CN220201193U - Novel supporting rod for mounting and dismounting landing leg of gantry crane - Google Patents

Novel supporting rod for mounting and dismounting landing leg of gantry crane Download PDF

Info

Publication number
CN220201193U
CN220201193U CN202320955546.7U CN202320955546U CN220201193U CN 220201193 U CN220201193 U CN 220201193U CN 202320955546 U CN202320955546 U CN 202320955546U CN 220201193 U CN220201193 U CN 220201193U
Authority
CN
China
Prior art keywords
steel pipe
landing leg
angle
gantry crane
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320955546.7U
Other languages
Chinese (zh)
Inventor
宋军
刘皓
邵长江
杨士兵
郑伟平
程佳怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Power China Jiangxi Hydropower Engineering Bureau Co ltd
Original Assignee
Power China Jiangxi Hydropower Engineering Bureau Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power China Jiangxi Hydropower Engineering Bureau Co ltd filed Critical Power China Jiangxi Hydropower Engineering Bureau Co ltd
Priority to CN202320955546.7U priority Critical patent/CN220201193U/en
Application granted granted Critical
Publication of CN220201193U publication Critical patent/CN220201193U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a novel support rod for mounting and dismounting a landing leg of a gantry crane, and relates to the technical field of mounting and dismounting of gantry cranes. The two ends of the double-hook tightener are welded at the end parts of the first steel pipe and the second steel pipe respectively through round steel plates, the lug plates are welded on the pipe bodies of the first steel pipe and the second steel pipe respectively through the right-angle stiffened plates, and the two stay bar bodies are connected into a whole through the angle iron. The utility model has simple operation, good supporting performance, capability of reducing the physical consumption of operators, great improvement of the mounting and dismounting efficiency of the landing leg of the gantry crane, strong reliability, low cost, safe feasibility and wide application prospect.

