CN209053126U - A kind of inspection shaft - Google Patents
A kind of inspection shaft Download PDFInfo
- Publication number
- CN209053126U CN209053126U CN201821718039.7U CN201821718039U CN209053126U CN 209053126 U CN209053126 U CN 209053126U CN 201821718039 U CN201821718039 U CN 201821718039U CN 209053126 U CN209053126 U CN 209053126U
- Authority
- CN
- China
- Prior art keywords
- pit shaft
- bar planting
- shaft
- layer
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Transplanting Machines (AREA)
Abstract
The utility model relates to a kind of inspection shafts, including well bore, the well bore is made of pit shaft and shaft bottom plate, the pit shaft is arranged on bed course, several bar plantings are provided on the inner sidewall of the pit shaft, the bar planting is located at the bottom end setting of pit shaft, the bar planting is arranged around the inner wall of pit shaft, bar planting on the pit shaft is at least arranged with 2 layers, in setting up and down, and the bar planting being distributed up and down is in dislocation or alignment setting, each layer of bar planting is arranged in same plane, reinforcing mat is provided in each layer of the bar planting, the shaft bottom plate is laid on the bottom of pit shaft by bar planting and reinforcing mat, and a whole installation is constituted with pit shaft.The utility model can prevent occurring making after settling the occurrence of pit shaft and bottom plate separate, be effectively prevented this on poor location, also can be reduced the work of later maintenance and repairerment while improving its stability, and reduce its cost.
Description
Technical field
The invention belongs to building field more particularly to a kind of inspection shafts.
Background technique
Fields, the inspection shafts such as the communications cable, electric power cable, plumbing and other infrastructure constructions are all indispensable
Equipment, it is all extremely important for the maintenance of pipeline and its middle medium.But for some special areas, soil property is poor,
It is be easy to cause different degrees of sedimentation, so that meeting inspection shaft damages, so as to cause the maintenance and repairerment for needing the later period, simultaneously
The purpose for facilitating inspection can not be played, to influence the inspection in later period.
In view of the above shortcomings, the designer, is actively subject to research and innovation, to found a kind of new structural inspection
Well makes it with more the utility value in industry.
Summary of the invention
In order to solve the above technical problems, the object of the present invention is to provide a kind of inspection shafts.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of inspection shaft, including well bore, the well bore are made of pit shaft and shaft bottom plate, and the pit shaft is arranged on bed course,
Several bar plantings are provided on the inner sidewall of the pit shaft, the bar planting is located at the bottom end setting of pit shaft, and the bar planting surrounds pit shaft
Inner wall setting, the bar planting on the pit shaft is at least arranged with 2 layers, in setting up and down, and the bar planting being distributed up and down in dislocation or
Alignment setting, each layer of bar planting are arranged in same plane, are provided with reinforcing mat, the shaft bottom in each layer of the bar planting
Plate is laid on the bottom of pit shaft by bar planting and reinforcing mat, and constitutes a whole installation with pit shaft.
Further again, described a kind of inspection shaft, wherein one end of the bar planting is provided in pit shaft, the other end
The side wall of pit shaft is protruded from, the length of protrusion is at 4 centimetres to 10 centimetres.
Further again, described a kind of inspection shaft, wherein protrude and be provided with mounting ring in the bar planting of pit shaft.
Further again, described a kind of inspection shaft, wherein the bed course is concreting molding, and thickness exists
25 centimetres to 50 centimetres.
Further again, described a kind of inspection shaft, wherein the shaft bottom plate is armored concrete pouring molding.
A method of implementing inspection shaft installation, comprising the following steps:
Step 1: carrying out pouring pit shaft by armored concrete, be then placed on pit shaft by the way of immersed tube specified
Position;
Step 2: after reinforcing mat is installed in the bar planting of first layer, being fixed by pouring reinforcement concrete, thickness
At 5 centimetres to 10 centimetres;
Step 3: according to the mode of step 2, continuing to install in the second layer and/or third layer bar planting above first layer
Then reinforcing mat is poured, the thickness of the second layer and third layer is at 5 centimetres to 10 centimetres;
Step 4: waiting all layers of solidification, pit shaft and shaft bottom plate is made to constitute a whole installation.
It is further again, the method for a kind of implementation inspection shaft installation, wherein in prefabricated well in the step 1
When cylinder, bar planting is prefabricated on pit shaft.
It is further again, the method for a kind of implementation inspection shaft installation, wherein in the step 2 and step 3
First layer, the second layer and third layer thickness are preferably 8 centimetres.
According to the above aspect of the present invention, the present invention has at least the following advantages:
1, the present invention can prevent from separating pit shaft and bottom plate after occurring sedimentation on poor location, be effectively prevented the situation
Generation, also can be reduced the work of later maintenance and repairerment while improving its stability, and reduce its cost.
2, the present invention on pit shaft by installing the bar planting of different height, and fixes it using reinforcing mat, to allow
It is formed between shaft bottom plate and pit shaft with a firm overall structure.
3, the configuration of the present invention is simple, it is easy to implement, it is implemented convenient for operator, and shaft bottom can be effectively prevented
The problem of plate disconnects.
The above description is only an overview of the technical scheme of the present invention, in order to better understand the technical means of the present invention,
And can be implemented in accordance with the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention and the accompanying drawings.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram between mounting ring and reinforcing mat of the invention.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below
Example is not intended to limit the scope of the invention for illustrating the present invention.
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction with attached in the embodiment of the present invention
Figure, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only this
Invention a part of the embodiment, instead of all the embodiments.Embodiments of the present invention, which are generally described and illustrated herein in the accompanying drawings
Component can arrange and design with a variety of different configurations.Therefore, the implementation of the invention to providing in the accompanying drawings below
The detailed description of example is not intended to limit the range of claimed invention, but is merely representative of selected implementation of the invention
Example.Based on the embodiment of the present invention, those skilled in the art are obtained all without making creative work
Other embodiments shall fall within the protection scope of the present invention.
Embodiment
The present invention can prevent from separating pit shaft and bottom plate after occurring sedimentation on poor location, be effectively prevented the situation
Occur, also can be reduced the work of later maintenance and repairerment while improving its stability, and reduce its cost.Institute as shown in Figure 1, Figure 2
Show, including well bore 1, the well bore 1 is made of pit shaft 11 and shaft bottom plate 12, and the pit shaft 11 is arranged on bed course, the pit shaft
Several bar plantings 13 are provided on 11 inner sidewall, the bar planting 13 is located at the bottom end setting of pit shaft 11, and the bar planting 13 surrounds well
The inner wall of cylinder 11 is arranged, and the bar planting 13 on the pit shaft 11 is at least arranged with 2 layers, is in bar planting setting up and down, and being distributed up and down
13 be in that dislocation or alignment setting, each layer of bar planting 13 are arranged in same plane, is provided with and adds in each layer of the bar planting
Strong net, the shaft bottom plate 12 is laid on the bottom of pit shaft 11 by bar planting and reinforcing mat, and constitutes a whole installation with pit shaft 11.
One end of heretofore described bar planting 13 is provided in pit shaft 11, and the other end protrudes from the side wall of pit shaft 11, convex
Length out is provided with mounting ring 14 at 4 centimetres to 10 centimetres, and in the bar planting 13 of protrusion pit shaft 11, passes through mounting ring
14 can facilitate installation reinforcing mat, facilitate the construction in later period, reduce operation difficulty.
Heretofore described bed course is concreting molding, and thickness is at 25 centimetres to 50 centimetres.
The shaft bottom plate 12 is armored concrete pouring molding.
A method of implementing inspection shaft installation, comprising the following steps:
Step 1: carrying out pouring pit shaft by armored concrete, be then placed on pit shaft by the way of immersed tube specified
Position;
Step 2: after reinforcing mat is installed in the bar planting of first layer, being fixed by pouring reinforcement concrete, thickness
At 5 centimetres to 10 centimetres;
Step 3: according to the mode of step 2, continuing to install in the second layer and/or third layer bar planting above first layer
Then reinforcing mat is poured, the thickness of the second layer and third layer is at 5 centimetres to 10 centimetres;
Step 4: waiting all layers of solidification, pit shaft and shaft bottom plate is made to constitute a whole installation.
In heretofore described step 1 in prefabricated pit shaft, bar planting is prefabricated on pit shaft.
Embodiment one
A method of implementing inspection shaft installation, comprising the following steps:
Step 1: carrying out pouring pit shaft by armored concrete, be then placed on pit shaft by the way of immersed tube specified
Position;
Step 2: after reinforcing mat is installed in the bar planting of first layer, being fixed by pouring reinforcement concrete, thickness
5;
Step 3: according to the mode of step 2, continuing to install in the second layer and/or third layer bar planting above first layer
Then reinforcing mat is poured, the thickness of the second layer and third layer is at 5 meters;
Step 4: waiting all layers of solidification, pit shaft and shaft bottom plate is made to constitute a whole installation.
Embodiment two
A method of implementing inspection shaft installation, comprising the following steps:
Step 1: carrying out pouring pit shaft by armored concrete, be then placed on pit shaft by the way of immersed tube specified
Position;
Step 2: after reinforcing mat is installed in the bar planting of first layer, being fixed by pouring reinforcement concrete, thickness
At 10 centimetres;
Step 3: according to the mode of step 2, continuing to install in the second layer and/or third layer bar planting above first layer
Then reinforcing mat is poured, the thickness of the second layer and third layer is at 10 centimetres;
Step 4: waiting all layers of solidification, pit shaft and shaft bottom plate is made to constitute a whole installation.
Embodiment three
A method of implementing inspection shaft installation, comprising the following steps:
Step 1: carrying out pouring pit shaft by armored concrete, be then placed on pit shaft by the way of immersed tube specified
Position;
Step 2: after reinforcing mat is installed in the bar planting of first layer, being fixed by pouring reinforcement concrete, thickness
At 8 centimetres;
Step 3: according to the mode of step 2, continuing to install in the second layer and/or third layer bar planting above first layer
Then reinforcing mat is poured, the thickness of the second layer and third layer is at 8 centimetres;
Step 4: waiting all layers of solidification, pit shaft and shaft bottom plate is made to constitute a whole installation.
The present invention has at least the following advantages:
1, the present invention can prevent from separating pit shaft and bottom plate after occurring sedimentation on poor location, be effectively prevented the situation
Generation, also can be reduced the work of later maintenance and repairerment while improving its stability, and reduce its cost.
2, the present invention on pit shaft by installing the bar planting of different height, and fixes it using reinforcing mat, to allow
It is formed between shaft bottom plate and pit shaft with a firm overall structure.
3, the configuration of the present invention is simple, it is easy to implement, it is implemented convenient for operator, and shaft bottom can be effectively prevented
The problem of plate disconnects.
The above is only a preferred embodiment of the present invention, it is not intended to restrict the invention, it is noted that for this skill
For the those of ordinary skill in art field, without departing from the technical principles of the invention, can also make it is several improvement and
Modification, these improvements and modifications also should be regarded as protection scope of the present invention.
Claims (5)
1. a kind of inspection shaft, it is characterised in that: including well bore (1), the well bore (1) is by pit shaft (11) and shaft bottom plate (12) structure
At the pit shaft (11) is arranged on bed course, is provided with several bar plantings (13), the bar planting on the inner sidewall of the pit shaft (11)
(13) bottom end positioned at pit shaft (11) is arranged, and inner wall of the bar planting (13) around pit shaft (11) is arranged, on the pit shaft (11)
Bar planting (13) be at least arranged with 2 layers, in setting up and down, and the bar planting (13) being distributed up and down is in dislocation or alignment setting, each
The bar planting (13) of layer is arranged in same plane, and reinforcing mat is provided in each layer of the bar planting, and the shaft bottom plate (12) is logical
It crosses bar planting and reinforcing mat is laid on the bottom of pit shaft (11), and constitute a whole installation with pit shaft (11).
2. a kind of inspection shaft according to claim 1, it is characterised in that: one end of the bar planting (13) is provided with pit shaft
(11) in, the other end protrudes from the side wall of pit shaft (11), and the length of protrusion is at 4 centimetres to 10 centimetres.
3. a kind of inspection shaft according to claim 1 or 2, it is characterised in that: the bar planting (13) of protrusion pit shaft (11)
On be provided with mounting ring (14).
4. a kind of inspection shaft according to claim 1, it is characterised in that: the bed course is concreting molding, thick
Degree is at 25 centimetres to 50 centimetres.
5. a kind of inspection shaft according to claim 1, it is characterised in that: the shaft bottom plate (12) pours for armored concrete
Molding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821718039.7U CN209053126U (en) | 2018-10-23 | 2018-10-23 | A kind of inspection shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821718039.7U CN209053126U (en) | 2018-10-23 | 2018-10-23 | A kind of inspection shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209053126U true CN209053126U (en) | 2019-07-02 |
Family
ID=67051158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821718039.7U Active CN209053126U (en) | 2018-10-23 | 2018-10-23 | A kind of inspection shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209053126U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109137988A (en) * | 2018-10-23 | 2019-01-04 | 苏州同尚工程设计咨询有限公司 | A kind of inspection shaft and its implementation method |
-
2018
- 2018-10-23 CN CN201821718039.7U patent/CN209053126U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109137988A (en) * | 2018-10-23 | 2019-01-04 | 苏州同尚工程设计咨询有限公司 | A kind of inspection shaft and its implementation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102758451B (en) | Concrete cable channel construction process | |
CN207347929U (en) | Crash barrier template structure and anticollision barrier casting system | |
CN107700533B (en) | A kind of box quick assembly and disassembly mould piping lane construction technology | |
CN208167794U (en) | Monoblock type forms cast-in-place concrete cable duct | |
CN205502577U (en) | A thimble assembly for buried sleeve one shot forming construction in piping shaft | |
CN205530344U (en) | Utility tunnel is pour to split type no mould | |
CN110029599A (en) | Prefabricated culvert steel connecting structure and construction method | |
CN106759478B (en) | A kind of prefabricated piping lane construction method | |
CN106284412A (en) | A kind of prefabricated pipe gallery and construction method | |
CN105971007A (en) | Split type non-formwork pouring underground comprehensive pipe gallery | |
CN105064759B (en) | A kind of GFRP pipes reinforced concrete combined structure member multiloop power transmission rod | |
CN109779087A (en) | A kind of light gauge steel structure and wall | |
CN209053126U (en) | A kind of inspection shaft | |
CN209099600U (en) | A kind of assembled steel bar concrete floor structure | |
CN112160639A (en) | Telegraph pole and production process thereof | |
CN109137988A (en) | A kind of inspection shaft and its implementation method | |
CN205502058U (en) | Pin -connected panel tower crane foundation | |
CN206706958U (en) | Without the mould construction cast-in-place drainage ditch structure of top plate | |
CN204850639U (en) | GFRP pipe reinforced concrete combined member multiloop transmission of electricity pole | |
CN209675906U (en) | A kind of prefabricated cable tank systems | |
CN208323769U (en) | A kind of assembled car case general prefabricated component | |
CN112359869A (en) | Combined structure pipe gallery of UHPC and steel | |
CN208857844U (en) | A kind of assembled cable work well | |
CN207812271U (en) | A kind of prefabricated assembled bridge pier | |
CN205077974U (en) | Split type iron tower base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |