CN103981896B - The seamless link construction method of a kind of outer wall of basement and fender post - Google Patents

The seamless link construction method of a kind of outer wall of basement and fender post Download PDF

Info

Publication number
CN103981896B
CN103981896B CN201410146379.7A CN201410146379A CN103981896B CN 103981896 B CN103981896 B CN 103981896B CN 201410146379 A CN201410146379 A CN 201410146379A CN 103981896 B CN103981896 B CN 103981896B
Authority
CN
China
Prior art keywords
construction
wall
basement
fender post
metope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410146379.7A
Other languages
Chinese (zh)
Other versions
CN103981896A (en
Inventor
程伟
马明国
程群
魏俊松
林贵顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201410146379.7A priority Critical patent/CN103981896B/en
Publication of CN103981896A publication Critical patent/CN103981896A/en
Application granted granted Critical
Publication of CN103981896B publication Critical patent/CN103981896B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the seamless link construction method of a kind of outer wall of basement and fender post, it comprises the steps: the construction first completing fender post, then assembling reinforcement mesh sheet on the inner side soil body of foundation ditch, gunite, the soil body inside foundation ditch is made to form metope, fender post carries out draining setting, and pile body is processed, retaining design does waterproofing work, arrange the vertical reinforcement of outer wall of basement, horizontal reinforcement and stirrup, install the template inside outer wall of basement, the soil body inside itself and foundation ditch is made to form a single surface formwork system, concreting, stripping when design strength requires is reached until outer wall of basement.This construction method, directly metope inside foundation ditch is directly regarded a side template of outer wall of basement, job site, only need the inner side template installing outer wall of basement, make metope inside itself and foundation ditch form single surface formwork system, decrease one working procedure, reduce artificial work amount, save the engineering time, improve efficiency of construction, decrease the use of mould material; Outer wall of basement and retaining design adopt jointless construction, compared with traditional handicraft, without the need to carrying out isothermal holding in the middle of exterior wall and retaining design.

Description

The seamless link construction method of a kind of outer wall of basement and fender post
Technical field
The present invention relates to the realm of building construction, particularly the seamless link construction method of a kind of outer wall of basement and fender post.
Background technology
Existing outer wall of basement construction method, after normally space enclosing structure having been constructed, setting-out goes out the extension line of outer wall of basement, arrange the reinforcing bar of outer wall of basement, install template, build outer wall of basement concrete, reach stripping when design strength requires until concrete.This kind of technique waste template, the artificial amount of needs is comparatively large, and length consuming time of constructing, retaining design wastes a large amount of architectural spaces.
Summary of the invention
The object of the present invention is to provide a kind ofly increases architectural space, reduces template consumption, decreases one working procedure, reduces artificial work amount, saves the engineering time, improves the outer wall of basement of efficiency of construction and the seamless link construction method of fender post.
The technical solution used in the present invention is as follows:
A seamless link construction method for outer wall of basement and fender post, construction sequence comprises:
1) fender post construction
Setting-out is carried out, construction fender post according to the fender post size that construction drawing is given;
2) anchor is sprayed
Assembling reinforcement mesh sheet on the inner side soil body of foundation ditch, shotcrete, thus make the soil body inside foundation ditch form metope, the bar diameter that reinforced mesh uses needs >14mm;
3) metope is levelling
In subsequent construction, retaining design will use as a face die plate, therefore will carry out leveling to metope, guarantee planeness;
4) draining is arranged
On fender post, carry out the construction of drain hole hole according to designing requirement, after having constructed, bury draining channel-section steel in drain hole underground, constructing according to design drawing in the angle of inclination of channel-section steel, inside outer wall of basement, arranges gutter;
5) fender post pile body process
Use digging machine to dig out pile body outside fender post, the construction processing increasing frictional behaviour is carried out to pile body;
6) construction of waterproof layer
After the levelling construction of metope completes, metope carries out waterproof construction, waterproof is according to two-layer process, and one deck is protective coating, and one deck is waterproof roll, and waterproof layer does layer protective layer;
7) lacing wire is arranged
Lacing wire is mainly used to the template of fixed outer wall, adopts draining channel-section steel to be used as lacing wire and use, in order to fixed form in subsequent construction in this construction method;
8) exterior wall reinforcing bar is arranged
According to the dimensional requirement of design drawing, arrange vertical reinforcement, horizontal reinforcement, the stirrup of exterior wall, the channel-section steel that draining is arranged is embedded in outward within the walls as one bearing diagonal;
9) template is installed
Retaining design, as a side template, therefore only collaterally within the walls outside need be established one template, fix template, make itself and space enclosing structure form a kind of single surface formwork system with the lacing wire that fender post is arranged;
10) concreting
After formwork erection completes, carry out concreting, retaining design and exterior wall are linked to be entirety, guarantee the jointless construction of exterior wall and retaining design;
11) form removable
After outer wall of basement has been built, reach after design strength requirement until concrete, stripping, completes the jointless construction of outer wall of basement and retaining design.
The construction method of outer wall of basement of the present invention, directly metope inside foundation ditch is directly regarded a side template of outer wall of basement, job site, only need the inner side template installing outer wall of basement, make metope inside itself and foundation ditch form single surface formwork system, decrease one working procedure, reduce artificial work amount, save the engineering time, improve efficiency of construction, decrease the use of mould material; Outer wall of basement and retaining design adopt jointless construction, compared with traditional handicraft, without the need to carrying out isothermal holding in the middle of exterior wall and retaining design.
Accompanying drawing explanation
Fig. 1 is construction schematic diagram of the present invention.
Number in the figure: 1-fender post, 2-metope leveling layer, 3-lacing wire, 4, waterproofing course, 5-vertical reinforcement, 6-horizontal reinforcement, 7-stirrup, 8-template, 9-outer wall of basement concrete.
Detailed description of the invention
See accompanying drawing, the seamless link construction method of a kind of outer wall of basement and fender post, construction sequence comprises:
1) fender post construction
Setting-out is carried out, construction fender post according to the fender post size that construction drawing is given;
2) anchor is sprayed
Assembling reinforcement mesh sheet on the inner side soil body of foundation ditch, shotcrete, thus make the soil body inside foundation ditch form metope, the bar diameter that reinforced mesh uses needs >14mm;
3) metope is levelling
In subsequent construction, retaining design will use as a face die plate, therefore will carry out leveling to metope, guarantee planeness;
4) draining is arranged
On fender post, carry out the construction of drain hole hole according to designing requirement, after having constructed, bury draining channel-section steel in drain hole underground, constructing according to design drawing in the angle of inclination of channel-section steel, inside outer wall of basement, arranges gutter;
5) fender post pile body process
Use digging machine to dig out pile body outside fender post, the construction processing increasing frictional behaviour is carried out to pile body;
6) construction of waterproof layer
After the levelling construction of metope completes, metope carries out waterproof construction, waterproof is according to two-layer process, and one deck is protective coating, and one deck is waterproof roll, and waterproof layer does layer protective layer;
7) lacing wire is arranged
Lacing wire is mainly used to the template of fixed outer wall, adopts draining channel-section steel to be used as lacing wire and use, in order to fixed form in subsequent construction in this construction method;
8) exterior wall reinforcing bar is arranged
According to the dimensional requirement of design drawing, arrange vertical reinforcement, horizontal reinforcement, the stirrup of exterior wall, the channel-section steel that draining is arranged is embedded in outward within the walls as one bearing diagonal;
9) template is installed
Retaining design, as a side template, therefore only collaterally within the walls outside need be established one template, fix template, make itself and space enclosing structure form a kind of single surface formwork system with the lacing wire that fender post is arranged;
10) concreting
After formwork erection completes, carry out concreting, retaining design and exterior wall are linked to be entirety, guarantee the jointless construction of exterior wall and retaining design;
11) form removable
After outer wall of basement has been built, reach after design strength requirement until concrete, stripping, completes the jointless construction of outer wall of basement and retaining design.
The object of the present invention is achieved like this, the construction method of this outer wall of basement, it comprises the steps: the construction first completing fender post, then assembling reinforcement mesh sheet on the inner side soil body of foundation ditch, gunite, the soil body inside foundation ditch is made to form metope, fender post carries out draining setting, and pile body is processed, retaining design does waterproofing work, arrange the vertical reinforcement of outer wall of basement, horizontal reinforcement, stirrup, install the template inside outer wall of basement, the soil body inside itself and foundation ditch is made to form a single surface formwork system, concreting, stripping when design strength requires is reached until outer wall of basement.
Due to the construction method of this outer wall of basement, directly metope inside foundation ditch is directly regarded a side template of outer wall of basement, job site, only need the inner side template installing outer wall of basement, make metope inside itself and foundation ditch form single surface formwork system, decrease one working procedure, reduce artificial work amount, save the engineering time, improve efficiency of construction, decrease the use of mould material; Outer wall of basement and retaining design adopt jointless construction, compared with traditional handicraft, without the need to carrying out isothermal holding in the middle of exterior wall and retaining design.