Description

Novel supporting rod for mounting and dismounting landing leg of gantry crane
Technical Field
The utility model relates to the technical field of installation and dismantling of gantry cranes, in particular to a novel support rod for installing and dismantling of gantry crane support legs.
Background
When the gantry crane is installed in a reinforcement processing field of a construction site of a thermal power plant, the installation and removal methods are as follows (fig. 1):
(1) And (2) mounting: when the two supporting legs A are connected with the trolley B and the main beam C through bolts, the distance L2 between the innermost two bolt holes on the main beam C is generally larger than the distance L1 between the innermost two bolt holes of the two supporting legs A, and the distance between the two bolt holes is about 10 cm. If the distance L1 is not adjusted on the ground to enable l1=l2, when the main beam C and the supporting leg a are connected by bolts at high altitude, the connection work of the main beam C and the supporting leg a cannot be successfully completed due to the large difference of the bolt hole distances. In the past, the operator should measure first the bolt hole pitch L2 of two innermost on girder C, and then measure two innermost bolt hole pitches L1 of two landing leg A, then prop up two landing legs A with square timber apron in the middle of two landing leg A, make L1=L2, then set up the shelf with scaffold steel pipe and fix two landing legs A.
(2) Dismantling: in the high altitude, fix two landing legs A with scaffold steel pipe rack, ensure that after demolishing girder C and landing leg A connecting bolt, two landing legs A can not take place the danger of toppling because of rocking to guarantee the life safety at high altitude operating personnel.
The method for using the scaffold steel pipe rack as the stay bar has the following defects: because many projects need to go to the suitable scaffold steel pipe of length of remote job site search and set up, from seeking scaffold steel pipe to the shelf to set up and finish, generally need take about 1 hour, this kind of operation mode not only consumes the physical power of operating personnel, waste time again, landing leg ann tears inefficiency down, influences the construction progress, and the cost is higher. Based on the above, it is especially necessary to design a novel support rod for mounting and dismounting the landing leg of the portal crane.
Disclosure of Invention
Aiming at the defects in the prior art, the utility model aims to provide the novel support rod for mounting and dismounting the landing leg of the gantry crane, which has the advantages of simple structure, reasonable design, capability of reducing the physical consumption of operators, improvement of the mounting and dismounting efficiency of the landing leg of the gantry crane, good supporting performance, strong reliability, low cost, high safety and feasibility and easiness in popularization and use.
In order to achieve the above object, the present utility model is realized by the following technical scheme: the utility model provides a novel vaulting pole is installed and torn open to gantry crane landing leg, including two vaulting pole bodies and angle bar, every vaulting pole body comprises first steel pipe, second steel pipe, right angle stiffening plate, double hook turn-buckle, otic placode and steel sheet, installs double hook turn-buckle between first steel pipe and the second steel pipe, and the both ends of double hook turn-buckle are respectively through circular steel sheet welding at the tip of first steel pipe, second steel pipe, and all there is the otic placode on the body of first steel pipe, second steel pipe through right angle stiffening plate welding, connects into a whole through the angle bar between two vaulting pole bodies.
Preferably, the first steel pipe and the second steel pipe are fixedly welded with a harness cord screw; the two angle irons are arranged, wherein two ends of one angle iron are respectively connected to the two corresponding first steel pipes through the harness screws, and two ends of the other angle iron are respectively connected to the two corresponding second steel pipes through the harness screws; the angle iron is screwed on the harness screw rod through the nut.
The utility model has the beneficial effects that: the device is simple to operate, has good supporting performance, can reduce the physical consumption of operators, greatly improves the mounting and dismounting efficiency of the landing leg of the gantry crane, and has the advantages of strong reliability, low cost, safe feasibility and wide application prospect.
Drawings
The utility model is described in detail below with reference to the drawings and the detailed description;
FIG. 1 is a schematic view of a gantry crane in the prior art;
FIG. 2 is a schematic diagram of the structure of the present utility model;
FIG. 3 is a top view of FIG. 2;
FIG. 4 is a left side view of FIG. 2;
FIG. 5 is a schematic diagram of the connection of a first steel pipe according to the present utility model;
FIG. 6 is a top view of FIG. 5;
FIG. 7 is a left side view of FIG. 5;
FIG. 8 is a schematic diagram showing the connection of a second steel pipe according to the present utility model;
FIG. 9 is a top view of FIG. 8;
FIG. 10 is a left side view of FIG. 8;
FIG. 11 is a schematic view of the angle iron of the present utility model;
FIG. 12 is a top view of FIG. 11;
FIG. 13 is a left side view of FIG. 11;
fig. 14 is a schematic structural view of the double hook tightener of the present utility model.
Description of the embodiments
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
Referring to fig. 2-14, the present embodiment adopts the following technical scheme: the utility model provides a novel vaulting pole is installed and torn open to gantry crane landing leg, including two vaulting pole bodies and angle bar 1, every vaulting pole body comprises first steel pipe 2, second steel pipe 3, right angle stiffening plate 4, double hook turn-buckle 5, otic placode 6 and steel sheet 7, install double hook turn-buckle 5 between first steel pipe 2 and the second steel pipe 3, the tip at first steel pipe 2, second steel pipe 3 is welded through circular steel sheet 7 respectively at the both ends of double hook turn-buckle 5, all there is otic placode 6 on the body of first steel pipe 2, the second steel pipe 3 through right angle stiffening plate 4 welding, connect into a whole through angle bar 1 between the two vaulting pole bodies.
Notably, the first steel pipe 2 and the second steel pipe 3 are fixedly welded with a harness cord screw 8; the two angle irons 1 are arranged, wherein two ends of one angle iron 1 are respectively connected to two corresponding first steel pipes 2 through a through-wire screw rod 8, and two ends of the other angle iron 1 are respectively connected to two corresponding second steel pipes 3 through the through-wire screw rod 8; the angle iron 1 is screwed on the harness screw rod 8 through a nut.
The length-adjustable stay bar is manufactured according to the principle of the screw jack, and the manufacturing method is simple and comprises the following steps: firstly, one end of a double-hook wire stretcher 5 with hooks at two sides cut is welded on a first steel pipe 2 through a round steel plate 7, then the other end of the double-hook wire stretcher 5 is welded on a second steel pipe 3 through the round steel plate 7, the materials are connected together through welding connection, each of the first steel pipe 2 and the second steel pipe 3 is welded with an ear plate 6 through a right-angle stiffening plate 4, namely, one stay bar body is manufactured, the other stay bar body is manufactured through the same process, and finally the two stay bar bodies are connected into an integral stay bar through two angle irons 1.
The specific implementation mode is simple and convenient to operate, and the using method comprises the following steps: when the double-hook wire stretcher is used, firstly, the lower stay bar body is installed, then the upper stay bar body is installed, then, the two stay bar bodies are fixedly connected through the two angle irons 1, and when the stay bar is adjusted, two workers simultaneously rotate the handles of the double-hook wire stretcher 5 to control the extension or shortening of the stay bar, and the installation is completed to a proper position.
The manual adjusting stay bar is adopted in the specific embodiment, the operation is convenient and simple, the difficulty is low, the cost is low, the stay bar has good supporting performance, the reliability is high, the efficiency of installing and detaching the landing leg of the gantry crane is effectively improved, the construction progress is ensured, the physical consumption of operators is reduced, the safety and the feasibility are high, and the wide market application prospect is achieved.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (3)

1. The utility model provides a novel vaulting pole is installed and torn open to gantry crane landing leg, a serial communication port, including two vaulting pole bodies and angle bar (1), every vaulting pole body comprises first steel pipe (2), second steel pipe (3), right angle stiffening plate (4), double hook turn-buckle (5), otic placode (6) and steel sheet (7), install double hook turn-buckle (5) between first steel pipe (2) and second steel pipe (3), the both ends of double hook turn-buckle (5) are welded at the tip of first steel pipe (2), second steel pipe (3) through circular steel sheet (7) respectively, all have otic placode (6) through right angle stiffening plate (4) welding on the body of first steel pipe (2), second steel pipe (3), connect into a whole through angle bar (1) between two vaulting pole bodies.
2. The novel support rod for installing and detaching the landing leg of the portal crane according to claim 1, wherein two angle irons (1) are arranged, two ends of one angle iron (1) are respectively connected to two corresponding first steel pipes (2) through a wire passing screw rod (8), and two ends of the other angle iron (1) are respectively connected to two corresponding second steel pipes (3) through the wire passing screw rod (8).
3. The novel gantry crane landing leg dismounting stay bar according to claim 2 is characterized in that the harness screw (8) is welded and fixed on the first steel pipe (2) and the second steel pipe (3); the angle iron (1) is screwed on the harness screw (8) through a nut.
CN202320955546.7U 2023-04-25 2023-04-25 Novel supporting rod for mounting and dismounting landing leg of gantry crane Active CN220201193U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320955546.7U CN220201193U (en) 2023-04-25 2023-04-25 Novel supporting rod for mounting and dismounting landing leg of gantry crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320955546.7U CN220201193U (en) 2023-04-25 2023-04-25 Novel supporting rod for mounting and dismounting landing leg of gantry crane

Publications (1)

Publication Number Publication Date
CN220201193U true CN220201193U (en) 2023-12-19

Family

ID=89145043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320955546.7U Active CN220201193U (en) 2023-04-25 2023-04-25 Novel supporting rod for mounting and dismounting landing leg of gantry crane

Country Status (1)

Country Link
CN (1) CN220201193U (en)

Similar Documents

Publication Publication Date Title
CN208734109U (en) A kind of steel roof joist safety rope hanging apparatus
CN204934670U (en) A kind of electric drill auxiliary stand
CN102486051A (en) Manual demolishing method of large-area spherical net rack
CN220201193U (en) Novel supporting rod for mounting and dismounting landing leg of gantry crane
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN214737292U (en) Telescopic sliding formwork device for prefabricating steel-concrete composite beam
CN205975635U (en) Foundation pit support structure
CN213061799U (en) Vehicle restriction device for bridge engineering
CN201722937U (en) Sliding platform for installation of net rack
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN204754175U (en) Construction is with simply climbing a support
CN206028597U (en) Processingequipment and system of processing of steel reinforcement cage
CN206220472U (en) A kind of bracing means for improving bracing members stability of strutting system
CN205294678U (en) Hoist and mount of instrument formula and uninstallation device of large -scale truss structure
CN219239011U (en) Hoisting device
CN218912192U (en) Clamp type operation platform suitable for box girder
CN217025100U (en) Hoisting mechanism for assembling steel structure of low-rise building
CN209931185U (en) Assembled guardrail for sheep raising convenient to reuse
CN209099870U (en) A kind of mast lifting device
CN204549791U (en) The attaching/detaching apparatus of web turnover lifting appliance bolt
CN220265089U (en) Heavy pipeline mechanical lifting device
CN219287014U (en) Special frock of switch board dismouting
CN215926949U (en) Steel leaning tower force rod type support structure system
CN218805841U (en) Movable railway bridge guardrail steel beam installation auxiliary device
CN220550827U (en) Transition device for adjusting overhanging scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant