CN219909990U - Construction structure of lifting hook stable formwork - Google Patents

Construction structure of lifting hook stable formwork Download PDF

Info

Publication number
CN219909990U
CN219909990U CN202321314093.6U CN202321314093U CN219909990U CN 219909990 U CN219909990 U CN 219909990U CN 202321314093 U CN202321314093 U CN 202321314093U CN 219909990 U CN219909990 U CN 219909990U
Authority
CN
China
Prior art keywords
lifting
template
mountain
formwork
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321314093.6U
Other languages
Chinese (zh)
Inventor
申正岭
王骞
谷子鉴
任桂华
林硕
刘原
张宝
程龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Jiujian Construction Engineering Co ltd
Original Assignee
Heilongjiang Jiujian Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Jiujian Construction Engineering Co ltd filed Critical Heilongjiang Jiujian Construction Engineering Co ltd
Priority to CN202321314093.6U priority Critical patent/CN219909990U/en
Application granted granted Critical
Publication of CN219909990U publication Critical patent/CN219909990U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a firm template construction structure of lifting hook, relates to construction technical field, concretely relates to improvement technique of the hoisting structure of dismantling the template in the concrete casting construction. Comprises a template; the device also comprises a lifting hook component for lifting the template and a steel wire rope; the lifting hook component comprises a lifting rod, a mountain-shaped clamp and a nut, wherein one end of the lifting rod is provided with a claw lifting hook, and the other end of the lifting rod is provided with external threads; the die plate is provided with a lifting hole, the threaded end of the suspender is inserted into the lifting hole on the die plate, the mountain-shaped clamp is sleeved on the threaded end, and the nut is arranged at the outer end of the suspender thread to fix the mountain-shaped clamp; the claw hook is hooked on a steel wire rope for hoisting. The problems that the existing template hoisting structure has potential safety hazards of unhooking in the assembling process and the holes of the wood block deform and the like are solved.

Description

Construction structure of lifting hook stable formwork
Technical Field
The utility model relates to the technical field of building construction, in particular to an improvement technology of a lifting structure for a detachable formwork in concrete pouring construction.
Background
The wall, the pipe well, the elevator well and the like of the existing building are mainly cast by concrete, an inner group of templates and an outer group of templates are generally adopted in the construction process, and a certain distance is kept between the two groups of templates for casting concrete. The building is generally cast from low to high layer by layer, when the casting construction of a certain floor is finished, the building needs to be demolded after the concrete is solidified, and the detached template is used for the casting construction of the previous floor. The building templates widely adopted at present are wood templates, and the templates are easy to damage and cannot be reused for a long time. In demolding, a lifting machine is generally required to lift the template upwards for demolding. In addition, the hoisting machine is also required to be used for hoisting during loading and unloading during transportation. In order to facilitate the hoisting of the formwork by using hoisting machinery, holes are generally formed in the battens or split bolts on the upper frame of the wood formwork for fixing the lifting hooks. When loading, unloading and demoulding, the building template can be lifted upwards by hooking the lifting hook by the lifting mechanism. The common situation in actual construction is that a worker self-makes a steel bar S-shaped lifting hook, and the lifting hook is convenient to construct and has the following problems: 1. the unhooked Shi Mu square holes are deformed because the wood has small rigidity and is easy to deform due to uneven stress; 2. the S-shaped lifting hook is convenient to unhook when being hooked with a machine, but potential safety hazards of unhook exist in the lifting process. 3. Many lifting hooks need to be matched with a steel wire rope for use, and irregular construction is easy to cause.
Disclosure of Invention
The utility model provides a construction structure for a stable formwork of a lifting hook, which solves the problems that the existing formwork lifting structure has potential safety hazards of unhooking, deformation of square holes and the like in the assembly process.
In order to solve the problems, the utility model adopts the following technical scheme: the lifting hook stabilizes a template construction structure, comprising a template; the device also comprises a lifting hook component for lifting the template and a steel wire rope; the lifting hook component comprises a lifting rod, a mountain-shaped clamp and a nut, wherein one end of the lifting rod is provided with a claw lifting hook, and the other end of the lifting rod is provided with external threads; the die plate is provided with a lifting hole, the threaded end of the suspender is inserted into the lifting hole on the die plate, the mountain-shaped clamp is sleeved on the threaded end, and the nut is arranged at the outer end of the suspender thread to fix the mountain-shaped clamp; the claw hook is hooked on a steel wire rope for hoisting.
Further, the construction structure of the lifting hook stable template has the following characteristics: the template is a horizontal template, the suspender is straight rod-shaped, the threaded end is positioned below, the threaded end is inserted into a lifting hole on the horizontal template, and the mountain-shaped clamp is positioned below the horizontal template.
Further, the construction structure of the lifting hook stable template has the following characteristics: a steel pipe is clamped between the mountain-shaped clamp and the horizontal template.
Further, the construction structure of the lifting hook stable template has the following characteristics: the template is perpendicular template, has frame flitch on the perpendicular template, has the lifting hole on the frame flitch, and the jib is right angle bent rod and screw thread end is located the side, and the screw thread end inserts in the lifting hole on the frame flitch, and mountain type card is blocked on the frame flitch and is fixed through the nut.
Further, the construction structure of the lifting hook stable template has the following characteristics: the threaded end of the suspender is also provided with a round hole, the cotter pin is inserted into the round hole, and the cotter pin is arranged at the outer end of the nut.
The utility model has the advantages that: 1. the threaded end of the suspender is matched with the template lifting hole and is fixed by the mountain-shaped clamp and the nut, so that the deformation of the template hole and the falling of the template can be prevented.
2. The construction method has the advantages of facilitating the installation of workers, reducing the damage of the templates, saving working hours, safely preventing the templates from unhooking, and improving the construction safety and economy.
3. The method is suitable for all wood formworks to be disassembled and hoisted and semi-finished product entering field hoisting, and finished product wood formworks are assembled and hoisted by hooks.
4. The installation of the vertical template and the horizontal lifting hook can be realized, and the applicability is strong.
Drawings
FIG. 1 is a schematic view of a hook assembly according to an embodiment;
FIG. 2 is a construction structure diagram of an embodiment;
FIG. 3 is a schematic view of a two hook assembly according to an embodiment;
fig. 4 is a construction structure diagram of a second embodiment.
The symbols in the drawings illustrate: the lifting hook comprises a lifting hook assembly 1, a lifting rod 11, a claw lifting hook 12, an anti-falling hook clamping tongue 13, a mountain clamp 14, a nut 15, a cotter pin 16, a steel wire rope 2, a horizontal template 3, a steel pipe 31, a vertical template 4 and a frame batten 41.
Detailed Description
The present utility model will be described in detail with reference to preferred embodiments.
Examples
As shown in fig. 1-2, the lifting hook stabilizes the formwork construction structure, including the formwork; the device also comprises a lifting hook component 1 for lifting the template and a steel wire rope 2; the lifting hook assembly 1 comprises a lifting rod 11, a mountain-shaped clamp 14 and a nut 15, wherein one end of the lifting rod 11 is provided with a claw lifting hook 12, and the other end is provided with external threads; the template is provided with a lifting hole, the threaded end of the suspender 11 is inserted into the lifting hole on the template, the mountain-shaped clamp 14 is sleeved on the threaded end, and the nut 15 is arranged at the outer end of the thread of the suspender 11 to fix the mountain-shaped clamp 14; the claw hook 12 is hooked on the steel wire rope 2 for hoisting, and the claw hook 12 is provided with an anti-unhooking clamping tongue 13 for preventing unhooking.
The template is a horizontal template 3, the suspender 11 is straight rod-shaped, the threaded end is positioned below, the threaded end is inserted into a lifting hole on the horizontal template 3, the mountain-shaped clamp 14 is positioned below the horizontal template 3, and a steel pipe 31 is clamped between the mountain-shaped clamp 14 and the horizontal template 3.
The threaded end of the suspender 11 is also provided with a round hole, the cotter pin 16 is inserted into the round hole, the cotter pin 16 is arranged at the outer end of the nut 15, the nut and the mountain-shaped clamp 14 are prevented from falling off, and the safety protection function is achieved.
Examples
As shown in fig. 3-4, the first difference between the present embodiment and the embodiment is that: the template is a vertical template 4, a frame batten 41 is arranged on the vertical template 4, a lifting hole is formed in the frame batten 41, a suspender 11 is a right-angle bent rod, a threaded end is located on the side, the threaded end is inserted into the lifting hole in the frame batten 41, and a mountain-shaped clamp 14 is clamped on the frame batten 41 and fixed through a nut 15.
And (3) checking whether the battens of the template frame are firm or not in detail, after the fact that the battens are firm is confirmed, installing a right-angle suspender lifting hook, inserting the suspender into the battens of the template frame, fastening the upper parts of the threaded ends by using a fixed mountain-shaped clamp, fastening by using a nut after the fixation is firm, and inserting an cotter pin to prevent the nut from sliding.
The right-angle suspender lifting hook is required to be symmetrically used, the other side is the same as the side, and after checking whether the right-angle suspender lifting hook is fixedly checked by installation personnel, a mechanical driver is contacted to connect a mechanical hook or a steel wire rope lifting ring.
The lifting hook component is divided into two types, the first straight rod structure is suitable for lifting of the elevator shaft template and the water collecting well template, the horizontal template is lifted, and the second right-angle bent rod structure is suitable for lifting and installing of the finished vertical template.
And in the lifting process, observing whether the template deviates or not after lifting, after the template is lifted and reserved in advance, firstly fixing the lower part of the template, carrying out inclined bracing by using a batten after landing, fixing the lower part of the template to prevent the template from overturning, and unhooking until the template is completely firm.
The process principle is as follows: the manufactured lifting hook component penetrates into a formwork or a formwork frame batten, a mountain-shaped clamp and a nut are arranged on the outer side of the formwork, a cotter pin is additionally arranged, a falling rod penetrates into the formwork in the construction of the batten, a screw is fixed and screwed, and the cotter pin is inserted to prevent falling. The mechanical lifting hook or the steel wire rope hanging ring is connected with the closed claw lifting hook with the unhook blocking tongue, the lifting hook is lifted after the template lifting hook is confirmed to be firm, the split pin is pulled out, the nut is loosened, and the mountain-shaped blocking hook is pulled out of the hanging rod when the template lifting hook is detached. When the horizontal lifting is carried out at the end of a shift, firstly, placing steel pipes at the bottom of the template with the skid and fixing the template with the skid, penetrating holes of the split bolts in advance by using a lifting rod, clamping two steel pipes by using a mountain-shaped clamping sleeve to fix the template to prevent rollover, then, tightly inserting an cotter pin by using a turnbuckle, and connecting a mechanical lifting hook or a steel wire rope lifting ring by using a closed lifting hook.
Benefit analysis: 1. funds are saved: through some project experiments, the lifting hook is used for lifting an elevator shaft, a water collecting well and horizontal and vertical templates by a worker originally for 15 minutes, lifting and temporary reinforcing and unhooking are carried out once, 5 minutes are saved, 10 minutes are saved for each time of lifting and temporary reinforcing and unhooking, 30% of time is saved for each time of lifting and temporary reinforcing and unhooking, 50 large templates required to be lifted are counted on each layer, 4 persons need to work for 12.5 hours to finish, each worker payroll is 400 yuan per day, 50 yuan payroll is carried out by the worker per hour, 12.5 hours of 200 yuan per hour of 4 persons are equal to 2500 yuan, 8.3 hours of working time is required for 50 large templates required to be lifted by the method per layer, 8.3 hours of 8.3 yuan per hour of 200 yuan is required by the 4 persons per hour of 200 yuan, 840 yuan of layers are saved for each layer building, four monomer projects are all used, and 73920 yuan is saved.
2. Engineering example: in project experiments, the utility model is proved to be safe, practical and economical, accords with the standard, is novel and convenient to construct, is simple and convenient to use, improves the hoisting speed, saves working hours and construction period, and achieves better economic and social benefits.

Claims (5)

1. The lifting hook stabilizes a template construction structure, comprising a template; the device is characterized by further comprising a lifting hook component for lifting the template and a steel wire rope; the lifting hook component comprises a lifting rod, a mountain-shaped clamp and a nut, wherein one end of the lifting rod is provided with a claw lifting hook, and the other end of the lifting rod is provided with external threads; the die plate is provided with a lifting hole, the threaded end of the suspender is inserted into the lifting hole on the die plate, the mountain-shaped clamp is sleeved on the threaded end, and the nut is arranged at the outer end of the suspender thread to fix the mountain-shaped clamp; the claw hook is hooked on a steel wire rope for hoisting.
2. The construction structure of the lifting hook stabilizing formwork according to claim 1, wherein the formwork is a horizontal formwork, the hanging rod is straight rod-shaped, the threaded end is located below, the threaded end is inserted into a lifting hole in the horizontal formwork, and the mountain-shaped clamp is located below the horizontal formwork.
3. The construction structure of the hook stabilization formwork of claim 2, wherein a steel pipe is clamped between the mountain clamp and the horizontal formwork.
4. The construction structure of the lifting hook stabilizing formwork according to claim 1, wherein the formwork is a vertical formwork, a frame batten is arranged on the vertical formwork, a lifting hole is formed in the frame batten, the lifting rod is a right-angle bent rod, the threaded end is located at the side, the threaded end is inserted into the lifting hole in the frame batten, and the mountain-shaped clamp is clamped on the frame batten and fixed through a nut.
5. The construction structure of a hook fastening form according to claim 1, 3 or 4, wherein a circular hole is further provided at the threaded end of the hanger rod, and a cotter pin is inserted into the circular hole, the cotter pin being provided at the outer end of the nut.
CN202321314093.6U 2023-05-29 2023-05-29 Construction structure of lifting hook stable formwork Active CN219909990U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321314093.6U CN219909990U (en) 2023-05-29 2023-05-29 Construction structure of lifting hook stable formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321314093.6U CN219909990U (en) 2023-05-29 2023-05-29 Construction structure of lifting hook stable formwork

Publications (1)

Publication Number Publication Date
CN219909990U true CN219909990U (en) 2023-10-27

Family

ID=88465345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321314093.6U Active CN219909990U (en) 2023-05-29 2023-05-29 Construction structure of lifting hook stable formwork

Country Status (1)

Country Link
CN (1) CN219909990U (en)

Similar Documents

Publication Publication Date Title
CN204040446U (en) The shaped steel suspension scaffolding structure
CN110904954B (en) Suspension rack for suspending steel reinforcement cage
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN102733608B (en) Construction method for spray head layer of granulation tower
CN219909990U (en) Construction structure of lifting hook stable formwork
CN110439249B (en) Overhanging bearing frame and mounting method thereof
CN215287701U (en) Special lifting appliance for prefabricated wall
CN108086697B (en) Precise positioning device and precise positioning method for embedded part hoisting
CN203022761U (en) Novel vertical shaft formwork
CN212027054U (en) Overhanging scaffold
CN2216104Y (en) Hanging lift scaffold
CN210976550U (en) Adjustable fastening tool type externally-hung protection frame system
CN210888045U (en) Assembled lifting die
CN113001749A (en) Column prefabricating construction process
CN102605964B (en) Separately mounted grille on elevator shaft opening and construction method of separately mounted grille
CN214834649U (en) Safety protection structure for installing or dismantling outer frame
CN219546456U (en) Steel bar hoisting system
CN205530902U (en) Whole over -and -under type steel truss of circular cone roofing
CN214243483U (en) Be used for supplementary hoist device of cast-in-place roof beam stretch-draw
CN220467316U (en) Cast-in-place pile reinforcement cage hoisting device
CN212769673U (en) Hydraulic lifting device for constructional engineering
CN110118014A (en) A kind of outer wall template system and its construction method for exempting from external scaffolding
CN214090904U (en) Inverted lifting scaffold with novel hanging assembly
CN212863790U (en) High stability wind-powered electricity generation base is with casting compound die hoist device
CN220596779U (en) Steel bar hoisting and clamping device for constructional engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant