CN107326923A CN201710595514.XA CN201710595514A CN107326923A CN 107326923 A CN107326923 A CN 107326923A CN 201710595514 A CN201710595514 A CN 201710595514A CN 107326923 A CN107326923 A CN 107326923A
Authority
CN
China
Prior art keywords
wall
underground structure
inwall
construction
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710595514.XA
Other languages
Chinese (zh)
Inventor
徐汉东
何刚
符新军
王燕
曹亚强
王飞燕
张国露
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Railway Construction Place
JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd
Changzhou Institute Of Building Science Group Ltd By Share Ltd
Original Assignee
Changzhou Railway Construction Place
JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd
Changzhou Institute Of Building Science Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Railway Construction Place, JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd, Changzhou Institute Of Building Science Group Ltd By Share Ltd filed Critical Changzhou Railway Construction Place
Priority to CN201710595514.XA priority Critical patent/CN107326923A/en
Publication of CN107326923A publication Critical patent/CN107326923A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of outer wall of underground structure HCMW engineering method composite walls, including:Soil-cement piling wall, the Soil-cement piling wall includes precast reinforced concrete piles are spaced or be continuously inserted with multiple cement mixing methods being continuously mutually twisted, the multiple cement mixing method;On screed-coat, the inwall for being arranged on Soil-cement piling wall;Outer wall of underground structure, the outer wall of underground structure is arranged on the inwall of screed-coat, and the outer wall of underground structure includes reinforcing bar and the concrete mixed with waterproof compacting agent;Present invention also offers the construction method of above-mentioned outer wall of underground structure HCMW engineering method composite walls.By the above-mentioned means, the present invention is simple and reasonable, cancel fertile groove, so that the series of malpractice of fertile groove is avoided, water resistance enhancing, process simplification, easy construction, shortening duration.

Description

Outer wall of underground structure HCMW engineering methods composite wall and its construction method
Technical field
The present invention relates to technical field of building construction, more particularly to a kind of outer wall of underground structure HCMW engineering methods composite wall and Its construction method.
Background technology
Traditional outer wall of underground structure working procedure:Supporting, excavation (increasing fertile groove), bed course, waterproof slab, colligation Bottom Board Steel Muscle and reinforcing steel bars of wallboards, pour underplate concrete, edge-on mould inside and outside colligation exterior wall and post reinforcing bar, outer wall of underground structure, pour exterior wall Concrete, external wall waterproof coiled material are pasted, waterproofing protection, fertile groove are backfilled, outdoor pipeline is buried, floor construction, in work progress Following problem generally existing:
1st, exterior wall shuttering constructional difficulties
Excavation of foundation pit space is limited, and the typically reserved fertile well width of construction space is less than 1.2 meters, narrow space outer wall of underground structure mould Plate difficulty of construction is big, and the working environment of workers is poor, and job scheduling is slow, and scaffold is torn open take twice, and turnover wastes serious;
2nd, the fertile difficult densification of groove backfill is real
Space is excessively narrow and small between exterior wall and supporting construction, and waterproof roll needs protection, and backfill is unable to mechanized construction, quality It is difficult to control to.Feed back is loose, is often mixed into the debris such as fragment of brick, batten, rubbish, or even with water backfill.Posterior settlement perdurabgility Long, settling amount is big, causes the facility destructions such as water pipe leak, pipeline are damaged, aproll is decorated;
3rd, backfill is loose, the retaining basin artificially manufactured
Backfill is loose around outer wall of underground structure, has artificially manufactured a retaining basin, underground structure is just seated in retaining basin, Rainy ponding, pipe leakage ponding are collected in the fertile groove of foundation ditch, because excavation slope safeguard procedures stop that ponding is lost in, retaining basin Interior water level is higher than ordinary water level in the soil body of periphery.Water buoyancy exceedes design anti-floating standard.This is the master that many underground structures float Want reason.If local coiled material damages leak, then whole waterproof coiled material system slowly fails;
4th, supporting construction system is scrapped after foundation ditch backfill, is wasted the serious obstacle that formed simultaneously and is permanently present.
The content of the invention
The present invention solves the technical problem of provide a kind of outer wall of underground structure HCMW engineering methods composite wall and its construction Method, it is simple and reasonable, cancel fertile groove, so as to avoid the series of malpractice of fertile groove, water resistance enhancing, process simplifies, applied Work is convenient, shorten the duration.
In order to solve the above technical problems, one aspect of the present invention is:A kind of outer wall of underground structure is provided HCMW engineering method composite walls, including:
Soil-cement piling wall, the Soil-cement piling wall includes multiple cement mixing methods being continuously mutually twisted, described It is spaced in multiple cement mixing methods or is continuously inserted with precast reinforced concrete piles;
On screed-coat, the inwall for being arranged on Soil-cement piling wall;
Outer wall of underground structure, the outer wall of underground structure is arranged on the inwall of screed-coat, and the outer wall of underground structure includes steel Muscle and the concrete mixed with waterproof compacting agent.
In a preferred embodiment of the present invention, the cross section of the precast reinforced concrete piles is in dumbbell shape.
In a preferred embodiment of the present invention, waterproof mortar course, the underground are provided with the inwall of the screed-coat Structure outer is arranged on the inwall of waterproof mortar course.
In a preferred embodiment of the present invention, the thickness of the waterproof mortar course is 25 ~ 30mm.
In order to solve the above technical problems, another technical solution used in the present invention is:A kind of outer wall of underground structure is provided The construction method of HCMW engineering method composite walls, including step in detail below:
A, using multi-shaft stirring stake machine carry out Soil-cement piling wall construction;
B, underground structure earth excavation, dig to set depth, and the inwall of precast reinforced concrete piles is substantially exposed;
C, on the inwall of precast reinforced concrete piles it is implanted into split bolt;
D, progress construction of leveling blanket;
E, the construction of outer wall of underground structure framework of steel reinforcement;
F, using the inwall of screed-coat as outboard template, inner side template is installed on the other end of split bolt;
G, pour concrete mixed with waterproof compacting agent;
H, after concrete reaches design strength, form removal, composite wall construction complete.
In order to solve the above technical problems, another technical solution used in the present invention is:A kind of outer wall of underground structure is provided The construction method of HCMW engineering method composite walls, it is characterised in that including step in detail below:
A, using multi-shaft stirring stake machine carry out Soil-cement piling wall construction;
B, underground structure earth excavation, dig to set depth, and the inwall of precast reinforced concrete piles is substantially exposed;
C, on the inwall of precast reinforced concrete piles it is implanted into split bolt;
D, progress construction of leveling blanket;
E, waterproof mortar course is smeared on the inwall of screed-coat, and is conserved, curing time is more than or equal to 15 days, during maintenance, Waterproof mortar course keeps moistening;
F, detection waterproof mortar course have the defects such as free from flaw, hollowing, if any then being repaired, until qualified;
G, the construction of outer wall of underground structure framework of steel reinforcement;
H, using the inwall of screed-coat as outboard template, inner side template is installed on the other end of split bolt;
I, pour concrete mixed with waterproof compacting agent;
J, after concrete reaches design strength, form removal, composite wall construction complete.
The invention has the advantages that:
1st, Soil-cement piling wall and water-proof concrete wall are cement base inorganic material using material, and buried underground connects with soil Touch, particularly soil cement is long in underground chemical reaction perdurabgility, and intensity, crystalline solid constantly increase, with underground structure wall main body Concrete structure is gradually fused into one;
2nd, water resistance is significantly increased, and impervious coefficient, in 10-8cm/s, there is waterproof action to Soil-cement piling wall in itself;Soil cement Churned pile wall is combined closely with underground structure concrete exterior wall, is eliminated the fertile groove of excavation, has been cut off permeable path, permeation pathway is prolonged Long, infiltration hydraulic pressure is substantially reduced;In Soil-cement piling wall, cement soil wall be it is continuous, it is firm from soil, soil cement, concrete walls Degree is gradual change, smaller to concrete walls deformation constraint, and impervious strong, plasticity is big in itself for soil cement, be difficult to form permeable crack, Every prefabricated pile independently bears external force, is wrapped in cement soil wall, bears the anti-permeability performance that external force has no effect on soil cement;
3rd, difficulty of construction is reduced, only need to be in the unilateral shuttering in inner side, process letter using Soil-cement piling wall as outboard template Single, by being implanted into split bolt on prefabricated pile, unilateral shuttering operation is easy, easily simple;Cement mixing method enclosure wall, Substantially plane, simple linked network mortar powder is put down, you can do rigid composite waterproof layer;Whole flow process is simple, and working face is open, workman Construction environment improves;
4th, the duration shortens, and process simplifies, and coiled material construction, backfilling of earthwork, outside scaffold template construction is eliminated, by weather, sky Between etc. external factor influence it is small, construction joint quantity is reduced, and the duration substantially shortens;
5th, cost savings, turnover is using reducing, and outside shuttering is required more with quantity such as short and small steel pipe, fasteners, wastes tight Weight, is all eliminated;Process simplifies, and construction joint quantity is reduced, cost of labor reduction;Backfill cost savings;Construction land tenure subtracts It is small, it can amplify using space, development & construction resource is exaggerated.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, it can also obtain other according to these accompanying drawings Accompanying drawing, wherein:
Fig. 1 is the structural representation of the preferred embodiment of outer wall of underground structure HCMW engineering methods composite wall one of the present invention;
Fig. 2 is Fig. 1 A-A to sectional view;
Fig. 3 is the structural representation of another preferred embodiment of outer wall of underground structure HCMW engineering method composite walls of the present invention;
Fig. 4 is Fig. 3 B-B direction sectional view.
The mark of each part is as follows in accompanying drawing:1st, cement mixing method, 2, precast reinforced concrete piles, 3, screed-coat, 4, Outer wall of underground structure, 5, split bolt, 6, inner side template, 7, waterproof mortar course.
Embodiment
The technical scheme in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation Example is only a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, this area is common All other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected Enclose.
Fig. 1 to Fig. 4 is referred to, the embodiment of the present invention includes:
Embodiment one:
The present embodiment is adapted to two grades and the requirement of following classification of waterproof, specific as follows:
A kind of outer wall of underground structure HCMW engineering method composite walls, including:
Soil-cement piling wall, the Soil-cement piling wall includes multiple cement mixing methods 1 being continuously mutually twisted, described It is spaced in multiple cement mixing methods or is continuously inserted with precast reinforced concrete piles 2;
On screed-coat 3, the inwall for being arranged on Soil-cement piling wall;
Outer wall of underground structure 4, the outer wall of underground structure is arranged on the inwall of screed-coat, and the outer wall of underground structure includes steel Muscle and the concrete mixed with waterproof compacting agent.
The cross section of the precast reinforced concrete piles is in dumbbell shape.
The invention also discloses the construction method of above-mentioned outer wall of underground structure HCMW engineering method composite walls, including walk in detail below Suddenly:
A, using multi-shaft stirring stake machine carry out Soil-cement piling wall construction;
