CN205688651U - One is novel assures masonry - Google Patents
One is novel assures masonry Download PDFInfo
- Publication number
- CN205688651U CN205688651U CN201620600401.5U CN201620600401U CN205688651U CN 205688651 U CN205688651 U CN 205688651U CN 201620600401 U CN201620600401 U CN 201620600401U CN 205688651 U CN205688651 U CN 205688651U
- Authority
- CN
- China
- Prior art keywords
- masonry
- fitting
- built
- pipeline
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The open one of this utility model is novel assures masonry, including masonry body, pipeline and built-in fitting, one end of described pipeline is fixedly mounted in built-in fitting, the structure of described built-in fitting is solid rectangles structure, described pipeline outer surface is additionally provided with an anticorrosive coat, the thickness of described anticorrosive coat is 0.02 0.06mm, and the center position of described masonry body is provided with a cavity, and described built-in fitting is fixedly installed in cavity.This utility model masonry hydroelectric line is pre-buried can slot, mend groove, wall block, hydroelectric line synchronize wall to build by laying bricks or stones, in construction speed arranges, can enter decoration construction in advance, without waiting for metope hydroelectric line pre-buried after carry out, effectively save the duration;This utility model is by arranging anticorrosive coat at pipeline outer surface, it is possible to is prevented effectively from pipeline and uses for a long time, be corroded, thus reduces service life.
Description
Technical field
This utility model relates to the realm of building construction, is specifically related to a kind of novel assure masonry.
Background technology
Secondary structure filled wall many employings air-entrained concrete building block or light weight small insulating concrete in architectural engineering at present
Building-block.The first masonry panel of many employings, the mode buried underground of slotting afterwards, this traditional construction when electromechanical pipeline lays in masonry wall
There are three aspect problems in method: after 1, on the body of wall laid, fluting need to increase artificial and easily cause wall damage;2、
Produce a large amount of building waste;3, need to paste metal lath and plaster after pipeline has been buried underground to cause manually and easily lead while material increase
Cause fluting position cracking in the future.
In existing building engineering construction, bury water pipe underground and conduit is and important working procedure, bury underground
Speed is directly connected to the progress of construction, and construction quality is directly connected to the service condition of owner in the future, the most commonly used
Method be to use mode that is pre-buried and that dig to carry out, although quantities is little, but difficulty of construction is big, so construction week
Phase increases accordingly, and cost is high, and pipe installation is limited by construction level, it is difficult to specification, maintenance difficult.
Utility model content
The purpose of this utility model is for the deficiencies in the prior art, a kind of simple in construction of existing offer, easy to use, survey
Measure and the most novel assure masonry.
For solving above-mentioned technical problem, the technical solution adopted in the utility model is: one is novel assures masonry, including building
Body body, pipeline and built-in fitting, one end of described pipeline is fixedly mounted in built-in fitting, and the structure of described built-in fitting is solid length
Cube structure, described pipeline outer surface is additionally provided with an anticorrosive coat, and the thickness of described anticorrosive coat is 0.02-0.06mm, described block
The center position of body body is provided with a cavity, and described built-in fitting is fixedly installed in cavity.
Further, the structure of described masonry body is the one in cross, circle, rectangle and triangle, described
The structure of cavity is hollow out rectangular structure, and described cavity carries out pouring with built-in fitting by concrete and is formed by connecting.
The beneficial effects of the utility model are as follows:
(1) this utility model masonry hydroelectric line pre-buried can slot, mend groove, and wall block, hydroelectric line synchronize handle
Wall has been built by laying bricks or stones, in construction speed arranges, can enter decoration construction in advance, it is not necessary to wait that metope hydroelectric line is pre-buried laggard
OK, the duration is effectively saved.
(2) this utility model passes through the one-off construction that masonry is pre-buried with hydroelectric line, it is to avoid loosens body of wall after fluting and draws
The seam infiltration of the outer the top of a wall, the doorframe that rise loosen and close Men Buyan etc., and avoid fluting, mend groove after cause the easy hollowing of floated coat,
Cracking etc..
(3) this utility model can effectively carry out " batch production " production, uses standardization cutting to produce, no longer cuts brick,
Waste fragment of brick, prefabricated section, lintel making aspect, building waste when using main body construction, material-saving environmental protection again;Reasonably optimizing work post and
Work efficiency, material-saving is saved manually simultaneously.When plastering, it is not necessary to join special steel wire for hydroelectric line groove, cost-effective.
(4) this utility model is by arranging anticorrosive coat at pipeline outer surface, it is possible to is prevented effectively from pipeline and uses for a long time,
It is corroded, thus reduces service life.
Accompanying drawing explanation
Fig. 1 is the top view of masonry body of the present utility model;
Fig. 2 is the structural representation of built-in fitting of the present utility model.
Drawing reference numeral:
1, pipeline;2, built-in fitting;3, cavity;4, masonry body;5, anticorrosive coat.
Detailed description of the invention
By particular specific embodiment, embodiment of the present utility model being described below, those skilled in the art can be by this
Content disclosed by description understands other advantages of the present utility model and effect easily.
As depicted in figs. 1 and 2, one is novel assures masonry, including masonry body 4, pipeline 1 and built-in fitting 2, pipeline 1
One end is fixedly mounted in built-in fitting 2, and the structure of built-in fitting 2 is solid rectangles structure, and pipeline 1 outer surface is additionally provided with one to be prevented
Rotten layer 5, the thickness of anticorrosive coat 5 is 0.02-0.06mm, and the center position of masonry body 4 is provided with a cavity 3, and built-in fitting 2 is solid
Surely it is arranged in cavity 3;This utility model is by arranging anticorrosive coat 5 at pipeline 1 outer surface, it is possible to be prevented effectively from pipeline 1 long time
Between use, be corroded, thus reduce service life.
The structure of masonry body 4 is the one in cross, circle, rectangle and triangle, and the structure of cavity 3 is hollow out
Rectangular structure, cavity 3 carries out pouring with built-in fitting 2 by concrete and is formed by connecting;This utility model masonry hydroelectric line 1 is pre-
Burying and can slot, mend groove, wall block, hydroelectric line 1 synchronize wall to build by laying bricks or stones, in construction speed arranges, and Ke Yiti
Advance into decoration construction, it is not necessary to wait that metope hydroelectric line 1 is carried out after pre-buried, effectively save the duration;This utility model passes through
The one-off construction that masonry is pre-buried with hydroelectric line 1, it is to avoid the seam infiltration of the outer the top of a wall, doorframe that after fluting, loosening body of wall causes loosen
Close Men Buyan etc., and avoid fluting, mend groove after cause the easy hollowing of floated coat, cracking etc..
This utility model can effectively be carried out " batch production " and produce, and uses standardization cutting to produce, no longer cuts brick, waste
Fragment of brick, prefabricated section, lintel making aspect, building waste when using main body construction, material-saving environmental protection again;Reasonably optimizing work post and work
Effect, material-saving is saved manually simultaneously.When plastering, it is not necessary to join special steel wire for hydroelectric line groove, cost-effective.
Construction technology:
1, hydroelectric line arranges secondary detailingi
Masonry project starts after agent structure completes, but part work just should need to be carried out, such as water power before going into operation
How the position that pipeline is arranged, optimize pipeline position and improve the quality assuring masonry construction, main in include electricity in beam
Pipe arranges, on concrete surface pipeline arrange, upper hose location etc. in toilet.
2, masonry secondary detailingi
Use AutoCAD software, according to the building material type in construction contract, building explanation and size, and plane
Wall size in figure is optimized design, wall tie bar position, facade entirety typesetting, calculates every piece and joins brick size, pre-
Manufactured goods air conditioner hole position, prefabricated electronic box electricity box frame position and size etc., metope elevation each in plane graph, node
Detail drawing make a whole set of construction operation figure.
3, brick processing is joined
Assure and join brick, i.e. opening joins brick, is also to assure one of construction core material, typically by following several forms.According to
The practical situation design of engineering body of wall, but the principle design of the upper hypodermis brick fissure of displacement must be met, join the quantity of brick and size by
The production of masonry secondary detailingi.
4, preformed bricks produces
By masonry Deepen Design, pre-cast concrete brick has right angle trigonometry brick, isoceles triangle brick, cement standard brick etc., according to height
Degree dome brick height and angle, the height etc. of masonry size, configure special punching block and make cement brick.
5, prefabricated components produce
Make with preformed bricks, need dedicated operations place, according to the scantling size of masonry Deepen Design, configure special
Punching block, make by hand.There are lintel, electronic box frame, electricity box frame etc..
6, masonry unwrapping wire
Masonry unwrapping wire, in addition to general work progress unwrapping wire (partition wall, the position line of door opening) is constructed, also needs to eject body of wall and executes
Work 300 control line, electricity box horizontal center position line, electronic box horizontal end etc., in order to construct when masonry is assured.
7, hydroelectric line is installed
1) after masonry unwrapping wire, tackle pre-buried electric line carry out rectifying a deviation, dredging etc., and connecing under switch spool, Outlet line
Connect on pipe and electronic box spool arrangement etc..
2) kitchen and toilet are in addition to installing electric line, also need to connect feed pipe, for ensureing quality, can first install kitchen guarding's flange coagulation
The water-supply line of soil part.
8, join brick to assure
Masonry is assured according to width of wall body, hydroelectric line thickness and the difference of number of lines, the method for employing also each not phase
With;100-120 brick wall typically uses opening to join brick, and to the mode pitched about employing, the vertical mortar joint that staggers is assured.
9, prefabricated electronic box, electricity box frame are built by laying bricks or stones
When building by laying bricks or stones, absolute altitude and position are electronic box or electricity box, should be strictly according to the absolute altitude in Deepen Design flow diagram and position
Build prefabricated electronic box, electric box frame by laying bricks or stones.
10, dome brick at the bottom of beam is built by laying bricks or stones
Dome brick building method, with flat brick masonry method, is joined brick and is carried out assuring construction with assuring when assuring equally, different
It is to assure to join brick and equally need with dome brick to build by laying bricks or stones sideling.
Above-described embodiment is preferred embodiment of the present utility model, is not the limit to technical solutions of the utility model
System, as long as the technical scheme that can realize on the basis of above-described embodiment without creative work, is regarded as falling into
In the range of the rights protection of this utility model patent.
Claims (2)
1. novel assure masonry for one kind, it is characterised in that: include masonry body (4), pipeline (1) and built-in fitting (2), described pipeline
(1) it is inner that one end is fixedly mounted on built-in fitting (2), and the structure of described built-in fitting (2) is solid rectangles structure, described pipeline
(1) outer surface is additionally provided with an anticorrosive coat (5), and the thickness of described anticorrosive coat (5) is 0.02-0.06mm, described masonry body (4)
Center position be provided with a cavity (3), in described built-in fitting (2) is fixedly installed on cavity (3).
One the most according to claim 1 is novel assures masonry, it is characterised in that: the structure of described masonry body (4) is
One in cross, circle, rectangle and triangle, the structure of described cavity (3) is hollow out rectangular structure, described cavity
(3) carry out pouring with built-in fitting (2) by concrete to be formed by connecting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620600401.5U CN205688651U (en) | 2016-06-18 | 2016-06-18 | One is novel assures masonry |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620600401.5U CN205688651U (en) | 2016-06-18 | 2016-06-18 | One is novel assures masonry |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205688651U true CN205688651U (en) | 2016-11-16 |
Family
ID=57415079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620600401.5U Expired - Fee Related CN205688651U (en) | 2016-06-18 | 2016-06-18 | One is novel assures masonry |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205688651U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112112360A (en) * | 2020-08-21 | 2020-12-22 | 中铁九局集团第四工程有限公司 | Construction method for prefabricated and shaped building block masonry |
-
2016
- 2016-06-18 CN CN201620600401.5U patent/CN205688651U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112112360A (en) * | 2020-08-21 | 2020-12-22 | 中铁九局集团第四工程有限公司 | Construction method for prefabricated and shaped building block masonry |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103758272B (en) | Autoclaved aerated concrete blocks built-in wall steel pipe buried in advance construction method | |
CN209723052U (en) | The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure | |
CN104746639B (en) | A kind of installation method that the prefabricated window that floats is installed in composite wallboard | |
CN110924692A (en) | Masonry pipeline direct-buried construction method | |
CN206667459U (en) | A kind of pre-splicing Standard formula building of prefabrication type reinforced concrete shear wall | |
CN106121231A (en) | A kind of skyscraper interts cross construction method | |
CN204782075U (en) | Have enough to meet need bathroom that room constitutes by standard | |
CN110284587A (en) | A kind of prefabricated window and connection joints of steel structure and the construction method of floaing of staggered floor | |
CN110295700A (en) | Assembled Sloping roof construction method | |
CN214942417U (en) | Prefabricated PC concrete fire hydrant case entrance to a cave structure | |
CN109797899A (en) | Blockwork and its construction with air-conditioning hole | |
CN111042392A (en) | Construction method of SDHH type disassembly-free formwork foam concrete partition wall | |
CN211257093U (en) | Underground cast-in-place structure outer wall post-cast strip template pre-supporting device | |
CN205688651U (en) | One is novel assures masonry | |
CN204753834U (en) | Partition plate of scissors stair and connection structure of floor roof beam | |
CN208396083U (en) | A kind of novel prefabricated out-hung panel system | |
CN101538904B (en) | Gypsum powder poured integral wall and manufacturing method thereof | |
CN109797988A (en) | A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole | |
CN109707184A (en) | The hard-cover integral vacuum toilet of fulgurite separate type, wall setting water pipe groove | |
CN209817245U (en) | Prefabricated building block with air conditioner hole | |
CN113931495A (en) | Precast concrete toilet chassis, manufacturing method and installation method | |
CN210140846U (en) | Independent foundation of precast concrete dry type combination | |
CN208782449U (en) | A kind of cable duct bank | |
CN206542144U (en) | A kind of prefabricated integrated line box building element | |
CN205743275U (en) | Assembled enclosing wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161116 Termination date: 20170618 |
|
CF01 | Termination of patent right due to non-payment of annual fee |