CN206800909U CN201720422222.1U CN201720422222U CN206800909U CN 206800909 U CN206800909 U CN 206800909U CN 201720422222 U CN201720422222 U CN 201720422222U CN 206800909 U CN206800909 U CN 206800909U
Authority
CN
China
Prior art keywords
reinforced concrete
concrete prefabricated
terrace
prefabricated board
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720422222.1U
Other languages
Chinese (zh)
Inventor
张昱
郭勇元
周灵次
邓勇超
谢刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201720422222.1U priority Critical patent/CN206800909U/en
Application granted granted Critical
Publication of CN206800909U publication Critical patent/CN206800909U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of assembled terrace in construction site, including some reinforced concrete prefabricated boards arranged successively, detachably it is connected as a single entity by side plug connector and flat connectors between adjacent reinforced concrete prefabricated board, make the terrace after assembling that there is good globality and flatness, coordinate ground water-proofing treatment can avoid because the influence of rainwater make reinforced concrete prefabricated board produce uneven subsidence the defects of, suitable for southern area use.Because terrace has good flatness, so be substantially not in use the damage of reinforced concrete prefabricated board, so reinforced concrete prefabricated board may be reused, cost-effective also environmental protection.

Description

A kind of assembled terrace in construction site
Technical field
The utility model belongs to building field, the assembled terrace in more particularly to a kind of construction site.
Background technology
Facing in project under construction and build in construction, the terrace of Office Area, living area and job site typically uses concrete cast-in-situ, After place has used, cast-in-place concrete floor need to crush removing, not only increase cost, and waste concrete money indirectly Source.Both it is uneconomical, and not environmentally.
At present, in northern area, because rainwater is less, so reinforced concrete prefabricated board terrace applies more, in general Way is layer overlay graded sand after ground leveling is compacted, then one piece of block of prefabricated board is tiled and can be used.But in south Side area, this terrace do not apply to.Because southern area is rainy, the spelling between the contiguous prefabricated plate of bright water inflow of prefabricated plate surface After seam, terrace basic unit maceration can be produced uneven subsidence under prefabricated board deadweight and plate face load action, cause monolithic The plate face of prefabricated board tilts, so as to influence the integral smoothness of terrace, so as to influence the use function of terrace.
Utility model content
The purpose of this utility model is to provide a kind of Prefabricated terrace for ensureing whole terrace flatness.
The assembled terrace in this construction site provided by the utility model, including some armored concrete arranged successively Prefabricated board.Detachably it is connected as a single entity by side plug connector and flat connectors between the reinforced concrete prefabricated board.Side Plug connector is metal shear-pin, and flat connectors are I-shaped metalwork.Welded on the length direction median plane of side plug connector Limited location circular ring plate.
The reinforced concrete prefabricated board is rectangular slab, and inside is configured with double-layer double-direction reinforcing bar.
Geometric center opening position of the reinforced concrete prefabricated board per side has one to be inserted for installing the side The circular hole of fitting.
The length direction of the reinforced concrete prefabricated board and width side are respectively symmetrically provided through plate body thickness The T-shaped breach of degree, for installing the flat connectors.
The T-shaped breach is surrounded by metallic plate, metallic plate and the reinforcement welding of configuration in reinforced concrete prefabricated board.
Metal chock is clogged between the edge of a wing of the flat connectors and T-shaped breach.
The utility model will be connected between each reinforced concrete prefabricated board of on-site consolidation by side plug connector with plane Part is detachably connected as a single entity, and the terrace after assembling is had good globality and flatness, coordinates ground water-proofing treatment to keep away Exempt from because the influence of rainwater make reinforced concrete prefabricated board produce uneven subsidence the defects of, suitable for southern area use.Due to Terrace has good flatness, so be substantially not in the damage of reinforced concrete prefabricated board in use, institute It may be reused with reinforced concrete prefabricated board, cost-effective also environmental protection.
Brief description of the drawings
Fig. 1 is the plane assembling schematic diagram of the present embodiment.
Fig. 2 is the A portions enlarged diagram in Fig. 1.
Fig. 3 is the B portions enlarged diagram in Fig. 1.
Fig. 4 is the C portions enlarged diagram in Fig. 1.
Embodiment
The assembled terrace in this construction site disclosed in the present embodiment, suitable for the more southern area of rainwater.Such as Fig. 1 It is shown, the assembled terrace by some reinforced concrete prefabricated boards 1 by I-shaped connector 2 and shear-pin 3 assembled, work Shaped connecting piece 2 and shear-pin 3 are metalwork.
Fig. 1 show the assembled schematic diagram of four pieces of reinforced concrete prefabricated boards, and reinforced concrete prefabricated board 1 is rectangular slab, Inside is configured with double-layer double-direction reinforcing bar.
When reinforced concrete prefabricated board 1 is prefabricated, the geometric center opening position in its each side reserves inserting for shear-pin 3 Connect hole.For the ease of the loading, unloading of shear-pin 3, make the diameter of spliced eye than external diameter about 2mm, the hole depth rate shear-pin of shear-pin 3 The half of 3 length is about 10mm.Respectively symmetrically set in the length direction of reinforced concrete prefabricated board 1 and width both sides in addition Two T-shaped breach 11 for running through plate body thickness are put, T-shaped breach 11 is symmetrically distributed in the both sides of circular hole.T-shaped breach 11 is by metallic plate Surround, and metallic plate and the reinforcement welding of the inner configuration of reinforced concrete prefabricated board are integrated.The structure for amplifying of T-shaped breach is as schemed Shown in 2.
For the ease of the loading, unloading of I-shaped connector 2, the size of I-shaped connector 2 is set to be slightly larger than the chi of T-shaped breach 11 It is very little.But in order to ensure globality and flatness after the assembly of reinforced concrete prefabricated board 1, after I-shaped connector 2 is installed, Metal chock 4 is clogged between I-shaped connector 2 and T-shaped breach 11.As shown in Figure 3.
In order to ensure that intubating length of the shear-pin 3 in adjacent two pieces of reinforced concrete prefabricated boards 1 is identical, in shear-pin 3 A circular ring plate 31 is welded on the median plane of length direction.
Before terrace installation, basement process is first carried out:After with digging machine, ground is flattened, tamped with water plus clay;Then in base One layer of face upper berth colour bar cloth is rebasing, then the plastic sheeting in the one layer of 0.5mm thickness in colour bar cloth upper berth, adds one layer of colour bar again on film Cloth is protected, and one layer of graded sand and stone is repaved on colour bar cloth.
Terrace assembly is can be carried out after basement process is good:Two pieces of adjacent reinforced concrete prefabricated boards are passed through first Shear-pin grafting is integrated, the I-shaped breach then surrounded between adjacent two pieces of reinforced concrete prefabricated boards by T-shaped breach The middle I-shaped connector of insertion.Because it is easy to the handling of I-shaped connector, it is necessary to make the undersized of I-shaped connector In the I-shaped breach that two T-shaped breach surround, so, after I-shaped connector installation, filled out at it between the rib of T-shaped breach Metal chock is filled in, by two pieces of adjacent reinforced concrete prefabricated board jam-packeds, ensures the globality of terrace.
The utility model is directed to the characteristics of southern area rainwater is more, devises the assembled terrace in this construction site, Devise a kind of I-shaped connector between the adjacent reinforced concrete prefabricated board plane of assembled terrace, I-shaped connector is from flat Adjacent two pieces of reinforced concrete prefabricated boards are connected as a single entity on face, and two pieces of adjacent reinforced concretes are tensed using bquster extruding Native prefabricated board.Shear-pin is provided with the side of reinforced concrete prefabricated board, it is pre- that shear-pin bears adjacent two blocks of armored concrete Shearing between making sheet, make two pieces of common stress of reinforced concrete prefabricated board.During basement process, membrane waterproofing is provided with basic unit Layer, prevents rainwater to be poured into basic unit's soil face, improves the service life of assembled terrace.

