CN205294678U - Hoist and mount of instrument formula and uninstallation device of large -scale truss structure - Google Patents

Hoist and mount of instrument formula and uninstallation device of large -scale truss structure Download PDF

Info

Publication number
CN205294678U
CN205294678U CN201521117750.3U CN201521117750U CN205294678U CN 205294678 U CN205294678 U CN 205294678U CN 201521117750 U CN201521117750 U CN 201521117750U CN 205294678 U CN205294678 U CN 205294678U
Authority
CN
China
Prior art keywords
steel
root length
group
truss structure
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521117750.3U
Other languages
Chinese (zh)
Inventor
张学军
黄伟
王江滨
陈有威
王贤坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QIANJIAN CO Ltd JIANGSU
Original Assignee
QIANJIAN CO Ltd JIANGSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QIANJIAN CO Ltd JIANGSU filed Critical QIANJIAN CO Ltd JIANGSU
Priority to CN201521117750.3U priority Critical patent/CN205294678U/en
Application granted granted Critical
Publication of CN205294678U publication Critical patent/CN205294678U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a hoist and mount of instrument formula and uninstallation device of large -scale truss structure, relates to the architectural engineering technology field, organizes supporting components with fixing at four of concrete capital including the main davit of a set of cross shape, the main davit of cross shape includes two root length I -steel and four group's pulleys, and two root length I -steel are vertical cross and arrange fixed connection, and four tip at the main davit of cross shape are connected respectively to four group's pulleys, four group's supporting components support in the below of the main davit of cross shape, and every group supporting component all includes short two I -steel of a lesson and two root canal posts, the upper end of two root canal posts all with short two I -steel welding, in four group's supporting components wherein two sections weak point pair I -steel be connected with a root length I -steel, two section other weak points pair I -steel are connected with another root length I -steel. The utility model discloses accessible batch production preparation, instrument degree height, installation, dismantlement are swiftly convenient, and it is simple and convenient to be under construction to but manifold cycles uses.

Description

The tool-type lifting of a kind of large-scale truss structure and discharge mechanism
Technical field
This utility model relates to construction engineering technical field, particularly relates to lifting and the unloading of a kind of large-scale truss structure engineering.
Background technology
In recent years, along with the development of scientific and technological level and improving constantly of society's esthetic requirement, increasing gymnasium, conference and exhibition center, airport etc. are built and are designed to large span steel truss structure, and steel truss structure has modern design, uniqueness, environmental protection, save the energy, the advantage such as short construction period.
Lifting and unloading are the important steps of large-span truss structure construction engineering, and when large-scale truss is lifted, conventional construction method is to use large-scale crane. But, if there is scenario described below, the lifting of large-scale truss just cannot be completed by loop wheel machine:
1, the large-scale truss depth needing lifting is higher, and the length of boom of loop wheel machine can not meet requirement.
2, the large-scale truss deadweight needing lifting is excessive, and the handling ability of loop wheel machine cannot be born.
3, the suspension centre needing the large-scale truss of lifting is limited by execution conditions, is positioned at the position that loop wheel machine cannot be reached.
Even if lifting construction can be carried out by loop wheel machine, after large-scale truss is in place, still need to immediately it be fixed temporarily, generally adopt welded still pipe or set up the mode of scaffold, not only work consuming consuming time time fixing, after truss structure is finally fixing, the synchronization unloading of temporary support, synchronization are removed and are also bothered very much.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that the tool-type lifting of a kind of large-scale truss structure and discharge mechanism, can be made by batch production, tool degree is high, install, dismantle quick facility, construct simple and convenient, and can repeatedly recycle.
The purpose of this utility model is achieved in that tool-type lifting and the discharge mechanism of a kind of large-scale truss structure, props up support component including one group of main arm of cruciform shape with four groups that are fixed on concrete capital;The main arm of described cruciform shape includes two root length I-steel and four groups of pulleys, and the two perpendicular arranged crosswise of root length I-steel also fix connection, and four groups of pulleys are connected to four ends of the main arm of cruciform shape; Four groups support modular support in the lower section of the main arm of cruciform shape, often group support component all includes short pair of I-steel of a joint and two endowels, the upper end of two endowels is all welded with short pair of I-steel, four groups are propped up wherein two short pair of I-steel of joint and root length I-steel connection in support component, and other two short pair of I-steel of joint are connected with another root length I-steel.
Operating procedure:
The operating procedure of tool-type lifting:
1, astrosphere bearing being fixed on capital, in astrosphere bearing surrounding, four groups of n shapes prop up the angle steel of 8 foothold places pre-buried certain altitudes respectively of support component (a short pair of I-steel of joint and two endowels form n shape)
2, prop up support component first with four groups of n shapes of tower crane handling, the tubing string that each n shape props up support component is inserted in pre-buried angle steel respectively, makes n shape prop up support component and be fixed
3, the recycling tower crane main arm of handling cruciform shape props up on support component to four groups of n shapes, the I-steel of four direction is respectively rested on each n shape prop up support component top spacing in, meanwhile, prop up both support components laminating position high-strength bolt in the main arm of cruciform shape and n shape to fix
4, being put down by the steel wire rope on pulley, one end fixes with the large-scale truss that need to lift, and the hoist engine that the other end controls with computer fixes
5, make each pulley work by computer Synchronization Control hoist engine, operator and truss are promoted to around astrosphere bearing together, truss is respectively welded with astrosphere bearing and is connected, so far complete hanging of truss is risen and be connected
Tool-type unloading and the operating procedure removed:
1, truss welding acceptance(check), reaches off-loadable condition
2, with Calculation Anaysis for Tunnel Structure for foundation, by computer Synchronization Control, slow releasing hoist engine carries out substep unloading
3, after having unloaded, first remove the main arm of cruciform shape and n shape and prop up support component and respectively fit the high-strength bolt at position, hang successively according still further to order from top to down and tear the main arm of cruciform shape open and four groups of n shapes prop up support component, finally cut off pre-buried angle steel
By above operation, this utility model has the following characteristics that
1, itself is namely as lifting device, again as discharge mechanism, decreases much unnecessary input, simplifies operation routine, remarkable in economical benefits
2, batch production processing, it is to avoid what on-the-spot processing brought manually have high input, makes place takies space, job site, many, the problem such as waste of material is serious consuming time
3, tool assembles, and structural safety is reasonable, and lifting is quick convenient, and recycling rate of waterused is high
4, replaced traditional artificial lifting jack unloading by the unloading of computer Synchronization Control, in place precisely, safe and efficient.
As improvement of the present utility model, at four angle welding angle steel that two root length I-steel intersect, to strengthen its globality.
As further improvement of the utility model, above two root length I-steel infalls, weld a mast post, weld oblique tubing string to four ends of the main arm of cruciform shape respectively at the top of mast post, be similarly its globality of reinforcement.
As further improvement of the utility model, all welding a pair limit steel bar at the upper surface often saving short pair of I-steel, long I-steel is spacing to be arranged between every pair of limit steel bar. Ensure that the main arm of cruciform shape when mounted can be precisely in place, stop to prop up support component and the main arm of cruciform shape due to n shape and be not reliably connected and the serious problems that cause a support arrangement unstability to be decayed.
As further improvement of the utility model, often transverse weld reinforced steel between two endowels of group support component, strengthens n shape and props up the globality of support component.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is partial schematic diagram of the present utility model.
Detailed description of the invention
As shown in Figure 1, 2, the tool-type of large-scale truss structure lifts and discharge mechanism, props up support component 10 including one group of main arm 5 of cruciform shape and four groups.
Often group support component 10 all includes short pair of I-steel of a joint 7 and two endowels 8, often the lower end of two endowels 8 of group support component 10 is embedded in the top of concrete column 11, the upper end of two endowels 8 is all welded with short pair of I-steel 7, transverse weld reinforced steel 9 between two endowels 8.
Four groups are propped up support component 10 and are supported on the lower section of the main arm 5 of cruciform shape, the main arm 5 of cruciform shape includes two root length I-steel 4 and four groups of pulleys 6, the two perpendicular arranged crosswise of root length I-steel 4 also connect by high-strength bolt is fixing, at four angle welding angle steel 2 that two root length I-steel 4 intersect. Four groups of pulleys 6 are connected to four ends of the main arm 5 of cruciform shape.
Four groups are propped up in support component 10 wherein two short pair of I-steel 7 of joint and are connected with long I-steel 4, and other two save short pair of I-steel 7 is connected with another root length I-steel 4. All welding a pair limit steel bar 12 at the upper surface often saving short pair of I-steel 7, long I-steel 4 is spacing to be arranged between every pair of limit steel bar 12.
Above two root length I-steel 4 infalls, weld a mast post 1, weld oblique tubing string 3 to four ends of the main arm of cruciform shape 5 respectively at the top of mast post 1.

Claims (5)

1. the tool-type of a large-scale truss structure lifts and discharge mechanism, it is characterised in that: include one group of main arm of cruciform shape with four groups that are fixed on concrete capital and prop up support component; The main arm of described cruciform shape includes two root length I-steel and four groups of pulleys, and the two perpendicular arranged crosswise of root length I-steel also fix connection, and four groups of pulleys are connected to four ends of the main arm of cruciform shape; Four groups support modular support in the lower section of the main arm of cruciform shape, often group support component all includes short pair of I-steel of a joint and two endowels, the upper end of two endowels is all welded with short pair of I-steel, four groups are propped up wherein two short pair of I-steel of joint and root length I-steel connection in support component, and other two short pair of I-steel of joint are connected with another root length I-steel.
2. the tool-type of large-scale truss structure according to claim 1 lifts and discharge mechanism, it is characterised in that: four the angles welding angle steel intersected at two root length I-steel.
3. the tool-type of large-scale truss structure according to claim 1 lifts and discharge mechanism, it is characterized in that: above two root length I-steel infalls, weld a mast post, weld oblique tubing string to four ends of the main arm of cruciform shape respectively at the top of mast post.
4. the tool-type of large-scale truss structure according to claim 1 lifts and discharge mechanism, it is characterised in that: all welding a pair limit steel bar at the upper surface often saving short pair of I-steel, long I-steel is spacing to be arranged between every pair of limit steel bar.
5. the tool-type of large-scale truss structure according to claim 1 lifts and discharge mechanism, it is characterised in that: often transverse weld reinforced steel between two endowels of group support component.
CN201521117750.3U 2015-12-30 2015-12-30 Hoist and mount of instrument formula and uninstallation device of large -scale truss structure Active CN205294678U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521117750.3U CN205294678U (en) 2015-12-30 2015-12-30 Hoist and mount of instrument formula and uninstallation device of large -scale truss structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521117750.3U CN205294678U (en) 2015-12-30 2015-12-30 Hoist and mount of instrument formula and uninstallation device of large -scale truss structure

Publications (1)

Publication Number Publication Date
CN205294678U true CN205294678U (en) 2016-06-08

Family

ID=56474473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521117750.3U Active CN205294678U (en) 2015-12-30 2015-12-30 Hoist and mount of instrument formula and uninstallation device of large -scale truss structure

Country Status (1)

Country Link
CN (1) CN205294678U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110203837A (en) * 2019-05-25 2019-09-06 招商局重工(江苏)有限公司 A kind of main loop wheel machine rest arm configuration of Semi-submersible type hoisting platform and lifting platform
CN110258534A (en) * 2019-06-17 2019-09-20 中南大学 A kind of device and method for guaranteeing ground-connecting-wall steel reinforcement cage and vertically hanging

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110203837A (en) * 2019-05-25 2019-09-06 招商局重工(江苏)有限公司 A kind of main loop wheel machine rest arm configuration of Semi-submersible type hoisting platform and lifting platform
CN110258534A (en) * 2019-06-17 2019-09-20 中南大学 A kind of device and method for guaranteeing ground-connecting-wall steel reinforcement cage and vertically hanging
CN110258534B (en) * 2019-06-17 2024-01-30 中南大学 Device and method for guaranteeing vertical hoisting of diaphragm wall reinforcement cage

Similar Documents

Publication Publication Date Title
CN102661054B (en) Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method
CN106812328B (en) The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer
CN106939707A (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN205558306U (en) Big profiled steel structure vestibule hoist and mount hoisting frame
CN205294678U (en) Hoist and mount of instrument formula and uninstallation device of large -scale truss structure
CN109853945A (en) A kind of new concrete column template device and its construction method
CN104018680A (en) Lifting method of large-span solid-web type arc beam
CN111809528B (en) A pier column vertical cage platform channel construction method and cage platform channel device
CN204983692U (en) Concrete panel's hoist device
CN210505201U (en) A kind of equipment for hoisting steel bars in batches
CN211173007U (en) Novel tripod of encorbelmenting
CN204876526U (en) Instrument formula girder steel of encorbelmenting
CN112324153A (en) A reinforcement auxiliary device for job site
CN208197158U (en) A kind of reinforcing bar tire suspender of precast segment box beam
CN217810515U (en) T roof beam wet joint exempts from high altitude construction and turns over device of mould
CN206174481U (en) Jack -up instrument is used in fan hoist and mount of tuber pipe and suspension type installation
CN214885399U (en) Adjustable operation construction equipment of steel column
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN112912567B (en) Integral lifting construction method for L-shaped bidirectional overhanging structure
CN204662933U (en) A kind of hoistway operation frame lift-type steel platform
CN202324658U (en) Device for installing large-span roof truss
CN208361796U (en) For cooperating the device of tower crane lifting girder truss