CN220225424U - Mounting foundation structure of portal crane walking I-steel rail - Google Patents

Mounting foundation structure of portal crane walking I-steel rail Download PDF

Info

Publication number
CN220225424U
CN220225424U CN202322277413.1U CN202322277413U CN220225424U CN 220225424 U CN220225424 U CN 220225424U CN 202322277413 U CN202322277413 U CN 202322277413U CN 220225424 U CN220225424 U CN 220225424U
Authority
CN
China
Prior art keywords
shaped
plate
strip
steel rail
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322277413.1U
Other languages
Chinese (zh)
Inventor
李守兵
崔明敏
韩晓明
庞文芳
晋芳
宋贺
张玉辉
胡虎云
岳保青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Sanjian Group Co Ltd
Original Assignee
Shanxi Sanjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Sanjian Group Co Ltd filed Critical Shanxi Sanjian Group Co Ltd
Priority to CN202322277413.1U priority Critical patent/CN220225424U/en
Application granted granted Critical
Publication of CN220225424U publication Critical patent/CN220225424U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an installation foundation structure of a portal crane walking I-shaped steel rail, which solves the problems of complex procedures and high construction cost in the existing portal crane rail foundation construction method; rectangular steel plates (3) are embedded at intervals on the top end face of the concrete strip-shaped foundation plate (1), a gantry crane walking I-shaped steel rail (5) is arranged on the rectangular steel plates (3), a left side pressing plate (6) is welded between a left lower flange plate of the gantry crane walking I-shaped steel rail (5) and the rectangular steel plates (3), a right side pressing plate (7) is welded between a right lower flange plate of the gantry crane walking I-shaped steel rail (5) and the rectangular steel plates (3), a fine stone concrete pouring layer (8) is secondarily poured on the top end face of the concrete strip-shaped foundation plate (1), and the left side pressing plate (6) and the right side pressing plate (7) are embedded in the fine stone concrete pouring layer (8); the utility model can save construction cost and improve construction speed.

Description

Mounting foundation structure of portal crane walking I-steel rail
Technical Field
The utility model relates to a portal crane in a factory building, in particular to a portal crane I-shaped steel rail fixed installation foundation structure.
Background
The portal crane is generally arranged in a workshop, the portal crane walks on a workshop ground track, the walking track of the portal crane is an I-shaped steel track, the track is arranged on the workshop ground in a pre-buried mode, and the traditional construction method of the pre-buried arrangement is as follows: firstly pouring a concrete strip foundation for installing a gantry crane track on the workshop floor, reserving anchor bolt installation holes for fixing the track on the surface of the strip foundation when the concrete strip foundation is poured, removing a strip foundation pouring template, cleaning the reserved anchor bolt installation holes, installing and leveling anchor bolts, then performing secondary concrete pouring of the anchor bolt installation holes, and finally installing the gantry crane track; the construction method has the defects of complicated procedures and high construction cost.
Disclosure of Invention
The utility model provides a mounting foundation structure of a portal crane walking I-shaped steel rail, which solves the technical problems of complicated procedures and high construction cost in the existing portal crane rail foundation construction method.
The utility model solves the technical problems by the following technical proposal:
the utility model provides a portal crane walking I-steel rail's installation foundation structure, including concrete strip foundation slab, be provided with bar foundation slab internal reinforcement in concrete strip foundation slab, on concrete strip foundation slab's top terminal surface, the pre-buried rectangle steel sheet that has of interval, be provided with portal crane walking I-steel rail on the rectangle steel sheet, the welding has left side clamp plate between portal crane walking I-steel rail's left lower flange plate and rectangle steel sheet, welding has right side clamp plate between portal crane walking I-steel rail's right lower flange plate and rectangle steel sheet, fine stone concrete placement layer has been pour on concrete strip foundation slab's top terminal surface for the second time, left side clamp plate and right side clamp plate are pre-buried in fine stone concrete placement layer.
An anchor bar is arranged on the lower bottom surface of the rectangular steel plate, and the lower end of the anchor bar is welded with the steel bars in the strip-shaped foundation plates; a strip-shaped groove is formed in the top end face of the fine stone concrete pouring layer, and the upper end of the gantry crane walking I-shaped steel rail is arranged in the strip-shaped groove.
The utility model can save construction cost, improve construction speed, and has simple structure and easy construction.
Drawings
Fig. 1 is a schematic structural view of the present utility model.
Description of the embodiments
The utility model is described in detail below with reference to the attached drawing figures:
the utility model provides a portal crane walking I steel rail's installation foundation structure, including concrete strip foundation board 1, be provided with bar foundation inboard reinforcing bar 2 in concrete strip foundation board 1, on the top face of concrete strip foundation board 1, the pre-buried rectangle steel sheet 3 that has of interval, be provided with portal crane walking I steel rail 5 on rectangle steel sheet 3, the welding has left clamp plate 6 between portal crane walking I steel rail 5's left lower flange plate and rectangle steel sheet 3, the welding has right clamp plate 7 between portal crane walking I steel rail 5's right lower flange plate and rectangle steel sheet 3, fine stone concrete placement layer 8 has been secondarily placed on concrete strip foundation board 1's top face, left side clamp plate 6 and right side clamp plate 7 are pre-buried in fine stone concrete placement layer 8.
An anchor steel bar 4 is arranged on the lower bottom surface of the rectangular steel plate 3, and the lower end of the anchor steel bar 4 is welded with the steel bar 2 in the strip-shaped foundation plate; a strip-shaped groove 9 is formed in the top end face of the fine stone concrete pouring layer 8, and the upper end of the portal crane walking I-shaped steel rail 5 is arranged in the strip-shaped groove 9.
The utility model comprises the following steps:
firstly, binding steel bars 2 in a strip-shaped foundation plate according to the position of the concrete strip-shaped foundation plate 1 in a workshop;
secondly, processing a rectangular steel plate 3, and welding an anchor steel bar 4 on the lower bottom surface of the rectangular steel plate 3;
setting elevation points at equal intervals, arranging the processed rectangular steel plate 3 in a pouring template of a pre-poured concrete strip-shaped foundation plate according to elevation, and welding and connecting the lower ends of the anchor steel bars 4 with the steel bars 2 in the strip-shaped foundation plate;
fourthly, pouring to finish the concrete strip foundation plate 1;
fifthly, after the concrete of the concrete strip foundation plate 1 is finally solidified, welding a left side pressure plate 6 between a left lower flange plate of the gantry crane walking I-shaped steel rail 5 and the rectangular steel plate 3, and welding a right side pressure plate 7 between a right lower flange plate of the gantry crane walking I-shaped steel rail 5 and the rectangular steel plate 3 to fix the gantry crane walking I-shaped steel rail 5;
and sixthly, secondarily pouring a fine stone concrete pouring layer 8 on the top end surface of the concrete strip-shaped foundation slab 1, and embedding the left side pressing plate 6 and the right side pressing plate 7 in the fine stone concrete pouring layer 8.

Claims (2)

1. The installation foundation structure of the portal crane walking I-shaped steel rail comprises a concrete strip-shaped foundation plate (1), wherein steel bars (2) in the strip-shaped foundation plate are arranged in the concrete strip-shaped foundation plate (1); the concrete strip-shaped foundation slab is characterized in that rectangular steel plates (3) are embedded at intervals on the top end face of the concrete strip-shaped foundation slab (1), a gantry crane walking I-shaped steel rail (5) is arranged on the rectangular steel plates (3), a left side pressing plate (6) is welded between a left lower flange plate of the gantry crane walking I-shaped steel rail (5) and the rectangular steel plates (3), a right side pressing plate (7) is welded between a right lower flange plate of the gantry crane walking I-shaped steel rail (5) and the rectangular steel plates (3), a fine stone concrete pouring layer (8) is secondarily poured on the top end face of the concrete strip-shaped foundation slab (1), and the left side pressing plate (6) and the right side pressing plate (7) are embedded in the fine stone concrete pouring layer (8).
2. The installation foundation structure of the portal crane walking I-shaped steel rail according to claim 1, wherein an anchor bar (4) is arranged on the lower bottom surface of the rectangular steel plate (3), and the lower end of the anchor bar (4) is welded with the steel bar (2) in the strip-shaped foundation plate; a strip-shaped groove (9) is formed in the top end face of the fine stone concrete pouring layer (8), and the upper end of the portal crane walking I-shaped steel rail (5) is arranged in the strip-shaped groove (9).
CN202322277413.1U 2023-08-24 2023-08-24 Mounting foundation structure of portal crane walking I-steel rail Active CN220225424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322277413.1U CN220225424U (en) 2023-08-24 2023-08-24 Mounting foundation structure of portal crane walking I-steel rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322277413.1U CN220225424U (en) 2023-08-24 2023-08-24 Mounting foundation structure of portal crane walking I-steel rail

Publications (1)

Publication Number Publication Date
CN220225424U true CN220225424U (en) 2023-12-22

Family

ID=89195438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322277413.1U Active CN220225424U (en) 2023-08-24 2023-08-24 Mounting foundation structure of portal crane walking I-steel rail

Country Status (1)

Country Link
CN (1) CN220225424U (en)

Similar Documents

Publication Publication Date Title
CN110056092B (en) Connecting structure of bolting-inserting type upper and lower prefabricated shear walls and superimposed sheet and construction method
CN108331385B (en) Inspection pit precast column structure and construction method thereof
CN110409244B (en) Composite bearing prefabricated road slab and prefabricated pavement construction method
CN111456088A (en) Subway station with overlapped assembly type structure and assembly construction method
KR100454405B1 (en) Method for changing steel bridge of supporting rail into concreat bridge
CN107355072A (en) Formwork quick disconnecting joint
CN213417462U (en) Novel assembled road
CN220225424U (en) Mounting foundation structure of portal crane walking I-steel rail
CN216108909U (en) Drainage ditch water grate mounting structure
CN100570066C (en) Change the Template Location method of laminated rubber bearing on the road bridge abutment
CN217629396U (en) UHPC-RC superposed wet joint structure and bridge thereof
CN102352581B (en) Wide joint device for slab ballastless track
CN202247539U (en) Wide seaming device of plate-type ballastless track
CN209177871U (en) Platform structure for memorial archway continuously hoisting
CN212271005U (en) Superposed assembly type structure subway station
CN211762299U (en) Template and system for prefabricating T beam
CN114561873A (en) Bridge high pier construction method
CN209975279U (en) Settlement adjustment structure suitable for CRTS II type plate ballastless track
CN202577138U (en) Integrated support suitable for mounting precast beams
CN111042047A (en) Construction process for lower cross beam of platform
CN213710402U (en) A bottom plate support for steel bar is quilted and is put up building carrier plate
KR101756965B1 (en) Height adjusting type maintanable rail track construction method and maintanance method using the same
CN219909080U (en) Post-cast strip local pre-installation structure
CN212835996U (en) Device for plugging gap of support position of laminated slab
CN111809460B (en) Rapid high-precision high-speed rail wall type inspection pit track laying construction method