CN219710751U - Spool installation system of brick-covered pipe on block wall - Google Patents

Spool installation system of brick-covered pipe on block wall Download PDF

Info

Publication number
CN219710751U
CN219710751U CN202321019014.9U CN202321019014U CN219710751U CN 219710751 U CN219710751 U CN 219710751U CN 202321019014 U CN202321019014 U CN 202321019014U CN 219710751 U CN219710751 U CN 219710751U
Authority
CN
China
Prior art keywords
building block
holes
block
hole
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321019014.9U
Other languages
Chinese (zh)
Inventor
李彦杰
秦聪玮
魏亚辉
江泽剑
秦淑红
秦春华
薛岩峰
刘桓溥
李春浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Sanjian Group Co Ltd
Original Assignee
Shanxi Sanjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Sanjian Group Co Ltd filed Critical Shanxi Sanjian Group Co Ltd
Priority to CN202321019014.9U priority Critical patent/CN219710751U/en
Application granted granted Critical
Publication of CN219710751U publication Critical patent/CN219710751U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a line pipe installation system of brick-covered lines on a block wall, which solves the problems that in the prior art, a grooving is easy to cause the loosening of a masonry, the surface of the masonry is damaged, and wall hollows and cracks are easy to occur in the grooving process; the building block wall comprises a building block wall body consisting of a bottom building block (5), a middle building block (4) and an upper building block (3), wherein reserved '1' -shaped reserved through holes (6) are respectively arranged in the upper building block (3) and the middle building block (4), L-shaped through holes (7) are reserved in the bottom building block (5), the '1' -shaped reserved through holes (6) are communicated with the L-shaped through holes (7) after being butted, and a threading tube (2) led out from a concrete beam (1) sequentially passes through the '1' -shaped reserved through holes (6) and the 'L' -shaped through holes (7) and then penetrates out of the outer end of the inner side surface of the bottom building block (5); the line pipe can be installed in advance to be constructed, the construction period is shortened, and the installation is simple.

Description

Spool installation system of brick-covered pipe on block wall
Technical Field
The utility model relates to a line pipe installation system, in particular to a line pipe installation system of brick-covered lines arranged on a block wall body.
Background
In the construction of a high-rise building with a shear wall structure, a large number of building block walls are required to be built, after the building block walls are built, the electric wire pipes are arranged in grooves on the built walls, and the electric wire pipes are laid; the construction mode has the advantages that the masonry is easy to loosen, the surface of the masonry is damaged, the wall hollowing and cracking and other problems are easy to occur in the grooving process, later repair is needed, the construction cost is increased, and the construction quality is limited.
Disclosure of Invention
The utility model provides a line pipe installation system of a brick-covered pipe on a block wall, which solves the technical problems that in the prior art, a grooving is easy to cause the loosening of a masonry, the surface of the masonry is damaged, and wall hollowing and cracking are easy to occur in the grooving process.
The utility model solves the technical problems by the following technical proposal:
the utility model provides a spool installation system of brick parcel pipe on block wall, include the block wall that comprises bottom block, middle block and upper end block, be provided with the concrete beam directly over the block wall, be provided with the threading spool in the concrete beam, in upper end block and middle block, all be provided with the "1" font of reservation and reserve the through-hole, reserve "L" shape through-hole in the bottom block, "1" font is reserved the through-hole and is in the same place with "L" shape through-hole butt joint back intercommunication, the threading spool that draws forth from the concrete beam loops through "1" font and reserves the through-hole and "L" shape through-hole after, wears out the medial surface outer end of bottom block.
The reserved through holes in the shape of the Chinese character '1' and the L-shaped through holes are prefabricated in the building block when the building block is prefabricated.
The utility model adopts advanced factory processing, so that the installation of the line pipe can enter the construction in advance, the construction period is shortened, the installation is simple, and the construction operation is convenient, quick and efficient.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
fig. 2 is a schematic structural view of the upper end block 3 of the present utility model;
fig. 3 is a schematic structural view of the bottom end block 5 of the present utility model.
Description of the embodiments
The utility model is described in detail below with reference to the attached drawing figures:
the utility model provides a spool installation system of brick parcel pipe on block wall, include the block wall that comprises bottom block 5, middle block 4 and upper end block 3, be provided with concrete beam 1 directly over the block wall, be provided with threading pipe 2 in concrete beam 1, all be provided with the "1" font of reservation in upper end block 3 and middle block 4 and reserve through-hole 6, reserve "L" shape through-hole 7 in bottom block 5, "1" font reservation through-hole 6 and "L" shape through-hole 7 butt joint back intercommunication together, the threading pipe 2 that draws forth from concrete beam 1 is through "1" font reservation through-hole 6 and "L" shape through-hole 7 after, wear out the medial surface outer end of bottom block 5 in proper order.
The "1" shaped reserved through holes 6 and the "L" shaped through holes 7 are prefabricated in the block when the block is prefabricated.
The site construction steps are as follows:
firstly, deeply designing the embedded pipeline according to an electrical drawing, and positioning and designing the position of the pipeline in the masonry wall;
secondly, intensively processing the building blocks: drilling holes on the building blocks by adopting a drilling machine according to the deepening drawing;
thirdly, floor cleaning and wall paying-off: after cleaning floors, carrying out secondary structure paying-off by technicians according to a drawing;
fourthly, constructing a masonry wrapped pipe: the hole sites are consistent in the masonry construction process, so that the pipeline can pass through the hole sites;
fifth, installing a water and electricity pipeline: the spool penetrates upwards from the spool box position and is connected with the reserved spool in main body construction;
step six, building a top brick: and building the top bricks after seven days.

Claims (2)

1. The utility model provides a spool installation system of brick package pipe on building block wall body, include the building block wall body of constituteing by bottom building block (5), middle building block (4) and upper end building block (3), be provided with concrete beam (1) directly over building block wall body, be provided with threading spool (2) in concrete beam (1), a serial communication port, in upper end building block (3) and middle building block (4), all be provided with "1" font reservation through-hole (6) of reservation, reservation has "L" shape through-hole (7) in bottom building block (5), the intercommunication is in the same place after "1" font reservation through-hole (6) and "L" shape through-hole (7) butt joint, threading spool (2) that draw forth in concrete beam (1) are through "1" font reservation through-hole (6) and "L" shape through-hole (7) back in proper order, wear out to the medial surface outer end of bottom building block (5).
2. A conduit installation system for tile-covered conduit in a block wall according to claim 1, wherein the "1" shaped reserved through holes (6) and "L" shaped through holes (7) are prefabricated in the block when the block is prefabricated.
CN202321019014.9U 2023-05-01 2023-05-01 Spool installation system of brick-covered pipe on block wall Active CN219710751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321019014.9U CN219710751U (en) 2023-05-01 2023-05-01 Spool installation system of brick-covered pipe on block wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321019014.9U CN219710751U (en) 2023-05-01 2023-05-01 Spool installation system of brick-covered pipe on block wall

Publications (1)

Publication Number Publication Date
CN219710751U true CN219710751U (en) 2023-09-19

Family

ID=87979550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321019014.9U Active CN219710751U (en) 2023-05-01 2023-05-01 Spool installation system of brick-covered pipe on block wall

Country Status (1)

Country Link
CN (1) CN219710751U (en)

Similar Documents

Publication Publication Date Title
CN203420403U (en) Infilled wall construction structure based on wire box and wire tube mounting precasting building blocks
CN101736839B (en) Construction method for prestressed concrete floor slab reserved with water-heating pipeline well opening
CN110331727B (en) Support structure combining cast-in-place pile and underground diaphragm wall and construction method
CN105544798B (en) Assembled hollow slab shear wall structure and construction method thereof
CN105756089A (en) Transverse laminated connection type single compartment precast multiple-compartment assembled comprehensive pipe gallery
CN219710751U (en) Spool installation system of brick-covered pipe on block wall
CN205444201U (en) Reinforced concrete waist rail structure
CN211640390U (en) Supporting and maintaining system for precast box girder
CN201095831Y (en) Beam-splitting U shaped prestressing force anchorage cable
CN113931495A (en) Precast concrete toilet chassis, manufacturing method and installation method
CN114809512A (en) Oversized prefabricated bare concrete hanging plate and manufacturing and mounting process
CN112302197A (en) Assembled green wall body without sleeve pier head reinforcing steel bar indirect lap joint and manufacturing method
CN111560982A (en) Installation method of cable prefabricated well
CN204491947U (en) A kind of laminated floor slab
CN217517953U (en) Wire pipe reservation device for passing through secondary wall masonry lintel
CN202580338U (en) Prestressed concrete cylinder pipe for jacking construction method
CN216587897U (en) Precast concrete bathroom chassis
CN206947893U (en) It is a kind of for skyscraper index bed can Fast Installation distribution box device
CN205688651U (en) One is novel assures masonry
CN218265043U (en) PVC pipe embedded assembly
CN215406701U (en) Sleeve-free pier head steel bar indirect lap joint assembly type green wall
CN217580790U (en) Prefabricated wall surface non-perforated building block combined wall body
CN212304531U (en) Prefabricated assembled cable duct bank
CN220891264U (en) Indoor water supply pipeline laying structure
CN220440330U (en) PVC line box pre-buried wall body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: No.266 Taihang East Street, Changzhi City, Shanxi Province 046000

Patentee after: SHANXI THIRD CONSTRUCTION Co.,Ltd.

Address before: No. 266, Taihang East Street, Taiyuan City, Shanxi Province 046000

Patentee before: SHANXI THIRD CONSTRUCTION Co.,Ltd.

CP02 Change in the address of a patent holder