tilted surface 6, left tilted surface 10, rear facade 5, back bevel 7, lower plane 9 six planes enclose and form, one side is uncovered towards excavator, wherein, upper plane about 11 two minor face respectively with vertical right facade 4, the upper end-face edge of left facade 12 is connected, right facade 4, the lower edge of left facade 12 respectively with the right tilted surface 6 of opposite tilt, the upper end-face edge of left tilted surface 10 is connected, right tilted surface 6, the lower edge of left tilted surface 10 is connected with two minor faces of lower plane 9 respectively.Rear facade 5 is vertical hexagon, and on it, the length of side is short below, and the dual-side first half is vertically, Lower Half opposite tilt.A long limit of upper plane 11 is connected with a long limit order of rear facade 5, back bevel 7, two vertical minor faces of rear facade 5 are connected with a minor face of right facade 4, left facade 12 respectively, and the minor face of two opposite tilts of rear facade 5 is connected with the back edge of right tilted surface 6, left tilted surface 10 respectively.Back bevel 7 is inverted trapezoidal, and its two waist is connected with the back edge of right tilted surface 6, left tilted surface 10 respectively.On the inner face of upper plane 11, rear facade 5, back bevel 7, lower plane 9, interval is connected with vertically " ribs 8 in shape.Be connected with arm seat 2 and outer ribs 3 in upper plane 11 outer face, excavator forearm lower end is even contained on arm seat 2.
Construction method:
It is 1:1.5-1:1.25 gradient that trapezoidal bucket is applicable to side slope, channel height 45-200cm, the excavation of the trapezoidal channel of bottom width 40-200cm, can according to the different section size of design channel, excavator steering angle and excavator power, the trapezoidal bucket of the different size that changes the outfit.
Construction method one:
1. by ground levelling, by designing requirement, the above place mat earthwork in ground layer, all use road roller compacting for every layer, single monolayer thick controls at 30cm, the total place mat thickness after compacting reaches 60-80% of the profile height of design channel.Execute picture channel center line, sideline, both sides at the earthwork layer of topmost, excavator is installed corresponding trapezoidal bucket and is carried out excavation construction, one-shot forming;
2. artificial at the bottom of canal and both sides side slope to be repaired, make it the planeness reaching design;
3. at the bottom of canal and the side slope lay polystyrene board heat-insulatation material of both sides, benzene plate unit weight 18-20kg/m 3, cement mortar laid by benzene plate, puts cement pre-fabricated panel on mortar upper berth, jointing, do shrinkage joint process.
Construction method two:
1. construction method one is same as 1.;
2. construction method one is same as 2.;
3. at the bottom of canal and the side slope lay polystyrene board heat-insulatation material of both sides, benzene plate unit weight 16-22kg/m 3, the concrete that directly cast-in-place 8-12cm is thick on benzene plate, floating, conventional maintenance.
Construction method three:
1. by ground levelling, by designing requirement, ground above place mat gravel cubic meter of stone layer, all use road roller compacting for every layer, single monolayer thick controls at 30cm, and the total place mat thickness after compacting reaches the profile height of design channel.Execute picture channel center line, sideline, both sides at the gravel cubic meter of stone layer of topmost, the trapezoidal bucket that corresponding band bucket tooth installed by excavator carries out excavation construction, one-shot forming;
2. artificial at the bottom of canal and both sides side slope to be repaired, make it the planeness reaching design specifications;
3. at the bottom of canal and both sides side slope lay cement pre-fabricated panel, jointing, do shrinkage joint process; Or the thick concrete of cast-in-place 8-12cm, floating on the face of the gravel cubic meter of stone, jointing, do shrinkage joint process, conventional maintenance.
Above-mentioned construction method is all carried out according to following step: during excavation trapezoidal channel, must carry out according to the center line of channel setting-out and sideline, first excavate the canal bottom part at channel center ,stage excavation, cutting depth controls at 20-30cm, and excavation length controls at 3-5m.When the trapezoidal channel cross dimensions excavated is greater than trapezoidal bucket, must slope construction be carried out, first dig out one section of shaping channel, begin from the tail end left side bearing of this shaping channel, continue and to excavate by the order at left side bearing, right side bearing, center.In operation, the upper plane 11 of trapezoidal bucket will remain level.

Claims (6)

1. one kind is applicable to the bucket of trapezoidal channel construction, the structure of bucket and shape: by upper plane, right facade, left facade, right tilted surface, left tilted surface, rear facade, back bevel, lower plane six planes enclose and form, bucket one side is uncovered towards excavator, it is characterized in that: on, lower plane is rectangle, about upper plane two minor faces respectively with vertical right facade, the top of left facade is connected, right facade, left facade below respectively with the right tilted surface of opposite tilt, the top of left tilted surface is connected, right tilted surface, being connected with two minor faces of lower plane respectively below of left tilted surface, rear facade is vertical hexagon, and parallel below on it, the upper length of side is short below, and the side first half is vertically, Lower Half opposite tilt, the rear long limit of upper plane is connected with the top of rear facade, and the top of the following and back bevel of rear facade is connected, two vertical sides of rear facade are connected with the rear minor face of right facade, left facade respectively, and the side of two opposite tilts of rear facade is connected with the back of right tilted surface, left tilted surface respectively, back bevel is inverted trapezoidal, and its two waist is connected with the back of right tilted surface, left tilted surface respectively, lower plane two minor face is connected with right tilted surface, the following of left tilted surface respectively, interior ribs is connected with at upper plane inner face, rear facade, back bevel, interval, lower plane upper surface, be connected with excavator arm seat and outer ribs in upper plane outer face, excavator forearm lower end is even contained on arm seat.
2. be applicable to the bucket of trapezoidal channel construction as claimed in claim 1, it is characterized in that: interior ribs is " shape.
3. be applicable to a method for trapezoidal channel construction, it is characterized in that: construction method one:
1. by ground levelling, by designing requirement, the above place mat earthwork in ground layer, all use road roller compacting for every layer, single monolayer thick controls at 30cm, and the total place mat thickness after compacting reaches 60-80% of the profile height of design channel, executes picture channel center line, sideline, both sides at the earthwork layer of topmost, excavator is installed corresponding trapezoidal bucket and is carried out excavation construction, one-shot forming;
2. artificial at the bottom of canal and both sides side slope to be repaired, make it the planeness reaching design;
3. at the bottom of canal and the side slope lay polystyrene board heat-insulatation material of both sides, benzene plate unit weight 18-20kg/m 3, cement mortar laid by benzene plate, puts cement pre-fabricated panel on mortar upper berth, jointing, do shrinkage joint process.
4. be applicable to the method for trapezoidal channel construction as claimed in claim 3, it is characterized in that: construction method two:
1. construction method one is same as 1.;
2. construction method one is same as 2.;
3. at the bottom of canal and the side slope lay polystyrene board heat-insulatation material of both sides, benzene plate unit weight 16-22kg/m 3, the concrete that directly cast-in-place 8-12cm is thick on benzene plate, floating, conventional maintenance.
5. be applicable to the method for trapezoidal channel construction as claimed in claim 3, it is characterized in that: construction method three:
1. by ground levelling, by designing requirement, ground above place mat gravel cubic meter of stone layer, all use road roller compacting for every layer, single monolayer thick controls at 30cm, and the total place mat thickness after compacting reaches the profile height of design channel, executes picture channel center line, sideline, both sides at the gravel cubic meter of stone layer of topmost, the trapezoidal bucket that corresponding band bucket tooth installed by excavator carries out excavation construction, one-shot forming;
2. artificial at the bottom of canal and both sides side slope to be repaired, make it the planeness reaching design specifications;
3. at the bottom of canal and both sides side slope lay cement pre-fabricated panel, jointing, do shrinkage joint process; Or the thick concrete of cast-in-place 8-12cm, floating on the face of the gravel cubic meter of stone, jointing, do shrinkage joint process, conventional maintenance.
6. the method being applicable to trapezoidal channel construction as described in claim 3 or 4 or 5, it is characterized in that: above-mentioned construction method is all carried out according to following step: during excavation trapezoidal channel, carry out according to the center line of channel setting-out and sideline, first excavate the canal bottom part at channel center ,stage excavation, cutting depth controls at 20-30cm, and excavation length controls at 3-5m; When the trapezoidal channel cross dimensions excavated is greater than trapezoidal bucket, must slope construction be carried out, first dig out one section of shaping channel, begin from the tail end left side bearing of this shaping channel, continue and to excavate by the order at left side bearing, right side bearing, center; In operation, the upper plane of trapezoidal bucket remains level.
CN201510630735.7A 2015-09-29 2015-09-29 Excavator bucket suitable for construction of trapezoid channel and construction method Pending CN105256854A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510630735.7A CN105256854A (en) 2015-09-29 2015-09-29 Excavator bucket suitable for construction of trapezoid channel and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510630735.7A CN105256854A (en) 2015-09-29 2015-09-29 Excavator bucket suitable for construction of trapezoid channel and construction method

Publications (1)

Publication Number Publication Date
CN105256854A true CN105256854A (en) 2016-01-20

Family

ID=55096758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510630735.7A Pending CN105256854A (en) 2015-09-29 2015-09-29 Excavator bucket suitable for construction of trapezoid channel and construction method

Country Status (1)

Country Link
CN (1) CN105256854A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958230A (en) * 2017-05-19 2017-07-18 山西省水利建筑工程局 Dam slope U-shaped drainage ditch in earth dam downstream is excavated and lining cutting device
CN107574801A (en) * 2016-07-05 2018-01-12 天津卡斯特机械有限公司 A kind of practical excavator-type shovel clamshell excavator
CN108193728A (en) * 2018-03-01 2018-06-22 河北科工建筑工程集团有限公司 Channel shaping excavation device
CN109281286A (en) * 2018-10-22 2019-01-29 浙江水利水电学院 A kind of construction method of mountain area energy dissipating diversion channel
CN111395362A (en) * 2020-03-23 2020-07-10 中电建十一局工程有限公司 Construction method for quickly excavating and forming small-section channel by customized bucket
CN111945671A (en) * 2020-07-27 2020-11-17 中电建十一局工程有限公司 Construction method of concrete tooth wall at channel toe
CN113550268A (en) * 2021-08-18 2021-10-26 广东洋晟建设工程有限公司 Irrigation and water conservancy construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62112833A (en) * 1985-11-12 1987-05-23 Hazama Gumi Ltd Excavating method for side-ditch for viscous soil
CN202519721U (en) * 2012-05-04 2012-11-07 熔盛机械有限公司 Digging bucket
CN203878638U (en) * 2014-06-12 2014-10-15 中国水利水电第五工程局有限公司 Bucket for excavating and quickly forming drainage ditch
CN104674853A (en) * 2015-02-10 2015-06-03 华信咨询设计研究院有限公司 Isolation trench
CN205100272U (en) * 2015-09-29 2016-03-23 李新星 Bucket suitable for construction of trapezoidal channel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62112833A (en) * 1985-11-12 1987-05-23 Hazama Gumi Ltd Excavating method for side-ditch for viscous soil
CN202519721U (en) * 2012-05-04 2012-11-07 熔盛机械有限公司 Digging bucket
CN203878638U (en) * 2014-06-12 2014-10-15 中国水利水电第五工程局有限公司 Bucket for excavating and quickly forming drainage ditch
CN104674853A (en) * 2015-02-10 2015-06-03 华信咨询设计研究院有限公司 Isolation trench
CN205100272U (en) * 2015-09-29 2016-03-23 李新星 Bucket suitable for construction of trapezoidal channel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
买买江·木莎等: "新疆金沟河灌区渠道改建施工方法简介", 《西部探矿工程》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574801A (en) * 2016-07-05 2018-01-12 天津卡斯特机械有限公司 A kind of practical excavator-type shovel clamshell excavator
CN106958230A (en) * 2017-05-19 2017-07-18 山西省水利建筑工程局 Dam slope U-shaped drainage ditch in earth dam downstream is excavated and lining cutting device
CN108193728A (en) * 2018-03-01 2018-06-22 河北科工建筑工程集团有限公司 Channel shaping excavation device
CN109281286A (en) * 2018-10-22 2019-01-29 浙江水利水电学院 A kind of construction method of mountain area energy dissipating diversion channel
CN109281286B (en) * 2018-10-22 2020-09-15 浙江水利水电学院 Construction method of energy dissipation diversion channel in mountainous area
CN111395362A (en) * 2020-03-23 2020-07-10 中电建十一局工程有限公司 Construction method for quickly excavating and forming small-section channel by customized bucket
CN111945671A (en) * 2020-07-27 2020-11-17 中电建十一局工程有限公司 Construction method of concrete tooth wall at channel toe
CN111945671B (en) * 2020-07-27 2021-07-09 中电建十一局工程有限公司 Construction method of concrete tooth wall at channel toe
CN113550268A (en) * 2021-08-18 2021-10-26 广东洋晟建设工程有限公司 Irrigation and water conservancy construction method

Similar Documents

Publication Publication Date Title
CN105256854A (en) Excavator bucket suitable for construction of trapezoid channel and construction method
CN102635124B (en) Construction method aiming to large open caisson in weak soil area
CN102061923B (en) Tunnel construction method capable of protecting existing building
CN101906768B (en) Panel construction method of concrete faced rock-fill dam
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN103774616A (en) Construction method for ecological retaining wall built by self-embedded blocks
CN104846781A (en) Ecological interlocking block and ecological interlocking block type slope protection construction method
CN104131502A (en) Construction method for widening road in rapid erection manner
CN107151950A (en) The construction method of desert area railway underground water route moat
CN205100272U (en) Bucket suitable for construction of trapezoidal channel
CN111778941A (en) High-standard farmland channel construction method and structure
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN109610483B (en) Construction method of road rock slope
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN105332382B (en) Adjacent river foundation ditch builds island cofferdam clay water stop construction method
CN108385612B (en) Construction method of concrete protective panel with good stability
CN206800909U (en) A kind of assembled terrace in construction site
CN212272234U (en) High-strength combined template for open groove section of large-section inclined shaft
CN110453687B (en) Protection structure of subway station foundation pit excavation pipeline and construction method
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN102704437A (en) Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area
CN205776083U (en) A kind of chain the guarding wave slope protection prefabricated section system
CN209324423U (en) A kind of reparation structure that water seepage of tunnel is left white
CN211421139U (en) Shield constructs well crown beam bearing structure
CN110359513A (en) A kind of scraper bowl and method having the trapezoidal gutter channel excavation of shoulder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160120

WD01 Invention patent application deemed withdrawn after publication