Claims (1)

1. a seamless link construction method for outer wall of basement and fender post, it is characterized in that, construction sequence comprises: 1) fender post construction carries out setting-out according to the fender post size that construction drawing is given, construction fender post;
2) spray anchor assembling reinforcement mesh sheet on the inner side soil body of foundation ditch, shotcrete, thus make the soil body inside foundation ditch form metope, the bar diameter that reinforced mesh uses needs >14mm;
3) metope is levelling in subsequent construction, and retaining design will use as a face die plate, therefore will carry out leveling to metope, guarantee planeness;
4) draining arranges and on fender post, carries out the construction of drain hole hole according to designing requirement, and after having constructed, bury draining channel-section steel in drain hole underground, constructing according to design drawing in the angle of inclination of channel-section steel, inside outer wall of basement, arranges gutter;
5) process of fender post pile body uses digging machine to dig out pile body outside fender post, carries out to pile body the construction processing increasing frictional behaviour;
6) after the levelling construction of construction of waterproof layer metope completes, metope carries out waterproof construction, waterproof is according to two-layer process, and one deck is protective coating, and one deck is waterproof roll, and waterproof layer does layer protective layer;
7) arrange that lacing wire lacing wire is mainly used to the template of fixed outer wall, in this construction method, adopt draining channel-section steel to be used as lacing wire use, in order to fixed form in subsequent construction;
8) arrange the dimensional requirement of exterior wall reinforcing bar according to design drawing, arrange vertical reinforcement, horizontal reinforcement, the stirrup of exterior wall, the channel-section steel that draining is arranged is embedded in outward within the walls as one bearing diagonal;
9) install template retaining design as a side template, therefore only collaterally within the walls outside need establish one template, fix template with the lacing wire that fender post is arranged, make itself and retaining design form a kind of single surface formwork system;
10) after concreting formwork erection completes, carry out concreting, retaining design and exterior wall are linked to be entirety, guarantee the jointless construction of exterior wall and retaining design;
11), after form removable outer wall of basement has been built, reach after design strength requirement until concrete, stripping, completes the jointless construction of outer wall of basement and retaining design.
CN201410146379.7A 2014-04-11 2014-04-11 The seamless link construction method of a kind of outer wall of basement and fender post Expired - Fee Related CN103981896B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410146379.7A CN103981896B (en) 2014-04-11 2014-04-11 The seamless link construction method of a kind of outer wall of basement and fender post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410146379.7A CN103981896B (en) 2014-04-11 2014-04-11 The seamless link construction method of a kind of outer wall of basement and fender post

Publications (2)

Publication Number Publication Date
CN103981896A CN103981896A (en) 2014-08-13
CN103981896B true CN103981896B (en) 2016-01-20

Family

ID=51274048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410146379.7A Expired - Fee Related CN103981896B (en) 2014-04-11 2014-04-11 The seamless link construction method of a kind of outer wall of basement and fender post

Country Status (1)

Country Link
CN (1) CN103981896B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480929B (en) * 2014-10-17 2017-03-15 中建四局第六建筑工程有限公司 A kind of pile wall interaction construction method that interlocking pile is applied to permanent outer wall of basement
CN105569329B (en) * 2016-02-02 2018-08-28 陈君 Single surface formwork basement construction method and basement
CN105604099B (en) * 2016-03-11 2018-02-13 中建三局集团有限公司 A kind of waterproof roll basic unit
CN105926815A (en) * 2016-05-10 2016-09-07 江苏东晟新诚建设集团有限公司 Integrated construction method for board wall formwork and support formwork in restricted area
CN106759843A (en) * 2016-12-27 2017-05-31 宁波二十冶建设有限公司 A kind of outer wall of basement waterproof construction and its construction method
CN107119695A (en) * 2017-06-27 2017-09-01 中国建筑第二工程局有限公司 A kind of operation support body and construction method for cancelling outer wall of basement backfill
CN107326923A (en) * 2017-07-20 2017-11-07 常州市建筑科学研究院集团股份有限公司 Outer wall of underground structure HCMW engineering methods composite wall and its construction method
CN107975042A (en) * 2017-12-08 2018-05-01 中冶天工集团天津有限公司 A kind of supporting type water-stop curtain and its construction method
CN109083192A (en) * 2018-08-30 2018-12-25 中国十七冶集团有限公司 It is a kind of without fertile slot underground pipe gallery method of construction
CN109518697A (en) * 2018-12-12 2019-03-26 中铁局集团厦门建设工程有限公司 The construction method of form concrete between a kind of subway station fender post
CN111550037A (en) * 2020-05-29 2020-08-18 青岛东建建设有限公司 Building outer wall construction method for foundation pit in narrow site
CN111663540A (en) * 2020-06-29 2020-09-15 河北建设勘察研究院有限公司 Foundation pit supporting structure and wall formwork integrated construction method thereof
CN112482555A (en) * 2020-11-06 2021-03-12 云南建投第六建设有限公司 Shear wall structure and construction method of shear wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080001711A (en) * 2006-06-29 2008-01-04 충주대학교 산학협력단 The construction method of retaining wall
KR100976621B1 (en) * 2008-06-03 2010-08-17 주식회사 가인이앤피 Construction method for basement extention
CN201874008U (en) * 2010-11-12 2011-06-22 中国京冶工程技术有限公司 Discontinuous concrete grouting pile and wall structure
KR20110136987A (en) * 2010-06-16 2011-12-22 주식회사 한빛구조엔지니어링 Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow
CN103088830A (en) * 2013-02-01 2013-05-08 江苏省江建集团有限公司 Construction method for composite outer wall structure of ultra-deep basement
CN103132690A (en) * 2013-03-13 2013-06-05 江苏南通三建集团有限公司 Basement exterior wall unilateral template and method for supporting template thereof
CN103470026A (en) * 2013-09-04 2013-12-25 中建三局第一建设工程有限责任公司 Basement external wall single-face framework erecting system and construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080001711A (en) * 2006-06-29 2008-01-04 충주대학교 산학협력단 The construction method of retaining wall
KR100976621B1 (en) * 2008-06-03 2010-08-17 주식회사 가인이앤피 Construction method for basement extention
KR20110136987A (en) * 2010-06-16 2011-12-22 주식회사 한빛구조엔지니어링 Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow
CN201874008U (en) * 2010-11-12 2011-06-22 中国京冶工程技术有限公司 Discontinuous concrete grouting pile and wall structure
CN103088830A (en) * 2013-02-01 2013-05-08 江苏省江建集团有限公司 Construction method for composite outer wall structure of ultra-deep basement
CN103132690A (en) * 2013-03-13 2013-06-05 江苏南通三建集团有限公司 Basement exterior wall unilateral template and method for supporting template thereof
CN103470026A (en) * 2013-09-04 2013-12-25 中建三局第一建设工程有限责任公司 Basement external wall single-face framework erecting system and construction method

Also Published As

Publication number Publication date
CN103981896A (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN103981896B (en) The seamless link construction method of a kind of outer wall of basement and fender post
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN101672041B (en) Top-down construction method of large underground structure outer wall
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN102444143B (en) Construction method for cancelling operation channel for facades of basement
CN103132690B (en) Basement exterior wall unilateral template and method for supporting template thereof
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN103015719A (en) Integral casting process for reinforced concrete wastewater tank in predrilling engineering
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN104452812A (en) Construction method of basement outer wall
CN203654318U (en) Prefabricated reinforced concrete plate mold
CN101949226B (en) Cross construction method for large pool body
CN107119695A (en) A kind of operation support body and construction method for cancelling outer wall of basement backfill
CN103726508B (en) A kind of precast rc slab material loose tool and construction method
CN203160254U (en) Pit support structure
CN103306497B (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
CN104328790A (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN210216452U (en) Old excavation supporting system reinforced structure
CN106193120B (en) Basement is encorbelmented, and bottom plate is inverse to make structure and construction method
CN204851265U (en) Bearing structure in work well under high water pressure condition
CN207727603U (en) Big cushion cap deep basal pit formwork supporting system
CN207934055U (en) A kind of prefabricated cushion cap template and prefabricated cushion cap loose tool
CN103821149A (en) Large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method
CN211113774U (en) Assembled PC basement lateral wall post-cast strip structure
CN211421139U (en) Shield constructs well crown beam bearing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 230000 building 3, 262 Heping Road, Yaohai District, Hefei City, Anhui Province

Patentee after: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau

Address before: 230011 science and Technology Department of No.6 company of China Construction Fourth Bureau, Dongfang Building, intersection of Changjiang East Street and Mingguang Road, Yaohai District, Hefei City, Anhui Province

Patentee before: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120