Claims (6)

1. a kind of assembled terrace in construction site, including some reinforced concrete prefabricated boards arranged successively, it is characterised in that: Detachably it is connected as a single entity by side plug connector and flat connectors between the reinforced concrete prefabricated board;Side plug connector is Metal shear-pin, flat connectors are I-shaped metalwork;Limited location circle is welded on the length direction median plane of side plug connector Ring plate.
2. the assembled terrace in construction site as claimed in claim 1, it is characterised in that:The reinforced concrete prefabricated board is Rectangular slab, inside are configured with double-layer double-direction reinforcing bar.
3. the assembled terrace in construction site as claimed in claim 2, it is characterised in that:The reinforced concrete prefabricated board is every The geometric center opening position of side has a circular hole for being used to install the side plug connector.
4. the assembled terrace in construction site as claimed in claim 2, it is characterised in that:The reinforced concrete prefabricated board Length direction and width side are respectively symmetrically provided through the T-shaped breach of plate body thickness, connect for installing the plane Fitting.
5. the assembled terrace in construction site as claimed in claim 4, it is characterised in that:The T-shaped breach is enclosed by metallic plate Into metallic plate and the reinforcement welding of configuration in reinforced concrete prefabricated board.
6. the assembled terrace in construction site as claimed in claim 5, it is characterised in that:The edge of a wing of the flat connectors with Metal chock is clogged between T-shaped breach.
CN201720422222.1U 2017-04-21 2017-04-21 A kind of assembled terrace in construction site Active CN206800909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720422222.1U CN206800909U (en) 2017-04-21 2017-04-21 A kind of assembled terrace in construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720422222.1U CN206800909U (en) 2017-04-21 2017-04-21 A kind of assembled terrace in construction site

Publications (1)

Publication Number Publication Date
CN206800909U true CN206800909U (en) 2017-12-26

Family

ID=60733474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720422222.1U Active CN206800909U (en) 2017-04-21 2017-04-21 A kind of assembled terrace in construction site

Country Status (1)

Country Link
CN (1) CN206800909U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756142A (en) * 2018-05-23 2018-11-06 江苏无锡二建建设集团有限公司 The construction method of large-area concrete terrace
CN112282380A (en) * 2020-09-29 2021-01-29 上海市政工程设计研究总院(集团)有限公司 Pre-buried hoisting box, prefabricated slab and hoisting and connecting method of prefabricated slab
CN112643815A (en) * 2020-12-22 2021-04-13 吴静 Bamboo coarse fiber plywood

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756142A (en) * 2018-05-23 2018-11-06 江苏无锡二建建设集团有限公司 The construction method of large-area concrete terrace
CN112282380A (en) * 2020-09-29 2021-01-29 上海市政工程设计研究总院(集团)有限公司 Pre-buried hoisting box, prefabricated slab and hoisting and connecting method of prefabricated slab
CN112643815A (en) * 2020-12-22 2021-04-13 吴静 Bamboo coarse fiber plywood
CN112643815B (en) * 2020-12-22 2022-10-11 吴静 Bamboo coarse fiber plywood

Similar Documents

Publication Publication Date Title
US11143027B2 (en) Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof
US11319690B2 (en) Assembled recyclable rectangular working well with preset detachable door opening and construction method thereof
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN103981896B (en) The seamless link construction method of a kind of outer wall of basement and fender post
CN103643971B (en) Tunnel invert sizing end mould rapid constructing method
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
CN206800909U (en) A kind of assembled terrace in construction site
CN102444143B (en) Construction method for cancelling operation channel for facades of basement
CN103912000A (en) Reusable composite-material soil nailing wall supporting face plate and construction method thereof
CN110485468B (en) Permanent circular working well with water-rich stratum preset jacking pipe door opening and construction method thereof
CN111577334B (en) Operating tunnel inverted arch repairing method
CN105256854A (en) Excavator bucket suitable for construction of trapezoid channel and construction method
CN109914474A (en) A kind of pipe gallery U-type groove, which is excavated, presses push construction method
CN110306396A (en) A kind of assembly concrete road surface and construction method
CN203096762U (en) Anti-frost ground beam
CN102425228A (en) Multifunctional environment-friendly movable water tank
CN109681243B (en) Comprehensive restoration method for tunnel lining two-lining concrete waterproof board exposure
CN209443459U (en) Cut-pff wall assembled leads wall
CN207228173U (en) A kind of underground project waterproof structure
CN212642730U (en) Collapsible loess area tunnel passes people's air defense structure
CN109137884B (en) Assembled guide wall of impervious wall and construction method thereof
CN113585336A (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN110093945B (en) Pit with elevator steel structure
CN106758658A (en) A kind of construction method of precast rc slab block and the heavily loaded temporary road of laying