B, underground structure earth excavation, dig to set depth, and the inwall of precast reinforced concrete piles is substantially exposed, herein The construction such as also need to carry out conventional waterproof slab, pour, I will not elaborate;
C, the implantation split bolt 5 on the inwall of precast reinforced concrete piles;
D, progress construction of leveling blanket;
E, the construction of outer wall of underground structure framework of steel reinforcement;
F, using the inwall of screed-coat as outboard template, on the other end of split bolt install inner side template 6;
G, pour concrete mixed with waterproof compacting agent;
H, after concrete reaches design strength, form removal, composite wall construction complete.
Embodiment two:
The present embodiment is adapted to the requirement of one-level classification of waterproof, specific as follows:
A kind of outer wall of underground structure HCMW engineering method composite walls, including:
Soil-cement piling wall, the Soil-cement piling wall includes multiple cement mixing methods being continuously mutually twisted, described It is spaced in multiple cement mixing methods or is continuously inserted with precast reinforced concrete piles;
On screed-coat, the inwall for being arranged on Soil-cement piling wall;
Waterproof mortar course 7, the waterproof mortar course is arranged on the inwall of screed-coat, the thickness of the waterproof mortar course for 25 ~ 30mm;
Outer wall of underground structure, the outer wall of underground structure is arranged on the inwall of waterproof mortar course, the outer wall of underground structure bag Include reinforcing bar and the concrete mixed with waterproof compacting agent.
The invention also discloses the construction method of above-mentioned outer wall of underground structure HCMW engineering method composite walls, it is characterised in that bag Include step in detail below:
A, using multi-shaft stirring stake machine carry out Soil-cement piling wall construction;
B, underground structure earth excavation, dig to set depth, and the inwall of precast reinforced concrete piles is substantially exposed, herein The construction such as also need to carry out conventional waterproof slab, pour, I will not elaborate;
C, on the inwall of precast reinforced concrete piles it is implanted into split bolt;
D, progress construction of leveling blanket;
E, waterproof mortar course is smeared on the inwall of screed-coat, and is conserved, curing time is more than or equal to 15 days, during maintenance, Waterproof mortar course keeps moistening;
F, detection waterproof mortar course have the defects such as free from flaw, hollowing, if any then being repaired, until qualified;
G, the construction of outer wall of underground structure framework of steel reinforcement;
H, using the inwall of screed-coat as outboard template, inner side template is installed on the other end of split bolt;
I, pour concrete mixed with waterproof compacting agent;
J, after concrete reaches design strength, form removal, composite wall construction complete.
The invention has the advantages that:
1st, Soil-cement piling wall and water-proof concrete wall are cement base inorganic material using material, and buried underground connects with soil Touch, particularly soil cement is long in underground chemical reaction perdurabgility, and intensity, crystalline solid constantly increase, with underground structure wall main body Concrete structure is gradually fused into one;
2nd, water resistance is significantly increased, and impervious coefficient, in 10-8cm/s, there is waterproof action to Soil-cement piling wall in itself;Soil cement Churned pile wall is combined closely with underground structure concrete exterior wall, is eliminated the fertile groove of excavation, has been cut off permeable path, permeation pathway is prolonged Long, infiltration hydraulic pressure is substantially reduced;In Soil-cement piling wall, cement soil wall be it is continuous, it is firm from soil, soil cement, concrete walls Degree is gradual change, smaller to concrete walls deformation constraint, and impervious strong, plasticity is big in itself for soil cement, be difficult to form permeable crack, Every prefabricated pile independently bears external force, is wrapped in cement soil wall, bears the anti-permeability performance that external force has no effect on soil cement;
3rd, difficulty of construction is reduced, only need to be in the unilateral shuttering in inner side, process letter using Soil-cement piling wall as outboard template Single, by being implanted into split bolt on prefabricated pile, unilateral shuttering operation is easy, easily simple;Cement mixing method enclosure wall, Substantially plane, simple linked network mortar powder is put down, you can do rigid composite waterproof layer;Whole flow process is simple, and working face is open, workman Construction environment improves;
4th, the duration shortens, and process simplifies, and coiled material construction, backfilling of earthwork, outside scaffold template construction is eliminated, by weather, sky Between etc. external factor influence it is small, construction joint quantity is reduced, and the duration substantially shortens;
5th, cost savings, turnover is using reducing, and outside shuttering is required more with quantity such as short and small steel pipe, fasteners, wastes tight Weight, is all eliminated;Process simplifies, and construction joint quantity is reduced, cost of labor reduction;Support pile may be used as main body stake one Point, engineering pile quantity can be reduced;Backfill cost savings;Construction land tenure is reduced, and can be amplified using space, development & construction money Source is exaggerated.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair Equivalent structure or equivalent flow conversion that bright description is made, or directly or indirectly it is used in other related technology necks Domain, is included within the scope of the present invention.

Claims (6)

1. a kind of outer wall of underground structure HCMW engineering method composite walls, it is characterised in that including:
Soil-cement piling wall, the Soil-cement piling wall includes multiple cement mixing methods being continuously mutually twisted, described It is spaced in multiple cement mixing methods or is continuously inserted with precast reinforced concrete piles;
On screed-coat, the inwall for being arranged on Soil-cement piling wall;
Outer wall of underground structure, the outer wall of underground structure is arranged on the inwall of screed-coat, and the outer wall of underground structure includes steel Muscle and the concrete mixed with waterproof compacting agent.
2. outer wall of underground structure HCMW engineering method composite walls according to claim 1, it is characterised in that the armored concrete The cross section of prefabricated pile is in dumbbell shape.
3. outer wall of underground structure HCMW engineering method composite walls according to claim 1 or 2, it is characterised in that the screed-coat Inwall on be provided with waterproof mortar course, the outer wall of underground structure is arranged on the inwall of waterproof mortar course.
4. outer wall of underground structure HCMW engineering method composite walls according to claim 3, it is characterised in that the waterproof mortar course Thickness be 25 ~ 30mm.
5. a kind of construction method of outer wall of underground structure HCMW engineering method composite walls as claimed in claim 1 or 2, its feature exists In, including step in detail below:
A, using multi-shaft stirring stake machine carry out Soil-cement piling wall construction;
B, underground structure earth excavation, dig to set depth, and the inwall of precast reinforced concrete piles is substantially exposed;
C, on the inwall of precast reinforced concrete piles it is implanted into split bolt;
D, progress construction of leveling blanket;
E, the construction of outer wall of underground structure framework of steel reinforcement;
F, using the inwall of screed-coat as outboard template, inner side template is installed on the other end of split bolt;
G, pour concrete mixed with waterproof compacting agent;
H, after concrete reaches design strength, form removal, composite wall construction complete.
6. a kind of construction method of outer wall of underground structure HCMW engineering method composite walls as claimed in claim 3, it is characterised in that bag Include step in detail below:
A, using multi-shaft stirring stake machine carry out Soil-cement piling wall construction;
B, underground structure earth excavation, dig to set depth, and the inwall of precast reinforced concrete piles is substantially exposed;
C, on the inwall of precast reinforced concrete piles it is implanted into split bolt;
D, progress construction of leveling blanket;
E, waterproof mortar course is smeared on the inwall of screed-coat, and is conserved, curing time is more than or equal to 15 days, during maintenance, Waterproof mortar course keeps moistening;
F, detection waterproof mortar course have the defects such as free from flaw, hollowing, if any then being repaired, until qualified;
G, the construction of outer wall of underground structure framework of steel reinforcement;
H, using the inwall of screed-coat as outboard template, inner side template is installed on the other end of split bolt;
I, pour concrete mixed with waterproof compacting agent;
J, after concrete reaches design strength, form removal, composite wall construction complete.
CN201710595514.XA 2017-07-20 2017-07-20 Outer wall of underground structure HCMW engineering methods composite wall and its construction method Pending CN107326923A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710595514.XA CN107326923A (en) 2017-07-20 2017-07-20 Outer wall of underground structure HCMW engineering methods composite wall and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710595514.XA CN107326923A (en) 2017-07-20 2017-07-20 Outer wall of underground structure HCMW engineering methods composite wall and its construction method

Publications (1)

Publication Number Publication Date
CN107326923A true CN107326923A (en) 2017-11-07

Family

ID=60227312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710595514.XA Pending CN107326923A (en) 2017-07-20 2017-07-20 Outer wall of underground structure HCMW engineering methods composite wall and its construction method

Country Status (1)

Country Link
CN (1) CN107326923A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764400A (en) * 2020-07-06 2020-10-13 常州市建筑科学研究院集团股份有限公司 Waterproof construction method for laminated wall based on HCMW construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296630A (en) * 2011-06-17 2011-12-28 北京中岩大地工程技术有限公司 Construction method of long-screw high-pressure mix jetting cement diaphragm wall
CN102312445A (en) * 2010-06-29 2012-01-11 中交第三航务工程勘察设计院有限公司 Diaphragm wall and construction method thereof
CN102605765A (en) * 2012-04-09 2012-07-25 常州市鼎达建筑新技术有限公司 Prestressed concrete supporting pile wall
CN103452101A (en) * 2013-08-26 2013-12-18 江苏鼎达建筑新技术有限公司 Prestressed concrete pile and supporting pile wall
CN103981896A (en) * 2014-04-11 2014-08-13 中建四局第六建筑工程有限公司 Seamless connecting construction method for basement outer wall and fender piles
CN204662499U (en) * 2015-03-09 2015-09-23 江苏南通三建集团有限公司 Concrete of basement exterior wall, waterproof, fertile groove integrated construction structure
CN105926815A (en) * 2016-05-10 2016-09-07 江苏东晟新诚建设集团有限公司 Integrated construction method for board wall formwork and support formwork in restricted area
CN106759843A (en) * 2016-12-27 2017-05-31 宁波二十冶建设有限公司 A kind of outer wall of basement waterproof construction and its construction method
CN207211187U (en) * 2017-07-20 2018-04-10 常州市建筑科学研究院集团股份有限公司 Outer wall of underground structure HCMW engineering method composite walls

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102312445A (en) * 2010-06-29 2012-01-11 中交第三航务工程勘察设计院有限公司 Diaphragm wall and construction method thereof
CN102296630A (en) * 2011-06-17 2011-12-28 北京中岩大地工程技术有限公司 Construction method of long-screw high-pressure mix jetting cement diaphragm wall
CN102605765A (en) * 2012-04-09 2012-07-25 常州市鼎达建筑新技术有限公司 Prestressed concrete supporting pile wall
CN103452101A (en) * 2013-08-26 2013-12-18 江苏鼎达建筑新技术有限公司 Prestressed concrete pile and supporting pile wall
CN103981896A (en) * 2014-04-11 2014-08-13 中建四局第六建筑工程有限公司 Seamless connecting construction method for basement outer wall and fender piles
CN204662499U (en) * 2015-03-09 2015-09-23 江苏南通三建集团有限公司 Concrete of basement exterior wall, waterproof, fertile groove integrated construction structure
CN105926815A (en) * 2016-05-10 2016-09-07 江苏东晟新诚建设集团有限公司 Integrated construction method for board wall formwork and support formwork in restricted area
CN106759843A (en) * 2016-12-27 2017-05-31 宁波二十冶建设有限公司 A kind of outer wall of basement waterproof construction and its construction method
CN207211187U (en) * 2017-07-20 2018-04-10 常州市建筑科学研究院集团股份有限公司 Outer wall of underground structure HCMW engineering method composite walls

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764400A (en) * 2020-07-06 2020-10-13 常州市建筑科学研究院集团股份有限公司 Waterproof construction method for laminated wall based on HCMW construction method

Similar Documents

Publication Publication Date Title
CN103741714B (en) Underground engineering full sheltered reverse excavation construction method
CN100412275C (en) Waterproof and plugging construction method for precipitation well in foundation pit
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN104846841B (en) Anti-floating construction method for basements without uplift piles
CN100473790C (en) Tower crane foundation for construction and manufacturing method thereof
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN101787701B (en) Construction method for supporting pine pile in elevator shaft foundation pit
CN101225664A (en) Caisson dock structure and construction method therefor
CN207211188U (en) Outer wall of underground structure HCMW engineering methods overlap wall
CN109706952A (en) Large-scale well-sinking construction method
CN106609508A (en) Construction technology and construction method for large-particle-size pebble stratum super-deep foundation pit in strong water permeation environment of Yellow River flood plain
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN103306497A (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
CN102383442B (en) Water inlet pump chamber construction method
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN107700521B (en) Building foundation reinforcement underpinning pier and construction method thereof
CN106988337B (en) It is a kind of for reducing the reinforcement means of bar shaped shallow foundation house differential settlement
CN207211187U (en) Outer wall of underground structure HCMW engineering method composite walls
CN111636483A (en) Waterproof device for reverse construction concrete structure gap and construction method
CN107326923A (en) Outer wall of underground structure HCMW engineering methods composite wall and its construction method
CN114809000B (en) Rapid construction method of prefabricated plate brick moulding bed
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN111519647A (en) Novel foundation suitable for marine soft foundation treatment and reinforcement and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171107