CN218935486U - Device for preventing floating up during pouring of pipeline - Google Patents

Device for preventing floating up during pouring of pipeline Download PDF

Info

Publication number
CN218935486U
CN218935486U CN202223153614.2U CN202223153614U CN218935486U CN 218935486 U CN218935486 U CN 218935486U CN 202223153614 U CN202223153614 U CN 202223153614U CN 218935486 U CN218935486 U CN 218935486U
Authority
CN
China
Prior art keywords
pipe
thread bush
support piece
pipeline
upper portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223153614.2U
Other languages
Chinese (zh)
Inventor
曲雅娟
贺小俊
张志宏
章民权
李绍飞
尚韶婷
宿宇骥
韦荣
刘倩
郝文慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Sixth Construction Group Co ltd
Original Assignee
Shanxi Sixth Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Sixth Construction Group Co ltd filed Critical Shanxi Sixth Construction Group Co ltd
Priority to CN202223153614.2U priority Critical patent/CN218935486U/en
Application granted granted Critical
Publication of CN218935486U publication Critical patent/CN218935486U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the field of buildings, and particularly relates to a device for preventing floating up during pipeline pouring, which comprises a plurality of bases arranged at the bottom of a pipe ditch, wherein the bases are poured along the arrangement direction of the pipeline. According to the utility model, the excavated pipe trench is utilized, the support is driven into the bottom of the pipe trench, the support fixing mode is utilized to fix the encapsulated pipeline, the floating is prevented, and meanwhile, the construction progress can be effectively improved.

Description

Device for preventing floating up during pouring of pipeline
Technical Field
The utility model belongs to the field of buildings, and particularly relates to a device for preventing floating up during pouring of a pipeline.
Background
When the MPP pipe pipeline calandria is arranged, the multi-layer calandria is carried out by combining the design drawing requirement and the field actual condition, and after the civil engineering pipe trench is excavated, construction operators carry out calandria. Most construction sites have pipeline floating conditions in construction. The construction method comprises the steps of pouring a layer of concrete, and pouring upper concrete after the concrete reaches a certain strength, wherein a floating phenomenon is generated in the concrete pouring process of the pipeline, so that a construction joint appears in the concrete pouring to influence the construction quality.
Disclosure of Invention
In order to solve the problems, the utility model discloses a device for preventing floating up during pouring of a pipeline, which is used for fixing an encapsulated pipeline in a bracket fixing mode to prevent floating up.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
prevent device of come-up when pipe casting, including installing a plurality of bases in the trench bottom, the base is pour along the pipeline direction of arranging, every pedestal mounting has the support, the support includes from the lower part connecting pipe, lower part support piece, middle part connecting pipe, middle part support piece, upper portion connecting pipe and upper portion support piece that upwards connect gradually earlier, lower part support piece middle part support piece with upper portion support piece's structure is the same, lower part support piece has bottom thread bush, holding ring and upper portion thread bush, bottom thread bush with lower part connecting pipe connection, the holding ring will bottom thread bush with upper portion thread bush is connected, upper portion thread bush with middle part connecting pipe connection.
Preferably, both sides of the supporting ring are provided with arc structures for matching with the outer contour of the encapsulated pipeline.
Preferably, two threaded rings are symmetrically welded on the outer side wall of the upper threaded sleeve, and each threaded ring is connected with a pipe pressing rod.
Compared with the prior art, the utility model has the beneficial effects that:
according to the utility model, the excavated pipe trench is utilized, the bracket is driven into the bottom of the pipe trench, the sealing pipeline is fixed in a bracket fixing mode, the floating is prevented, and meanwhile, the construction progress can be effectively improved; when the traditional concrete encapsulation pipeline is constructed, the pipeline is encapsulated by the concrete for half. And when the concrete reaches a certain strength, pouring the upper layer concrete. When the lower layer concrete is poured, the condition of floating up the pipeline still exists, and meanwhile, the construction joint exists, so that the progress is slow.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the utility model. In the drawings:
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a reference diagram of the usage status of the present utility model;
FIG. 3 is a left side view of the bracket;
fig. 4 is a schematic view of the lower support structure.
Detailed Description
It should be noted that, in the case of no conflict, the embodiments and features in the embodiments may be combined with each other.
In order to better understand the embodiments of the present application, the following description will clearly and completely describe the embodiments of the present application, and it is apparent that the described embodiments are only some embodiments of the present application, not all embodiments. All other embodiments, which can be made by one of ordinary skill in the art based on the embodiments herein without making any inventive effort, shall fall within the scope of the present application.
As shown in fig. 1 to 4, the device for preventing the floating up during the pipe casting comprises a plurality of bases 2 installed at the bottom 1 of the pipe trench, wherein the bases 2 are cast along the arrangement direction of the pipe, each base 2 is provided with a bracket 3, the brackets 3 comprise a lower connecting pipe 31, a lower supporting piece 32, a middle connecting pipe 33, a middle supporting piece 34, an upper connecting pipe 35 and an upper supporting piece 36 which are sequentially connected from the beginning, the lower supporting piece 32, the middle supporting piece 34 and the upper supporting piece 36 have the same structure, the lower supporting piece 32 is provided with a bottom thread bush 321, a supporting ring 322 and an upper thread bush 323, the bottom thread bush 321 is connected with the lower connecting pipe 31, the supporting ring 322 connects the bottom thread bush 321 with the upper thread bush 323, and the upper thread bush 323 is connected with the middle connecting pipe 33.
The two sides of the supporting ring 322 are provided with arc structures for matching with the outer contour of the encapsulating pipeline 4.
Two threaded rings 424 are symmetrically welded on the outer side wall of the upper threaded sleeve 323, and each threaded ring 424 is connected with a pipe pressing rod 325, and one pipe pressing rod 325 can press the encapsulated pipeline 4.
The above description is only of the preferred embodiments of the present utility model and is not intended to limit the present utility model, but various modifications and variations can be made to the present utility model by those skilled in the art. Any modification, equivalent replacement, improvement, component disassembly, or combination thereof, etc. that falls within the spirit and principles of the present utility model should be included in the scope of the present utility model.

Claims (3)

1. Prevent device of come-up when pipe casting, including installing a plurality of bases in the trench bottom, the base is pour along the direction of arranging of pipeline, its characterized in that, every pedestal mounting has the support, the support includes from the lower part connecting pipe, lower part support piece, middle part connecting pipe, middle part support piece, upper portion connecting pipe and the upper portion support piece that up connects gradually earlier, lower part support piece middle part support piece with the structure of upper portion support piece is the same, lower part support piece has bottom thread bush, holding ring and upper portion thread bush, bottom thread bush with lower part connecting pipe is connected, the holding ring will bottom thread bush with upper portion thread bush is connected, upper portion thread bush with middle part connecting pipe is connected.
2. The device for preventing floating up in pouring a pipe according to claim 1, wherein both sides of the supporting ring have arc structures for fitting with the outer contour of the pipe.
3. The apparatus for preventing floating up in pouring a pipe according to claim 1, wherein two screw rings are symmetrically welded on the outer side wall of the upper screw sleeve, and each screw ring is connected with a pipe pressing rod.
CN202223153614.2U 2022-11-26 2022-11-26 Device for preventing floating up during pouring of pipeline Active CN218935486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223153614.2U CN218935486U (en) 2022-11-26 2022-11-26 Device for preventing floating up during pouring of pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223153614.2U CN218935486U (en) 2022-11-26 2022-11-26 Device for preventing floating up during pouring of pipeline

Publications (1)

Publication Number Publication Date
CN218935486U true CN218935486U (en) 2023-04-28

Family

ID=86088493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223153614.2U Active CN218935486U (en) 2022-11-26 2022-11-26 Device for preventing floating up during pouring of pipeline

Country Status (1)

Country Link
CN (1) CN218935486U (en)

Similar Documents

Publication Publication Date Title
CN202391019U (en) End part thickened grouting connector of steel bar
CN208168368U (en) A kind of construction wall construction template connector
CN206591685U (en) Prefabricated assembled shear wall structure
CN218935486U (en) Device for preventing floating up during pouring of pipeline
CN110565962A (en) Tool type chute and construction method
CN106930391B (en) Cast-in-place drainage channel structure of top plate for formwork-free construction and construction method
CN206987200U (en) A kind of short grout sleeve of bar connecting
CN206973068U (en) A kind of through-flooring is pre-buried to use the pre-buried adapter of flexible interface adjusting center
CN209703510U (en) A kind of template system suitable for the ring-like foundation pile of major diameter manually digging hole
CN105951987A (en) Sub-frame post-cast joint with external permanent aluminum plate outer mold
CN202099809U (en) EHV steel pipe plug-type foundation and EHV iron tower
CN206844097U (en) Low clearance diaphragm wall reinforcement cage structure under a kind of high-voltage line
CN215562770U (en) Frame column base connecting structure of prefabricated building
CN211647357U (en) Tool type chute
CN209053126U (en) A kind of inspection shaft
CN211714006U (en) Basement water-resistant plate and tower crane one-step forming foundation structure
CN203730920U (en) Sill anchor used in tunnel and used for fixing petroleum and natural gas pipelines
CN209557016U (en) A kind of bending resistance hollow steel tube concrete support
CN207526109U (en) Hole device is blocked up around through the erect riser of floor
CN217651957U (en) Prefabricated mould in rainwater chute of rainwater inspection well
CN206917125U (en) A kind of assembled stair
CN111022056B (en) Assembly circulating type municipal well wall template supporting device
CN109267805A (en) A kind of assembly node that rubber support is connect with up-down structure and construction method
CN221258054U (en) Pre-buried type water stop connector for sewer pipe
CN215733094U (en) Mounting tool suitable for concealed installation of electronic box on masonry structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant